Same Cost Element in multiple Controlling Areas

Can a same Cost Element under the Chart Of Accounts(CSKA) used in multiple controlling areas under the Chart Of Accounts or it should be used only by one Controlling Area. Then as Cost Element category is under CSKB (Cost elements (data dependent on controlling area)) it depends on Cost element and  controlling area. So can a Cost elemtnt in different controlling areas has different cost element category. Is that possible as in that case COst ELement becomes GL Account in one Controlling area and doesnt have GL Acvcount in another.

Yes.  Provided it's the same chart of accounts being used across all of the controlling areas.  In the case of primary cost elements, you will still need to individually create the equivalent G/L accounts in every applicable company though.

Similar Messages

  • Same operating concern for multiple controlling area

    Dear all,
    We have a senario in which multiple controlling area is defined with multiple currency. Is it feasible to use same operating concern or different.
    Thanks & Regards,
    Vishal

    Hi
    As long as the Fiscal Yr Variant is same between the two, you can use same Op Concern
    I dont think the above reply is valid because in my opinion, there is no restriction with regards to Currency
    br, Ajay M

  • Copy Cost Elemets from one controlling area to new controlling area

    I want to copy cost elements from controlling area 1000 to 0860 with same chart of accounts.
    KA01 allow me to crete cost element one by one through reference but this will not solve the problem.
    Is there any transaction where I can copy all the cost elements which is in controlling area 1000.

    Hello
    no need to copy cost element from 1000 controlling area
    u must have ur chart of accounts and GL accounts
    u can do that automaticaaly insted of going to KA01
    u can do that in Tcode - OKB2
    enter the chart of accounts
    Range the GL accounts ( lets primary cost element  with catagory 1)
    range aal Gl accounts ( lets for all revenue account with catagory  11)
    save
    create batch input session in OKB2
    execute batchinput in OKB3
    hoep this would solve ur problem
    regards
    Anup
    Assign points if u find this answer useful

  • Multiple controlling area with same chart account

    Hi Experts,
    can we consolidate multiple controlling area with same chart account in SAP BI?
    for example, if in R3 I have 4 Controlling Areas with the same chart of accounts, I can get an standard BW reports summarizing  them.

    Hi
    Chart of accounts i.e. 0CHRT_ACCTS is an attribute of Controlling area. This means each Controlling area will have it's own chart of accounts. This chart of accounts could be similar in terms of content values. So it is possible to consolidate and produce a report which provides a summary of the chart of accounts.
    Cheers
    Umesh

  • COPA Assessment Cycle using KEU5 for multiple controlling areas

    Hello All,
    There is an organization with operations in several countries. There is a separate controlling area for each country. There is one controlling area, for instance, for Germany and another for Netherlands.
    A problem is encountered while executing transaction KEU5 for multiple controlling areas in parallel. For instance, when one user from Germany executes KEU5 for an assessment cycle for Germany controlling area and at the same time another user from Netherlands tries to execute KEU5 for a cycle for NL controlling area, the user from Netherlands encounters an error message u201C'Cycle XXXX 01.02.2008 cannot be started because run group 0000 is locked'.
    Apparently SAP allows assessment cycles for exactly one controlling area to be executed together. This poses a problem since the organization plans to implement SAP in several other countries (There will be one separate controlling area for each country as per the organization structure adopted by the company).
    Any ideas, views or suggestions on the aforesaid issue would be highly appreciated.
    Regards,
    Soumya

    Hi Soumya,
    Did you find any text in SAP Documentation saying that "SAP does not allow cycles belonging to different controlling areas to be executed at the same time"...?
    Pls find the following text from SAP Help...
    Parallel Processing of Cycles of an Allocation Type
    Use
    Parallel processing of cycles results in considerable time savings. To process cycles of one allocation type in parallel, they must be assigned to different cycle run groups.
    You define the cycle run groups in the cycle header data. You also assign cycles to the cycle run groups in the header data.
    To process the cycles of a cycle run group in parallel, start the cycles one after the other, if required, in different sessions.
    You are carrying out a cross-company code cost accounting and want to perform the actual assessment in the individual company codes in parallel. Create a cycle run group for each company code and assign the appropriate cycles to these groups. You can then carry out the actual assessment in the individual company codes in parallel.
    When you execute a cycle, you can start a consistency check. The system checks whether you are allowed to execute the selected cycles in parallel.
    Though I didn't come across such requirement, I feel, my earlier suggestion will work out...
    Srikanth Munnaluri

  • USING MULTIPLE CONTROLLING AREA in the column

    Dear Experts,
    As per my requirement i need fetch the data from multiple controlling areas in to one report. please let us know how many ways are there? can i able to use controlling are in the column of the report. when i try to select the controlling area is not appearing in the coumn and it is appearing only in the gene

    Hi,
    You can select multiple Controlling area Please try with following steps.
    Maintain variant
    Click on attributes.
    Environment > Maint.sel.varables.
    Click on Display/Change.
    Create new Parameter.
    Maintain selection options to new parameter.
    Save and back.
    Select "T" in selection variable against Field name :Controlling Area.
    Select the selection variable(Newly created Parameter)
    Regards
    Mahesh

  • Copy a group of cost centers from one controlling area to another

    Hello,
    is it possible to copy a group of cost centers from one controlling area to another?
    Or a group of internal orders?
    Thanks
    Jasmina

    No. If you used any upload tools like LSMW, perhaps you may use that for uploading the second controlling area.

