Same inspection plan for different materials

Hi, our materials are such that only visualinspection is required. so wants to create one insp plan to assign multiple materials. please advise how to do the same.

Dear Raju,
1.     QP01
2.     Do not specify the material at initial screen
3.     Put plant code
4.     If required put group externally, otherwise system will generate internal number for it.
5.     Enter
6.     At header level you find Material assignment tab. Click there.
7.     Here paste all material codes which have the same parameters of inspection.
8.     Put group counter and plant code
9.     If you want to assign n number of material codes, I would suggest to go for LSMW by recording method.
Best Regards,
Anand Rao

Similar Messages

  • How to use Same Inspection plan for Multiple Plants?

    Hello,
    When I create a Process Order for material (M1), release and save it for a Plant A then I get the Inspection lot automatically.
    Now I have another Plant B that we have created. We would like to use the same Inspection plan that has been created for Plant A and M1
    So in the changed mode(QP02) of the Inspection plan for Plant A in the material assignment tab I added the Material M1 and the Plant B. I am assuming this means when I create the Process order for M1 in Plant B then it should use the same Inspection plan.
    But when I create the Process Order for M1 for Plant B, release and save it then it does not created the Inspection lot automatically(though I can create Inspection lot manually)
    Can you tell me if there is setting that will allow me to create the Inspection lot automatically on saving the Process order which should use the Inspection plan that I just assigned.
    And also let me know if there is a better way to handle same Inspection Plan for same material but multiple Plants.
    Thanks
    SAP Fans...

    Dear,
    For your message my understanding is that you are not getting Inspection lot created in Plant"B". Inspection lot for a material would get created based on the Inspection Setup for the material master "QM View", so compare the QM for the material in both plants and correct it for Plant "B".
    Probably I feel Inspection Setup is not complete for the material in Plant "B" - Generally when extending material by copying referance, in the QM view you need to click the Inspection Setup Button, for the data to be copied...otherwise it does not copy the Inspection setup from the referance plant.
    Regards,
    Prasobh

  • Inspection plan for all materials GOODS Receipt

    Hi qm experts,
    I have a scenario. How could I make an inspection plan which covers all materials with variable base unit of measure. Its because my client is using winlims for their results recording. I want to create only one inspection plan to incorporate all materials for assignment, how could I make this one. I hope anybody could answer my question.
    Regards,
    Edsel matildo
    QM Consultant

    Hi,
      Say u have different materials with different base unit of measure ( kg / ltr / ea / pc /  --- -
    etc ) And u have assigned all these material in qulity plan having only one unit of measure (say mm )for characterisrics then there is absolutely no need to maintain conversion rule for all these
    Beacuse base unit of measure is different and unit of measure is different .
    Note Conversion rule is only required if ur using alterenate base unit of measure
    Amol

  • Muliple inspection plan for same material and same usage

    Hi,
    I need to create multiple inspection plans for same material with same usage.during the inspection lot creation i need to select any one inspection plan.
    In standard SAP its not possible.Any user exits available for this..
    Regards,
    S.P.Selvathangam

    Dear Selvathangam Palanisamy ,
                                                       My Dear Shayamal is absolutely correct and we are corrently using this SAP facility. You can create 'N' number of inspectio plans for a material and then whenever the inspection lot will created ( Thru a process order or Manual) then you will get the Inspection Lot Status 'CRTD' (Created mode) then you have to select your Inspection Task list manually by two way...
    Either go to QA02 and then select it from the list of multiple plans.
    Or you can directly go from QA32 ...select your inspection lot row and directly click on the Inspection Lot icon to go directly to the inspection lot window to slect the Task list.
    Further there is no need to remove the Automatic Assignment from the QM View of the Material Master as if there is only one task List then system will automatically assign the TASK LIST, if you deselect it then you have to select in every case.
    Thanks

  • Assignments of materials and vendors to inspection plans for the plant 1500

    Hi to all,
    Please give me solution for make assignments of materials and vendors to inspection plans for the plant 1500.
    Thanks,
    NAgesh

    hi gang,
    try to make usage decision ,kindly check in material document which you have created while making the GR, check in which storgare location you have specified and try to transfer the stock from quality to unrestricted.and also make a note on batch number also if you have activated the batch management
    regards
    thyagarajan

  • Measuring Instrument Needs to be added in inspection plan for each part

    Hi
    How to assign the Measuring Instrument in the quality inspection plan for all the materials.
    Whether i need to assign as material assignment or as PRT.
    how to use prt to assign to the operation in the quality plan (task list)
    Thanks
    VRAJ

    Hi,
    when i try to assign the Equipment for first Inspection Characteristics.
    the system thru the ERROR as,
    Production resource/tool is not intended for this type of task list
    Message no. CF230
    Diagnosis
    You want to use the production resource/tool in a task list or work order with task list type Q. However, according to usage 004 of the PRT, this task list type does not exist.
    Procedure
    Change the usage of the PRT in the master record or select a PRT which can be used in this task list type.
    How to resolve this issue.

