Running MPS also runs MRP type PD materials

Hello experts,
In ECC 6.0, we have certain critical FINI materials to run with MPS ( ie type M0) while there are other FINI materials ( non critical) to run on MRP ( ie type PD).
The issue we are finding is that ECC running MPS even for other MRP driven FINI materials in Tcode : MD40 ( with the Process MRP materials field checked). What we actually need is that MPS run for only those FINI materials that have MPS (ie type M0) & it's direct subassemblies of those materials which are MRP type PD.
We do not want the MPS run to drive MRP for other FINI materials that have MRP type PD.
I have checked SAP notes and they had similar issue & hence have a resolution note for earlier versions of SAP ( 3.0 to 4.6 versions). So this issue seems to be occouring again in ECC.
Has anyone else come across this issue in ECC 6.0? If yes how it was resolved.
Appreciate your feedback.
Thanks,
Ram

Hi Ram,
Just to understand the query better, can you let me know why you dont want the MPS run to drive the MRP run for other finished parts which are marked for MRP run? Is it that these parts are not to be planned?
Regards,
Vivek
Added
Also which SAP notes did you refer to?
Edited by: Vivek on Mar 18, 2009 11:26 AM

Similar Messages

  • I have windows 8 with adobe flash running, it also runs in facebook except in games.

    I have windows 8 with adobe flash installed and running, it also runs in facebook except in games.It shows me a blank screen with adobe flash download box in the upper left hand corner. but when i click it, no down load begins.

    Windows 8 comes with Flash Player built in (for Internet Explorer). If you run WIndows Update, it should update your Flash Player Plugin for IE.
    If you've "broken free of Microsoft's chains" and use another browser (like Firefox or Chrome), download the Adobe Flash Player installer directly by clicking the following link.
    Flash Player Plug-in (All other browsers)

  • Creation of SDEB's for MRP type = VB materials.

    Hi Gurus,
    When we run plant wise MRP, SDEB's are created instead of Purchase requisitions for all Manual re-order point materials. We understand that SDEB's are created when the stock of tha material is above tha Re-order point, and this SDEB's indicate tha MRP controller whether he can create manually Purchase requisitions or not.
    But, we are getting these SDEB's for the materials that have stock below the Re-order point as well. Which is not correct i think.?
    For your information, when we run material wise MRP there are no SDEB's at all.
    Please explain what might be the Root cause and the solution to over come this..
    Thanks for your understanding..
    Naveen.A

    Dear colleague,
    without checking the issue it is difficult to know if there is an error.
    Please check if the following information can explain the behaviour of your system:
    A)When you do MD01 or MDBT the creaton indicators defines in the
    customising are used . whereas when you run MD02 or MD03 the creation
    indicator on the individual screen is used.
    Single-item planning and total planning follow a different logic
    concernng the creation indicators.This is also described in the
    documentation for Master Planning/Materials Planning (Chapter 4, Section
    2) and in the Implementation Guide.
    Single-item planning:
            The entered creation indicators are generally valid.
    Total planning:
           The entered creation indicators are used as default values.
           For materials from an MRP group, the values from the MRP group
           apply (if available).
           The creation indicator for delivery schedules can additionally be
           specified per plant. This is used if nothing was specified via
           the MRP group.
           Thus, the priority is as follows:
          1.  MRP group
          2.  Plant
          3.  Initial screen
    B)In MD02 system can de multilevel (For components of a header Materia)
    or/and Multiplant (Stock Transfre ) planning. In such cases for all the
    materials involved the creation indicator used in the screen is used.
    C)The creation indicator makes sense only for materials having
    procurement type external procurement (F) in material master. For the
    materilas which are produced in house (Procurement type E) system will
    always create planned orders.
        And Materials having procurement type X(Both procurement types ) is
    treated as Inhouse produced material by planning . Thus for such
    materials system will always create a planned order. Now this planned
    order can be converted into a production orer or into a purchase
    order(via purchase Requisition).
        When you run MRP with "Create Purchase Requisition " in the opening
    period , then the syetm uses in the opening period defined via  the
    scheduling margin Key. In material master , MRP 2 View we maintain
    scheduling margin key. And in Transaction OPP1->Planning->Scheduling and
    Capacity Parameters ->Define floats we maintain the opening periods per
    plant. I am attaching details of Opening period :
       opening period: Opening period is the time which the MRP controller
    needs to analyse.Thus he has this buffer with him to rectify any issues
    before converting the planned order into purchase requisition.
    The opening period is only used in backward scheduling.
    Suppose There is a requirement for a material on date =RD1
    Let the Goods receipt processing  time  is= T1
    Let the planned delivery time =L1
    Let the purchasing Processing time = X1
    Let the opening period for this material is P1
    Time line  for external procurement:
            Planned Del   Pur proc         GR Process
              Time            Time          Time
    ___|__________|_________|___________|___
                  L1            X1         T1
       SD                                         RD1
    Now accoring to Basic scheduling:
       Receipt/Requirements Date(RD1)
       Release/Start Date(SD) = RD1-T1-L1-X1
    Now let me explain to you when the planned order an purchase
    Requisitions are created:
    Let us say the date on which you do MRP be MR1
    OD = Opening Date
    From above diagram :
                                     Opening Per
                                     In Sch Mar Key
    __________________|______________|
      XX                          OD                 SD
                                                  Release/Start Date
    If your MRP date(generally Today) is lying between XX and OD (and
    excludind OD)then
    MRP creates planned order and if it lies between (and indclind OD)
    OD and SD then we create purchase req.
    when your MRP date comes between the period OD and SD then you do not
    have time left to analyse and therefore instead of you in such cases
    forgetting and delaying system automatically creates purchase req.
          In general if , if your order start date or release date is after
    the opening period from today then MRP will create planned order.
    Oterwise it creates Purchase req.
    Check also if you have the note 1063969 applied in your system.
    I hope it solves the issue. Otheriwse I think you should open an OSS message with connection to your system,
    best regards,
    maria

