Running MRP in projects

can anybody help me in knowing the configurations and the transactions to run MRP in projects using md51?

please refer this post.
Re: MRP role in PS
also check this help materail
http://help.sap.com/erp2005_ehp_04/helpdata/EN/4c/227a5d46e611d189470000e829fbbd/frameset.htm
Regards
Nitin
Edited by: Nitin  Patoliya on Dec 26, 2008 4:17 PM

Similar Messages

  • Grouping, Pegging and Distribution (GPD) when run MRP for PS

    Dear all,
    As you know, MRP is a core of Planning Process. So when you run MRP for PS, SAP can't check stock in general stock and project stock at the same time. Now, my client have accept to run MRP base on project stock. But there are some problem when they give me requirement and actually situation in their company. One of them as below:
    They have 3 WBS element (WBS 1, WBS 2, WBS 3) and they use the same material A. Their requirement is they want to run MRP to plan material for 3 WBS.
    Solution 1: use MD51 and run MRP for Project definition and each of WBS element have respective project stock, the system will generate some of planned order for each oder reservation. After that, I will convert all of planned order to PR => PO => Good Receipt for each WBS element. When run MD04, I can see the stock for each project stock for respective WBS element.
    Ok, I will talk about the limited of this solution. I suppose after complete technical for all of order reservation in WBS 1 and in project stock of WBS 1 have 3 material A not be use. But in WBS 2 is missing 3 material A. So when I run MRP again for WBS 2 by tcode MD51, the system will generate new planned order for this missing material A. This is not logic because I have enough material A for reservation in WBS 1. So I suggest my client that you should transfer material A from WBS 2 to WBS 1, they agree with me if they don't have many WBS element. But they have about 300 WBS element and they can't do transfer posting between many many WBS element. This solution 1 is not be accept.
    Solution 2: I use GPD for this requirement. Firstly I will group WBS 1, WBS 2 and WBS 3 into WBS group. So use tcode MD04, I can see only WBS group and all of order reservation in each WBS 1, 2, 3 be showed on MD04 table. When I run MRP, the system will generate planned order for them. After that, I will conver all to PR => PO => Good receipt to WBS group. And in MD04 table, I can see project stock for WBS group. I begin transfer material from WBS group to each WBS 1, 2, 3. When all of order reservation in WBS 1 is technical complete, the material in WBS 1 have 3 material A not be use. And in WBS 2, I have a new order reservation and it be assigned 4 material A. At this time, project stock on WBS group is 0 but in WBS 1 is 3. But when I run MRP by tcode MD51, the system generate planned order with amount is 4. I wonder that why SAP does not check all material on all WBS element in WBS group to suggest a planned order with amount is 1. If SAP can solve this problem, my client will be accept this solution.
    Hoping you support me.
    Thanks, Regards
    Hoai Vu

    Hi Ahmed Rifaee
    Thanks for your reply, I will talk about process in SAP.
    So, I have 2 WBS element, that's simple because my project is have about 200 WBS element.
    WBS1 have 2 order reservation for each actvity and material A0001 be use in 2 order reservation.
    Order Reservation 1 needs 3  A0001
    Order Reservation 2 needs 5  A0001
    WBS2 have 1 order reservation for each activity and material A0001 be use in it
    Order Reservation 3 needs 4  A0001
    1.)     If I don't group 2 WBS1 and WBS2 to one WBS group, SAP will have 2 project stock for each WBS. and when I run MRP, WBS1 and WBS2 run independent base on current project stock at each WBS. So, although project stock WBS1 is run out of A0001 while A0001 still exist A0001 in project stock WBS2, SAP still generat planned order for missing part A0001 in project stock WBS1.
    2.)     If I use GPD by group WBS1 and WBS2, I can solve this problem easy because they will use only one project stock for WBS group. Ok, after I good receipt A0001 into project stock, I'm sure that I have enough A0001 for 2 WBS1 and WBS2. But I can trace which reservation be ordered to delivery to them exactly. I try to use tcode MD09 to trace from Purchase order to Order reservation but I have just to trace in case PO have not been good receipted. I wonder that Pegging can help me in this case (PO have been good receipted).
    Can you give me any idea for these problem
    Thanks, Regards
    Hoai Vu

