Same Batch Material to be sold at different selling prices

Hello,
  I have a customer requirement where a material at depot belonging to the same batch should be sold at different sales price.
Eg: on 1st of May, Material XYZ belonging to batch AB052011 of 100 qts was GR into the Depot at Rs 100 / qty. A selling Price PR00 will be maintained at Rs 100 / qty. On 5th of May, sales happen for 50 qts, hence PR00 condition of Rs 100 /Qty will be picked accordingly. Till this point everything is fine.
Price change happens for the material at the plant.
Again on 15th of May another GR for XYZ material of Batch AB052011 of 200 qts was GR'ed into the Depot at Rs 150 / qty now. Accordingly PR00 price was changed to Rs 150 /qty.
On 20th of May the total stock of Material XYZ belonging to Batch AB052011 is 250 qts. On 20th if sale happens for 250 qts, Customer requirement is pick a PR00 of Rs 100 for the 50 qts and PR00 of Rs 150 for the remaining qty.
We dont want to allow price to be changed manually, this should only happen through condition records. Is there any way by which I can create a condition table which allows me to maintain two different prices for the same batch at a given point of time.
Regards
Raj

Hi Rajendra,
Option1:
Assuming that you are only talking about Batch Number based price (and not Batch characteristics based price) you can maintain price condition record based on Batch where Batch number will be one of the key criteria in your Access Sequence. So you many need to create a new Condition table with Material/Batch Number and insert it into your Pricing condition Access Sequence.
Since you will not know what batch you deliver till the goods been issued, you may need to redetermine the Pricing procedure during the Billing. Based on the batch that is delivered system will redetermine the Price from Condition record maintained on Batch basis.
Option2:
If you are talking about Batch Characteristics based Price, you have more to do.
Please check these forums links which might help you and also look at the OSS Note: 675409
http://www.sapfans.com/forums/viewtopic.php?f=5&t=285438
http://www.sapfans.com/forums/viewtopic.php?f=5&t=222440
Good Luck

Similar Messages

  • Same batch for 2 deliveries

    Hi All,
    Is it possible to have material with same batch numbers for 2 or more different deliveries ( Not partial deliveries ).
    Where can I see this setting if it is a configurable item.
    Thanks and best regards,
    Kalingeri

    Hi Vikram,
                    Generally customers want to have an item of the same batch in a given delivery, as it becomes easy from their end also to update their stocks. In the sense a delivery corresponds to a batch.
                    However the basic thing is we need to have stock of that item belonging to a particular batch in the required quantity. As already suggested there is no configuration setting required to do this. We can rather select an item from various batches also if required, which anyway we wouldnt want to do.
                   Hope the explanation gives some more clarity. Pl. reward if it helps.
    Thanks & Regards
    Sadhu Kishore

  • Process Order creates Multiple Inspection for Same Batch

    Hi Guys,
    Expert opinion is needed to have this issue fixed.
    Issue:When a new Process Order is created it automatically creates in storage location A.  There are times when a process order needs to be created into another storage location B.  When the Process Order is created and then is changed from A to B  it will  create two inspection lots for one batch, one for each storage location.  From the plant perspective they only need one Inspection lot as they will not create two set of samples for testing since it is the same batch it just went into a different storage location then it was originally created for.  Is there a way to change SAP  so that it only creates one Inspection lot per batch.
    Control InspLot field in QM view for Insp Type 04 is X
    We had different scenarios with same Batch
    SCENARIO #1:  Sloc is changed to B prior to Release, in CRTD status of order Sloc was A
    So there are 2 Insp. Lot created one for A & another for B after GR in Sloc B
    SCENARIO #2:  Sloc is changed to B after  Release
    IL is created after Release of order with Sloc A, after changing Sloc B in process order and performing GR, new IL is created for Sloc B
    Business scenario is certain times of the year where one creates a PO with one Sloc and then it needs to be GR into a different Sloc.
    They are generating a lot of IL’s that are not used and it seems like every year they need to get UD’s made on IL’s for finance to close out the year which is cumbersome.
    Please suggest way out, objective is one process should have one IL per Batch irrespective of Sloc
    Regards
    Nitin Desai