  • Multiple Controlling Areas

    I have a client with multiple controlling areas in ECC 4.6c.  We are preparing them to upgrade to ECC 6.0 then migrate to the new G/L.  The questions is:  When is it "easier" to convert to a single controlling area, before or after the ECC 6.0 Upgrade?  Before or as part of the New G/L Migration?
    They may not upgrade until very late this year or early next year.  They want to improve consolidated reporting as quickly as possible but are wary of the amount of time needed to eliminate the multiple controlling areas.

    Have you thought about re-implementing???
    Migrating Company Codes from different controlling areas can be a complicated process. You may need to create new Company Codes and link them all to the new controlling area.
    This will be a massive job - even if you dont want history.
    Think of the master data - Customers, Vendors, Assets, Materials etc.
    If you are to do anything you should get your rg Structure defined - i.e. one Controlling Area and then go for the new gl document splitting program.
    The two pieces of work are Fiscal Year dependant, the next FY you would need to move to a single Controlling Area, and then the following move to document splitting.
    You could do the Controlling Area and Upgrade (re-implementation) in one project and then do the document splitting the next Fiscal Year.
    Either way - good luck, sounds like you are going to be very busy !!!

  • Activate Cost Component Split in Controlling Area Currency

    Hello,
    I have controlling area currency USD and company code currency INR. When I do WIP run then system is giving error messages "contr.area currecy is missing" and "not find valid cost component structure" and suggesting to maintain "Cost Component Split in Controlling Area Currency".
    When I maintain then after that I am not able to run CK11N for std.cost estimate only with the error "cost componenet spit costed with zero" and also system giving this message on front screen of ck11n, means not allowing to go into ck11n result screen.
    Could you please give me some tips or check point on this issue.
    Thanks
    Regards
    Ravi

    I'd revert to the Cost Component per Co Area currency config that you were forced to delete (as per your other post) - but this time, just for a Costing Type or a specific Val Variant and check the results.
    Maybe that'll throw some light... also check if you maintained all the Exchange Rate config in your system... check General Settings for all the config that is required.
    Cheers.

  • Deactivate Cost center accounting in controlling area

    Hi all,
    Could you describe the consequences of the deactivation of CO-CCA in the controlling area?: should I expect incoherencies ?
    The activation (deactivation) code setting is free in OKKP transaction. My first deactivation test show me it's possible to make new postings in FI (FB60) and the cost center is not necessary anymore.
    In fact in my case I don't need to check FI-CO reconciliation.
    Regards
    Pascal Cuenin

    Hello
    Why this type of requirement is coming into our mind. SAP controlling has very good funtionalities for internal reporting. If you deactivate cost center accounting then how your management would see...cost center reporting, budgeting, controlling
    for example you have cost element salary,,,,,with one gl for a company,,,how you will distinguish salary with reference to a division , dept, location....
    how you will get your assessment, settlement, costing all these for which CO functionalities are developed
    regards
    dinabandhu

  • Cost element groups and conrtolling area.

    Dear Experts,
    Is there any possible way I can find out which all cost element groups are coming under a controlling area?
    In KAH3 when i press F4 i dont have the selection parameter as controlling area.
    If not stadard transaction any table?
    regards
    Paul

    Hello,
    When you are working under a controlling area, your controlling area will be set. Otherwise, set your controlling area in OKKS. You cannot work parallely under two controlling areas without setting controlling area.
    Obviously, you will see the cost element groups created under that controlling area. When you press F4 on cost element groups, you must be getting controlling area and must have been greyed out.
    Regards,
    Ravi

  • Cost elements with incorrect  functional area

    Hello,
    We have two cost elements 9xxxx1 and 9xxxx2with no functional area assignment in the master data. But these cost elements are posted with a debit to the 5000 functional area when they are posted to a production order. Request help on analyzing from where the assignment to this functional area 5000 are coming from.
    Thank you

    hi..
    Goto CO03 (Prod Ord display) select GOTO top of the screen and select cost > analysis. It will display your element booked in the order. Double click on Element and analyse.
    kkumar

  • Different Company Code with same fiscal year variant and controlling area

    Hi
    I have three company codes in three three different countries: 1000 (ABC India), 2000 (ABC Inc, US), 3000 (ABC Dubai)
    But our consultants have assigned only one fiscal year variant V3 and one controlling area 1000 (with fiscal year variant v3)
    So what problem one may face because of above settings and what is ideal setting for such scenario
    Edited by: Meenu_ND on Oct 18, 2010 2:35 PM

