Running change on prod ord. numbers

Hi Experts,
Could any of you pls help me to set substitutionals for production orders?
I need to change number range on a prod order type, but as a running change: existing orders could not be closed u2013 long standing orders, duration more than 6 month, but newly created orders got the new numbers. The goal is to have better reporting in CO/FI u2013 as prod. order is the primary cost collecting object u2013 and through ord. number the prod. areas / field could easily be selected in CO / FI reports.
So, we are about to create a new order for the existing ones (number 1), with using new number range (number 2) and settle the new orders 2* to the old ones 1* one-by-one. But I want to make sure, that no further confirmation / material movements on the old orders 1will be done. In the system, I have already changed TECO-status (for different purpose), and cnf, GI, GR etc. is forbidden to this status, but CO-month end closing / variance calc, settlement etc are allowed. Thought I could not use TECO here, bec. of the WIP u2013 calculation u2013 the amount related to WIP could be seen for the old orders 1, and acc to standard setting the WIP is settled if status is TECO.
New user status u2013which will forbid the business statuses u2013 is not a help, bec. the orders1* have already created, released and so, therefore, the status profile could not be changed.
Could anyone support me with a useful solution / best practice to handle this situation?
Answers will be appreciated.

Use BADI:
WORKORDER_GOODSMVT to prevent any goods movement posting (take a look at MB_DOCUMENT_BADI as well if it helps) and
WORKORDER_CONFIRM to prevent any confirmations.
Select the relevant method in the above BADI's to prevent any postings to your 1 series order as per your logic. This should give you control on the cost postings.

Similar Messages

  • Payroll has not been run successfully for all personnel numbers Message no.

    please all , i got this error while doing exit to payroll , although this employee has left one year ago , i m fear of doing the changes from pu03 as stated by SAP , doing that will make  personnel numbers processed with this transaction will have an undefined payroll status.
    error:
    Payroll has not been run successfully for all personnel numbers
    Message no. PG508
    please help

    HI,
    Generally, this type of error is occured when all the ee were not sucessfully execute, to clear the same, please follow the below:
    Exeucte the program RPUTRBK0 and assign payroll are and execute payroll correction.
    After doing this, you may able to delete and create new control record.
    Regards,

  • I have file with 500 pages created from AutoCad file. In all pages, I have different document numbers.The file is not editable in pdf. How to change all the document numbers using "Comment" feature? Any alternate method?  alternate method? I have Adobe Ac

    I have pdf file with 500 pages created from AutoCad file. In all pages, I have different document numbers.The file is not editable in pdf. How to change all the document numbers using "Comment" feature? Any alternate method?  alternate method? I have Adobe Acrobat X Pro and Windows -7 platform.

    Yes, I just want to cover up all the pages for those particular area of document numbers.
    Nothing sensitive about it. I just want to show the correct document numbers on all pages in print out.
    So, I wanted to cover up by comments, but commenting on each page will be difficult. So, I wanted to comment the same on all pages.

  • How can I rearrange the pages in a PDF without changing the assigned paged numbers.

    How can I rearrange the pages in a PDF without changing the assigned paged numbers? These correspond to the original document folio numbers.

    In theory it would be possible to 'record and play back' the page numbers using a folder-level script, but it's far from trivial. You would have to use the doc.movePage() function - presumably driven by a dialog box - to do the page shuffling so there was a way to track what was being done, then swap the page 'labels' of the two affected pages. That's where it gets messy.
    We have functions in the JSAPI which can read and write the page label, but they don't do things in a logical way. The 'getPageLabel()' function simply returns a string, but the 'setPageLabel()' method expects to be told the numbering scheme, prefix, etc. You'd have to parse the string and work out what scheme it was implementing.

  • Sale order - mtrl - prod ord ; table link

    hi,
    pl tell me a link through table and field -
    how to get a link between sale ord - item no. - mtrl - prodn ord no. - prodn posted qty.
    regards

    I have an understanding that you are in need of the tables for mat.no,prod.ord.and sales order to make a report to make them all appear in the report...
    If that is so,there is no need for tables..YOu can get that in standard SAP..
    Go to COOIS..enter the plant and execute.. In the resulting screen, go to chane layout. There u can add the sales order in the layout...material and production order will be there by default...
    Thus you can have the material,production order and the corresponding sales order in a single transaction...
    hope this clarifies...
    karthick

  • How to change format of phone numbers in PowerShell?

