Sales Rule Grading Adjustment within already settled period
Hi
Under component RE-FX-SR, (i.e. Flexible Real Estate - Sales Based Settlement)
At a glance, there needs to be an adjustment made to grading of a sales rule in settled period expecting the correction entries in the cash flow accordingly.
In Detail:
Case 1 without Sales Based Rent enabled----
(Working)
In a regular contract(without sales-based enabled),
Contract start : January 1, 2009
Contract end : December 31, 2009
Term in months : 12
Basic rent as of January 1, 2009 : $ 1,000
Total contract value : $ 12,000
Monthly postings : Executed until Jun 30, 2009
Now, if the "Basic Rent" condition is changed retroactively from
January1, 2009 with new Unit Price : $ 1,100 then there shall be a
correction
entry with $100 inserted in simulated cash flow which is valid.
Case 2 with Sales Based Rent enabled----
(Awaiting Workaround)
Now when the same is what expected in Sales Based enabled contract i.e.
Contract start : January 1, 2009
Contract end : December 31, 2009
Term in months : 12
Sales Rule 10: Monthly settlement period (with grading enabled)
Reporting Rule 10 : Montly with $1000 each month
Monthly postings : Executed until Jun 30, 2009
Under these settings, suppose if a settlement is made through 06/30/2009, can you please let me know how to make adjustments with new grading %rate for the sales rule from January 1, 2009 expecting correction entries just like in case 1.
Date Format Used: mm/dd/yyyy
Regards
Sekhar Muthaluru
(1) Update your Sales rule sales grading rates (2) In reporting rule > sales report > change sales report, create version 001 and enter the same net sales for each of the six (6) months. (3) Execute RESRSECORRECT and the system will compute i.e.
Sales based rent 1000 x grading (old)
Sales based rent (V001) 1000 x grading (new)
Difference (=/-)
Try for one month and verify if results are valid. Hope this helps.
Similar Messages
-
Difference between Full settlement & periodic settlement
What is Difference between Full settlement & periodic settlement, & how these works works on orders. Can anyone tell me that how can I check result for the same. (Kindly mention t-codes also)
Regards.....KaushalHi,
Please find below some salient features of each os the settlement type you have asked for:
1. Periodic settlement -
a) Will have Product cost collector as cost object (both REM and Descrete scenarios)
b) WIP and scrap variances are based on Target costs
c) Variances are recognized in the month in which they are actually incurred based on the target costs. Varainces = Total costs - GR - Target WIP
d) Default rule in OPL8 should be periodic settlement
2. Full Settlement
a) Manufacturing orders will be costs objects
b) WIP will be at actuals. WIP = Total costs - GR value
c) Varainces will be recognised only when the order is fully delivered. till that time though there are variances, they will not be recognized but will be included in WIP value. This is the key aspect of Full Settlement
d) Default Rule in OPL8 would be full settlement
T.codes relevant:
KSV5 Run dist cycle
KSU5 Run assessment cycle
KSUB Run assessment cycle
KEU5 Run COPA assessment cyle
KKA0 Change Cutoff Period for WIP
KKAS/KKAX WIP - Individual Processing
KKAO WIP - Collective Processing
KKS6/KKS2 Variance Calculation - Individual
KKS5/KKS1 Variance Calculation - Collective
KK87/KO88 Settlement - Individual
CO88 Settlement - collective
*For Sale Order controlling *
KKA3 Execute Result Analysis - Individual
KKAK Execute Result Analysis - Collective
VA88 Sale Order Settlement
Best Regards
surya -
Hi
I'm trying to come up with query report to show Inactive Item bought within a specific period and not sold within a specific period by whse and have stock
The report should show Item Number, Item Name ,Item cost,Retail Price [Based on a price list], Qty in Whse, Last Purchase Date, Last sale Date etc.
e.g item bought between 2011-2013 and have not been sold with the same date range or the last 12 months.
Regards
Brian Ndunda.Hi,
Try this query:
SELECT T0.[ItemCode], T0.[ItemName], T0.[OnHand], T0.[AvgPrice], T0.[LastPurPrc], T0.[LstSalDate] FROM OITM T0 left JOIN INV1 T1 ON T0.ItemCode = T1.ItemCode left JOIN OINV T2 ON T1.DocEntry = T2.DocEntry WHERE T1.[Quantity] is null and T0.[OnHand] >0 GROUP BY T0.[ItemCode], T0.[ItemName], T0.[OnHand], T0.[AvgPrice], T0.[LastPurPrc], T0.[LstSalDate]
Thanks & Regards,
Nagarajan -
CJ88: Amount already settled in full
Hello,
I have a problem with the upgrading from 46c to 6.0.
