Run MRP for production order/maintenance order has been release

Hi all,
please tell me how to configure for running mrp for production order/maintenance order has been release. as you know, i want production order has not release will not appear in MD04. I think that is the way for running mrp will not take care about this production order has not release
Thanks all

Hi Hoai,
It is impossible to exclude production order from net requirement calculation in MRP run. You may take a look at the online documentation under the PP-MRP area.
Material Requirements Planning (PP-MRP)
   Planning Process
     Net Requirements Calculation
       Net Requirements Calculation for MRP
But there is a way to temporarily exclude production order from MRP. That is you can set the 'delivery completed' indicator in 'Goods receipt' Tab in in production order. Please note that this order will not appear in MD04. Actually to some degree, this order could be considered as completed because ticking the indicator could set status 'DLV' for the order. But you still can execute confirmation, goods issue and goods receipt activities. This way is just a workaround. You may
consider it.
Or maybe you can consider the useage of BADI: MD_CHANGE_MRP_DATA to change the MRP run data to see if this could fulfill your requirement.
Regards,
Rachel

Similar Messages

  • Using MD50 to run MRP for Sale Order

    Dear all,
    I have some problem when using MD50 with Mill Product Industry.
    When SAP system not activate Mill Product yet. I used transaction code MD50 to run MRP for Sale Order, the system have generated planned order for multilevel. But when SAP system have activated Mill Product, I used transaction code MD50 to run MRP for Sale Order, the system only generate planned order for single level. I think that we have to configure something based on Mill Product Industry. So can you help me for this
    Thanks, Regards

    Hi,
    Check with following links which may help you resolve your issue :
    http://www.sap.com/sme/whysap/industries/millproducts/index.epx
    http://help.sap.com/saphelp_di471/helpdata/en/4e/1796374b088e5ce10000009b38f8cf/frameset.htm
    http://help.sap.com/content/documentation/industry/docu_is_mill.htm
    Regards,
    Tejas

  • Run time error while running BDC for production order creation and confirmation:

    Dear Gurus,
    We have a situation, where the users are trying to do the entries creation of order or confirmation (through manual and BDC). But, if there is any kind of a deficit quantities in consumption or GR quantity, then it is going to run time error and Dumps are coming in program SAPLCORB
    and the transaction code is coming for CO11N.
    How to avoid this error to run the production system in smoothing way...Any flash lights on this will be great full
    Regards,
    Madhu.G

    Hi Madhu,
    Expert Caetano has rightly point out. Refer Note 1840705 - RAISE_EXCEPTION short dump if running CO11N in background
    Cause
    The short dump is triggered because SAP transaction CO11N contains new GUI elements that cannot always be dealt with in a background process,
    such as the confirmation texts.
    Resolution
    SAP recommends that the standard production order BAPIs, such as BAPI_PRODORDCONF_CREATE_TT, should be used to post a confirmation in background.
    If this is not feasible, the following workaround may be uses:
    Define a confirmation profile in transaction OPK0; 
    In the detail areas, remove the area "Confirmation text"; 
    Set this profile as standard, so that it is chosen automatically by the system when a batch-job
    is started; 
    Assign this confirmation profile to the batch user with transaction SU3 using parameter CORUPROF.
    Also see Note 429432 - CO11N: Batch input in background dumps if long text is maintained
    Refer to note 1154692 - Endless loop during confirmation in background if you doing Auto GR during confirmations
    Thanks & Regards,
    Ramagiri

  • No planned order created when run MRP for Sale Order

    As I have told on the subject. My problem is system does not generate planned order for components in BOM
    Some more information is: requirement class in SO is 043
    I have choose "2" in tab MRP 4 for individual/collective and all component and finish product have MRP type is PD and Strategy is 20 - make to order
    Please help me to solve this
    Thanks

    Hi Hoai Vu,
    Please check in OPPQ plant parameters in SPRO weather you maintained for the plant conversions of planned order to production order.
    SPRO-> Production> material requirement planning> plant parameters--> carry out plant parameters or over all maintenance of plant parameters (OPPQ)
    Then check the for the material did you maintained the work scheduling view or not.
    I hope helps you any queries please revert me back.
    Regards,
    Madhu.G

  • Run MRP for process order's requirements only

    Dear Gurus,
    is it possible to run MRP only for opened process orders, created on basis of planned orders?
    The issue caused by very often production plan changes:
    Example:
    - during the working week quntity of one producing finished good can be frequently changed:
    either down or up.
    All these plan changes are shown in data of opened process orders (there is no other useful way)
    To make such changes in MD62 won't be correct (plan and fact have to be compared)
    At this moment system generates purch requsitions on the basis of all requirements (planned orders and process orders for finished good).
    Partition of planned and process requirements will allow us to make the most accurate procurement supply.
    Thanks a lot to all who will answer.
    Viktor.