  • MRP for Project MD51

    Hi all,
    I have a problem that is showed below:
    Our general stock is 100 for material ABC (procurement type is F: external procurement).
    We have 3 project stock for 3 WBS element. They are
            - Project stock 1: 0
              OrdRes: 50
            - Project stock 2: 0
              OrdRes: 30
            - Project stock 3: 0
              OrdRes: 60
    Total requiment for 3 WBS element is 140.
    When I run MRP for PS by tcode MD51, the system generate 3 PR for material ABC particular for each of OrdRes.
    1. I think that the system will generate 3 transfer posting for each of OrdRes, doesn't is? That is the first system.
    2. The system will generate one PR (quantity 40) to cover 3 OrdRes based on current stock (quantity 100), doesn't is? That is the second question.
    3. Are there any distribution key to distribute auto from general stock to project stock? And when I run MRP by MD51, the system will generate PR with quantity exactly for each OrdRes, doesn't is?
    Thanks all
    Regards,
    Hoai Vu

    Hi Mario
    I have checked by assign "2" in field individual/collect on tab MRP4. When I have assigned this material to activity in project and release. in MD04, I can't see Order Reservation be assigned in project stock. So, when I run MD51 for project, the system does not generate planned order for this material while I want run MRP for WBS element
    Besides, if field individual/collect on tab MRP4 not be assigned "2", the order reservation will be appear follow project stock in MD04. And when I run MD51, the system will not check stock in general stock.
    I wonder why SAP does not support for me to run MRP for each WBS element and generate planned order base on check general stock and project stock at the same time?
    Can you aupport me to solve this case
    Thanks and regards
    Hoai Vu

  • What are the dependent master data for running MRP

    Hi Experts,
                      My client wants to Run MRP After 8 Months of implementation. Now i want to know
    1) What are the Master Data need to be check. They are Using the Strategy 20.
    2) They have confirmed sales order for few customers. Forecast sales orders for few customers.How to map it in sap.
    3) Where will i get Gross Requirement in SAP. Because  MRP run will generates the net requirements.
    4) Is there any report in SAP displays the Forecast values for the selected material.
    Please help me on the above points.
    Thanks
    Satheesh

    HI Vishwa Upadhyay,
                                     Thank you Once again,
    The first point is cleared. Can you please suggest me on the 2,3& 4 points please. What are the configuration settings needed for the different sales order type( i.e.. confirmed and forecast)
    Thanks
    Satheesh.N

  • Material in two plants, I run MRP with the BOM is not found in prod plant

    Hi all,
    I have plant 1020 material 12345
    Plant 1020 is the production plant for material 12345
    The material 12345 exists in plant 1070.
    The material 12345 in plant 1070 has no MRP.
    Plant 1020 material 12345 config in MM03
    MRP1 --> MRP Type = PD
    MRP1 --> MRP Controller = G03
    MRP3 --> Planning material = PLAN_1020_GR03
    MRP3 --> Planning plant = 1020
    Plant 1070 material 12345 config in MM03
    MRP1 --> MRP Type = P3
    MRP1 --> MRP Controller = 017
    MRP3 --> Planning material = empty
    MRP3 --> Planning plant = empty
    The BOM in cs11 for plant 1020 material 12345
    has 3 components
    Comp#1
    Comp#2
    Comp#3
    The Dependency is code
    TABLE TB_1020_SUPERBOM (PP_nuance_interne = $ROOT.PP_nuance_interne,
    PP_dim_billette_bom = $ROOT.PP_dim_billette_bom,
    PP_CODE_LONG_BILL = $ROOT.PP_CODE_LONG_BILL,
    pp_component_bom =$self.pp_component_bom).
    The dependency is not found because it is looking for it in the plant 1070 and not the plant 1020.
    When the MRP runs for a Delivery type stock transfer order I get
    CONFIG_1020_BILLET <---- This is the BOM item component field in CS11 in the Basic data tab
    Comp#2
    Comp#3
    instead of
    Comp#1
    Comp#2
    Comp#3
    When I run MRP for the same material, if there's no
    "Delivery based on Stock transfert orders" the MRP associates the correct components
    Hope this explains m'I situation.
    Regards!
    Curtis

