RQAAAS10 - Deadline monitoring of batches

Hi, 
RQAAAS10 program is scheduled in background for weekly.
The first job run correctly 27.09.2011
After that all weekly scheduled jobs are cancelled.
Why ?
Thanks.

check SM21
also
check very interesting thread
SAP  Back ground Jobs getting cancel automatically

Similar Messages

  • Problem in deadline monitoring of batches

    Dear experts,
    Deadline monitoring of batches (transaction QA07) is not working. I tried running this but it did not post stock of a batch whou2019s expiry date was in next 2 days in blocked stock. I had specified the material no, plant, initial run in days (the one that is underu201D batch status change when expiration date is reachedu201D) and also flagged the checkbox for u201CBlock batchu201D. All other fields were left empty. Also QM module is not active. The message was u201CNo entries foundu201D , I confirmed the batch details with u201CMSC2Nu201D , it was in next 2 days and the same is reflected in report u201CMB5Mu201D too.
    Please let me know whether QM is required to be active for execution of QA07 or there is some other problem.
    thanks in advance

    Ok... I'm still confused. Why can't you run the standard deadline mointoring program?
    I believe you still need to activate the 09 inspection type but this can be done in mass using QA08.  Since your not using inspection intervals, don't maintain the inspection interval field in the QM view.
    No config needs to be done, the standard as delivered config in QM should work.
    Run the deadline mointoring program (QA07?) but only fill in data in the bottom half for blocking expired batches.
    Set the program up to to run nightly with whatever 'window' you desire, i..e block those that expire in 1 day, or 5 days, or ten days.
    If you are using batch status management, then the batches will be restricted.  If you are not, they will be moved to blocked stock.
    Craig

  • Creat 'recurring inspection' in Deadline monitoring of Batches

    Hi guys,
    Conditions:
    (1) Today is '11.24.2011''.
    (2) MSC3N
    - 'Shelf Life Exp. Date' is '11.30.2011' and 'Next Inspection' is '12.10.2011'.
    (3) QA07
    - 'Initial run in days' is '30' and Check radiobutton at 'To insp.stock at lot creation' in the 'Additional goods movement at time of recurring inspection' box.
    'Initial run in days' is '00' and Check 'Block batch' in the 'Batch status change when expiration date is reached' box.
    i think, in order for the 'Shelf Life Exp. Date' to arrive first, no recurring inspection lot created??
    But, when i am running QA07, the system automatically creates 'recurring inspection'.
    The inspection lot not to make automatically, it will be able to setting??

    Dear,
    The function for recurring inspections allows you to monitor the quality of batches contained in the warehouse stock.
    For this purpose, an inspection date is calculated (in addition to the expiration date) when a batch is received in a goods receipt shipment
    To be able to determine the inspection date, you must enter an inspection interval when you maintain the QM data in the material master record. The inspection interval defines the time period that must expire before the next recurring inspection must be carried out.
    A program that is run periodically (batch job) monitors the batch materials in the warehouse and causes one of the following activities to be carried out when the inspection date is reached or exceeded:
    Inspection lot creation
    Inspection lot creation and batch posting to inspection stock
    Inspection lot creation and changing status of batch to "not released"
    If the expiration date is reached or exceeded for a batch, the batch is blocked. This changes the batch status to "not released" or causes the batch quantity to be posted to blocked stock, if the batch status management function is not active. In this case, an inspection lot is not created.
    When you make a usage decision to accept an inspection lot, the batch quantity is posted to unrestricted-use stock or the batch status is changed to "released," depending on the option you selected.
    The system calculates the next inspection date for the batch and stores it in the batch record.
    Please go through:
    http://help.sap.com/bp_bblibrary/600/Documentation/P18_BB_ConfigGuide_EN_DE.doc
    http://help.sap.com/saphelp_45b/helpdata/en/2d/350e0c448c11d189420000e829fbbd/frameset.htm
    Regards,
    Ram

  • Deadline monitoring of batches

    Dear Experts,
              In retest inspection even if we have mentioned total shelf life 60 months & retest period a 360 days, system is automatically updating in the batch master any irrelevent shelf life expiry date & retest date.
    Previously this was working fine but since from some days this is happening. And this is happening for any material in random & not for all materials.
          Can anybody suggest any note which is to be applied to the system to correct this problem.
    Thanks & regards
    Milind

    Thanks Radhak MK,
           But there is no any differance in the master data maintained for the faulty material & normal materials. And it is not material specific. But  the same material one batch have correct results & the other batch have faulty results. Is there anything else.
    Regards
    Milind

