Routings for Variant BOMs

Hi,
           I've created a variant BOM for material T-F. The variants are T-FX, T-FZ, etc. Now I need to create routings for the variant BOM. Could u guide me how to create routings for these variants, Whether I've to create individual routings for all these variants, or a single routing is enough?
      awaiting for ur replies.
Thanks and Regards,
R.Jeyaraman

Hi,
     For variant configuration, you create routing in the normal procedure. But assign the object dependencies(Selection conditions) in the operation, operation sequences wherever it is needed to select a particular variant.
You can also refer  for more details:
[Super Routing procedure|http://help.sap.com/erp2005_ehp_03/helpdata/EN/92/58d455417011d189ec0000e81ddfac/frameset.htm]
Thanks
Muthu

Similar Messages

  • For Variant BOM & Variant configuration

    Dear All,
    Is there any tool to upload Variant BOM & Routing in standard SAP. Is it complete manual ?
    Regards
    Aniruddha

    1. Since youare using class item you will hvae one more characteristics called Plastic type in the Class
    2. You can maintian one variant table, in which you can maintain Plastic Type and specific Gravity
    3. Now using this you can try to infer the value and using a procedure you should be able to calculate the weight for the BOM item.
    Kindly let me know for feedback
    Reg,
    Dsk

  • Fields for Super BOM, Work Center & Super Routing for Variant Config

    hi! gurus,
    Please can you give me mandatory fields & values for Super BOM, Work Center & Super Routing for Variant Config
    thank you

    Hi,
    In the Super BOM you need to maintain the object dependencies.
    Workcenter fields are as usual for other production processes.
    Also you can use search option in the forum to view the threads posted in the past. There are many posts related to variant configuration.
    Regards,
    Senthilkumar

  • Steps for Variant Configuration

    Hi Gurus,
    Can any body tell me step by step procedure for variant configuration.
    My e-mail id. <REMOVED>
    Regds.......
    Sumit

    Hi Sumit,
    Variant configuration is for manufacturing complex products. The manufacturer always has to offer new variants of its products. Often, new variants are created by modifying existing product designs as you process the order. The important thing is to react quickly to customers' requirements.
    The customer determines the features of the product. A customer buying a car, for example, can choose the features of the car and combine these features as required.
    The product configurator improves information exchange between sales, engineering, and production. Variant configuration helps the customer or salesperson to put together specifications for the product and ensure that the product can be produced from these specifications. It also ensures that production costs do not overstep the mark.
    Procedure -
    Create a Material - KMAT type with Item category (002)
    Create Characteristics in CT04 - Zbike, where in values mention the Color of the bile like Red, Blue etc
    Create another characteristics in CT04 - ZPrice, where directly go the additional data tab and maintain the table SDCOM and field VKOND (ABAP Dictionary it will ask for)
    Assign these two characteristics to a Class in CL01 - ZBikeclass (Type 300) in characteristics tab page.
    Then go to CU41 Configuration profile select the material and enter the description click on the class assignment i.e. assign Zbikclass.
    Now go back to CT04 - enter Zbike -go to values- select Red- go to extras - Other Dependencies - Select Procedure enter in front 10 write - $self.ZPrice='Red' and save
    Now go back go to extras - Other Dependencies - assignments and assign relationship ( by default it will come just save)
    Now select Blue- go to extras - Other Dependencies - Editor - Select Procedure enter in front of 10 write - $self.ZPrice='Blue' and save
    Now go back go to extras - Other Dependencies - assignments and assign relationship ( by default it will come just save)
    Now go to VK11 - Enter VA00 (Condition) (For Std RVA001 Pricing Procedure) - enter variant Red and Blue give the rates accordingly and create the sales order.
    Variant configuration is for manufacturing complex products. The manufacturer is
    always having to offer new variants of its products. Often, new variants are created
    by modifying existing product designs as you process the order. The important thing
    is to react quickly to customers' requirements.
    The customer determines the features of the product. A customer buying a car, for
    example, can choose the features of the car and combine these features as required.
    The product configurator improves information exchange between sales, engineering,
    and production. Variant configuration helps the customer or salesperson to put
    together specifications for the product and ensure that the product can be produced
    from these specifications. It also ensures that production costs do not overstep the
    mark.
    Integration
    Variant configuration is integrated in the following applications:
    a.. CA Classification
    b.. LO Material Master
    c.. PP Bill of Material
    d.. PP Routings
    e.. PP-PI Master Recipes
    f.. SD Sales
    g.. SD Conditions
    h.. MM Purchasing
    i.. CO Costing
    j.. PP Material Requirements Planning (MRP)
    k.. PP Production Orders
    You can configure the following objects:
    a.. Materials
    b.. Standard networks in the Project System.
    c.. PM General maintenance task lists
    d.. Model service specifications
    Features
    You do not need to create a separate material for each variant of a product in your
    company. You can use one configurable material to cover all variants. You create a
    super BOM and a super routing for this material, containing all the components and
    operations for producing all variants of the product.
    To define the features of a configurable material, you use characteristics. To
    enable you to use characteristics to configure a material, you assign the material
    to a class of class type 300. Possible characteristics of a car, for example, are
    model, country, color, and engine. The customer can choose from among different
    options for each characteristic (values).
    The only limitations are combinations of features that are not possible for either
    technical or marketing reasons. You cannot combine all types of car engine with all
    types of transmission, for example, or certain types of upholstery are only
    available for more expensive models. In Variant Configuration, you use dependencies
    to control this. This prevents combinations of options that are not allowed.
    Dependencies also select exactly the right BOM components and operations to produce
    a variant.
    Each configurable object must have a configuration profile. The configuration
    profile for a material controls the configuration process in the sales order.
    You can make the price of a variant dependent on the characteristic values assigned
    (Pricing). You can use variant conditions to define surcharges and discounts for a
    variant.
    For variants that are required frequently, you can create material variants, which
    can be produced without a sales order and kept in stock. When you receive a sales
    order, you can check whether the variant required is in stock, so that you can
    deliver immediately.
    Pl go thr below links:
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOVC/LOVC.pdf
    http://sap-img.com/sap-sd/steps-for-sd-variant-configuration.htm
    Please Reward If Really Helpful,
    Thanks and Regards,
    Sateesh.Kandula

