Runs not Posting to a Challenge (help)

Has anyone had a problem with runs not posting to a challenge. We are seeing this in our Challenge which started today.
Any suggestions?

Our challenges for friends and myself aren't working either. Do you have to wait until everyone, who's invited, accepts before everyone can start? Nothing on Nike+ gives you any info on this.
Bummer, because I had good speed times in some extreme heat yesterday that now went for not. Sure I can see them in my runs, but there's no way to share among friends. Hope that becomes an option to accept buddies and see each others stats, not just in the challenge your in with them.

Similar Messages

  • K9A2 Platinum - Will not post... need help.

    mobo: k9a2 platinum
    cpu: am2 6400 black edition OR phenom 9750
    ram: super talent ddr2 800 OR corsair dominator ddr2 1066  - have both been tried single stick only
    video card: msi nvidia 9600gt OR ati x300 - used ati card to test video card failure
    power supply: 610w pc power and cooling
    hdd: seagate barracuda 250gb 32mb cache
    OK... original configuration, being the phenom 9750 with the corsair dominator ram, and the nvidia 9600gt.
    would not post, black screen... with 2 fast short beeps(1 long beep?) and 6 short beeps, for a beep code... which isn't even covered in the manual or anywhere online for some reason
    it has been stated that the bios has to be flashed to the latest version in order to accept the phenom processors... so i then took a am2 6400 and put it in.
    proceeding with the same beeps, i took out the ram and replaced it with a stick of super talent ddr2 800, dimm1 slot, single channel. it's also been stated in various comments that this motherboard doesn't initially accept dual channel, nor 1066 ram. i get the same beeps out of the dimm1 slot. i take the stick out and place it in the dimm3 slot... beeps go away, but the black screen remains.
    i try different video card configurations, trying the two different video cards in either of the two pci-x 16 slots, black screen remains. in my last configuration, the beeps come back, so i am at a total loss.
    anybody able to help me out?

    Have you done >>Clear CMOS Guide<< yet? (With power cord removed from the PSU)
    What keyboard you use?
    Have you connected power cable for VGA?

  • Payment Run not posting to the Vendor

    I have created a payment proposal which shows one payment processed. But for some reason it is not being posted to the vendor account.
    Am I missing some step? After creating the payment proposal, I had scheduled the payment run and run it in SM37.

    Hi
    Steps to be followed in the payment program
    - Enter parameters
    - Schedule a proposal : Once you schedule a proposal if everything is correct then it will give you a message posting orders generated and posting orders completed. At this stage, yuour vendor account gets posted and a payment doc is created.
    If there are any errors it will throow as an exception and you can edit your proposal accordingly
    - Schedule a print - At this stage, the print program gets trigerred wit the variant selected.
    This is the rpocess for an APP
    Hope this clarifies your doubt. Assign points as a way to say thanks
    regards,
    radhika

  • Depreciation run not posted for 2006/2007 and 2008.

    Hi,
    I have a situation where depreciation has not been posted for 2006,2007 and 2008.
    Now since there are 2 fiscal years already open the system does not allow to post to the 2008. since only 2 fiscal years can be open at a time.
    Old periods cannot be opened to post depreciation.
    I feel the only way out is to assign a new depreciation area?
    Is it possible to change the Chart of Depreciation or active (posted to) depreciation area?
    Any suggestions.
    Thanks,
    Daksha

    Hi
    If your 2007 is open then post the depreciation thru AFAB with unplanned posting run, after completing it you can close the periods & open 2008
    Hope this solves your issue
    Regards
    Veena

  • Payment Run Not Posted to Vendor.

    Hi Experts,
    We are facing Issue with payment Run, User has run the payement run but he is unable complete the Payment Run & his status is " Payment proposal has been created".I checked with user & found that there is somewhere another payment programme that hasn't been completed.
    Because of this uncompleted Payment run the Vendors got block & user is unable to Run the new payment run for these vendors.
    Can you please Guide me How can we Overcome this issue.
    Thanks,
    Kapil

    Hi Kapil,
    1st you need to find out the old proposal run which was failed, you can get it from REGUS table if you know the vednor no , you also get this informatin from Regup table, in this table there will be two lines one for clearing doucument & other one for proposal run. where ever you will find only proposal run. take the date go to F110, delete the proposal by going to edit
    Once above is done then delete the latest proposal whihc was filed by going through F110. after completeing both steps now you can able to complete payment run..still if you face any issue. share log. it will help to understand more........
    Hope this will help..
    Regards,
    Sid

  • @uncle_bear - You are still not posting any message. Help !!!