  • Why we use tcode qa07 deadline monitoring batches

    Dear Sir,
    i m new in qm module,can u tell what is deadline monitoring baches,what exactly the use of this tcode-QA07
    There is initial run days enter what the use of  that days.its for transfer there quality stock to unrestricted befor retest date or what.
    pl guide me

    hi
    this is for recurring inspection lot  inspecion type 09
    for ex : if your company is food grade industry having shelf life for every product. for ex one product having 1 month shelf life.
    so if the batch's shelf life exceeded then system would automatically transfer that particulor batch into blocked stock and create inspection lot for that particulor batch. so this setting we have to define in QA07 and that we have schedule this variant so that this should be done back ground in QA05.
    Regards
    Pravin

  • Deadline monitoring batch jobs

    Hi batch jobs for deadline monitoring are getting hanged for few times. Sometimes it works fine.
    I am not getting why it is getting hang out for few times.
    If anybody faced this problem, pls share the possibilities.
    regards,
    Kedar

    Hi,
    Please check parameters of deadline monitoring especially parameter "Interval for call objects".If its very long in future then possible reason is system is trying to generate calls for this long period and it may that job is not completed with time parameters set by basis administrator.And this may resulting into termination of job.
    So try to limit this parameter and also no of maintenace plan if you have a very huge list.Also check with basis person if any such jobs terminated due to very long time they are running
    regds,
    atul

  • Error in Schedule Background Job for Deadline Monitoring of swu3

    While Auto Customization swu3 i am getting error message 'Output device "" not known' in 'Schedule Background Job for Deadline Monitoring'
    Please advice what could be cause of it

    the earlier problem of background job was solved by changing the  output device assigned to user wf-batch .
    regarding the transport request :
    when i was trying to execute the step : "Schedule bakgrd for missed deadlines " MANUEL it was giving me an option of SAVE AND SCHEDULE . which was creating the transport request . but when i executed it automatically it worked fine without asking a request to me ... i don't know why )-: ... probablly we can specify a different interval then the standard of three minutes and which will be transported (it's just a guess) . i have  executed it  automatically ...
    well thanks all for u r help

  • Multiple levels escalation for deadline monitoring

    Hi all,
    We have a business requirement to perform multiple levels escalation in one of the workflow steps. If the approver does not approve the work item(WI) after one day,  a mail notification will be sent to the approver.  A second mail will be sent again if approver still doesn't approve WI after 48 hours.  Then the third/fourth mail will be sent to approver and approver's boss if approver still doesn't approve WI after 72 / 96 hours.  The fifth mail will be sent to approver's boss's boss if WI is not approved still after 5 days.
    I know how to do simple and modeled deadline monitoring in workflow builder. But I don't know whether our business requirement can be achieved in workflow builder( and this is a step in dynamic parallel processing).  Other option I have is to create an ABAP report to go through the table stores workflow run time data and make this report run several times a day in the batch to send mail notification reminder.
    Did anybody have a similar business requirement like ours? What's the best way to handle it - build it in workflow builder or write an ABAP report?
    Thank you in advance,
    Merta

    Hi Merta,
    We had a similar requirement and this is how I achieved it:
    1.  Pleace your approval task into a loop (while not approved) and create a container element as the approval flag.  This allows you to get out of the loop when the item has been correctly actioned.  Also create a DL element to hold your calculated deadline value;
    2.  Create a method and task to determine the next escalation point based on how many loop passes the instance has had, ie:
         Pass 1 - DL = sy-datum + 1 day;
         Pass 2 - DL = DL1 + 1 day, and so on.
    3.  Create a method to determine who should get what.  Link this to a condition so you know whether to send a mail or escalate the entire workitem.  Create the notification as a send mail within the condition;
    4.  Change the Deadline parameters in your step to "Refer.date/tim" = Expression and bind the DL element;
    5.  Set the processing obsolete property to ensure the workitem is killed when a new pass (and therefore and new deadline/agent etc) is started.
    See the following:
    This one handles the loop/obsolete concept.
    http://help.sap.com/saphelp_47x200/helpdata/en/c5/e4b97e453d11d189430000e829fbbd/frameset.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/bc/ecdd5ad24e11d2b494006094b9ea0d/frameset.htm
    Regards
    Gareth

  • Deadline monitoring is not working

    HI,
    i had requirement to change the text displayed in the decision step type. I copied that task using pftc and changed the description and i replaced the new task number with old one. the deadline monitoring is not working for the new task .
    Please anybody have idea about why deadline is not working for the new task ?
    advance thanks
    regards
    paveee