    We need to append the area code and hyphen in front of the office phone number field in their domain user account for all our users that have office phones now that we are changing from 7 digit numbers to 10 digit numbers.
    I found a script that finds and edits phone numbers, but the author chose a different way to format the numbers.
    This is the part of the script I need to change:
    # Format number as xxx xx xx xxx.
            $Phone = '{0}
    {1} {2} {3}' -f$Phone.Substring(0,3),$Phone.Substring(3,2),$Phone.Substring(5,2),$Phone.Substring(7,3)
    I'm trying to figure out how to edit that so that it formats it as xxx-xxx-xxxx
    (3 digit area code, hyphen, 3 digit prefix, hyphen, four digit number) instead of xxx xx xx xxx.
    Can someone show how to rewrite this section?

    The modified script:
    # This format number as xxx-xxx-xxxx.
    $Phone = '{0}-{1}-{2}' -f $Phone.Substring(0,3),$Phone.Substring(3,3),$Phone.Substring(6,4)
    Hope this helps.
    Regards,
    thennet
    Please take a moment to "Vote as Helpful" and/or "Mark as Answer", where applicable. This helps the community, keeps the forums tidy, and recognises useful contributions. Thank you!

  • Photos recently changed from sequential numbering to date/timestamp.  When I import into apps for editing they are out of order.  What can be done to change back to sequential numbering instead of date/timestamp?

    Photos recently changed from sequential numbering to date/timestamp.  When I import into apps for editing they are out of order.  What can be done to change back to sequential numbering instead of date/timestamp?

    The date information is taken from the camera which writes it to the file. This needs to be set to the correct date and time in the camera itself.
    The order the images are shown in the Library mode is set by clicking on the sort button in the tool bar, which if not showing can be activated from view, tool bar. There are different sort orders that can be applied including sorting by file name. You can also sort by dragging the images to the order you wish them to appear in by selecting user order.

  • Running Change Manager Connected to an Oracle Management Server

    hi
    how can i run Change Manager with connect to an Oracle Management Server ?
    my change manager (oracle client 10g ) is on windows xp and my OMS (installed by OEM Grid control 10g ) is on Linux (CentOS) .
    (i can run that , by connecting to standalone )

    Hi,
    >>(i can run that , by connecting to standalone )
    So, are you able to create a service in your TNSNAMES.ORA file where your Oracle Client 10g is installed and connect directly to database, right ?
    Cheers
    Legatti

  • Why doesn't mail merge in Pages reflect changes made to the numbers source document?

    When using mail merge in a Pages envelope document, changes made to its Numbers address source document are not reflected.  I have to create a whole new Pages envelope document and choose the Numbers address source document merge fields all over again.
    I never had any trouble doing this with Word and Exell!  
    What am I doing wrong?

    Denney,
    Mail Merge from Numbers works just as you are trying to use it.
    You create a Numbers document with the proper layout for merging.
    Enter the data in teh numbers document and Save it.
    You create a Pages Document to merge into and create the links to the Numbers document.
    You Edit > Mail Merge in Pages.
    To merge again from the Numbers document, make the necessary edits, Save the Numbers document and do the mail merge again in the Pages document that you created for that purpose. The only problem that normally arises is that we forget to Save the Numbers document after editing.
    Jerry

  • Do I need to run "Change run" if I have no aggregates in the cubes

    Hello
    Do I need to run "Change run" if I have no aggregates in the cubes?
    If yes, why?
    thanks

    Hi there,
    As said the change run will activate the modified records from a master data of a characteristic.
    If this characteristic is used in any aggregate then the change run will also rearrange the aggregates.
    Diogo.

  • Capacity Evaluation: CM01 does not consider partially confirmed Prod Ord

    Dear Gurus,
    I was doing a test for CM01 and I found out that the Production Order with partial confirmation/delivery is still being considered as a full quantity in CM01 pegged requirements. For example is below:
    Prod Ord Qty is: 1500
    Partial Confirmation made: 500
    Now in CM01 it still shows 1500, I thought it should only be 1000. Reason is this order is backlog from last week thus I only want the system to consider the 1000 open quantity and not the whole 1500. Is it achievable in CM01?
    Thanks,
    Raymond

    Hi,
    but this Production Order is still open with 1000 PC. I will still need to process the 1000 remaining quantity out of 1500 and in CM01 I would like it to show on 1000 PC instead of 1500 PC.
    Another thing is for example, Im on the middle of the week, my available capacity is reduced and I also have already partially confirmed the production order. Then when I execute CM01, it will show capacity overload eventhough the open quantity is also decreased.
    So my concern is instead of Production Order Base Quantity, can the system check the production Order Open Quantity?
    Thanks,
    Raymond