  • Creation of Variant BOM using Simple BOM

    Hi
    I am havign a production BOM, i wanted to create Variant BOM using Production BOM.
    Pls let me know, whether we have any Function modules for the same.
    Regards
    MD

    check SAP std.program to create variant BOM .
    <b>RCSBI030</b>
    Regards
    Prabhu

  • How to create production version for multiple BOM & Routing ?

    If I have 3 BOMs ( A, B & C ) and 2 Routing ( 1 & 2 ) for material XYZ then how then production version will be created ? I feel that there will be 6 PVs.
    combination of A1, A2, B1, B2, C1 & C2. but some one told me that  I have to create duplicate routing of 1 & 2
    with number 3 & 4 and use it for bom B, and another duplicate Routing with number 5&6 and use it for BOM C.
    in this case my PV data will be like this A1, A2, B3, B4, C5, C6.
    Please guide me which way is correct. I feel that the first way is right, because in that case I have 2 routing in system, and in second way I have total 6 routings for that product. please guide me.

    Hi Archana
      If you are doing component allocation with routing ,
    routing for material 1  counter 1 you are choosing alternate Bom  1 or 2 for material.
    similarly for Material 1 counter 2 you are choosing alternate Bom 1 0r 2 according to your choice
    like this   3 routing groups will get created with each have 2 counters
    if you allocate similar kind of material in one group in material allocation tab & you are going for component allocation it will assign one material bom.
    second material bom will not get assigned to the operation.
    if you are not going assign the component at the routing level than you can follow first process.
    if you are planning to allocate components at routing level than you have to follow second process.
    If have any more doubt kindly revert back with your query.
    Thanks & Regards
    Sandeep Kumar Praharaj