    Hi,
    Check with following links which may help you resolve your issue :
    http://www.sap.com/sme/whysap/industries/millproducts/index.epx
    http://help.sap.com/saphelp_di471/helpdata/en/4e/1796374b088e5ce10000009b38f8cf/frameset.htm
    http://help.sap.com/content/documentation/industry/docu_is_mill.htm
    Regards,
    Tejas

  • License Transfer for Production Premium CS5 - form has been filled out, how do I upload and file a case?

    Hi guys,
    I would like to transfer my license to another person, we have both filled out the form but the helpline isn't working, the chat has been unavailable for the past 5 days so how do I upload it and file a case so the new owner can register the product in their name?
    Thank you

    this is the help available online, Transfer an Adobe product license
    if you've already followed those steps and need more help, you'll need to contact adobe support by clicking this link and then clicking 'still need help', https://helpx.adobe.com/contact.html

  • No maintenance plan has been confirmed for Order 000004024181; Follow-up ca

    Hi
    I try to close a list of preventive order (initiated by maintenance plan) from the transaction IW38 but the system displays the following error message
    "No maintenance plan has been confirmed for Order 000004024181; Follow-up call exists
    Message no. IW597"
    thank you for your help

    Hi,
    You mean close -
    >TECO???
    If yes Go in IW38 select all orders  ,click Enviroment Tab and you can do the TECO but that order should not have Open reservation.
    Regards,
    Rakesh
    Edited by: RAKESH ASHOK MANE on Aug 26, 2010 1:02 PM

  • Colective Settlement and "CLSD"Status for Production and Maintenance Orders

    Hi dear experts,
    Is that possible to use transaction KO8G for collective settlement of Production Orders? Apparently it only works for Maintenance Orders.
    The same applies for transaction CO99 for getting "Closed" status in Orders. Apparently it does not take the Production Orders, even if the selection "With CO Production Orders" is active. Is there any additional configuration we should do?!
    We would like to do settlement (and mass set "Close" status after) for Production and Maintenance Orders at the same time.
    Thanks in advance,
    Lígia Moreira

    Hi,
    You can use CO88 for settlement of production orders. Normally, CO99 should take production orders if the flag is switched. Do you receive any error when you do it?
    Regards,
    Eli

  • MRP Generated production orders greys out Sales Order and Customer fields

    Hi there,
    The MRP generated production orders greys out the Sales Order and Customer fields for some reasons. These fields are really important as they link the production order to the sales order and the customer's purchase order. Could the SAP team please fix this or advise alternative way of getting the sales order and customer info on production order? Thanks.

    Hello
    MRP only poulated this fields in case the material master has been set up with a strategy group hich is make to order (normally 20). Otherwise MRP summarizes all the requirements from different Customer orders and creates a production order
    Stephan

  • Running MRP for finised product material

    i have a material BOM (finished product material and it consist of some raw material) those materials have MRP
    when i run MRP for this BOM i want to generate PR for the raw materials and a production order for the finised product material
    Please i want all the steps for these senario

    Nehad,
    You need to create PIR(Demand) for the finshed product for the MRP to trigger Planned order for the Finished product and Dependent requirments/PR for the Raw materials.
    1. Use transaction MD61 to enter demand for the finished product with respect to the plant and requirement type "LSF" if it was strategy "10" or "BSF" for strategy "11". You can check the planning strategy used for the finished product using transaction "MM03" in the MRP3 view... if no strategy is assigned you can still use "LSF" requirement type.
    2. Now run MRP using "MD02", you should get planned order for the finished materail and PR for raw material. Please note the MRP type for both the materails should be "PD" you can check this in "MM03" - MRP1 view of the materails.
    Regards,
    Prasobh

  • Query for Alert on production order to be released

    Dear all users and experts,
    I need a query for getting an alert on production orders to be released (from planned status to release status) by whether reading the release date of production orders created from 'order recommendation window' or by reading the due date of production order and substract the lead time(days) of the item from its due date or by any means you know best.
    Thanks and best regards,
    Farhan Sufi

    Hi Gordon and Joseph,
    Thanks to both of you for giving me queries.
    Gordon, I made 3 production orders for testing from MRP order recommendation window from which 2 production orders has release date of today 9th July, 2010 (due date 12th July monday) and the 3rd one has release date of after weekend i.e. 12th July 2010 (due date is 13th July). release dates are calculated by MRP acording to the items' lead time and due date.
    Gordon, when I applied your query It gave me msg 'no data was found as a result of this selection criteria' Can you explain what your query will give me in result?
    where as Joseph, when I applied your query on alert, it gave me all 3 production orders as an alert to be released. I was expecting it will give me alert for 2 production order for today as their release date in MRP is today(9th July, 2010) and the alert for 3rd production order should come on 12th July and not today.
    what I understood your query is displaying all production orders which have status 'planned' regardless of their release date.is it?
    Joseph can you edit this query in such a way that It should consider the release date (calculated from due date and lead time in MRP order recommendation window) and display only those production orders which should be released today and exclude those which have release date in future. so that I can get alert for only those production orders which should be released today.
    I hope good response from both of you
    Thanks and best regards,
    Farhan

