Sale wrt STO of raw material from a manufacturing plant to other plant

Hi Gurus,
My scenario is that, I have procured a raw material for PLANT A. At the time of procurement it  hits RG23A PART1 AND RG23A PART2 registers. Now I want to sell this raw material without any value addition to other PLANT B of the same company code.
Here the excise requirement is that at the time of delivery it should hit RG23A PAR1 AND PART2 and should not hit RG1 register.
i request you to pls guide me how to execute this process in SAP so that it satisfies excise requirements.
Thanks and Regards
ujwal

Seems you need new mov type- ( in place of 641)
is this requirement is only for Raw material STO??
Generally , even when you do STO for Raw Material,as per excise it should hit RG1- Not sure,why you want it to be posted in RG23A reg.

Similar Messages

  • Production Planning for industry getting raw material from farmers.

    I am working in a process industry where i get raw material from farmers.My production(quantity and quality) is compltely depend on the quality of raw material.How can I plan this in SAP, So that I can get  good quality of raw material.

    Hi
    SAP is ERP package which provides complete integration between all the other industry modules like Finance, Materials, sales, Production and Quality.
    The present system of your Production and Quality has to be mapped in the SAP. But the data has to be flown from the present systems to sap. We built some controls for Raw material inspection for quality, it will allow only raw materials which will meets your specifications. And at any point of time you will have better control on the production also. We can can easily which raw materils are used for production etc.
    Regards.
    Balu

  • STO from one plant to other plant

    Hi,
       Can some one send me the various  way's one can send a stock from one plant to other plant with complete flow's.

    Hi,
      Usually sotck transfers are of two types one is
    1. intercompany stock transfer between two plants of differnt company codes again in this two types are there 
       i) direct step process Or one step: in this the quantity of the supplying plant is directly posted into the inventory of receving plant.movement type of supplying plant is 645
      ii)Two step proces:in this the receiving plant has to do the MIGO i.e., goods receipt.movement type of supplying plant is 643
    2.intra company stock process i.e., stock transfer between two plants of the same company code.in this again two process
    i) direct step process Or one step: in this the quantity of the supplying plant is directly posted into the inventory of receving plant.movement type of supplying plant is 647
      ii)Two step proces:in this the receiving plant has to do the MIGO i.e., goods receipt.movement type of supplying plant is 641
    For stock transfer configuration process make a small search in this forum u can get lot of stuff.
    If it helps reward me .
    Regards,
    kishore.

  • Inspection Lot Not Triggered for STO - One Plant to other Plant in same Company

    Dear SAP Gurus,
    We have a scenario of STO for one plant to other plant with in the same company code.
    The process is being followed as follows ;
    1. We create stock transfer by creating P.O thru ME21N
    2. Create Outbound delivery thru VL10B
    3. Doing PGI & Picking thru 'VL02N. Thru movement type '641'
    The QM settings are as follows to trigger an inspection lot
    1. Inspection lot origin '08' activated in MM.
    2. Quality plan is defined and task list is released.
    3. 'VL02N' is defined thru 'OMJJ' for movemrnt type '641'.
    But while doing PGI no inspection lot is created.
    Our requirement is to trigger a inspection lot and Invoicing / Billing only possible after inspection lot Approval.
    Please advice.
    Thanks

    Hi
    As per my understanding  inspection type 10 should be activated in QM view material master.
    Can you please check the below thread and also check some similar threads.
    QUALITY INSPECTION FOR OUTBOUND DELIVERY
    I hope your problem will be resolved or else revert with your observation.
    Regards
    D Mohanty

  • How to transfer all materials from one plant to other plants?

    How to transfer all materials from one plant to other plants?

    Hi
    To transfer stock in one step  between plants belonging to same company code use movement type "301" and using transaction code "MIGO". IF you like in two step it helps to monitor stock in transit use movement type "303" and "305".
    303 Transfer posting plant to plant in two steps - removal from storage
    305 Transfer posting plant to plant in two steps - placement in storage
    to transfer stock between plants of diffrent company code go for stock transpor order using tcode "me21n"
    hope it helps

  • How to enter / Post Goods receipt of Raw Material from subcontractor

    Dear Experts,
    As standard subcontracting procedure, Raw Material Transfer posting is made to Subcontracting Vendor
    and the Semi finished material [Assembly] is received from the subcontractor.
    If in case extra or by any reason, raw material stock is with subcontractor, he want to return the raw material stock.
    How to receive raw material stock from subcontracting vendor and how to handle subcontracting challan transactions in SAP ?
    Thanks in Advance !