    My adobe cloud download messed up my trial premier pro and now nothing loads or works. I have windows7 64-bit and the pro was running fine untill I payed the $29.00 and everything went bad??? Help

    Hi Uncle_Bear,
    I'd check to see if you have a button that says "License this software" when you launch Premiere Pro, if you do, click it and sign in with your Adobe ID.
    -Dave

  • Application document not posted

    hi Gems,
    I am new to BW, have system installed 3.0B, r/3 as 4.7e
    I am learning Generic Extraction,  I have
    InfoCube: 0PA_CO1 which takes data from 2 Info sources 0hr_pa_0,0hr_pa_1 and datasources sources 0hr_pa_0,0hr_pa_1
    Installed BCT for ds
    Steps I followed
    1. Transfer DS
    2. Replicate Ds
    3.Already I have Infosources and already assigned datasources so,
    4. I created Info Packages and loaded the data,
    here I am getting an error, when I check in the Monitor's Details Tab
    Transfer IDoc's.....
          Requested Idoc's:Application document not posted
    will any body help me on this issues
    thanks in advance

    HI,
    Try to look at the links below . Might help you solve the problem
    Error in Data loading
    Re: Problem with Info Idoc -- please suggest
    Cheers,
    Kedar

  • AFAR test run showing the values but not posting in Real run.

    Hi Friends,
    i have an issue with AFAR recalculating the depreclation. The details are as below;
    1. Asset value date is 15.07.2010. but ordinary dep. start date was set as 01.01.2010 manually by the user.
    2. The Period control method 11, the dep. is calculated for entire year for acquisition.
    3. we have already calculated depreciation from period 12 2010 to period 04, 2011.
    4. Now, we have changed ordinary depreciation start date for 5 asset records from 01.01.2010 to 15.07.2010.
    5. Therefore, we recalculated AFAR for these assets for 2010 and test run is showing the values for these 5 asset. The same was expected by the business.
    6. When we execute the real run, it is not posting and no change in asset explorer for period 12, 2010 or in current period. No error message is available in spool / job log.
    We have opened FI periods as well.
    My question is  that why the system calculating the values in test run and if it is calculated in test run, why it is not posting in update run?
    As per the period control method, the depreciation should not recalculated for half year even we change the ordinary dep,start date from 1st Jan to 15th July.
    I  request you to clarify my doubt and help me to understand the error which is stoping the values in update run of AFAR.
    Best Regards,
    Padmaja

    Hi,
    Sorry...it is not worked out. Alternatively, i tried the shift factor with variable depreciation and i achieved the values which appeared in AFAR test run.
    Thanks for the help.
    Regards,
    Padmaja
    Edited by: PadmajaCH on May 19, 2011 3:26 PM

  • On my macbook pro I have a message on my homepage telling me that certain items want to use my keychain. I've pressed cancel the message will not go. The mac is now running very slow and iphoto and safari are not working. Can anyone help?

    On my macbook pro I have a message on my homepage telling me that certain items want to use my keychain. I've pressed cancel the message will not go. The mac is now running very slow and iphoto and safari are not working. Can anyone help?

    What version of Mac OS X?
    What home page?
    What browser?

  • I am having trouble dating to version 3.6.14. I am running Linux/Ubutu OS and I get this error message:/tmp/p7x3vko2.part could not be saved, because the source file could not be read. Please help. Thank you , Deb

    I am having trouble dating to version 3.6.14 or updating to the Beta testing. I am running Linux/Ubutu OS and I get this error message:/tmp/p7x3vko2.part could not be saved, because the source file could not be read. Please help. Thank you , Deb

    Solved for me.
    I set the owner/permissions of my profile's mozilla folder's (and all the files in it) to read/write access, and the problem disappeared.
    in linux:''
    * cd /home/myusername/.mozilla
    * chown -cR myusername:mygroup ./
    * chmod -cR +rw ./
    '''Never do that with root privs (nor with sudo)'''

  • Since up dating my Firefox I can not play any games on Facebook they all run very slow, can someone please help me with a solution.

    Since up dating my Firefox I can not play any games on Facebook they all run very slow, can someone please help me with a solution.It mainly seems to be with games.