    Hi,
    If you want a reply in one line, it would be SAP R/3 does not supoort this feature.
    You will have to go for APO module.
    There are few things which can be done in R/3 side, as in maintaining a scope for MRP run in OM0E, maintaining special procurement key etc etc, but all these will not do any check of stock in another plant & can only help in a very limited way if all any for your specific need.
    But SAP R/3 provides a cross plant evaluation via MD48 to know the stock & demands at all plants, this can help only for evaluation purpose.
    Hope it clarifies.
    Regards,
    Vivek

  • Ignore the number of schedule lines in sale order item when run MRP

    Dear All,
    I have a problem when I create production order (discrete manufacturing)
    When I create a sale order with one sale order item and 3 schedule lines for this sale order item.
    After that, I run MRP for this sale order, what I get is 3 planned orders for 3 schedule lines. It means that I will have 3 production orders for 1 sale order item.
    I want  create one production order for one sale order item whatever the number of schedule lines in sale order item.
    I think I have to config in MRP. Please help me.
    Thanks in advance

    Dear
    Check in OPPQ then look in Master data Availability Check & strategy for material also check whether u have maintained strategy for same material and see did u extended sales views for other material
    As u said 3 schedule lines for this sale order item check whether u have extended sales views for next material
    With Regards
    Pushpalas

  • One pr for multiple materials with line items while running mrp

    Hi SAP gurus,
                  I am config the system for MRP as per my client requerement.
                     We use CBP for different RAW materialsfor example they having a 10 materials for planning,were,
             MRP type is VB,
              LOT size is FX,with Different Reorder points and fix order quantity for all materials,
             My client whant run MRP for all these materials in single time that means they whant multiple item at single levels,
            i soles these requirement with the help of Product Group(sop) and its working but when we running md02 for product group all materials have planed and they give different purchase requistion numbers for all these materials but my client Wants single purchase requistion with line items for all these materials.
         Pls give me the solution for that requirement.
    thanks and Regards,
    abhi

    this is not the way SAPs MRP run works.
    Where is the benefit for this?
    the requisitions are not even split into header and item table, it is just one table EBAN, and either way you would get exact the same number of records in EBAN.

  • How to run the ejb project in j2ee server

    How to run the EJB project.
    I give like
    java conveterClient converterClient.jar
    here conveterClient is class file name and converterClient.jar is deployed file
    like wise i give some exception is come
    give some help pls friends

    Navigate to the "DBOrders" module in the catalog, right click on the "ORDERS" database below and click "Export Schema Stucture". That will produce a file containing the DML needed to create the database