    There are several things that come to mind.
    First and foremost, get the planning right so that the process orders are created properly the first time around.  This is a business issue.  Yes.. I don't know your business.. no, you really aren't all that different then the thousands of other businesses using SAP.  The root cause of this is you don't know what is going where when you order it or in the case of process orders, where you intend to make it or store it.  That's a basic planning problem.
    2 - you must have early lot creation turned on, "Y".  You can't be using "X".  X would only create an 04 lot when you do the GR so if you change the storage location prior to the Process order being released I'm not sure how you are generating two lots.  Are you sure all the lots in question are 04 lots? Are you maybe seeing an 03 lot?  Or possibly an 08 lot?  Something doesn't sound right here.
    3 - If you receive into two storage locations from one process order, you will get two inspection lots.  No way around this.  There is stock associated with these.  You could use customization to suppress the second receipt but that stock would go right to UR with no inspection.
    4. Don't change the storage locations  in the process orders at all.  You can use the stock posting screen in the UD and change the storage location when you make the UD.
    5.  Another option is to again, don't change the storage location in the PO but use QAC2 transaction to transfer the inspection lot into the proper storage location.
    You need to explain your scenarios better cause I really don't see how you are getting the two lots when you make all your changes in the process order prior to releasing the process order.  That doesn't make any sense at all.
    Craig

  • Same batch picked on two different delivery notes

    Hi all,
    We have a situation whereby on occasion the same batch of a material is picked by SAP on two different delivery notes.
    I'm trying to get to the bottom of why this is happening - from what I can tell this only seems to happen when the initial delivery is PGI'ed after the planned PGI date. i.e. delivery A created on Sep 1st with a planned PGI date of Sep 5th. Actual PGI date turns out to be Sep 7th (two days later). Delivery B created on Sep 6th - SAP picks same batch on delivery B as on delivery A. Delivery B needs to be manually amended with a different batch selection.
    Am I correct in saying that SAP standard functionality only allows for the batch to be scheduled for delivery (cannot be picked on another delivery note) up until the planned PGI date? If so, how I can I prevent this from happening?
    I need to try to get to the bottom of why this issue is happening.
    Any useful answers will be rewarded!
    Many thanks!

    you might have selected bacth but not completed picking thats why system allowed another batch selection with same quantity. pIcking reserves the quantity. Hope this will help you.
    Thanks & Regards
    Amit

  • Same Batch with different expiry dates

    Dear all,
    My vendor produced the same batch Y28 at an interval of 3 days eg 10/10/2008 , 11/10/2008, 12/10/2008 with an expiry date of 1year.
    He sent in the batch Y28 to me with the following expiry date 10/10/2009, 11/10/2009 and 12/10/2009.
    During GR, I need to enter the expiry date. However, I realised that the Batch Master for the same batch can only have 1 expiry date. I end up with the latest expiry date of 12/10/2009.
    Could anyone advise on how the above scenario sould be handled?
    Can I maintain 3 different expiry date for the same batch?
    Is it a norm that the same batch can have different expiry date?
    Thank you

    You should create a separate batch per day, if you really think that the exact date of expiry matters for a material that has a shelf life of one year.

  • Same batch selected in two different Deliveries

    Dear all
    I have a problem in Outbound delivery creation..
    I have created 2 different outbound deliveries. While creating & Batch determination of first outbound delivery  Batch number X with qty 100 is selected. Then it is saved with out PGI.
    when i create the second outbound delivery also the same batch number X with qty 100 is selected. Actually it should not happen. Because i have total stock of Batch no X is only 100.
    Please guide me how to solve this issue.
    Regards
    Bala

    you might have selected bacth but not completed picking thats why system allowed another batch selection with same quantity. pIcking reserves the quantity. Hope this will help you.
    Thanks & Regards
    Amit

  • Process Order -Batch determination for a BOM material(same batch)

    Hi Friends,
    Thanks in advance.
    Let us say, a material (ROH) has so many batches as A,B,C & D. Whenever we create a new process order, system has to pick only the particular batch( say -C here)  in the process order BOM through batch determination.  (during process order creation stage)
    1.How to achieve the same ?
    2. What are the ways are there to achieve the same ?
    3.Is there any Exit for this?
    Regards,
    Mani

    Hi Velmurugan & Vishwas,
    Thnaks for your feed back.
    1. Is there any other ways without batch classification ? ( Because there are so many material without MM-classification view.....and client wants without extending the Classification view for MM master as it suggests same batch for all GI for delivery & GR for purchase.....)...We want only for process order batch determination.....
    2. Is there any exit for this ?
    3. Is it possible through any kind of Characteristic assignment in the Sort sequence? How?
    Regards,
    Mani