    Hi,
    >>Receive the RM using MB1B / 542
    >> Reconcile using J1ifq
    >> Complete challan using J1if13
    Thanks,
    Rajoo

  • STO to transfer material from Stor.Loc. 0001 to 0002 under the same Plant

    Dear friends ,
    Does anyone already have used the new functionlity to transfer material from Storage Location 0001 to Storage Location 0002 under the same plant  with STO ?
    Which delivery  and movement type should I use to do that ? we put a mov. type 311 but errors appear for us.
    best regards,
    Alessandro

    Hi Alessandro,
    You can very well create an STO keeping the issueing and receiving plant as same and mentioning the issue S.location and do the DO using VL10B and PGI using VL02N.
    at the time of GR you can specify the receiving S.location and post the GR.
    There is no any requirement for specific config.
    Regards
    Merwyn

  • Problem arise during transfer of material from one company code to other co

    Dear CONS
    While doing transfer from one company code to other company code by using movement type- 301 ( direct one step) we got one error message '' Field Bus. Area is a required field for G/L account  JDPO 16020202
        Message no. F5808
    Diagnosis
        The value for field "Bus. Area" in the interface to Financial Accounting
        is an initial value but you are required to make an entry in the field
        selection for G/L account "16020202" in company code "JDPO" linked to
        the field selection for posting key "21".
    PL. SOLVE IT WHERE IS THE SETTING.

    no, the system is not accepting the GL ACCT. as it is a balace sheet account. pl. help.
    Edited by: nirupama swain on Sep 23, 2010 7:00 AM

  • Restrict PO creation as material blck for quality reason in other plant

    Hi QM Experts,
    one material (say MAT-1) in maintained in  two plants (Say- X & Y).
    qm in procurement active in material for both the plants.
    created two Q-info records with material MAT-1, vendor ( Say- V-1). one info record for plant X & other for plant Y.
    while creating PO for material -( MAT-1)  in plant X, system giving error- material blocked for quality reason.
    even though in Q-info record for plant X, material is not blocked . it is blocked in Q-info record of plant Y.
    why system looking for plant Y, even when we are trying to create PO in plant X for same material and vendor.
    please guide on same,
    Thanks & Regards,
    Roshan
    Edited by: roshan s on Dec 16, 2011 6:29 AM

    hi,
    Please check ur Q-info of Mat-1 V1 and X properly and please also check ur material master in X, whethere some control key is defined in QM in Procurement or Not. If any control key is there than chcek the settings of that control key and as per ur requirement remove it .
    regards

  • Availablity check in sales order considering the Raw material stock/procurement

    Hi Gurus,
    Our client Production process requires  the availability check at order level to consider the procurement time required for the Rawmaterial (BOM component of the FERT, whose sales order is taken) in cases when this RM is not available in the plant, and Availability check should not consider this procurement time when this RM is available in the plant.
    ie in first case, it should consider the total time for in-house production as well as the time required to procure the rawmaterials, along with all other times that we use like Gr processing time, packing picking etc.
    In second case it should not consider the RM procurement time, but only the inhouse production time and other times as applicable.
    To my understanding, Availability check at order level will only check the time given in the MRP view of the FERT, and it does not check anything about RM stock or RM procurement time.
    Can you please give me some suggestions to meet this requirement of the client (client is into Food Product Manufacturing).
    Your quick response will be very helpful

    You can try with user exits intended for ATP as recommended in the following note based on material type:-
    Note 1644443 - Documentation on User-Exits in the area of the availability
    That is as and when ATP runs for a sale order, with any of the exits listed out in the above note, you can validate for the material type which would be different for components and accordingly, write a coding in such a way not to consider such of those components.  But ensure that the user-exits are critical and should be tested carefully as cautioned in the note.
    G. Lakshmipathi

  • Raw material sells

    Hi,
      I want to sale raw materials .can i just extend the sales views and sale would there be any affect on excise duties?
    please through some light
    Regards
    Anil

    Dear sharukh
    Yesterday only, for the same subject, I had given a suggestion which is reproduced below and had you searched this forum, you would have got the solution.
    As per Central Excise law, you are not suppose to sell the raw material from a manufacturing unit.
    Hence, you copy the ROH material code with suffix A and assign the ROH to this newly created in CA01 with description packing.
    Apart from this, you need to maintain the renamed code in j1id with numeric value "1" under the tab "Declared".
    All other settings are similar to normal OR-LF-F2 process.
    thanks
    G. Lakshmipathi

  • Raw material Inspection  using STO

    Dear Gurus
    We are transferring the raw material from one plant to other using STO, In MIGO , while receiving the material , When i select the goods receipt & outbound delievery ,and post .  movement type is 101
    Which type of inspection lot should generate?
    Please tell me step  by step procedure  and config settings
    Please help
    regards
    aadi

    Hi.
    01 inspectype type  should me maintained in  Supplying & Receving plant  both?
    Also where i can check whether qm is activated for 101 movent type?