I try to settle a wbs against an asset . This wbs is new as weel as the asset . Never settled
When i insert an amount in the settlement rule , there is no problem , the system do it correctly.
But when i introdue a percentage in the settlement rule appeared a green mesage that doesnt allow me to execute it.
Appeared this message ( in green ) :
Amount already settled in full
Message no. KD227
Diagnosis
For one/a sender, there are only distribution rules with one amount. You may use this amount up to an upper level.
The system has already completed settlement of this amount.
I saw the wbs settlement profile , and allows you to insert % and amounts .
Do u know why i have this problem , or if i need to upload a oss note? ( i didnt find anything yet)
ThanksHi,
There is an amount but positive , expenses.
The funny thing is that if i insert the amount by hand , settle , but if i insert a percentage not.
And the settlement profile allow to use it.
thanks -
Production order settlement period
Dear Friends,
I have settled my production order in period 4 (Let us assume). After some time ( let us assume 15 days) i wants to reverse my order. But by the time of 15 days my period has been changed from 4 to 5. I have forgotten on which period that particular order has been settled, so that i can reverse the order on the same period.
Could anybody guide me , How to display production order settlement period?
Thanks
SenthilHi Mahesh,
I could not find any period related information under change management option.
But i have found the information under "Header----Settlement rule". Here we can find the details about settlement period (First used and last used).
Thanks
Senthil -
Create posting docs for recurring docs - Settlement period
Hi Gurus,
I am trying to run F.14 to create posting docs for recurring docs. What is the settlement period field used for? For a recurring doc that was created in May, i was able to run that during may end but now i want to run this for this month end and if give June month as settlement period, it's says batch session couldn't be created.
Also, to which date does the posting doc get posted to? Does that depend on settlement period?
All answers will be duly rewarded.
Thanks
NSettlement date is used for restricting selection of documents that are due.
If you run for 1 day and documents are due to be created that day u will have a batch for that. If you run for a month the system checks the documents due in that month and creates a batch.
This can be at any time and does not need to be during that period or at the end, posting possible depending on whether OB52 allows it.
Note that the system checks which documents have been already processed so you cannot run multiple times. -
Reversal of MR result within Full DPC period
Hi,
I'm unable to reverse a MR result within a Full DPC period, after a MO document exits.
In same cases I can reverse (if the billing period is still open) and others that I can't because the billing time period is already open for the new contract.
Thx in advance for your help.
AAL!Uwe,
The MR 09 is not billed since it was loaded after the Final Bill was sent. The MR 09 loaded within the billing period is only used on the next billing period (next year), hence, there won't be a next billing period since the BP has already MO, the Business wants to reverse the read.
Can & Can't
- The MR 09 consumption SHOULD BE ignore.
- Final Bill consumption is correct.
- Can't rebuild the customer and we don't need it also. Business impact and Customer is also impact.
Hope this clarifies the case.
KR,
AAL! -
Hi
i would like to settle ineternal order partially ,is it possible ,if it is possible where can i do the settings.
can any body help me.......
regards
prasadhi,
internal order can be settled periodically.
GOTO settlement profile check it periodical settlement instead of full settlement.
Goto KO01 in settlement rule give peridically with percentage.
Goto ko88 and give the period u want to settle
Regards,
Sreekanth -
WINDOWS MANAGEMENT FRAMEWORK 4.0 - A required certificate is not within its validity period
Hello,
I can't figure out if this is because the Root Certificates were updated in April 2014 then apparently expired by Microsoft or if the PowerShell installer signed this file with a bad software release signature??
We were deploying PowerShell 4.0 (Windows6.1-KB2819745-x64-MultiPkg.msu) with ConfigMgr 2012 with a dependency of .NET Framework 4.5.1. Everything was working fine until sometime around April 24 (exact date unknown). Now any
Win 7 SP1 machines I try to update will not install WMF 4.0. They installed .NET 4.5.1 without any trouble..
The digital signature on it it states it was signed Sept 27 2013 and the certificate expires 4/24/2014.
Even if we change the system clock to April 1 2014 it still will not install.. but this shouldn't matter anyway. They just can't sign new software with that certificate.. surely I can install it..
