RTA installation on backend system

Hi Guys,
I have HR module in my backend system. I have completed my installation of the RTA (non-HR) and patch it to the latest patch (patch11). Now I need to install the RTA (HR) in the backend system but I found that the latest patch for the RTA (HR) is only on patch 0009.
Will that cause any problems for me?
Thanks.
Raymond

Hi Raymond,
the patch-level of the non-HR and HR RTAs are not always the same. Just take the latest of both and you are fine.
BR,
Frank

Similar Messages

  • Reg:RTA Plugin's for Backend system

    Hello All,
    We have applied VIRSANH RTA Plugin  and it's related support packs on our backend ECC system and also the system is HR system so is it mandatory to apply VIRSAHR plugin also .What would happen if we don't apply VIRSAHR package .Would it affect the HR functionality of whole backend system or will it only not allow us to use the HR functionality in GRC.
    We are not planning to use any HR functionality in GRC.
    Thanks
    Uday

    Thanks Frank for such a quick reply.The only reason I am asking is what if we go live and later install the VIRSAHR plugin i.e. after a month or two. In the meanwhile will it affect the functionality or affect the backend system.We are on very tight schedule hence all these q's else in ideal scenario we would have installed virsahr and then proceeded with go-live.
    Thanks
    Uday

  • Install GRC AC 5.3 RTAl in a backend system. (VIRSA) up on VIRSA 400_700

    Hi Supports,
    I want to install GRC AC 5.3 RTAl in a backend system. (VIRSA)
    Where we have below setups already. We have a NW 2004 server with GRC 5.3 Installed and SLD is configured. Now we need to install GRC AC 5.3  RTA in Backend systems, so that we connect the backend system with the GRC server (NW 2004).
    The backend system has ECC6.0 + Oralce 10g in AIX 5.3. This system is upgraded from 4.6c to ECC 6.0 recently.
    We have already VIRSA 400_700 release in this system. Now we need to install GRC AC 5.3 RTA upon this for configure newer version of VIRSA (GRC).
    Now here my quaries ??
    1) When we install GRC 5.3 RTA in this system then it over write the existing VIRSA 400_700 release or installed in separate ??
    2) We plan to take hole system backup before the installation. Including this we need to take backup of the existing VIRSA 400_700 release. Then what are the things i need to take backup and how ??  (tables of VIRSA backup only how ??)
    3)Any one have the RTA installation procedure please forward it ??
    4) After installation how can i sure that install is success or not ?? how can i check ??
    5) What are configuration settings for NW 2004 server and Backend system after installation require(Procedure) ??
    And i request to the guys to post the procedures/process is best way to share knowledge global.
    Advance thanks for your replies,
    Thanks & Regards,
    Jagadish

    Hi
    > 1) When we install GRC 5.3 RTA in this system then it over write the existing VIRSA 400_700 release or installed in separate ??
    > 2) We plan to take hole system backup before the installation. Including this we need to take backup of the existing VIRSA 400_700 release. Then what are the things i need to take backup and how ??  (tables of VIRSA backup only how ??)
    > 3)Any one have the RTA installation procedure please forward it ??
    > 4) After installation how can i sure that install is success or not ?? how can i check ??
    > 5) What are configuration settings for NW 2004 server and Backend system after installation require(Procedure) ??
    For GRC 5.3 check below SAP note
    1250521 GRC/Virsa Add-On Upgrade Best Practice
    SAP Note 1006083 - Virsa Access Control Suite- STMS to SAINT Migration
    Also check GRC upgrade guide.
    Thanks
    Sunny