  • Where used list for variant configuration

    Hello,
    We use a lot of configurable BOMs in our company.  In the case of deleting a material we need to know where the material is used. Is there a possibility to find out where a material is used in multi levels.
    For example a material is used for producing raw material this material is processed again to a more specified product and this product is processed again. We need to explore 3 variant configurations ...
    We need to display the bom level by level bottom up. If a material is part of an assembly which is part of a material we need to display it somehow.
    Thank you in advance.
    Regards,
    Christiane Hetzenauer

    dear Friend ,
    See there are 2 things material used in BOM direct assigment
    another is material is bond to BOM via a characterstic value.
    so if you want to see how many materials have values 123 attached to there classic=fication  view search through MM02 search via class , select the class and inout the value for example "01" it will return with all the materials which have value 01 attach to this class , in the same way you can use CL30N search objects assign to class.
    in your example
    For the BOM motor cycle the materials R123 B456 and Y789 are assigned.
    If i search in CS15 for 123 I get as example , also use tick classes in the first screen of CS15
    R123
    B456
    Y789
    then you will only get  R123 motorcycle as result.
    Check and revert back.
    Regards
    Ritesh
    Edited by: R S D on Jul 21, 2009 12:44 PM

  • T COde CS15 : Report is not showing the "Alternative BOM No" for some BOMs

    Hello Guru,
    I am facing a problem for the transaction CS15, when I use this transaction, in the output for some materials, system is not showing "Alternative number" of BOM.
    I cheked Deletion indicator, status of the BOM, validity period etc.
    But unable to get the reason why system is not showing alternative BOM number for the some materials / BOMs.
    Thanks to give your expert comments or solution.
    Thanks in advance
    Hemant

    Hi Hemant,
    please check in CS02 if those top level BOm's which dont show alternative BOm number in CS15, do they really have alternatives?
    the most probale reaosn why alternative is not shown is they dont have any alternate BOM or they are variant BOMs.
    please check.

  • Can we convert a variant bom in to a multiple bom

    my problem is i have  a variant bom for a material. i want to create  a alternative boms for that material.it says can not be done sine the bom is a variant bom. it can be done only for a multiple bom.

    Hi,
    Yes, This is the SAP standard functionality.
    Regards,
    V. Suresh

  • Variant Bom

    Hi All,
                 Please let me know about variant bom in pp. and how it will use full for pp with example.

    Dear
    In variant bom is nothing but the list of variants involved and with special features called Obj Dependencies
    Suppose u take a ex of Car or desktop
    here to manufacture car we required Tyres engine colour model of car these all nothing but variant these variants u assign as a configurable materials and we assign in one level or next level with item cat as N
    so variant bom consists of list of variants with combination of configurable materials with class items and object dependencies
    so its other way called super bom
    Please follow the link to no u better understanding
    [http://help.sap.com/saphelp_erp60_sp/helpdata/en/d8/fa9bd49ede11d1903b0000e8a49aad/frameset.htm] 
    With Regards
    Pushpalas

  • Class type has not been defined in Customizing as allowed for variant confi

    Hi,
    I want to use class type 200 in the varient configuration, but following error is showing so please reply me .
    Class type 200 cannot be used for materials
    Message no. CU731
    Diagnosis
    This class type has not been defined in Customizing as allowed for variant configuration.
    Procedure
    Choose a class type which is allowed for variant configuration.
    Thanks

    Thanks for ur reply.
    please help me regarding my requirements
    I will have to use the varient configuration. In this scenario multilevel BOM BOMis present & for every level varient is present.
    so how to map this scenario, so that it should pop up at the time of sales order creation. i.e. it should ask that which varient should be used at all the levels in the BOM.
    Thanks & Regards.
    Abhi

  • Settings for order bom

    Dear All,
    Can anyone tell me setting for order bom so that the order BOM is exploded in sales order and MRP can be carried out on this BOM
    Regards
    Prashant