    I have one leading ledger and two non leading ledger (i.e Group ledger and IFRS ledger). But Fiscal year variant is not mentioned for both the non leading ledgers.
    So i think it will take V3 only for non leading ledgers too.
    And in your solution, since India is main company, fiscal year variant for leading ledger needs to be V3 only.
    What if i keep non leading ledger as fiscal year from Jan to Dec. Then it will be:
    Leading Ledger: April to March
    Non leading ledger: Jan to Dec
    In above case, do i need to create separate controlling area ?
    Edited by: Meenu_ND on Oct 19, 2010 10:43 AM

  • CSKA & CSKB Tables -Cost Element+ Controlling Area, Cost Element Category

    I have few questions on Chart Of Accounts and Controlling Areas and CSKA(Cost elements (data dependent on chart of accounts)) and CSKB (Cost elements (data dependent on controlling area)) Tables--
    1) One Chart Of Accounts has one or more Controlling Areas. Is there any situation where One Controlling Area contains many Chart Of Accounts.
    2) CSKA Table contains all the Cost Elements under the Chart Of Accounts. So does all these Cost Elements appear under CSKB Table. Are there any Cost Elements which doesn't fall under any of the Controlling Area and only exists under Chart Of Accounts Level in CSKA Table.
    3) In CSKB Table How do we know the corresponding Chart Of Accounts for the Cost Element.
    4) In CSKB Table Cost Element Category depends on both Cost Element and Controlling Area. So does a Cost Element can be Primary Cost Element for one Controlling Area which happens to be GL Account and Secondary Cost Element for some controlling Areas.
    5) Are there any Company Codes under the Chart Of Accounts which doesn't belong to any of the Controlling Area and doesn't have any Cost Elements.

    Hi,
    1) One Chart Of Accounts has one or more Controlling Areas. Is there any situation where One Controlling Area contains many Chart Of Accounts. Never
    One controlling area can be assigned to many company codes, but all must have been assigned to the same chart of accounts only. This is the pre requisite for the so called cross company controlling
    2) CSKA Table contains all the Cost Elements under the Chart Of Accounts. So does all these Cost Elements appear under CSKB Table. Are there any Cost Elements which doesn't fall under any of the Controlling Area and only exists under Chart Of Accounts Level in CSKA Table.
    If some data exists in CSKA table, it mean that, it must have been created as a CE in any of the controlling area
    3) In CSKB Table How do we know the corresponding Chart Of Accounts for the Cost Element.
    In CSKB, you wont get the correspondant COA for the given controlling area. If you want to know it pass field value CSKB-KOKRS to table field TKA01-KTOPL to get the assigned COA
    4) In CSKB Table Cost Element Category depends on both Cost Element and Controlling Area. So does a Cost Element can be Primary Cost Element for one Controlling Area which happens to be GL Account and Secondary Cost Element for some controlling Areas.
    You cannot create a secondary cost elemant using a key matching with an GL code in cross company controlling. In case of both company codes assigned to different controlling areas this can be possible
    5) Are there any Company Codes under the Chart Of Accounts which doesn't belong to any of the Controlling Area and doesn't have any Cost Elements.
    Only In case of CO module is not active for the a company code
    Note: If you have more queries, post it separately rather than asking all in one thread. and be specific with your requirement with the actual scenario.
    Thanks,
    Srinu

  • Maintain Default cost element in Controlling area - FI660

    Dear All,
    We have implemented PS module for some company codes and hadn't implemented for others, when we are trying ot create a downpayment requrest its asking for default cost element assignment.
    We would like to know wheather this default cost element assignment at controlling area level will impact all the company codes or will it be applicable only to those company codes which are useing PS module.
    Please explain the detailed process flow if possilble.
    Thanks & Regards

    Hi
    It will not affect all company codes . Revenue will be generated for a particular company code for which you have created a project.
    SHASHANK

Maybe you are looking for

  • Poll interval with sender comunication channel in many servers

    Hello everybody , I have a question, we have PI 7.1 and we have the next requirement: File Adapter Sender->PI->SAP ECC now the file need to be picked up from 20 different servers, the file is in the same format in all the servers, is there a way in P

  • Use TM Back for New Machine

    I've replaced a PowerBook with a MacBook. I'd like to continue my Time Machine backups to the same sparseimage file that the old computer used. I found advice on correcting a TM problem with a new logic board, but they refer to files that don't exist

  • How do I delete some shows I downloaded with Amazon prime from my mini iPad?

    My iPad mini is getting full, so I'd like to delete the shows I've downloaded.  Can I just delete the shows, or do I need to delete amazon prime, and then reinstall it?

  • Can't purchase skype credit

    Hi, I'm not sure if this is the right place to write this, but I couldn't find anything relating to my question. I've tried to purchase some skype credit and I can't seem to do that for some reason. I went into my account and saw that I have some "pe

  • Sharing folios in Indesign

    Hello all. I am trying to share a folio with my team mate so he can review it. I looked on the adobe site and it says you go to the menu in the folio producer panel and there is a share button, but oddly on mine there is not, whem I go to the menu I