As for a log... If I run as C:\Windows\ccmcache\3>wusa.exe Windows6.1-KB2819745-x64-MultiPkg.msu /log:c:\windows\ccmcache\3\broken.txt
In the broken.txt I see:
Install Worker.01194: Operation Result Code of the installation: 0X4 HRESULT of the installation: 0X80240022 Operation
Result Code of the update:0X4 HRESULT of the update: 0X800b0101
Install Worker.01243: Failed install update Update for Windows (KB2819745)
Install Worker.01287: Exit with error code 0X800b0101 (A required certificate is not within its validity period when verifying against the current system clock or the timestamp in the signed file.)
WINDOWS MANAGEMENT FRAMEWORK 4.0 FOR MICROSOFT OPERATING SYSTEM PRODUCTS
Windows6.1-KB2819745-x64-MultiPkg.msu
I also see this same event information in Setup event log..
I don’t know what to do here. Anyone else having this problem?Hi,
Have you ever seen this article?
Event ID 4107 or Event ID 11 is logged in the Application log in Windows and in Windows Server
http://support.microsoft.com/kb/2328240/en-us
If you have any feedback on our support, please click
here
Alex Zhao
TechNet Community Support -
CRM 2007 Pricing based on settlement period of billing plan
Hi,
I need the ability to have disocunts on a service contract based on the settlement period of the billing plan.
A contract list price is 12 GBP per month.
If the customer want to bill monthly no doscount will be applied.
If the customer wants to bill quarterly a discount of 1 GBP will be applied.
If the customer wants to bill annually a discount of 2 GBP will be applied.
If the cusomter wants to pay upfront a discount of 5 GBP will be applied.
For this purpose I enhanced the field catalog for pricing with this new field.
A condition table using this field was created.
Badi CRM_COND_COM_BADI was used to pass the field from the billing plan to pricing. I used FM CRM_BILLPLAN_READ_OB in if_ex_crm_cond_com_badi~item_communication_structure.
When the contract is created the Badi is called and the period specific price is found.
When I change billing plan the badi is only called for the BRI (Billing Request Item) but not for the contract item for which the price is mantained.
Does someone has an idea how to establish this???
Thanks in advance.
Points guaranteed.
Regards
DirkHi Stas Shapiro,
Your question is related to u201CCustomer servicesu201D module in SAP, you can post such issues in a forum called u201CEnterprise Asset Management (EAM)u201D in sap.sdn forum,
Whether you have Service contract or in Warranty you need to have special condition types like ZZDC, PPAG etc. for pricing procedures PABR01/02 (Header or item pricing procedures.)
Similarly a different pricing type for Warranty need to be configured.
I suggest you to go through the following sap.help.link to get complete solution to your thread
http://help.sap.com/saphelp_46c/helpdata/en/e6/4a903f9e0311d189b70000e829fbbd/frameset.htm
For time related billing you need to use service orders with resource related billing, even for this you need to explore the above link.
all the best.
Regards
DSR
Edited by: D.Srinivasa Rao on Nov 1, 2011 12:05 PM -
HR ABAP Report: Display employee details changes within a time period!!
Dear Friends,
I need urgent help with the below HR-ABAP report.
Thanks in Advance!
Joy
I have to create a report which would display in ALV
A table containing details of all changes to fields specified iby the user within the selected period
Details :: ~
When executing the report, the user will be given the opportunity to select which fields will be displayed in the output of the employee changes table. They will also be given the choice to display the previous value for each field and the date the change becomes effective.
Please Help !!!First of all ensure that the fields that you need to audit have been configured.
refer to the documentation of report RPUAUD00.
You will need to create a report that extracts data fromPCL4.
If your audit data has been configure as Lond documents then look at using FM HR_INFOTYPE_LOG_GET_LIST &
HR_INFOTYPE_LOG_GET_DETAIL
If not you will to extract the header info & then the BELEGE info - beware of the differnt operas inuse.
J -
Create a Crystal report to display the sum of G/L account code within a specific period
Hi,
Just wonder is it possible to create a crystal report to display the total of a G/L account code within a specific period?
How to write the query to get the sum within a specific period?
For example:
Period: 2014-06-01-2014-06-10
Account code A: USD "TOTAL"
Account code B: USD "TOTAL"
ThanksHi Olga,
Please check below Query.