    RE: "P.S. I  found it aggravating that I couldn't copy and paste text  here, it wanted me to insert as a link or an image, how do you insert plain  text?"
    I take it you tried using the "right click" menu?   That doesn't seem to work, as you noted, but, you should be able to paste text by pressing your CTRL key  and while holding it down, press the "V" letter  key.
    CTRL + C = COPY
    CTRL + X = CUT
    CTRL + V = PASTE
    HTH,
    Ortho_Fan

  • Posting run is successful but document is not posted

    Hi Experts,
    I am able to run the Payroll results posting run (PC00_M99_CIPE) successfully and released. But when I check the status im getting the below Error.
    "Document was not posted to accounting.
    Message No 3G098."
    Kindly let me know, what is the required configuration to post the document to accounting.
    Regards
    Raveendra.

    Hi Ravendra,
    You might have forgot to post the document...
    First Document has to be released (Which you did)
    Next you have to post the document...  (Which is pending from your side)...
    Tcode :- PCP0
    look out for your document which is released .. You need to post it ...
    Regards,
    Veeram

  • Result Analysis(WIP) not posted after 4 cycle run

    Hi,
    Every month value is posted in Result Analysis GL account for WIP. But we found in period 10 and period 11 value is not posted Result Analysis GL account after running 4 cycle run (Overhead calculation, WIP calculation, Variance calculation and Settlement). What may be reason ??
    Regards,
    Samrat

    Hi Christian ,
    One question related to Cut-Off period regarding WIP calculation which myself and Ajay were discussing 15 days  back..
    Is it required to change the cut-off everymonth when we calculate WIP . In my client.. then donot do that .. but still we calculate the WIP..
    Is the significance of cut-off period is to tell the system the first period to calculate WIP .. during implementation .. My client never changes that and its in a MTS ( Process Order Senario )... but calculates WIP every month.
    Regards
    Sarada

  • I'm currently running 10.6.8 and would like to upgrade to mountain lion but all i keep getting is the following: We could not complete your purchase. OS X Mountain Lion is not compatible with this computer. help

    I'm currently running 10.6.8 and would like to upgrade to mountain lion but all i keep getting is the following: We could not complete your purchase. OS X Mountain Lion is not compatible with this computer. help

    ERA AND MCM wrote:
    We could not complete your purchase. OS X Mountain Lion is not compatible with this computer.
    it means exactly that, you mac is not compatible to run ML. http://support.apple.com/kb/SP654

  • Depreciation run: Assets posted, FI not posted

    Dear All,
      User created an AUC with reference to an existing asset, thereby deriving depn key of that asset.
    Depr run gave error for acc. depn account determination for that AUC.
    Values of that AUC trf to other AUC with depn key 0000.
    Depn deactivated and thereafter original AUC deleted.
    First depn run has posted values in AA module without any reference document.
    We have analysed and found that Table ANLP has data of this original AUC.
    How can one by-pass this data which is being picked in the depn run?

    Dear Dattatray,
    Basically AUC should not be charged with depreciation. For that matter you should not even maintain depreciation accounts against AUC asset class.
    Also, asset gets picked up in depreciation run as it is getting capured thru any of the tables viz. ANLB, ANLC< ANLZ, ANLP, ANLQ etc.
    Still as I understand you should not charge depreciation to AUC.
    Regards,
    Ajay Gupte

Maybe you are looking for

  • Changing screen sequence in sales order header

    Hi Folks we have a requirement to change the sequence of the screens which appear in sales order header and we need to add an additional custom screen. Request you all to suggest how we can achieve this functionality.

  • Content Conversion issue for header record

    Hi, We have a very urgent question on an issue here with one of our XI objects.  This is an inbound interface from an external system into R/3 & BW.  The inbound file has a header record (with about 8 fields) and detail records (about 900 fields per

  • Scroll Bar or Slide Bar to control Playhead or Layer On/Off

    Hello Lingo Forum... I need to generate a script that will control the location of the Playhead or Turn off/on Layers based on the location of a slider bar. For example.. A slider bar needs to be created and lingo attached so when a user moves the sl

  • CREATIVE SUITE 5 WEB PREMIUM FILE SIZE SHOWING UP 936 GB

    The file size of creative suite 5 web premium showing up 936GB in installed programes(windows 7). The actual size is below 4 GB. The capacity of my computer hard disk is just 250 GB only.  Iam not able to uninstall the software. Nothing happening whe

  • Communication channel - cache problem?

    Hi experts, sometimes when I change parameters in communication channels that have thrown an error (in order to solve the problem), this modification is not immediatly working after activation of CC: the CC still works with old configuration. To solv