  • SAP QM Default Inspection Plan for all Inspection Lots created in the Plant

    Scenario: We have a Proto type plant in which Daily 15 to 20 materials are created every day. We have only one inspection plan for all the materials.
    Problem: We don't want to do material assignment in the Inspection Plant header every time a new material is created
    Requirement: Is there any way to default the inspection plan for all the inspection lots created in the Plant by Standard Configuration or User Exit.
    Your answers will be much appreciated and rewarded.
    Thanks in advance,
    Thiyagu

    Hi,
    In our case Creation of Inspection lots are controlled by QM View of Material Master. Our problem is to find alternative for assignment of New Materials in the Plan header in Tcode QP02, as we have only ONE INSPECTION PLAN. So our expection is all QM Inspection Lot created in the Plant should always get assigned to the SINGLE INSPECTION PLAN, with out doing any assignment of material in the Plan.
    Thanks,
    Thiyagu.

  • One inspection lot for multiple materials of purchase order line items

    Hi All,
    My client requirement is one inspection lot for multiple materials of purchase order line items.
    Please share your thoughts.
    Thanks in advance for early reply.
    Regards,
    Jishu

    I totally agree with Amol.
    I don't think I would touch that development nor would I ever tell a client it could reliably be done through development.
    Knowing what I know about the table structures, I don't think you could create any development for this that could use a significant amount of the existing tables and functionality.  I think you'd have to create all your own Z tables and basically rebuild the functionality.  Tying it back in with SAP data will be difficult.
    You're even looking at all custom screens for your results recording and UD as well.  And if you have follow-on functions like batch classification requirements, batch determination, COA publication, results copy functions, use of DMR and sampling procedures, physical samples, quality notifications, etc. etc.. you could be looking a whole lot of development.
    Craig

  • Can i use the same email address for different users?

    we are a small department with one email address, can i use the same email address for different users?

    No. Each user needs to have his unique ID.
    Mylenium

  • Is it possible to have same file size for different dpi?

    I changed one.TIFF file (300dpi, 1024X1332)  to .jpg files of four different dpi. But when I checked the four result jpg files, I found out that they are all in same file size and quality.( I also have checked the property of the files in the Windows.)
    I think more DPI means more data and more file size. Am I wrong?
    I use Photoshop CS 5.1(64bit, WINDOWS) - which is part of my Adobe Master Collection CS5.5.
    TIFF(300dpi, 1024X1332) ->
    1. JPG(72dpi, 1024X1332) : 306KB
    2. JPG(108dpi, 1024X1332) : 306KB
    3. JPG(144dpi, 1024X1332) : 306KB
    4. JPG(600dpi, 1024X1332) : 306KB
    I tested a few times more with different files. and same result comes out.(same file size for different dpi)
    Thanks in advance.

    Yes absolutely. Great observation.  PPI does not control the number of pixels, just how big they are.
    Now, if you change the PPI in the Image Size dialog with Resample checked.. then, that is a different story. In that case you will be changing the pixel dimension of an image (i.e.,changing the total number of pixels making up the image) while keeping its print size.
    In your test files, you will notice all the print sizes are different, because all you were telling Photoshop to do was change the size of the pixels (if or when the image is ever printed), which is really just a bit of metadata of the file.

  • Same preparedstatement object for different queries.. ?

    Actually I m getting same preparedstatement object for many queries in a for loop..In this scenario its not working properly..Suppose like dis..
    connection con.setAutoCommit(false);
    PreparedStatement prepStmt = con.prepareStatement(
    "UPDATE DEPT SET MGRNO=? WHERE DEPTNO=?");
    prepStmt.setString(1,mgrnum1);
    prepStmt.setString(2,deptnum1);
    prepStmt.addBatch();
    PreparedStatement prepStmt = con.prepareStatement(
    "UPDATE EMP SET EMPNO=? WHERE DEPTNO=?");
    prepStmt.setString(1,empno1);
    prepStmt.setString(2,deptnum2);
    prepStmt.addBatch();
    Whether we can take same preparedstatement object for different query..??Its not giving any error but its not updating all the records but only the last one...
    Any solution..

    kriti123 wrote:
    Actually I m getting same preparedstatement object for many queries in a for loop..In this scenario its not working properly..Suppose like dis..
    Ignore all of the above.
    You are using a batch.
    There is a specific idiom for that. You create the statement once and then keep calling the appropriate methods on it to load and then execute the batch, and check errors.
    When done you close it. If you need commit you are going to need to deal in blocks.
    If you have a large volume of data then database import tools are very likely to be substantially faster.