  • Best MRP type and strategy to run MRP for component using PIR and forecast

    Hi Experts,
      I want to run MRP for Component parts. I need to run MRP based on Planned independent requirements and Forecast Data.
    Which is the best suited MRP type and strategy.
    Please help to share bestpractices if any. thank you.
    Rayudu

    Hi,
    is the components you are talking are Semi finished materials or Raw materials and Packing materials which are procured from vendors ???....
    It is not a good idea to maintain planning strategy for Components which are part of BOM...these materials are automatically planned when the header materials of these components are planned....
    If these components are not part of any BOM then you can try the option of using forecast based planning.. MRP type  VV and maintain the forecasting view in the material master
    You can also explore the option of consumption based planning like manual or automatic reorder point planning...
    Thanks
    Kumar

  • Delivery Schedules not created after MRP Run for MRP Type PD

    HI All,
    I have created Schduling Agreement, maintained Source List with MRP Relevant - 2 option and maintained Vendor as Fix, maintained info record.
    I have created a material with MRP type as PD and lot size as EX, and strategy group as MTS. Now when i enter requirement through MD61 and do MRP Run through MD02, system is generating PR instead of Del Schdule line inspite of schduling agreement.
    But If i change MRP type to VB and maintain reorder point and maintain min lot size, then system generates Del Schdule lines for the same material.
    What could be the reason. I want delivery schedules based on MRP Type PD.
    Where I am wrong in MRP Views or in any cutomization. It seems that purchasing part is fine since it creats scudles line so no problem in SA or in Source List.
    Please help
    Regards,
    Vikas

    Hi Vikas,
    Go through this link you will able to customize correctly
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/3b/66596eda7b11d1b6330000e8a738dc/frameset.htm
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d2da044af11d182b40000e829fbfe/frameset.htm
    Cheers
    Kris

  • MRP Type V1 does not consider Ext. req. Sales Order after MRP run

    Hi Buddies
    My client wants to use MRP Type V1 which should consider re-order point as well as external requirement (i.e. Sales Order) for net requirement calculation.However when i tried using V1 in material master and ran MD03 it only considered re-order point  and ignored Sales Order.Sales Order didnt even reflect in MD04.Moreover in OMDQ for V1 under additional ext req there is no Sales Order for selection.
    Please reply how i can have ext req sales order for MRP Type V1.
    Regards,
    Sachin Narvekar

    Hi
    MRP Type V1 creats the requirement when the need exceeds the Reorder Point, where as the MRP type VB creats the requirement when the stock qty goes below the reorder point.
    Regards