  • Not able to run my webobject project on WO5.4

    When I am trying to run my WebObject project,it stops running and the following message is displayed on the console:-
    [2012-12-21 09:19:19 PST] <main> WOMaxIOBufferSize=8196
    [2012-12-21 09:19:19 PST] <main> WOWorkerThreadCountMin=16
    [2012-12-21 09:19:19 PST] <main> WOSocketMonitorSleepTime=50
    [2012-12-21 09:19:19 PST] <main> WODirectConnectEnabled=true
    [2012-12-21 09:19:19 PST] <main> WOIncludeCommentsInResponse=false
    [2012-12-21 09:19:19 PST] <main> WOWorkerThreadCount=8
    [2012-12-21 09:19:19 PST] <main> WOAdaptorURL=http://127.0.0.1/cgi-bin/WebObjects
    [2012-12-21 09:19:19 PST] <main> WOLaunchdEnabled=false
    [2012-12-21 09:19:19 PST] <main> WOHost=127.0.0.1
    [2012-12-21 09:19:19 PST] <main> WOIDE=WOLips
    [2012-12-21 09:19:19 PST] <main> WODebuggingEnabled=true
    [2012-12-21 09:19:19 PST] <main> WOListenQueueSize=128
    [2012-12-21 09:19:19 PST] <main> WOMissingResourceSearchEnabled=true
    [2012-12-21 09:19:19 PST] <main> WOApplicationClassName=Application
    [2012-12-21 09:19:19 PST] <main> WOSessionStoreClassName=WOServerSessionStore
    [2012-12-21 09:19:19 PST] <main> WOContextClassName=WOContext
    [2012-12-21 09:19:19 PST] <main> WOCachingEnabled=false
    [2012-12-21 09:19:19 PST] <main> WOAcceptMalformedCookies=false
    [2012-12-21 09:19:19 PST] <main> NSProjectSearchPath=(..,../..)
    [2012-12-21 09:19:19 PST] <main> WOMonitorEnabled=false
    [2012-12-21 09:19:19 PST] <main> WOAllowRapidTurnaround=true
    [2012-12-21 09:19:19 PST] <main> WORootDirectory=C:\Apple
    [2012-12-21 09:19:19 PST] <main> WOGenerateWSDL=true
    [2012-12-21 09:19:19 PST] <main> WOWorkerThreadCountMax=256
    [2012-12-21 09:19:19 PST] <main> WOAllowsConcurrentRequestHandling=false
    [2012-12-21 09:19:19 PST] <main> WOAdaptor=WODefaultAdaptor
    [2012-12-21 09:19:19 PST] <main> WOSessionTimeOut=3600
    [2012-12-21 09:19:19 PST] <main> WORoot=C:\Apple
    [2012-12-21 09:19:19 PST] <main> WOMaxSocketIdleTime=180000
    [2012-12-21 09:19:19 PST] <main> WODefaultUndoStackLimit=10
    [2012-12-21 09:19:19 PST] <main> WOAutoOpenClientApplication=true
    [2012-12-21 09:19:19 PST] <main> WOAutoOpenInBrowser=true
    [2012-12-21 09:19:19 PST] <main> WOApplicationBaseURL=/WebObjects
    [2012-12-21 09:19:19 PST] <main> WOMaxHeaders=200
    [2012-12-21 09:19:19 PST] <main> WOLifebeatEnabled=true
    [2012-12-21 09:19:19 PST] <main> WOAllowsCacheControlHeader=true
    [2012-12-21 09:19:19 PST] <main> WOSMTPHost=smtp
    [2012-12-21 09:19:19 PST] <main> WOFrameworksBaseURL=/WebObjects/Frameworks
    [2012-12-21 09:19:19 PST] <main> WOStatisticsStoreSessionMax=50
    [2012-12-21 09:19:19 PST] <main> WOAdditionalAdaptors=()
    [2012-12-21 09:19:19 PST] <main> WOLifebeatDestinationPort=1085
    [2012-12-21 09:19:19 PST] <main> WOPort=4003
    [2012-12-21 09:19:19 PST] <main> WOLifebeatInterval=30
    [2012-12-21 09:19:19 PST] <main> WOSocketCacheSize=100
    [2012-12-21 09:19:19 PST] <main> WOUserDirectory=C:\Juno\Empsoft\dist\Empsoft.woa
    [2012-12-21 09:19:19 PST] <main> WODisplayExceptionPages=true
    [2012-12-21 09:19:19 PST] <main> ------------------------
    [2012-12-21 09:19:19 PST] <main> WebObjects version = 5.4.3
    [2012-12-21 09:19:19 PST] <main> Created adaptor of class WODefaultAdaptor on port 4003 and address validation.sls.microsoft.com/127.0.0.1 with WOWorkerThread minimum of 16 and maximum of 256
    [2012-12-21 09:19:19 PST] <main> NSBundle is unable to find "ExtensionsForResources.plist" in the main bundle.  Ignoring optional configuration file.
    [2012-12-21 09:19:20 PST] <main> A fatal exception occurred: com.webobjects.foundation.NSArray.emptyArray()Lcom/webobjects/foundation/NSArra y;
    [2012-12-21 09:19:20 PST] <main> java.lang.NoSuchMethodError: com.webobjects.foundation.NSArray.emptyArray()Lcom/webobjects/foundation/NSArra y;
    at com.webobjects._ideservices._PBXProjectWatcher.openProjectsAppropriateForFile(_ PBXProjectWatcher.java:50)
    at com.webobjects._ideservices._IDEProjectPBX.pbxProjectAtPath(_IDEProjectPBX.java :200)
    at com.webobjects._ideservices._WOProject.ideProjectAtPath(_WOProject.java:85)
    at com.webobjects.appserver._private.WOProjectBundle._isProjectBundlePath(WOProjec tBundle.java:225)
    at com.webobjects.appserver._private.WODeployedBundle.bundleWithNSBundle(WODeploye dBundle.java:745)
    at com.webobjects.appserver._private.WODeployedBundle.deployedBundle(WODeployedBun dle.java:124)
    at com.webobjects.appserver.WOResourceManager._initAppBundle(WOResourceManager.jav a:140)
    at com.webobjects.appserver.WOResourceManager.<init>(WOResourceManager.java:60)
    at com.webobjects.appserver.WOApplication.createResourceManager(WOApplication.java :2067)
    at com.webobjects.appserver.WOApplication.<init>(WOApplication.java:841)
    at Application.<init>(Application.java:284)
    at sun.reflect.NativeConstructorAccessorImpl.newInstance0(Native Method)
    at sun.reflect.NativeConstructorAccessorImpl.newInstance(NativeConstructorAccessor Impl.java:39)
    at sun.reflect.DelegatingConstructorAccessorImpl.newInstance(DelegatingConstructor AccessorImpl.java:27)
    at java.lang.reflect.Constructor.newInstance(Constructor.java:513)
    at java.lang.Class.newInstance0(Class.java:355)
    at java.lang.Class.newInstance(Class.java:308)
    at com.webobjects.appserver.WOApplication.main(WOApplication.java:547)
    at Application.main(Application.java:145)
    Please let me know,where i am going wrong.Any help will be appreciable.
    Thanks.....
    Mritunjay Kumar