  • J2EE fails to connect to the ABAP backend system

    We have J2EE 640 Sp16 Abap+Java. As we configured this node in high-availability, we applied note Oss 757692 to the J2EE.
    Anyway the J2EE does not come up.
    Into the std_server0.out we see the following:
      Service dbpool started. (1503 ms).
    May 25, 2006 3:44:09 PM         com.sap.security.core.persistence [SAPEngine_System_Thread[impl:5]_25] Fatal: User Management Engine
    (com.sap.security.core.persistence.datasource.imp.R3Persistence) failed to connect to the ABAP backend system. Check that connectio
    n data are correct and the backend system is available. Error message: "User not authorized (session closed)". Connection data (
    obtained from properties of UME service in section "ume.r3.connection.master.": "{
      passwd=********
      receiverid=master
      sysnr=00
      client=100
      poolmaxsize=10
      user=SAPJSF
      receiverid_guest=master
      ashost=sap3
      snc_mode=0
    We double checked the set6tings of note 757692 and all of them seems to be correct.
    We changed also the psw of SAPJSF in the ABAP stack and also in Global server configuration by mean of the configtool for the ume.r3.connection.master.psswd item
    Neverthless we continue to recive this error.
    What's wrong ?
    Regards

    Could it be because you tried to do this in an AS Java + AS ABAP installation? The note 757692 says quite distinctly, "This note covers the procedure for the j2ee engine only!" The statement does not make it clear if this note refers to only a standalone AS Java.
    My saying so is not very helpful, but the note also goes on to say, "Should you wish to change the host name of a server in a test !!! !!! system, you should do so only with the assistance of an SAP!!! !!! consultant.!!!

  • SAP Backend systems and SAP OPI Integration

    Dear Experts
    I have been reading many articles and blogs on Operational Process Intelligence but have couple of doubts regarding capturing events
    from different backend systems
    1. There is a Business workflow in ERP which we needs to be imported in SAP OPI. In one of the guides its mentioned that
    "The ERP system needs to have the software component
    SAP_BS_FND satisfying the below mentioned support package levels for various releases. ● 731: support package level 5 ● 730: support package level 4 ● 702: support package level 10 ● 701: support package level 12".
    If a customer is not on SAP Business Suite and its only ERP installation then does this mean that we cannot import Business workflows in SAP OPI?
    2. In lot of blogs its mentioned to use Process Observer in backend systems but what if client has not activated or using Process Observer in their landscape. What would be our options here to capture events ?
    3. In SRM system we typically use Process Controlled workflows. Can these be imported directly in SAP OPI business scenario. Again assume there is no Process Observer here. Has anybody tried this?
    Would be really great if I get clarity on these items
    Regards
    Rahul

    Hello
    Do you need to connect SAP R/3 users to ADS?
    for that just follow SPRO setting of LDAP and customize your SAP system to access LDAP.
    If you need to define HPUX users using ADS, It will require you the define login stack for HPUX.
    Erez

  • How to install ABAP as a backend system in my EHP1 composition enviornment

    I have successfully installed EHP1 composition enviornment from SDN , now i m able to work on
    NWDS for JAVA and Enterprise portal . it contains java application server .
    but in order to get data from ABAP Backend system from NWDS(JAVA) , I don't have ABAP Backend sysytem , how to install abap backend system with abap application server in my system ????
    there is one link to install Netwaever ABAP 7.1 trial version( webdynpro abap and abap application server ) in sdn but in system requirement it clearly mentioned that " make sure that there is no SAP sysytem installed in ur system " .
    I need webdynpro java ,webdynpro abap and enterprise portal together but i have only webdynpro java and EP , so how to install abap as a backend system in my EHP1 ?
    or any other download link which contain all three ??
    please help me ?