    Hi,
    Pls. find the details of Maintaining an Order BOM without Variant Configuration as below :
    Create an Order BOM :
    Prerequisites:
    You have entered the sales order for which you want to create the order BOM.
    Procedure:
    1.Choose Logistics ® Production ® Master data ® Bills of material ® Bill of material ® Order BOM ® Create.
    The Create Order BOM: initial screen appears.
    2.Enter the sales order number, the order item, the material number and the BOM usage.
    If you want to use a material BOM, or an existing order BOM to copy from, go to step 4. If you want to create an order BOM without a reference, click  and go to step 7.
    You cannot use a configurable BOM as a reference.
    3.Click  Order BOM (copy order BOM) or  Material BOM (copy material BOM).
    The Copy material BOM or Copy order BOM dialog box appears.
    4.Enter the data required and click .
    The item overview appears, for the bill of material you are using as a reference.
    5.Select the items you want to copy to the order BOM and click .
    The item overview for your new order BOM appears. The items you transferred are displayed in the item overview.
    6.Enter new items and alter items if necessary. Entering items in order BOMs is similar to entering items in material BOMs. However, you cannot enter class items in order BOMs. You can find further information in the Bills of Material documentation in  Creating New Items.
    Save your order BOM.
    Example: Creating Order BOM Without Variant Configuration :
    The material BOM for material A contains components B and C, which are themselves assemblies. The material BOM for material C contains components D and E and the material BOM for material C contains components F and G.
    A sales order is created for customer Smith, with the number 821. Material A is inserted under sales order item 10 in this sales order. At the request of customer Smith, for this sales order, the bill of material for assembly C is changed manually. Component H is added to components F and G. This change should not take effect in the material BOM, because assembly C is only expected to be produced once in this form, for customer Smith.
    An order BOM is generated from the material BOM for material C. Since nothing was changed in the bills of material for materials A and B, in this sales order the material BOM will continue to be used for these assemblies.
    Hope this helps.
    Revert if any doubt and reward if useful.
    Regards,
    Tejas

  • Using ECN for creating Bom

    Hi Friends
    We usually use ECN for making any changes to Bom or Routing.  Any idea whether change number could also be used for creating Boms, Routings? Or  rather, when we do not put an ecn number while creating Bom, system should give an hard stop.
    thanks and regards
    L.Ramesh

    Hi Mr.Ramesh,
    As u asked,ECN can be made as a mandatory field while creating & changing a material,BOM,Routing.
    <b>1.For material,ECN can be made as mandatory by using a field exit.For Field exit,you can check in SE37.
    2.For BOM,Check in SPRO-Prod-Basic Data-BOM-Control Data for BOM-Define modification parameters(OS27).Also Check in OS25,for more settings.
    Check whether there's a tick mark in the check box for EC Management Active.
    3.For routing,Check in OP5A,Prod-Basic Data-Rotuing-Control Data-Define Field Selection.</b>
    I hope this will be helping you.
    If useful reward your points.
    Thanks & Regards
    Mangal

  • How to remove the Variant BOM?

    Dear All,
    I am currently having the variant BOM. I need to create alternative BOM for all the BOM headers.
    I cannot create it till i remove the variant bom tag from the BOM headers.
    Kindly let me know the procedure to remove the Variant BOM tag from the BOM header materials.
    Thanks.
    Aditya.

    Hi,
    As you have already maintained alternative BOM for materials system will not allow you to create variant BOM as already alternative BOM is present for the same.
    So you need to delete all alternative BOM for required materials. Then you can create variant BOM for those materials.
    You can delete BOM's on mass basis also. Use CS28 for the same.
    Hope this will help you.
    Regards,
    Ashish

  • Multiple BOM and Variant BOM

    Hi Gurus
    Just a small question...
    Can we change the technical type of the BOM from V(Variant) to M(Multiple).
    As that field is always grayed out in editing mode (CS02).
    If we can change, how ??
    Thanks Vineet

    Dear Vineet,
    If a product has more than more than one alternative BOM(more than one BOM for the same BOM
    usage) for that products under the BOM header you will be able to see the technical type as M -
    Multiple BOM.
    You cannot change this.
    variant BOM
    Production Planning and Control (PP)
    A combination of a number of bills of material that lets you describe a product, or several products that have a lot of identical parts.
    The variant BOM describes each object completely, for example, the product "lamp." Each variant BOM contains all the components. This type of BOM is not configurable.
    Procedure
    The system allocates technical types:
    according to the number of alternative BOMs
    When you create the first alternative for a BOM, the technical type is not yet defined. If you extend the BOM by creating an alternative, the system automatically assigns the technical type multiple BOM.
    according to the transaction
    If you create a BOM using the Create variant of... function, the system assigns the technical type variant BOM. After this, you can no longer create alternatives for the BOM.
    Regards
    Mangalraj.S