Routing & Work Center ALE TCODE

Hello All,
          What are tcode to send WORK CENTER & ROUTING using ALE?
Points will be awarded.
Regards,
Dilip

For wrok center :HRKK1WRKC
,LOIWCS01,LOIWCS02
PPCC2RECWORKCENTER01 Send work centers to PDC system
WORKC2 Workcenters in CC2
WORKC3 Work centers in CC3
WORKC4 Workcenters in CC4
LOIROU01 Master routing
LOIROU02 Master routing
ROUTING_CREATE01 Creation of a routing
Hope this`ll help you ..
Thanks

Similar Messages

  • Work center--ALE

    Hi
      I need to know what is the inbound process code for work centers trasnfer through ALE
    Thanks In advance
    Sree

    Hello.
    I'm trying to send work centers by idocs as well.
    May you tell me the selection criterias I have to give to select work centers ? Actually, I just choose :
    - "complete" transfer mode,
    - "work center for" radio button
    - and fill the plant I want.
    But unfortunately, no work center is selected and 0 idoc is sent whereas, I've checked that at least 80 work centers should be concerned.
    Do you undestand why ? Shall I set the change pointers ?
    Thank you in advance for your answer.
    David.

  • LSMW for Work center text

    Hi Experts,
    Im developing LSMW to upload the Work center text(TCode CA10).
    I did tried on Direct input -> program /SAPDMC/SAP_LSMW_IMPORT_TEXTS in LSMW. The uploading process was done successfully but it <u>can not</u> be used in Master Recipe assignment(TCode C202). Reason due to the direct input program doesn't has <u>Work center short text</u>. FYI, the Work center short text is entered during the Work center text creation via CA10 first screen.
    And i did tried on CA10 manually, work center text only <u>can be used</u> in TCode C202 when it is created <u>with short text key in at CA10 first screen</u>. While for the Work center text that created <u>without</u> short text key in, system will prompt <u>error</u> when i try to assign the Work center text into C202.
    Thus, i may need you advice. In LSMW other that direct input,is there any BAPI or IDOC available for the Work center text upload?
    Please comment.
    Thanks in advance.

    Hi SKK,
    Thanks for you reply.
    I did tried on FM SUBMISSION_PROCESSING, and found:
    It is being trigger online, whereby i need to key in the text manually.
    Since my requirement is mass upload, hence that is impossible for me to execute the FM to key in the text manually.
    Do you know there is any other FM/BAPI/IDOC that can perform the <u>Work center Short and Long text</u> in background mode?
    Please comment.

  • PP costing Formula for  work center

    Hello Experts
    I am having issue to set up formula for given below case,
    I have on my work center three parameters, x time (unit: Hr) and   Y Power (unit:kw).
    i want to multiply both the parameters and get the answer in terms of energy Z  (unit: kwh) paramenter.
    so i already define activity type unit with KWH.
    for example:
    From Routing: 
    work center: 1111,
    x: 10
    Y: 20
    so Z= X*Y
           = 10hr * 20kw  = 200kwh
    So which would i apply formula for all 3 parameters to get result 200 kwh? Do i need to assign 3 different formula to X,Y,Z   or   1 formula direct to Z?
    Sooner response highly appreciated
    Thanks
    Nixal

    Dear Nixal,
    Assume this 10 hours is for some base quantity and this value gets changed based on operation(order quantity) means,you can
    check with standard SAP formula SAP006 = Machine * Operation quantity / Base qty.
    In case if the duration 10 hours is for any operation quantity means,then there is no relation between base quantity and
    operation,so you have to assign a formula which has only duration alone.
    Likewise you can decide and select the suitable formula and use the formula key in the costing tab to calculate the cost based on
    the formula selected.
    Regards
    Mangalraj.S

  • Tables for routing (for work center)

    hi friends,
    I am doing report on routing but i did not get value for work center i got tables CRHD CRCA CRCO CRHH CRHS CRTX KAKO KAZY .
    i try to get result by using link with PLPO and PLKO.
    in TCode CA03 when i see the technical attributes it stors the dat ain structure PLPOD but i am unable to use it.
    kindly can anybody tell me how to work center.
    thanks & regards
    Bhupinder Singh Kaler