    Hello Shilpa,
    in other [thread|Re: ABAP and JAVA version of NW2004s sneak on the same system;, where you have the contribution to the same topic, Raja has written:
    earlier i had abap and ep sp16 (first ep was installed and then abap was installed)
    I would try on your side to instal ABAP instance now. At worst scenario, you have to make both installation
    again on clean up HD.
    Bye,
    Peter

  • Applying GRC-addons in Backend systems

    Dear Freinds,
    I am trying to install the GRC RTA's VIRSANH 530_700 and VIRSAHR 530_700 in the SAP backend systems. I started applying the Add-on for the VIRSANH which prompted a password by displaying the note 1133167. When checked in SMP it says "The requested SAP Note is either in reworking or is released internally only" and the same message for the Note:1133168(VIRSAHR). Please suggest
    how to proceed like do i need raise an OSS to SAP Team.
    Your advice/help in this regard is highly appreciated
    Thanks & regards,
    Sitaram

    Hi,
    You are right, the notes is currently unavailable, however i have the saved passwords mentioned in the notes when it was available.
    try you luck with below passwords.
    VIRSANH 530_700  E46B5BFA5F
    VIRSANH 530_700   C420870F14
    Vijay Kothapalli

  • User cannot connect to backend system with user J2EE_ADMIN.

    I am using Rapid Installer to initiate the second part of the installtion "ERP 6.0 EhP 3 – Self-Service Scenarios and Automatic Roles".  When I get to the J2EE User section to enter the parameters, the user is defaulted to "Administrator" and I enter my password.  I click next and get this message "User cannot connect to backend system with user J2EE_ADMIN."  Any ideas?

    If this is a double stack installation, you need to enter J2EE_ADMIN as user, NOT administrator.
    Markus

  • Error while reading the PO in the Backend system. Inform system admin

    Hi All,
    We are having a peculiar issue of 'Error while reading the PO in the Backend system. Inform system admin'.
    The P.O is in ordered status in SRM but the same is not getting transferred to backend ECC system.
    No error messages or logs in RZ20, SLG1 any where.
    All programmes like BBP_GET_STATUS_2 and CLEAN_REQREQ_UP are running fine.
    Tried pushing the P.Os manually using function module (BBP_PD_PO_TRANSFER_EXEC_V2) to backend ECC.
    It was working fine till a week ago and suddenly this problem is coming.
    We had implemented few OSS notes suggested by SAP for the issue of 'shopping carts appearing in sourcing cockpit even after P.O creation' in both development and test system.
    Now this issue is coming up in test system where as development system is working fine.
    Please let us know where to look and how to resolve this issue.
    A quick response would be highly appreciated.
    Regards,
    Teja

    I am facing the same issue with one PO in the Production system.
    SRM 5.0 , R/3 4.6C Extended classic scenario.
    I checked the status of other PO's created today. I see them in R/3. There is one PO which was created a week back which shows up as "ordered" in SRM but the PO is missing in R/3. When clicked on the details on the web, system throws the error
    Error while reading the PO in the Backend system. Inform system admin.
    Message no. BBP_CF010
    I checked RZ20, SLG1 no errors were found. I checked RFC connection, it was working fine too.
    I tried pushing the PO using the FM BBP_PD_PO_TRANSFER_EXEC, it did not solve the problem.
    In SRM WEBGUI Process PO - Item data -->follow on documents --> PO status is shown as Archived.
    Any inputs would be greatly appreciated. Please throw some light on this issue.
    Krishna

  • Error while reading PO in backend system Inform system adiministrator

    Hi All,
    I am working on extended classic scenario and the problem is that after the PO ís ordered it gives the message " Error while reading PO in backend system Inform system administrator" and this is happening only for a particular local PO.
    When I check the PO number in R/3 it does not exist.
    The number range is correct both in SRM and R/3 (external no. range is ticked).
    Also I could not find any logs in RZ20 nor a dump.
    When I checked in bbp_pd, couldnt find any relevant information except that the PO has the status ordered.
    I am on SRM version BBPCRM 4.0 SAPKU40007
    R/3 version 4.6 C SAPKH46C47
    Thanks in advance,
    Rgrds,
    Raj
    Message was edited by:
            Raj Malhotra

    Hi
    Have you tried out this ?
    <b>There are two BADIs which might help you in achieving the job.</b>
    <u><b>BBP_EXTLOCALPO_BADI</b> [Control Extended Classic Scenario ]
    <b>and</b>
    <b>BBP_GROUP_LOC_PO</b>
    [Exit Grouping of Items for Local Purchase Orders]</u>
    <u>Read the documenatation first, using transaction - SE18
    before implementing them for your requirement.</u>
    Hope this will help.
    Please reward suitable points.
    Regards
    - Atul

  • Error while reading the PO in the Backend system   !