    Is this error specific to this project or are you unable to get any projects running? If you are having trouble with all projects it could be spaces in folder names in classpath.
    Are you running from eclipse? I know many people have had problems with eclipse 4.2 and the authors of WOLips recommend running eclipse 3.8 rather than 4.2. I am running 3.7.2 myself.
    If you don't get any luck with an answer on this discussion group, you might want to post the question to Apple's webobjects mailing list.
    https://lists.apple.com/mailman/listinfo/webobjects-dev
    Regards
    Tim

  • Not running MRP but has Purch Req with Sales Order as pegged reqmnt in AFS

    Hello Gurus!
    MRP run is activated in the Plant but we do not run MRP (no MRP batch job nor manual MRP). However, there are materials that have Purch Reqs with creation indicator as MRP showing pegged reqmnt from Sales Order even if Item category is the same.
    My initial check shows that those materials with issue has MRP Indicator as BLANK(Multi-level, transaction dependent MRP) and those that do not generate Purch Req from SOs has N(No transaction-dependent MRP). However, transaction dependent MRP is not activated.
    Can you provide areas where I should check/other probable cause of this?
    Your valuable insights is deeply appreciated. Thanks!

    Hello?
    I just want to update how this was resolved.
    I found out that MRP Indicator field in AFS MRP view for the materials with MRP generated Purch Reqs is maintained as BLANK(Multi-level, transaction dependent MRP) in AFS MRP view instead of N(No transaction-dependent MRP) but there is no transaction group maintained. So MRP run is triggered whenevert there is MRP relevant transactions performed.