  • Raw material transfer

    hi all
    i have a query on transfer of raw material from one plant to another plant.
    my question is: when we transfer raw material from one plant to another plant in sales are we going to create delivery?
    can anyone please give the process flow for this.
    if we are not going to create the delivery wht will be the delivery document for that transfer?
    regards
    rag

    Hello,
    As both the plants are under the same company code, you may use one-step stock transfer (through MM) without creating delivery. The movement type used will be 301 and the transaction MB1B.
    If you want to consider as a sale, then STO with delivery will be the best option , the document type will be UB.
    Prase

  • Withdrawal from other plant- sales

    Hi dudes,
    suppose if i am using 70  special proc. key for semifinished materials and are planned in other plant gets consumed for FERT materials order in the main plant.
    suppose if i maintain the sales views for these semifinshed materilas in the main plant and can i do the PGI for sales order from other plant to main plant where the sales procesing is happening.
    thanks in advance
    Robert

    Special procurment key 70 is reservation from FERT plant to the supplyiong plant.
    Against this reservation you need to issue the material? Is it your scenario?
    As I know the material will be withdrawn duting backflush from the supplying plant directly
    If you want to sell the raw material from supplying plant to production plant, then you need to set up STO, in OMGN.
    Since usually we use it for inter company tranfer and billing, I am not sure whether you can do it for the plants with in the same company code.

  • Production order link to raw Material

    Hi
    Experts
    We have manual Production order system (NO MRP)
    System works like this
    Work order (Manually given to Production) Part name Material Qty and Dispatch date.
    Finish Material A
         This contains semi finish material X, Y, Z
    X contains Raw material and Scrap Generated
    Y contains X and Scrap
    Z Contains Y and Scrap
    Finish A Contains Z material
    Then Production people create the sub semi finish Production order of X before he checks raw material from store and accordingly by calculating he create Production order of X then Production order of Y and Z and then Create Production Order Of Finish Material.
    Our problem is that as we create manually Production order the material issued from store we are not able to link with the production order.
    As this material is issued to this production order. How to map this?
    The other issue is regarding consumables we also want to map this to Production order. Like Coolant used and inserts used on work center how to map?
    Please guide me.
    Thanks & Regards
    Pert

    Hi,
    If you are creating production orders with CO08 (With reference to sales order ) then RM tracking can easily be done.
    Just need to give sales order number in COOIS report or in table AFPO it will give you all the production orders and RM can be traced till FG.
    But if you have MTS then the calculation must be assumption basis .
    If the same RM used in same SFG with different production orders then that might be impossible to trace without batch and sales order.
    Now you want to trace tool then use PRT
    You need to create material as PRT .
    Assign that PRT in routing with Usage formula .
    So PRT will be copied on production order with routing . When ever you will confirm the operation the usage value of PRT will be updated.
    Regards,
    Vishal

Maybe you are looking for

  • "There was an error downloading your purchased music. The disk could no..."

    I am trying to download a Video from the new iTunes 6 and I do have an iPod Video, but for some reason everytime I check for purchases to download it, I get this error message: "There was an error downloading your purchased music. The disk could not

  • Several vendor payments from single PO

    Hi experts, Good day to you all.. Can anybody tell me of how to give payments to multiple vendors from a single PO (t-code ME21N)?? If it is possible then please tell me the process step by step, so that we can handle those situations smoothly. Warm

  • How to translate dashboard prompt year/period into literal date range

    I am using OBIEE 10g. I have a dashboard that prompts for a fiscal year and fiscal period (both are numeric data types). I need to use these values in the date filter for my answers request - however, to fully utilize the indexes and partitioning tha

  • Rollback when SQLException is thrown

    Hi all, If the set autocommit is false and if any statement throws SQLException then what will happen to that transaction. Will it rollback the entire transaction ?. Before returning the connection to pool do I have to set autocommit to true ? By def

  • How to run forms in iview mode

    i tride to run my forms in iview mode i got following message frm-18121 the java bean, does not implement the iview interface cause : for forms to use this java bean, it must be implement oracle form iview interface Action : implement oracle forms or