    Hi Praveen,
    Deadline is failing only for this workflow? Or is it failing completely in the whole system. Just create a small dummy WF with a standard decision step (or some acitvity) with deadline monitoring activated and see if it fails there also.
    <b>If deadline monitoring is failing in all workflows</b>
    Can you just check whether the scheduled report RSWWDHEX are executing properly. You can check it in SM37 for user WF-BATCH. Also check in ST22 if there are any dumps for report RSWWDHEX (for user WF-BATCH).
    <b>If deadline monitoring is not failing in other workflows</b>
    In your activity where you have put your cutom task goto the "Outcomes" tab an check if the outcome for your deadline monitoring is "Active" (This may not change but just have a check)
    Also can you let us know what are the steps that you are using in your modelled outcome? Just suspecting if the first step in your modelled outcome is going to error (which is not displayed in log).
    Thanks,
    Prasath N

  • Possible loop deadline monitoring for a period of time?

    Hi All,
    Here is our scenario.. We have a task sent to the managers inbox with deadline monitoring on it.  If the manager does not action this task, we set this task to obsolete and then we want to send a reminder email every day until the manager performs the required action.
    So the problem.. originally this email was to be a task but the loop would not work with the task as it's waiting on action from the user.  We changed this task to an email and it looped as expected however the only way I could think to put a wait for a period of time before another email is sent is by actually counting down the time in a method.
    However, the problem with this is that wf-batch is locking the worklfow so it can never complete, even if the event to complete the workflow is triggered.  wf-batch has it locked so the workflow can never complete, so it loops infinitely.
    So my question.. is it possible to repeatedly send notifications to a manager at specifically defined time intervals without locking the workflow?
    Below is how the workflow currently looks:
    Any guidance on this would be most gratefully received!
    Thanks in advance,
    Liz.

    Hi Liz
    in your wait step, do not count down the time.
    Instead keep the method as a dummy method with no code.
    In the wait step, use the deadline monitoring - Requested Start - set it to current date + 1 day
    The step will start 1 day after 'today' , execute nothing in Dummy method and then go on to the mail step
    I am sure that the deadline monitoring job is running because "Latest End" of the first task is executed in your system. So the same job will take care of Requested Start of the wait step.
    regards,
    Modak

  • Inspection lot at deadline monitoring

    Hi all,
    I've a question about the deadline monitoring function in SAP. I want to create an inspection lot when the batch is about to expire. Here are a couple of assumptions:
    - We use batch status management
    - inspection type 09 active in material master
    - QA07 to trigger inspection.
    I don't want to use the next inspection date. So when i run qa07 i set the field batch status change when exp is reached. The batch is set to restricted, mvt 341 is used for this. But how do i create an inspection lot? I already activated mvt 341 in customizing, but nothing happens.
    Hope you can help.

    In config:  Materials Management > Inventory Management and Physical Inventory>Movement Types-->Copy,Change Movement Types
    Select "Movement Type"
    Enter in range of movement types to review.
    Select a movement type
    Click on folder "update control/WM movement types
    Double click on any of the lines displayed.
    Inspection lot origin field is on the bottom left.
    FF

  • Deadline monitoring & extended email without customizing a new workflow?

    Hi,
    I have a Position setup in Partner Profile - Post Processing:Permitted agent, to be notify if processing errors occur on the inbound idoc interface.
    My questions are:
    1. Besides receiving work item in SAP inbox for the idoc fallout, is there any way to send extended notification Outlook email to the users in that position when processing error occured?
    2. How can i setup a deadline monitoring for the work item triggered only by these specific idoc message variant? In SWWA, it does not narrow down by workitem, permitted agent,partner profile etc.
    3. If #2 can be fulfill, is it possible for me to trigger a new work item to another user/position? An escalation to next level after due date.
    I know this can be done through customizing a workflow, but in my situation, i need to search for a solution in a standard existing SAP way without creating any new workflow, program or object.
    Any suggestions?
    Thanks.
    Regards
    Eunice
    Edited by: Huwi Yin Puah on Oct 1, 2009 1:08 PM
    Edited by: Huwi Yin Puah on Oct 1, 2009 1:10 PM

    Huwi,
    1# You can send the external notification using Send mail step in the standard workflow it self. I suppose, You can add new steps in Standard Workflow also. Use Send mail step and chose recipient type as "Email Address'. Pass the email Address and it will sent out to MS outlook inbox if all the SCOt Configurations are done.
    2# You can activate the deadline monitoring on any activity by
    double click on the activity
    goto tab Latest End
    Select the relevent options
    3# For excalation you can set the deadline out come as a "Modeled" outcome. It would provide you an extra wing in your approval task and in that extra wing you can create your own task putting agent as manager's manager.
    Hope it helps!
    Cheers,
    Vikash