  • Dump while running MRP: MD03:   PERFORM_CONFLICT_TAB_TYPE CX_SY_DYN_CALL_IL

    Dear All,
    I am trying to run MRP for a single item at a single level. The program is giving a dump.
    If anyone knows a way around kindly tell me.
    Thanks. Anu.
    SHORT DUMP:
    Runtime errors         PERFORM_CONFLICT_TAB_TYPE                                         
    Exception              CX_SY_DYN_CALL_ILLEGAL_TYPE                                       
           Occurred on     28.02.2008 at   12:19:49                                                                               
    Illegal type when passing an internal table to a FORM                                                                               
    What happened?                                                                               
    Error in ABAP application program.                                                                               
    The current ABAP program "SAPLEINU" had to be terminated because one of the              
    statements could not be executed.                                                                               
    This is probably due to an error in the ABAP program.                                    
    A FORM was called incorrectly.                                                                               
    What can you do?                                                                               
    Print out the error message (using the "Print" function)                                 
    and make a note of the actions and input that caused the                                 
    error.                                                                               
    To resolve the problem, contact your SAP system administrator.                           
    You can use transaction ST22 (ABAP Dump Analysis) to view and administer                 
    termination messages, especially those beyond their normal deletion                     
    date.                                                                               
    Error analysis                                                                               
    An exception occurred. This exception is dealt with in more detail below                 
    . The exception, which is assigned to the class 'CX_SY_DYN_CALL_ILLEGAL_TYPE',           
    was neither                                                                             
    caught nor passed along using a RAISING clause, in the procedure                         
    "ME_UPDATE_AGREEMENT_PO" "(FUNCTION)"                                                   
    Since the caller of the procedure could not have expected this exception                 
    to occur, the running program was terminated.                                           
    The reason for the exception is:                                                         
    Incorrect FORM call.                                                                     
    The FORM call is incorrect for parameter number 1.                                       
    The current internal table passed to the formal table parameter has                      
    a type that is not compatible with the type of the formal parameter.                     
    The condition selected below has been violated:                                                                               
    (" ") The access types defined for the tables are incompatible.                          
          The following hierarchy shows the compatibility rules:                                                                               
    ANY_TABLE                                                                               
                        INDEX_TABLE   HASHED_TABLE                                           
                STANDARD_TABLE    SORTED_TABLE                                                                               
    A concrete access type is only compatible with types higher                        
          in the hierarchy. For example, STANDARD_TABLE is compatible                        
          with INDEX_TABLE and ANY_TABLE, but not with HASHED_TABLE.                                                                               
    ("X") The line types of the tables are incompatible.                                                                               
    (" ") The table keys of the tables are not identical.                                                                               
    (" ") One of the tables has a UNIQUE key, but the other has a                            
          NON-UNIQUE key.                                                                               
    How to correct the error                                                                               
    The exception must either be prevented, caught within the procedure                      
    "ME_UPDATE_AGREEMENT_PO"                                                                
    "(FUNCTION)", or declared in the procedure's RAISING clause.                             
    To prevent the exception, note the following:                                                                               
    You may able to find an interim solution to the problem                                  
    in the SAP note system. If you have access to the note system yourself,                  
    use the following search criteria:                                                                               
    "PERFORM_CONFLICT_TAB_TYPE" CX_SY_DYN_CALL_ILLEGAL_TYPEC                                 
    "SAPLEINU" or "LEINUU04"                                                                 
    "ME_UPDATE_AGREEMENT_PO"                                                                 
    If you cannot solve the problem yourself, please send the                                
    following documents to SAP:                                                                               
    1. A hard copy print describing the problem.                                                
       To obtain this, select the "Print" function on the current screen.                       
    2. A suitable hardcopy prinout of the system log.                                           
       To obtain this, call the system log with Transaction SM21                                
       and select the "Print" function to print out the relevant                                
       part.                                                                               
    3. If the programs are your own programs or modified SAP programs,                          
       supply the source code.                                                                  
       To do this, you can either use the "PRINT" command in the editor or                      
       print the programs using the report RSINCL00.                                                                               
    4. Details regarding the conditions under which the error occurred                          
       or which actions and input led to the error.