  • Sales Ord assignment on Prod Ord component

    Experts,
    I have a situation, where in a previously created MTO Sales Order had its receipts deleted & now I want to create a manual production order with the Sales Order assignment (CO08). When I add a component & try to make it Sales Ord assigned, it works fine as long as the component's material master carries a 1 or a blank indicator on the MRP 4 Ind/Coll field. If its collective, system does not accept the SO entry on the Prodn Ord.
    However, when I try to create a Prod Ord (CO01), no matter what, the system does not allow me to enter a Sales Order on any component. Is it possible to influence this behavior some way?
    Thanks

    Andy,
    ??  What behavior do you seek? 
    CO01 creates a production order without reference to a sales order.  It would make no sense to assign components to a sales order, and this is not supported.This behavior cannot be altered in standard SAP.  Sales orders are irrelevant.
    CO08 creates a production order with reference to a sales order.  Components' assignment is dependent on the settings in the Material Master of the component.  This behavior cannot be altered in standard.SAP. 
    What behavior do your seek?
    Best regards,
    DB49

  • Change the extension of .numbers to .pdf

    Hi. I have a problem. I want to change the extension of .numbers to .pdf 

    Hi maya,
    I think you want to export a numbers file as a pdf.
    Menu>File>Export To>PDF
    Should give you what you want.
    quinn

  • What is the difference between a Prod Ord (Created) and Prod Ord (Released)

    Hi
    Please can someone advise the significant differences between a Prod Ord (Created) and
    Prod Ord (Released)
    And what are the effects/relations of each of them to Dependant demand in APO SNP for a products BOM components.
    I currently have a product where the Ord Res for the BOM component only appears against Dependant demand key figure in APO SNP when the Prod Ord is Released
    Thanx
    Keegan

    In addition to what Senthil has mentioned
    The ATP Category on the order element at
    Header product                                            Component product Requirement Element
    Production Order (Created)                           Dependent Demand (AY)
    Production Order (Released)                         Order Reservation  (AU or AV)
    Check the category group assignment for Dependent Demand keyfigure in your SNP Planning Area.
    The Dependent Demand keyfigure 9ADMDSE for 9AMALO aggregate will have Category Group assignment DS1 as standard. DS1 has AU, AV, AY and EL Categories details of which are below
    ATP Cat                                     Catergory Description               Category Type
    AU     OrdRes     Order reservation not withdrawable     Requirements     
    AV     OrdRes (W)     Order reservation withdrawable     Requirements     
    AW     OrdRes     Order reservation not withdrawable     Receipts     
    AX     OrdRes (W)     Order reservation withdrawable     Receipts          
    AY     DepDmd     Dependent demand                                     Requirements     
    AZ     DepDmd     Dependent demand                                     Receipts
    So if you have some other Category Group assignment which does not have AY in it. So unless the Production Order is Released you do not see the component requirement in Dependent Demand keyfigure in Interactive SNP.
    Hope this helps.
    somnath

  • Stocks Of Prod Ord material no showing !!!

    HI Gurus ,
    When i m confirming prod ord in CO11n , there 's no stock showing in MD04 screen for the ordered material...
    Thanks in advance

    Hi Kumar,
    (ordered material is direct prod item)
    Are you working with collective orders? If yes then please check the item would have been issued to the parent order.
    Also go through the MB51 report for the material, it will give you the details.
    Hope the above helps.
    Regards,
    Vivek

Maybe you are looking for

  • How to identifyt he strock color in pdf

    cs11 cs 1 scn given in pdf document i can't able to find strock color so please help me to find it. cs11 contains color space dictionary and how i find color from it using scn value

  • P.O.item currency

    Dear sir, can i put different currency for 3 items in 1 PO. Hopeeeeeee.

  • Logs flooded with CGSResolveShmemReference when going from 10.5.7 to 10.5.8

    Could someone please explain to me what changed with respect to "CGSResolvShmemReference" between 10.5.7 and 10.5.8. I just upgraded to 10.5.8 earlier today and applied the latest security patch and I'm getting these messages in my logs: CGSResolveSh

  • I'm getting "invalid server response" when I try to spider a site

    I want to spider a partial website (to get documentation) but I am getting the error "invalid server response" when I start. The site is perfectly viewable with Firefox, Safari and on my iPad. Here is the section of the site I wanted to convert to PD

  • MRP Views Settings

    Dear Friends To run Forecast based MRp for a Finished product i need the Following Settings 1) MRP views settings for Finished product and their BOM raw materials 2) where have to enter the Forecast values 3)How to Run MRP- basic settings what are pr