  • Background Scheduling - Deadline Monitoring

    Hi Experts,
    I have created new maintenance plan , its around 250 for Mechanical and 250 for Electrical
    Maintenance plan having strategy like every two month , every three month , every six month etc..
    Scheduling period is 3 year
    Now scheduling will be done through IP10 one time , but after first call object scheduling will get hold.
    I want to make it background scheduling - Deadline Monitoring
    Now the requirement is , For Example :
    Maintenance plan X have PM plan date is 21.07.2014
    Maintenance plan Y have PM plan date is 24.07.2014
    Maintenance plan Z have PM plan date is 29.07.2014
    As per above example each equipment will have different plan date , background scheduling can be done through IP30 but by the date is concern how can make it possible ?
    Please advise each maintenance plan has to be run as per their plan date.
    Thanks,
    Abhishek

    Hi Mr.Jogeshwara,
    Nice Document , Its really useful
    But my query is each equipment have different plan date , as explained in above example
    If Maintenance plan have Cycle Unit 60 day and Plan X date is on 21.07.2014 then 21.07.2014+60day , same as if maintenance plan Y date is 25.07.2014 then 25.07.2014 +60day
    Like that
    background scheduling needs to be done as per cycle unit
    If i will do background scheduling together of both the above maintenance plan X and Y then scheduling will be run exactly after 60 day and order will be generated in advance for Maintenance plan Y.
    Hope you understand my query.
    Thanks,
    Abhishek

  • Workflow Deadline Monitoring for SC in SRM 7.0

    Hi,
    I have activated the deadline monitoring for WF_APPR_LATEST_START event for 1 hour. But didnt see any notification to the requestor and the approver. So need help here.
    Below is the setting that i have done to activate deadline.
    1. In Define event > BUS2121 > WF_APPR_LATEST_START:SC
    2. Define Event Schema > BUS2121 > Event scema : SC > WF_APPR_LATEST_START:Message (low priority):APPROVAL_DEADL_NOTIFIC_NEW:1.
    Thanks In Advance.

    Masa thanks for replying..
    They are in place.
    I checked the Workitems Log for administrator ... and could see the workitem 'Trigger Event: 'WF_LATEST_START'' fired exactly after one hour the SC was created as set in the config... but no notification is sent to Outlook.
    Background Job RSWWDHEX is also running every 5min ... But didnt see any notification.

  • Extended notification and deadline monitoring

    We are using extended notification to deliver new and changed workitem by email.  Now we want to update some workflow approval tasks to add deadline notification.  In SWU3 workflow customizing, we had setup "Schedule Background Job for Deadline Monitoring" to run job RSWFSLSDLEX (previous version is SWWDHEX). 
    My question: if there is some outstanding workflow task meet the deadline, will the notification email sent out by job RSWFSLSDLEX or extended notification report SWN_SELSEN?  Thanks in advance.
    Regards,
    Donald

    Hi,
    The deadline monitoring job only creates additional workitems if a deadline is met, the sending of an email job retrieves workitems and sends them as email.
    Kind regards, Rob Dielemans

Maybe you are looking for

  • OPEN DATA SET change character "SPACE" to '..'

    Hi!    I am loadind a XML file by OPEN DATA SET but it is changing from the "space" Hex = 20 to '..' Hex = "0D0C".    Do you know where is the problem? Thanks. ABAP  - >    OPEN DATASET VP_FILEXML FOR INPUT IN BINARY MODE.     OPEN DATASET VP_FILEXML

  • Oracle 8.1.7 install fails on RH Enterprise Linux  3

    Hi! I've been desperately trying to install Oracle 8i database to RedHat Enterprise Linux 3 (actually it's Whitebox 3.0 that is exactly the same as RH but the logos and other RH stuff stripped), with no luck. I tried to follow the numerous instructio

  • Number range in Solution Manager 3.2

    Hi , we are using solution Manager 3.2 with oracle 9i and Bi 7.0 (development) While we  raise Solution Manager Ticket from BW Development system,it is not mainatainig the proper sequence number(number range).Rest all other systems are maintaining it

  • New page unexpectedly loses ability to go BACK to previous page after clicking on a link in page (not consistent), why?

    Firefox 4.0 Vista 32 bit I will have a tab open, and click on a link, new page loads. The Back and Forward buttons do not work. Usually it shows in history (unless I opened too many pages before clicking on link). This has happened several times. It

  • How Do I Download CS 5 to a New Computer

    I bought Photoshop Extended CS5 in 2010 via a digital download. I do not have an installation disk, but I do have the serial number. I recently replaced my computer, how do I get a fresh copy on my new computer?