  • Same Batch Number with different characteristics value

    Dear Gurus,
    I have the following scenerio:
    The finished goods should be maintain in batch with external number  and at the time of confirming the finished goods in co11n the client want to capture the finished goods value like length, width and diameter.
    So we propose the batch characteristics with class type of 022 for finished good and we maintain the character as length, width and diameter under the batch class 022 and assign the batch class in finished good classification view.
    Now the requirement is we want to capture the batch characteristics value length width and diameter with same batch number for multiple confirmation.
    Example:
    Confirmation      Batch number               batch Class               Length     width     Diameter
    1                        1000                              022                              100        50             20
    2                        1000                              022                              120        25             10
    3                        1000                              022                              150        70             30  
    Now at present we are trying to capture the batch characteristics with same batch number but our standard system will not allow to maintain the different batch characteristics value under same batch number. If we overrite the batch characteristics in msc2n transaction the last value maintained be copied to all batch number. but we want same batch number with different batch characteristics value.
    Please share your idea and try to solve..
    Regards,
    Vimal

    Dear Vimal,
    It is not possible to maintain multiple batch characteristics in one batch.
    Work around is to create original batches and assign to your production order.  During CO11N, generate one batch per confirmation.  There is a report in batch information cockpit to link between original batch and batch per confirmation. 
    Rgrds,

  • Same batch number for different order materials

    Hi, pls advise can we assign same batch no's for different production order finished products?

    Yadav,
    Yes, it is possible to assign the same batch number to different production orders in the Order Goods Reciept tab.  If you are not maintaining any batch in this field then you can manually create a batch in MSC1N and use the same when making GR using MB31 or MIGO.
    Regards,
    Prasobh

  • Quality info records: different pack configurations for same raw material

    how can i differentiate different pack configuration for same raw material in quality info records, as one might approved and the other not? that is, besides creating different material master for each packaging?
    thanks
    Alisa

    You need to use the MPN profile functionality that is a standard part of SAP.
    In Config under the purchasing define the MPN profile.  There are several options you can turn on/off including info records.
    You assign the MPN profile to your material. It now is considered by SAP to be an internal material number. 
    You then create a HERS material type for each separate manufacturer material number you have.  You only need the purchasing view for these materials.  You can also create purchasing text views, classification and some others if you wish.
    In the SAP approved vendors list (AVL), you then assign each manufacturer vendor(s) with the HERS material created.
    You create a Q-info record for each manufacturer/HERS material combination.
    Now, when you specify the internal material number in a PO, the system will tell you to order the MPN material.  When you do the drop down for the material now, it will show you the approved manufacturers allowed in the AVL for the ordering plant.
    When the 01 inspection lot is created you will have a vendor number as well as a manufacturer's number in the inspection lot.  The DMR can be done by the manufacturer or the vendor depending on how you set up the inspection plan. Q-info record will be used accordingly.
    Take a look at it and research it.  It's not hard to set up.
    FF

  • GL : Importing different categories in the same batch (Unbalanced Amount).

    Hi,
    we need to post unbalanced amounts which have a different source and category into the Same Batch.
    Example:
    Source Category DR CR
    A B 100 NULL
    A B NULL 50
    C D NULL 50 (Craeted to Balance the Journal)
    The Journal Import was run and the error occured is given below:
    "EU02 This journal entry is unbalanced and suspense posting is not allowed in this set of books."
    This error is from the std pgm.
    Please Can Someone Suggest a Work Around to This Problem to Post all the Three Entries into the Same Batch and No Suspense Account is Allowed Here.
    Thanks

    you cann't acheive this way:
    Source Category DR CR
    A B 100 NULL
    A B NULL 50
    C D NULL 50 (Craeted to Balance the Journal)
    what you have to do , make a grouping based out of source + category
    Each Journal will have one source and one category..that is rule of thumb...
    in the above case....
    the system is recognize 2 journal entry
    1) 1 for
    Source Category DR CR
    A B 100 NULL
    A B NULL 50
    2)
    Source Category DR CR
    C D NULL 50 (Craeted to Balance the Journal)
    use grouping for balance the Journal total.
    You can create unbalance entry only for case of STAT Journal
    make sense

  • Same batch in different Process Order

    Hi Expert
        I have created one Process Order in COR1.Before saving the data batch is alloted for that Process
       Order.At the same time another person is created the another Process Order in the diiferent location
      and he also got the same batch what i got since both of them are not save d the data.
      The isuue is we get the same batch both the person.It is a serious issuen in our case.Please let me know it is a configuration issue.
    Regards
    Manoj

    Hi Manoj,
    It is highly impossible that system will give both the users same batch number. Even if both of you have created Process orders at the same time..System will not allot the same numbers as the numbers are alloted from the buffer. Incase both users get the same batch number then, system will allow only one you the users to save it. The other user will get a error (or atleast an warning msg.) check this yourself and you will get an answer to the problem. By changing the configuration it wont help as the probability of both the users releasing the PO at the same time is still possible.
    Regards,
    Zoheb Hasan