    Dear All,
    I am trying to run MRP for a single item at a single level. The program is giving a dump.
    If anyone knows a way around kindly tell me.
    Thanks. Anu.
    SHORT DUMP:
    Runtime errors         PERFORM_CONFLICT_TAB_TYPE                                         
    Exception              CX_SY_DYN_CALL_ILLEGAL_TYPE                                       
           Occurred on     28.02.2008 at   12:19:49                                                                               
    Illegal type when passing an internal table to a FORM                                                                               
    What happened?                                                                               
    Error in ABAP application program.                                                                               
    The current ABAP program "SAPLEINU" had to be terminated because one of the              
    statements could not be executed.                                                                               
    This is probably due to an error in the ABAP program.                                    
    A FORM was called incorrectly.                                                                               
    What can you do?                                                                               
    Print out the error message (using the "Print" function)                                 
    and make a note of the actions and input that caused the                                 
    error.                                                                               
    To resolve the problem, contact your SAP system administrator.                           
    You can use transaction ST22 (ABAP Dump Analysis) to view and administer                 
    termination messages, especially those beyond their normal deletion                     
    date.                                                                               
    Error analysis                                                                               
    An exception occurred. This exception is dealt with in more detail below                 
    . The exception, which is assigned to the class 'CX_SY_DYN_CALL_ILLEGAL_TYPE',           
    was neither                                                                             
    caught nor passed along using a RAISING clause, in the procedure                         
    "ME_UPDATE_AGREEMENT_PO" "(FUNCTION)"                                                   
    Since the caller of the procedure could not have expected this exception                 
    to occur, the running program was terminated.                                           
    The reason for the exception is:                                                         
    Incorrect FORM call.                                                                     
    The FORM call is incorrect for parameter number 1.                                       
    The current internal table passed to the formal table parameter has                      
    a type that is not compatible with the type of the formal parameter.                     
    The condition selected below has been violated:                                                                               
    (" ") The access types defined for the tables are incompatible.                          
          The following hierarchy shows the compatibility rules:                                                                               
    ANY_TABLE                                                                               
                        INDEX_TABLE   HASHED_TABLE                                           
                STANDARD_TABLE    SORTED_TABLE                                                                               
    A concrete access type is only compatible with types higher                        
          in the hierarchy. For example, STANDARD_TABLE is compatible                        
          with INDEX_TABLE and ANY_TABLE, but not with HASHED_TABLE.                                                                               
    ("X") The line types of the tables are incompatible.                                                                               
    (" ") The table keys of the tables are not identical.                                                                               
    (" ") One of the tables has a UNIQUE key, but the other has a                            
          NON-UNIQUE key.                                                                               
    How to correct the error                                                                               
    The exception must either be prevented, caught within the procedure                      
    "ME_UPDATE_AGREEMENT_PO"                                                                
    "(FUNCTION)", or declared in the procedure's RAISING clause.                             
    To prevent the exception, note the following:                                                                               
    You may able to find an interim solution to the problem                                  
    in the SAP note system. If you have access to the note system yourself,                  
    use the following search criteria:                                                                               
    "PERFORM_CONFLICT_TAB_TYPE" CX_SY_DYN_CALL_ILLEGAL_TYPEC                                 
    "SAPLEINU" or "LEINUU04"                                                                 
    "ME_UPDATE_AGREEMENT_PO"                                                                 
    If you cannot solve the problem yourself, please send the                                
    following documents to SAP:                                                                               
    1. A hard copy print describing the problem.                                                
       To obtain this, select the "Print" function on the current screen.                       
    2. A suitable hardcopy prinout of the system log.                                           
       To obtain this, call the system log with Transaction SM21                                
       and select the "Print" function to print out the relevant                                
       part.                                                                               
    3. If the programs are your own programs or modified SAP programs,                          
       supply the source code.                                                                  
       To do this, you can either use the "PRINT" command in the editor or                      
       print the programs using the report RSINCL00.                                                                               
    4. Details regarding the conditions under which the error occurred                          
       or which actions and input led to the error.

  • Problem running Lex in project created with Forte C++

    I am having a problem running Lex in project using Forte C++ 6. I believe I may have an installation problem, but can't figure out where it is.
    I created the project using Workshop. The make file generated is trying to run the following command: lex -o output/cmdscan.o cmsscan.l
    Which causes the following error message lex: illegal option -- o
    I checked the man pages and Lex doesn't have a -o option.
    Is there another version of Lex installed by Forte C++ that is different than Lex from Solaris?
    Ron

    I created the project using Workshop. The make file generated is trying to run the following command: lex -o output/cmdscan.o cmsscan.l
    Which causes the following error message lex: illegal option -- o
    I checked the man pages and Lex doesn't have a -o option.
    Yes, try in google.com
    Wishes , a [url http://personallfiles.com/Grant.Scholarship.asp]federal grant and scholarship-in need for me