    Hi Bhupi kaler,
    try to link CRHD and PLKO with WERKS ( Plant ) field ane get the ARBPL ( Work center ).
    Best regards,
    raam

  • All default routing value has to be changed, while changed the work center in production order

    Dear friends,
    our client they want to change the work center in production order.according to production version work center also they are changed.so while change the WC,all the default value has be changed as per routing what we maintained in routing.At present we have to enter the manually change the W.C as well as set up time and operation time enter manually.Any other option to do the automatically capture value from routing while change in Work center in production order.pl help me on this.
    Thanks&Regards
    Sabhapathy R

    Hi Rahul,
    Thanks for reply. I am maintained in diff value  maintained routing , Ex :First routing i have  work center 'X' value maintained as a setup time in 15 Min's and operation time 10 Min's
    second work center 'Y' I have maintained as set up time 10 Min's and operation time 30 Min's,
    Now I want to change the work center in production order as a 'Y' so whatever value maintained in routing , it has to be changed automatically (10 min's and 30 Min's), but system will not change only old value only picked (15Min's AND 10 Min's).
    Now I think you get to know what the client requirement, kindly do the need full.
    Regards,
    Sabhapathy R

  • Request for detailed acts to upload Work center,  BOM, Routing data in LSMW

    Hello PP ANgels,
    Request for detailed actions to upload Work center/Resource,  BOM, Routing/Recipe data in LSMW.
    Thanks in advance

    Sanjay,
    In the forum I found that you had used some "drops", that require a password to view.
    In these forums, the only links I post are public (help.sap.com) and from SAP support (service.sap.com/support).  SAP Support is mostly available only to customers and partners of SAP.  If you meet these criteria, and need a login for the SAP support site, contact the license administrator for your company's SAP licence (this is usually a Basis person).  If you cannot locate this person in your company, contact Service Marketplace directly (service.sap.com/mp).  Alternatively you can contact your local SAP Sales office and speak to your account administrator.
    Maybe it would be a better idea to group all standard solutions in one place.
    I expect it will be so...in Nirvana.  Here, life still entails suffering.
    With respect to your detailed questions, I would have a hard time answering, I have never used recordings in LSMW to create work centers, I always use standard batch/direct input.  I suspect that the VGEXX items are the units of measure from CRHD, I suspect LARXX items are activities from CSSL, and I couldn't comment on FORXX items without doing some research.
    This is the SCM PP forum.  You might get more answers posting this in the ERP PP forum SAP ERP Manufacturing - Production Planning (SAP PP) , since work centers/routings/recipes/BOMs are more or less irrelevant in SCM.
    Sorry I couldn't be of more assistance.
    Best Regards,
    DB49

  • Confirmation - Work Center - Routing

    Hi all,
    I try to understand routings. When i try to confirm an operation with BAPI_PRODORDCONF_CREATE_TT for a work center which is not defined in routings, it returns no problem. But it is not in routing. How can it be confirmed? Or what changes when define the workcenter and confirm with it?
    Thanks,

    Has it relation with standard times ?
    Regards,
    techmaster

  • Read Routing and work center details from transfer order

    Hello
    I am using transaction LT31 to print a form for the transfer order.
    The customer wants me to print a field that is in the work center details of the routing for this material and plant.
    I can see this data with transaction CA02 where i enter material and plant,and then the work centers are beeing displayed.From here i can double click on the work center and see the field Supply area that i have to print.
    My answer now is,how to read details on the work center starting from my transfer order number.Which is the table connection between transfer order table LTAK and the tables where i can find the work center details.
    Thank you

    I have found the solution:
    ltak-tanum = mseg-tbnum
    read aufnr from mseg and go to afko
    mseg-aufnr = afko-aufnr
    read plnnr from afko and go to plpo
    afko-plnnr = plpo-plnnr
    from plpo read arbid and go to crhd
    plpo-arbid = crhd-objid
    from here,we can find the arbpl and the field that i was looking for PRVBE

  • ALE/iDoc for Work Center data transfer

    Hello, community.
    I am working on several interfaces for the PP and PM modules using iDocs/ALE.
    One of the requirements is that only created and modified data must be distributed from R/3.
    For Work Centers, we are using basic type LOIWCS02 and message type LOIWCS. We are generating iDocs through transaction POIM, which has two transfer modes: Complete (data for all Work Centers etc.) and Change (only new and updated data).
    The Change Transfer Mode assumes you have set both Change Pointers and Change Documents for the objects to be transfered. Otherwise, it'll work just like the Complete Transfer Mode.
    Our PP consultant told me there is no configuration to generate Change Documents for Work Center data modifications.
    Can anybody give me other opinions? I'll resort to Z-table solutions only if I have no other options.