  • MRP FOR CBP MATERIALS- MRP TYPE 'VB', IN MD01

    Dear PP Gurus,
    My client wants to run MRP for consumption based planning materials (MRP type: VB), for there individual plants. For this I have suggested MD01 for planning in the perticuler plant by using the user exit available in the screen. But then also, after MRP run system is plannig all the materials which have MRP type PD as well as VB.
    The user exit parameters are
    User Exit Key: 002 (Consider MRP Controller for CBP)
    User Exit Parameters : CBP
    "CBP" is my MRP controller for materials which have MRP type 'VB'.
    Pl suggest me what & where is the problem?
    Thanks,
    Regards,
    Sachin Patil.

    Dear,
    It is possible through
    User Exit: M61X000.
    You need to maintain MRP group assign it to the VB type material then go ahead.
    For details please refer this thread,
    Re: mass MRP run
    Regards,
    R.Brahmankar

  • Firefox stops responding frequently and always runs slow, also wants to resend info a lot?

    I will be using Firefox fine one minute and then the next it will stop responding, it doesn't close down or anything, it just stops responding... nothing will work.
    Also, I've noticed a lot of the time Firefox will run extremely slow. I thought that maybe it was the website I was using or a program my computer was running, or even the settings in Firefox, but it was none of them... It just runs really slow.
    Frequently I get a window pop up that says that the script stopped working or that it needs to resend the information or something like that, it's very frustrating.
    I've had to start using Safari again because unlike Firefox, Safari works... Does anyone know how to fix these problems because I do prefer Firefox?
    Also I'm running Windows 7 on a Toshiba Laptop...

    Try to create a new profile. To create a new profile,
    1. Make sure Firefox is not running.
    2. Press Windows key+R to open Run command.
    3. Type '''firefox -p''' and hit enter.
    4. Firefox Profile Manager will open. Click New Profile.
    If the new profile works fine, import history and bookmarks from the old profile and delete the old profile.
    If the new profile doesn't work, get yourself a speed boost with Firefox 4 Beta.

  • Viewing the mrp run output based on mrp groups

    Hi, please advise how to view the mrp run result based on mrp groups? also advise how to run mrp on the basis of mrp groups?
    thanks.

    Hi,
    Can you use MRP Controller instead MRP Group. Because you have option to view MRP result by MRP Controller in MD05.
    And you can execute MRP based on MRP Contoller by using user exit M61X0001 in MD01.
    Regards,
    Vishal

  • HELP: SimplePass that apart from open web pages, can also run applications

    Operating System: Windows 7
    Good, to buy my laptop HP Pavilion m6, I came a version of SimplePass in which could add web pages, passwords and also run applications (such as games), but then I gave for updates thinking that a next version would contain improvements; but the version that was installed no longer gave the option of running applications.
    Since then and I tried to find the version I had in the beginning, but without results.
    If you know SimplePass versions running programs, or if you know a better version leave the download links, please put them in the answers.
    In advance we thank you comment.
    I used the google translator, sorry if you do not understand the text.

    Hi @Marco0o 
    Welcome to the HP Support Community. I see that you are looking for the original version of your HP SimplePass software. I will be happy to help you with that but I need to know your product number, please.
    Please click “Accept as Solution ” if you feel my post solved your issue.
    Click the “Kudos Thumbs Up" on the right to say “Thanks” for helping!
    Thank you,
    BHK6
    I work on behalf of HP

  • I have a mac book pro with Boot Camp that also runs windows.  I upgraded to Lion and somehow it crashes the mac side peridoically.  I am told I need to "clean" it and reinstall lion using the recovery drive.  will that delete the windows partition too??

    I have a mac book pro with Boot Camp that also runs windows.  I upgraded to Lion and now the mac side crashes/freezes periodically, especially iphoto.  I am told by the genius' that I probably need to "clean" it and reinstall lion using the "recovery drive" which resets everything back to default and reinstalls the lion operating system.  My question is will this also delete the "windows" partition drive and all that data too.  If so that will be a huge pain in the ___ to back up and reinstall boot camp and windows. I want to shoot the lion.