  • The problem about running MRP by MDBT

    Hello everydody,
    I encountered a strange problem in SAP system when I runned MRP by using MDBT.
    Usually running MRP has two ways.First running MRP by using T-code MD02 ; second running MRP by using T-code MDBT in the background.In my SAP system,I used T-code MDBT to run MRP, and the MPR parameter is below:
    Scope of planning
    Plant                             2000
    Processing key             NETCH 
    Create purchase req.      1      
    Schedule lines                 3      
    Create MRP list                1      
    Planning mode                 3      
    Scheduling                      1      
    Planning date             2010.06.30
    Normally if I choosed the Planning mode 3 Delete and recreate planning data,then after running MRP ,the Plan orders' number and purchase requestions number should be changed and produced new numbers.
    But I used T-code MDBT to run MRP, the Plan orders' number wasn't changed,the purchase requestions' number was changed. If I used T-code MD02 to run MRP, the  parameter is the same as above.After running MRP,the plan orders' number and the purchase reequestions' number were changed.
    I don't know how caused this happening.
    Is  there anybody who can help reslove this problem?
    Thanks & Best regards!

    Hi,Nikolai
    I was spending vacation, i can't get that now, and i will send it to you as soon as possible,i think maybe that error occured beacause I updated the metadata from V 9.0.2 and imported it into the new version of Builder?

  • Using MD50 to run MRP for Sale Order

    Dear all,
    I have some problem when using MD50 with Mill Product Industry.
    When SAP system not activate Mill Product yet. I used transaction code MD50 to run MRP for Sale Order, the system have generated planned order for multilevel. But when SAP system have activated Mill Product, I used transaction code MD50 to run MRP for Sale Order, the system only generate planned order for single level. I think that we have to configure something based on Mill Product Industry. So can you help me for this
    Thanks, Regards

    Hi,
    Check with following links which may help you resolve your issue :
    http://www.sap.com/sme/whysap/industries/millproducts/index.epx
    http://help.sap.com/saphelp_di471/helpdata/en/4e/1796374b088e5ce10000009b38f8cf/frameset.htm
    http://help.sap.com/content/documentation/industry/docu_is_mill.htm
    Regards,
    Tejas

  • What precoution should be taken to run MRP after GO-Live ?

    Dear All,
    Please give the inputs for run MRP at plan level.
    Also suggest the what type of precoution should be taken to carry out this task.
    What type of problem is to be faced after MRP run.
    Thanks In advance
    Vijay Mankar

    Dear Sir,
    Actualy,we gone live on 1st Feb, we have created the manual production order till date, & dispatched the material by maintaining the schedule line.
    Now, I have to put Plant independent requirement in Planning table.
    & convert the planned order to production order collectively by COHV on the bas
    Our aim is give production Plan for tommorow. We also used to maintain schedule lines.
    I have to give the production plan for 12 feb,
    Please revert me as soon as possible.
    Regards,
    Vijay Mankar

Maybe you are looking for

  • Drag and drop over AxAcroPDFLib.AxAcroPDF in C# Winform

    Hi, I've embedded the AxAcroPDFLib.AxAcroPDF PDF Browser control from SDK 2 in a .Net C# Winform, and can load and display a PDF within it. I want to be able to drag and drop System.Windows.Forms.TextBox (s) over the control and when dropped based on

  • Collaborating on the same file / project?

    Can you suggest the best way to work with a colleague on the same Fireworks file or in the same project? For example, two of us would like to be able to edit a document, sometimes one after another, and sometimes simultaneously. We could break a proj

  • Rep-0004 error

    Hi all, when I run a report in unix server side its giving me the error REP-0004: Warning: Unable to open user preference file. REP-0546: Invalid parameter input. The report is working fine from windows client machine. I removed all the parameters fr

  • Activatate second local currency(Group currency)

    hi Experts , I am going to activate activate second local currency(Group currency) on the current company [ which i close 2 years on it ] i face serious problem to evaluate the amount has been entered for the previous year is there any to way to eval

  • Unrendered Audio - sequence and clip settings are the same

    When I drag a clip to the timeline a redline appears on the top of the timeline. I know this means that there is a setting issue between the sequence and the clips. All the settings are the same with the exception of the: audio format - Clip: 8 bit i