    Hi all,
    We  are working on SRM 5.0(SP12) and Extended classic scenario.
    The problem is that after the PO ís ordered it gives the message " Error while reading PO in backend system Inform system administrator" .
    When I check the PO number in R/3 it does not exist.
    The number range is correct both in SRM and R/3 (external no. range is ticked).
    In RZ20,i find the log:
    The error ocurred by processing event SENT_AGAIN with GUID 490F3C0834351AC6E10000000AE48838 and object_id= 3000000307
    The R/3 System Version is 4.6C.
    Any help is highly appreciated.

    Hi,
    Thanks for the response.
    This problem is hapeening for all PO's in the system.
    The no range is smae in both the systems.In SPRO ,howevre we have not maintained the no range in SRM for R/3 system.
    Here is the config details:
    Supplier Relationship Management>SRM Server>Cross-Application Basic Settings>Number Ranges>SRM Server Number Ranges-->Define Number Range for Local Purchase Orders
    EC     3000000000     3999999999     3000000320
    Supplier Relationship Management>SRM Server>Cross-Application Basic Settings>Number Ranges>SRM Server Number Ranges-->Define Number Ranges per Backend System for Follow-on Documents
    SAPE02_050     EC            RS
    Supplier Relationship Management>SRM Server>Cross-Application Basic Settings-->
    Define Transaction Types
    ECDP     PO: Direct Material     03     02
    ECPO     Purchase Order     EC
    I have already gone thorugh note Note 1258634 - Certain events cannot be de-activated.
    This note is however valid for SRM 6 and 7.
    PO is not reaching R/3 system.
    No error in sm58/sm12.
    The status in BBP_PD for the PO is :
    Stats:
               Status         Description                    Inact
    HEADER     I1009          Held                           X
    HEADER     I1015          Awaiting Approval              X
    HEADER     I1021          Created
    HEADER     I1038          Complete
    HEADER     I1043          Ordered
    HEADER     I1080          In Transfer to Execution Syst. X
    HEADER     I1180          Document Completed
    Awaiting your inputs.

  • Error while posting return delivery to backend system

    Hi All,
    We are facing problem when we are posting return delivery. Currently we are in ECS implementation. Our SRM is 7.0 EHP3.
    Scenario goes as, SC is created then PO is created then further confirmation is created and on creating return delivery of this confirmation, this return delivery goes error in process.
    Now on further analyzing, I found out that outbound IDoc in SRM is getting posted successfully but when ECC receives this IDoc it is saying please enter reason for movement 122. This reason for return is already entered while creating the return delivery. But this reason is not flowing in IDoc (Message Type MBGMCR and Basic Type MBGMCR01) in SRM and further to ECC. This field MOVE_REAS in IDoc is populating blank.
    Can anybody help me resolving this problem? Any pointers or SAP notes related to can also be suggested.
    Thanks
    Siddarth

    Hi Siddarth,
    Please implement the note below, which is included in SP05.
    2007628 - Return delivery cannot be posted in backend system as reason for return delivery is empty
    Regards,
    Wendy

  • Unable to create a PO(in backend system) in ECS

    Hello all,
    I used the FM BBP_PD_SC_CREATE, BBP_PD_SC_UPDATE, BBP_PD_SC_SAVE to create a shopping cart in ECS scenario.
    The problem is I am unable to create a PO in the backend system for the shopping cart. I am also getting the message 'Vendor 3000014598 not intended for purch. org. Ref: MM Purchasing Org'.
    Please help me in this context.
    Thanks,
    Vishnu