  • Report to check open reservations for production orders where GI not posted

    Hi experts,
    Can we get reservation details from any report/ table for production order where material has not been issued, report should also display the value of the reserved material.
    I could not find desired details in RESB (it has price but not value) and MB25.
    Thanks in advance, useful ansers will be rewarded.
    Thnx
    Anand

    Hello Anand,
    there is no report but you may use the production order info system with list "components" and create a layout contaning the issued quantity and/or the final issue indicator. With a correct sorting, the list should show all orders with non-issued components at the top.
    Regards, Andreas

  • IDOC/BAPI for Production order creation from Legacy system

    Hi all
    We are using an interface to create Production orders from legacy to SAP. Would you recommend an IDOC or a BAPI to create Production orders. If IDOC or BAPI then could you please mention which one?
    thanks a bunch

    Hi John,
    For your purposes, please use BAPI for production order creation from legacy system. There is no standard inbound IDoc available to use. SAP has an IDoc for outbound interface only (message type LOIPRO).
    If there is an inbound IDoc available, I would recommend to use an IDoc.
    IDoc technology has excellent error handling and will allow you to reprocess an error (if any).
    BAPI is also good approach to use and fast in term of  processing.
    For BAPI approach, you can use BAPI BAPI_PRODORD_CREATE.
    Hope this will help.
    Regards,
    Ferry Lianto

  • Different GL accunts during GR for PO and GR for production order

    Hi
    For posting GR for PO and GR for Production order we use movement 101 only then how we can define or e different GL accounts for both the transactions ?

    Hi,
    As per my undestanding
    If you want to hit different GL for same material type for e.g. GR for PO and GR for Production order.
    you can define split valuation, Suppose material A has two Split valuation External Procurement or Inhouse Production.
    Now For valuation type External Procurement assign valuation class 1000 and for Inhouse Production 2000.
    Now in GBB for valuation modifier BSX assign two separate GL
    Like
    GBB     BSX     1000           120000(External Procurement)
    GBB     BSX      2000           130000(Inhouse Production)
    Solution 2 :-
    Define other movement type for Production create and create a new event key and assign GL to that one.
    Hope HElp U !
    Regards,
    Pardeep Malik

  • Early Inspection for a Goods Receipt for production order

    Dear Experts,
    This  is with respect  Early Inspection for a Goods Receipt for inspction type 04.( 03 is also active in material master)
    We made partial confirmation  250 qty for production order using t code co11n ( total qty of production order is 1000).
    made the usage decision with an acceptance and posted all open stocks. to unrestricted.
    Now  in second partial confirmation prodn order  of 250 qty was made . This suppose to be rejected .  but sytem will add this 250 qty directly to unrestricted stock .  how to over come this .
    Regards
    Sandeep

    Don't make the UD until all stock has been receipted?
    You basically approved the batch.  So why wouldn't the system put the stock to unrestricted?
    Why would you make a UD when you still have stock to be posted anyway?  You can post stock without without making a UD so why not just post some if you need it, and wait on making the UD?
    Craig

Maybe you are looking for

  • Can't delete file from LR, requires password from finder Mac OS

    I have an older Powermac running OSX 10.5.8. I store all of my images under the same folder on the same external hard drive. For some reason, and this has never happened before, has always functioned normally before this, I don't know why, images can

  • Do tunnels retain historic or live data?

    Hi All, A rather strange bit of LabVIEW black magic as far as i can see.............. In the attached picture the bits of interest are highlighted with red circles. The VI is for streaming data from a Picoscope (see http://downloads.picotech.com/driv

  • Web Services Complex Data Type Query

    Newbie trying to understand how to work with Complex Data Type. Came across the following example in the Dev Guide What is wrong with Client Code? What am I missing? Please help Thanks Prashanth

  • Network Adapter Properties Advance tab (Roaming Aggressiveness)

    Hi All, we need to change wireless network adapter (Intel Chipset) properties - advance tab - Roaming Aggressiveness from the default 3 medium to 4 Medium high How do i do this using GPO? please help. Thanks.

  • Is there a way to Downgrade from 2.1 to 2.0.2???

    Is there a way to downgrade my 3G iphone to 2.0.2? I have stability issues with the 2.1, and I think 2.0.2 is much better... Please your help....