    Hi Danilo,
    Do you know what the process codes are for
    LOIWCS and LOIROU ?
    Appreciate your help.
    Thanks,
    Gopi.

  • Routing and Work Center

    My Friend,
    What tables and fields I can user to create a report with link ( Work center X Routing X machine times X labor times) I need of list with this information to analysis.
    I need comparete the times SAP information(Routing) verses Real Operation ( production line) by list.
    Thank you for any help.
    Best regards
    Armando

    Hi,
    You should have searched or posted your question in production planning forum.
    For example, check the link [Labour time and Machine time - production order table   |Labour time and Machine time - production order table]
    Regards

  • Update Routing data after change in Work Center

    Hello All,
    I have just modified the Costing Data for 100 Work Centers CR02, setting a new "Activity Type" and "Activity Unit".  But the Routing Data CA02 does not get updated correspondingly.  I would like to ask is there any standard program which can help me to do the mass processing as to update the data to the corresponding routing?
    Thanks.

    1) You can change as per Mr Anupam sharma Said
    or
    2) YOU can also Update the data IN CA85N
    In selection criteria enter the respective work center and Plant
    and In new Value Give
    Same work center, Plant,  activity value , Unit  and activity type
    execute
    select the all the work center  and then click mass change
    Edited by: Sundaresan . E. V on Nov 12, 2010 10:25 AM

  • FM to get work center information from routing

    Hi all,
    Is there any FM to get work center information from routing?
    Points assured.
    Thanks and regards,
    Nilesh

    Use This FM
    CR_WORKSTATION_READ_ROUTING,ROUTING_DISPLAY
    Use table CRHD ,MAPL
    Please reward if useful.

  • Work center's description copy automatically in operation Routing

    Hi all,
    Could anyboy tell me where point of spro is to customize that work center's description is copied automatically in the operation Routing's description?
    I try to search for it but I don't find it still.
    Thanks in advance

    Hi,
    A suggestion:
    In CA10, create a key say Z1 & give the description same as work center's description.
    Now go to CR02 & for the work center in default values tab, assign the key to the field Standard Text key.
    Now when you create a routing which uses this work center, the operation description will contain the work center description.
    Regards,
    Vivek

  • Work Center Hierarchy and Routing

    Hi,
    I would like to know what exactly Work Center hierarchy mean?. Where is it used. In Routing, we maintain Sequence of operation along with workcenter where this operations are performed . Would like to know does work center hierarchy is linked to sequence maintained in Routing?. Thanks

    Hi,
    Any one can explain me the use of Workcenter Hierarchy?. In Routing, we maintain the sequence of operations. Does Routing and Workcenter Hierarchy has relation?. If Yes, what is the relation between these 2.
    Thanks in advance

Maybe you are looking for

  • Error: while applying Maintenance Pack

    Hiii.., IM applying the Maintanence Pack Patch 7303030, im upgrading my Apps version from 12.0.4 to 12.1.1. Im following the MEtalink Document *Oracle E-Business Suite Release 12.1.1 Maintenance Pack Installation Instructions [ID 752619.1]* while app

  • Multiple calendars and Notification?

    Simple question... is it only possible to get notifications from my default calendar on my iPhone? I have multiple calendars, but I only seem to be getting notifications from my main calendar?

  • Re: BT Infinity Speed

    Well I am frankly amazed at what I've seen today.  I knew that my speed was deteriorating and today I decided to check with a series of different checkers but I thought everyone would like to see what BT considers to be 'good' bearing in mind the mon

  • HT1338 can i replace my mac with a newest model and pay a difference

    can i replace my mac with the newest model and pay a difference>>>

  • Select query over database link hanging

    Hi All, I have been looking all over the internet and all over this forum but i could not find the solution for my issue given below. There are a number of distributed databases (Oracle 10g) over a private network. Sending and receiving data amongst