  • Same batch in deifferent plants-blocked

    Dear Gurus
    Our client has different Plants in various locations. when we Postgoods Issue in  Outbound delivery the system doesn't allow if the material with same batch is being processed at other location. can this be avoided where in same batch of a material in different plants at diff. locations can be processed simultaneously.
    regards
    Jim

    >
    Jimvero wrote:
    > Dear Gurus
    >
    > Our client has different Plants in various locations. when we Postgoods Issue in  Outbound delivery the system doesn't allow if the material with same batch is being processed at other location. can this be avoided where in same batch of a material in different plants at diff. locations can be processed simultaneously.
    > regards
    > Jim
    Check the level at which batches are managed. This can be done in the node:
    Logistics - General > Batch Management > Specify Batch Level and Activate Status Management
    I guess your batch level is currently material level. If you change it to plant level, this problem might get solved. But then the system will maintain different data for the same batch number in different plants.
    Check the following link:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/25/2838714f7811d18a150000e816ae6e/frameset.htm
    Regards,
    Aroop

  • GR Posting- in same batch

    Hi Gurus ,
    I have a doubt related to batch determentation:-
    If I post a GR with batch 123456 of 50 qty of material which exp. date is 28'th feb 2011.
    Again I post one more GR of 30 qty of matrial which has the same material,same plant,same sloc and same batch 123456.
    only difference is the exp. date,suppose it's now  10'th march 2011.
    hence after posting above both gr stock will show the qty 80 in the batch 123456.
    So my query is how system do distinguish between 50 qty of materials and 30 qty of materials,
    bcoz both has the different exp. date ,so at the time of GI both should have the different nature.

    >
    Tiwari Himanshu wrote:
    > Thanks for the replay Jogen,
    >
    > I agree with you
    >
    > The best pratice is to use the different batches for different exp. date of the product.
    >
    > 1.but SAP do not restrict it. I do not know why?
    > 2.Can be restrict it, I mean if any end user use the same batche for a product having different exp. date/mfg date.
    >    system can not be permitted for the same.
    > 3.I have one more doubt, can be use the concept of shelf life without batch detemination?
    >   If yes then whats its significance. I mean whats logic behind this recomended by sap.
    >
    >
    >                                                                                Waiting for your replay
    >                                                                                Thanks in advance........
    SAP allows as well to extend the shelf life with MSC2N, so doing it directly with the next receipt is just a short cut.
    If users are choosing an old batch and cahnging the shelf life, then this is  by intention.If you want prevent that , then you have to find a user exit. I would talk to user to  to get knowldege why he does it this way, maybe he needs training.
    Yes, with warehouse managment you can manage shelf life too, with some limitations.

  • Batch locked if some other user using same batch

    Dear All,
    I am facing the batch lock error which say like this :
    Batch XXXX of material XXXX is already locked by userXXX. Message no. M3682
    Now practically we have the same batch at different distribution centres at different plants. so even if any 1 person is doing anything on that batch than system gives this error message to other person.
    Can you please give me any solution to overcome the same.
    Thanks in advance......

    Firstly please check if you have activated the batch level as 'Batch unique at material level'. If yes, we have to confirm that the system behavior that you are facing is the standard system design.
    Please, consider that when you define the batch at material-level, then,the batch data is not plant-depended. This means that a lock on the batch will have effect on postings in all plants.
    However, you might want to consider a modification to this standard behavior, see the following  notes:
    157423 - Message M3682 for goods movement to the same batch.
    633750 - MIGO: Message M3682 with goods movement to same batch.
    1422983 - MIGO: Message M3682 during goods movement to same batch

Maybe you are looking for

  • Render files path is not correct...

    My Scratch Disk for video/audio capture and video/audio render is set (System Settings) to a special scratch disk, but FCP is >not< using this scratch disk (available space 700 GB). Instead of using my scratch disk FCP writes everything to my boot de

  • Regarding Quotation & purchase order

    Dear experts, I want to get clear how purchase order play a role in creating a quotation. So long i heard of process Enquiry->Quotation->Sale order -> Delivery->Billing->FI posting. But i have no idea how purchase order is used to create quotation. P

  • Type of Budget Entry document  info object

    hi what is info object for  Type of Budget Entry document

  • TypeError: sap.ui.app is undefined

    I am trying to develop a basic UI5 app using the Eclipse Plugins. I need to consume the service ZGWSAMPLE_SRV from the SAP gateway "sapes1.sapdevcenter.com". When i try to execute the app by running on the Tomcat server its giving the below error whe

  • OWB 10 R2 detailed presentation required and sequence jump problem

    Hello all Firslty i urgently need a presentation on OWB 10g R2. I have to deliver the presentation in next week to train people.can any one of you can help me out. secondly, i m facing a sequence jumps when i excute a mapping in upinsert mode.can any