    There is no system like Acronis for the Mac platform. You can try using the buiilt in Disk Utility to create an Image of the complete Mac drive but I have found that this does not work very well as on tryiing to restore it gives errors sometimes.
    You can use SuperDuper or Carbon Copy Cloner to create a bootable Clone of your system partition. But that is only for the System partition and not the complete drive.
    If you use Boot Camp to install Windows on your Mac neither of those two programs will clone the Windows side.
    Neither will Disk utility as Mac's can not create or write to a NTFS partition. So some other program is need for that.

  • I have a new PC with Win 7 Pro and trying to xfer my libraries from my previous PC also running Win 7 Pro. How do I accomplish that?

    I have a new PC running Win 7 Pro 64 bit.  I want to xfer all of my iTune libraries from previous PC also running
    Win 7 Pro 64 bit to my new PC.  Thus far have been successful in doing so.  Any suggestions on how I should
    accomplish this?

    Yes.
    tomfromlong beech wrote:
    "Remember one one level of subfolders is allowed."  Does this mean that you can have as many subfolders as you want, but they can only be one level deep under the main folder?

  • CreativeCloud application won't open after migrating to new Mac (also running Mavericks)

    I had CreativeCloud installed and working on my Mac running OS X Mavericks. Then I migrated to a new Mac, also running OS X Mavericks. My CreativeCloud 2014 applications all work properly. My problem is with the CreativeCloud application itself -- the little cloud icon that appear in my Mac's menu bar. When I double click the CreativeCloud application icon on my Dock,  I see the Cloud icon briefly appear in the menu bar and then it disappears after a second or two. I went to the Utilities folder and I used the uninstaller to remove the CreativeCloud application from my Mac. I then downloaded the application installer and reinstalled it on my Mac. The exact same problem persists. This problem occurs in two different OS X user accounts on my Mac. How can I fix this problem?

    Thannon88 please try utilizing the steps listed in Error "Failed to Install" Creative Cloud Desktop application - http://helpx.adobe.com/creative-cloud/kb/failed-install-creative-cloud-desktop.html to reinstall the Creative Cloud Desktop application.
    If you continue to face difficulties then I would recommend starting the migration process over again.  This time please only transfer your documents and settings.  This will allow you a clean system to reinstall your applications.

  • Will the iPhone 5 also run on 3g or will it only be 4g LTE?

    i don't want to get it if it can't also run on 3g because where i live i can't really get 4G LTE

    iPhone 5 order cancelled
    The maps are a show stopper for me
    Nick

  • How to know what reports are running by looking at SSReproting Services to see what reports are running and also any clue of which application is using the reporting services?

    How to know what reports are running by looking at SSReproting Services to see what reports are running and also any clue of which application is using the reporting services?

    To see what reports are running, take a look at the execution log views that are available in the database.  Which views that are available are dependent on your version of SSRS.
    http://technet.microsoft.com/en-us/library/ms159110.aspx
    To see which application is using SSRS is a little more difficult.  You can turn HTTP logging on, which will give you an idea of where connections are coming from, so you can see IP addresses.  You can also look at the execution log view to see
    user accounts.  So, depending on your environment and use of service accounts, this could be easy, or difficult.
    http://technet.microsoft.com/en-us/library/bb630443.aspx
    If all else fails you can look for clues in the SSRS logs.  Good luck...

Maybe you are looking for

  • Magsafe or battery issue? MBP 17"

    Hi Guys, My macbook has been in sleep mode for a couple of days off charge. i went to use it the other day and it was completey dead. There were no indicator lights on the battery not even 1 flashing to show battery drained, I left it charging over n

  • New to JSP-How to run a .jsp file

    I Have just begin to learn JSP. I downloaded the JSP developer kit from java.sun.com. However I dont know how to proceed. I have seen references to'the container'. what is it and how do I start it? and the same for the server which I have in the form

  • Product Variation Select Box Issue

    HI all! I'm having an issue with the production variations that I have out of stock and they're still showing in the select dropdown menu. I have tried to get support on this but they're telling me that it's something to do with my template. I haven'

  • Oracle Report Manager issue

    404 Not Found Resource /OA_HTML/oracle.apps.bne.webui.BneApplicationService-----displays this error when clicking any sub menu under Report Manager Responsibility

  • SAP BPC Updating Dimension and Elements whilst users are logged in?

    Hi, In SAP BPC (the Outlooksoft technology), can dimensions hierachies be updated and elements be added without users having to log out? Thanks in advance. Kaveenga