    Hi,
    The problem with organization structure , Please check your organizaiton structure.
    Change company code /Pur.org Separatlly it will work.
    while replicating vendor please select the flag 'with out reference to back end pur.org' and choose local purchasing organization.
    refer this link
    Vendor xxxxxxx not intended for purch. org. xxxx Purchasing Organization
    Thanks
    prasad .s

  • How to find out Shopping Cart created in backend system or ECC system

    Hi All,
    I am new  to SAP SRM7.0.  The Client has implemented "Extended Classic Scenario".  i.e. SC>Approval>PO>Confirmation>Invoice process in ECC.
    We created few SC with "Free text" i.e. Describe what you need option in SC.
    The SC is created with 4 digit number 2690.  Also, the Status " Approved". since its low value.say 5 GBP.
    I have like 25 to 30 SC created like this:  I need to know the following:-
    1. When i open SC and look for Related document, i see only SC number , but no Follow on document.  not sure why ?
    2. How can i know the list of SC in backend system. i.e like ECC of the SRM backend system.  Please let me know the table name it get stored.. I searched EBAN and found only those which has PO is stored.
    also can you please advise if by creating the SC in SRM.. will get replicated in ECC system ?. or only if Follow on doc gets created it will get replicated in ECC system?.
    Thx
    MJ

    Hi,
    SC is never replicated to backend.
    Extended scenario document flow is SC -> SRM PO(Main) -> ERP PO(Copy).
    Please go to BBP_PD transaction and navigate to SC item detail. You see what is the follow-on document.
    Regards,
    Masa

  • Automitic source of supply assignment in backend system for SRM

    Hello Experts,
    I am facing one issue regarding source of supply for SRM purchase Requisitions in backend ECC system.
    When we create a shopping cart in SRM 5.0, a purchase requisition is created in backend and has source of supply assigned to it.
    I donu2019t want to assign source of supply to purchase requisitions created for SRM.
    Can you please suggest how to achieve this?
    Also I think, SRM is internally using BAPI u201CBAPI_REQUISITION_CREATEu201D from backend ECC system for creation of requisition. This BAPI has an importing parameter u2018AUTOMATIC_SOURCEu2019, and if we pass space to this parameter, it creates requisition without assigning source of supply.
    If this is correct, then can I use any BADI or customization in SRM to set the value of this parameter as space when SRM calls this BAPI?
    Thanks in Advance.
    Thanks and Regards,
    Sanjay

    SPRO--> SRM > SRM server> cross application basic settings --> Define objects in backend system (PR,RS,PO)
    waht is the settings you maintained for your product category / purchase group - external procurement .
    the above setting determines your follow on documents in the backend systems.
    as discuused in the thread are you using any BADI ?
    Unable to create PO in backend system for a text material in Shopping cart
    peter offers how to debug to ..in the above link.
    br
    muthu

Maybe you are looking for

  • Sales order items due for delivery,customer want to cancel order reming ite

    Hi, sales order raised for 50 items and delivered 40 items. customer does not  want 10 items. how we can canceled that reaming 10items. Regards, Raja [email protected]

  • Billing issue with repair order(RA)

    Dear Experts, I am getting the following two errors while processing a repair order type RA for product swap (no repairs),using 101 Accept repair stage in repair procedure for creating a credit memo (as per client's req). Is tehre a work around, plea

  • Color Profiled Screen and ACR or Lightroom (Vista)

    Hi, My screen is calibrated and works with an .icc profile. I have set up the proofing colors in Photoshop to be my .icc profile. I do not attach any profiles to my pictures when I edit them in Photoshop and so they look the same in Photoshop and in

  • Poblem in installing Oracle patch OPatch_10205_Generic_v0.zip

    Hi All, My OS is windows 2003, SAP ECC 6.0 and database is ORACLE 10g. I have downnloaded the recent patch from the link..>https://websmp102.sap-ag.de/oracle-download>Oracle 10.2.0.5>OPatch>from there I selected>OPatch_10205_Generic_v0.zip and mopatc

  • Component for search all type of transactions