SELECT T1.[Account], T1.[ShortName], SUM (T1.[Debit]) as Debit, SUM (T1.[Credit]) As Credit, SUM (T1.[FCDebit]) As FCDebit, SUM (T1.[FCCredit]) As FCCredit, SUM (T1.[SYSDeb]) As SysDebit , SUM (T1.[SYSCred]) As SysCredit FROM OJDT T0 INNER JOIN JDT1 T1 ON T0.[TransId] = T1.[TransId] WHERE T1.[RefDate] >=[%3] AND T1.[RefDate] <=[%4]
Hope this Help
Regards::::
Atul Chakraborty -
Need a FM for gettng starting & ending date based on the settlement period
Hi,
I have to filter a database table based on the settlement period( IDENT3 ) and the field available is of date field. Can anyone give me a function module by which can calculate the starting date and ending date by providing the settlement period ( eg. AM- Monthly, AQ- Quarterly, AJ- Annually, etc ) and date.
Thanx in advance.
Regards,
Sumanth.Hi Sumanth,
Please use the function module 'DATE_CONVERT_TO_FACTORYDATE' to get the start date and end date for the particular factory calender.
For end date:
CORRECT_OPTION +
DATE sy-datum
FACTORY_CALENDAR_ID Aq(quaterly)
For start date:
CORRECT_OPTION -
DATE sy-datum
FACTORY_CALENDAR_ID Aq(quaterly)
According to sy-datum, it will calculate the Extreme interval .
Thanx,
Zenthil. -
Error: Device\Ide\iaStor0, did not respond within the timeout period.
Hello,
In last few months, I began getting the error:
The device, \Device\Ide\iaStor0, did not respond within the timeout period.
My system hangs and slows to a crawl. Error seems to be well-known, and solution is to install the latest version of Intel Matrix Manager, which is 8.6. I've done this, I reinstalled my OS, and I've reinitialized my hard Raid1 array. None of this has helped.
http://www.intel.com/support/chipsets/imsm/sb/cs-025783.htm
Any suggestions?
Thx.
ScottQuote
Have you tested HDD's with Seagate diagnostic utility?
Going by the link you have provided I assume you are using Vista?
Yes, I am using Vista and I did also use Sea Tools; no issue identified. I'd love to hear more suggestions. Things I've done:
1. Reformat / reinstall. Helped, but problem not eliminated.
2. Ran SeaTools Disk Diagnostic. No issue.
3. Installed Intel Matrix STorage, most recent version 8.6. Should've fix prob, but didn't.
4. Upgraded Bios from 7.5 to 7.9.
Seems like the upgrade to Intel Matrix Storage Manager should've fixed this issue, but it didn't. Any particular drive identified in the error message in the original post?
It is also not clear what changed to have introduced this error. My system has been stable for 2 years and from the errors looks like I've had problems for the last 3 months, but they got notably worse in the last 2 weeks. Reformatting / reinstall helped, but didn't eliminate these issues. Any insight would be appreciated. -
Standard function for settlement period
Hello
Does someone knows if there is a standard function that could define the settlement period based on a date (DD.MM.YYYY)?
The aim of this is to use it in report RKO7CO88 thanks to a link with table TVAR because we would like to run in background the settlement without having to change every month the variant.
Kind regards
ChrisHello Srikanth,
create 2 variables ...one for fiscal year and another for posting period...
for the column which should take the previous period...right click on the variable and you will see offset...put in -1....but what if the user enters 2006.001...should it take 2005.012 ?? In that case you should write an abap code i think ....
Maybe you are looking for
-
Video playback in AIR application
I'm a purely graphic and video producer who has recently had to take on a touchscreen kiosk project at the very last minute. I have a basic (read pitiful) knowledge of actionscript and html, but no practical experience. I'm using Flash CS5, but also
-
Hi all, In the Query I have to show something like this PO POITEM Net Price X 10 20 Result : 20 X 20 30 Result : 30 Same PO with Different POITEM and the result should be Sum of only
-
How can I get a listing of web orders entered by specific time period
How can I get a listing of all the orders which has been entered via website using webtools. We need to make sure that all the orders which has been entered from website it is synced to B1 instead of looking at the synch error messages. The problem i
-
Store Header and/or footer from flat file to an oracle table by customizing LKM.
I like to customize my LKM by adding extra option in LKM and extra step in LKM, so that I can store Header and Footer of the source File (Header : normally at beginning of the line Footer At the end of the line) in a separate oracle table. File form
-
I have 3 users who have wyse terminals that connect directly to Citrix sessions who then have Adobe 9.0 installed. The go to a specific site https://www.ubhonline.com/ from here they log in and open client files which are pdf's that should be prepopu