  • Inspection plan for inprocess inspection

    Hi QM Gurus
    please let me know can I use an inspection plan for inprocess inspection
    Thanks
    TR

    Dear,
    Inspection Plan is similar to routing, which will indicate what are all characteristics need to be checked / inspected when you receive a material. Is a master data. Once the inspection lot is created we will check the inspection plan and perform the inspection and give the defects recording and usage decision for the inspection lots.
    So for inspection type 03 use routing with usage as 1 and status as 4 and control key as PP04 to specify the inspection characteristics.
    when u cofirm that perticular operation it will ask to record the results. Inspection lot get genarated during order release this we can see in the order header data assignment tab. PP04 assignement says this operation is relevent for inprocess inspection and we need to assign MIC's for this which are relevent created in QS21 for this also sampling procedure created in QDV1.
    Regards,
    R.Brahmankar

  • Is it possible to create  inspection plan for "Inprocess Inspection"

    Hi,
    Is it possible to create  inspection plans for "Inprocess Inspection".
    If yes , what would be the "task List Usage".Is it "1"?
    If no ,then how to map this requirment?
    Regards
    Vemula

    Hi
    Vemula
    Generally as Per SAP std Routing is used for inspection of 03 type of inspection.
    but you can also customize the Inspection task list Usage for Inprocess Inspection.
    This is possible through
    QCC0>Quality Inspection>Insp lot creation>Assign Insp type to origine>
    here informt of 03 inspection type you can assign
    Task list type:Q
    Usage:either 1(Production) or 3(Universal)
    save
    Regards
    Poonam

  • Recorded results of inspection lots for several materials

    Hi Experts,
    Can any body explain how can I get recorded results of inspection lots for several materials?
    Regards,
    Shivkumar Dachawar

    There is no standard report.  You can use the inspection report button in QA02/QA03 to generate a report on a single inspectoin lot.  You'll want to modify the SAPscript provided by SAP more than likely as the one provided is provided only as an example.
    FF

  • Can we use same number range for different  fields

    can we use same number range for different  fields. how can we see the number range defined for a particular field

    Hai,
    Yes you can have same number range for different fields  by using the same domain to the data elements that are user to your two fields.
    To see the range:
    Go to SE11,Type table Name open it-->double click on the DataElement adjasent to the field name ,You will get Domian ,Double click on Domain You will get Domain.There See Value range option .Value range cam also be defined by Value Table which will also at the Doamin level.
    <b>Reward points if it helps you.</b>
    Regds,
    Rama.Pammi

Maybe you are looking for

  • The repository URL MASTER IS NOT COMPATIBLE WITH THE JDBC DRIVER

    Hello, I have windows 7 (64 bits), java 7 , OracleXE112_Win32 , ofm_rcu_win_11.1.1.7.0_64_disk1_1of1 ,ofm_odi_win_11.1.1.7.0_32_disk1_1of2 On  install ODI (c:\tmp\DISK1\install\setup.exe)     show message above Starting Oracle Universal Installer ...

  • Problem with the audio editor window into logic pro X

    hello everybody, I have a problem with the audio editor window ! the "onglet" (sorry I don't know the word in english) "file and track" doesn't appear in the top of the audio editor window ! I can just make no destructive data, I have no access to No

  • Lumia 1520 back light soft touch buttons always on after denim update

    Hello i have installed dev prew in my lumia 1520 but no demin update was found, so i unistalled it then the update appeared. But now after the update my light sensor Works differently is less reactive and the back light of soft touch buttons is alway

  • RDMSRealm And wlpsadmin invalid username/password

    I've using wlpsadmin servlet and the default RDBMSRealm in "out-of-box configuration" . For adding new users , anybody knows if this uses an weblogic.jdbc.Datasource to access to database ? I have in weblogic.properties this configuration : weblogic.

  • JTable and cell color

    Hello, hope you can help me here - I have a JTable, and based on the value of a certain column in a row, I want the background color of that entire row to change to a different color. How can I perform this operation? I have tried to override JTable'