Same order start date for 4 FG in same work center
Hi All,
I have four different Finished goods all have same lead time and same requirement date in same work center, I didn't have capacity planning so all FG have same start date in same work center after MRP run, how it is practically possible on the shopfloor.
Is there any solution available.
Sekhar
The fact of running MRP (with or without Lead time scheduling) has nothing to do with the leveling of capacity. Lets consider both cases :
Indicator "1" :
- No capacity load is determined
- Basic Dates from material master calculated to cover the requirements.
Indicator "2" :
- Capacity Loads are calculated.
- Dates coming from recipes or routings calculated to fulfill the material requirements.
- Overload displayed in CM01
What you need is to run Capacity Leveling (CM25, CM29 ), dispatching the orders to the work center in a feasible date. But this step is never included in MRP run.
Regards
Similar Messages
-
Hi
I am facing issue with order start date.
I have created a process order and finish date as 30/06/2011. Scheduling is Forward in Time.
When i do partial confirmation of order on 22/06/2011 in production system, Order start date gets changed to 22/06/2011 and order finish date remains same.
Whereas in Quality system, When i do partial confirmation of order on 22/06/2011, Order start date and order finish date remains same as 30/06/2011.
Please confirm how the standard process should work.
Why order start date is getting changed on partial confirmation in production system
Regards
SachinSachin,
This is normal standard behaviour
Normally when production order confirmation is posted in advance to order start date, actual order start date does not change until Manula / Automatic Scheduling is switched on.
You can go to the client where it is working correctly and manually reschedule the order in CO02 and check, order dates will get changed.
So somehow in your case Automatic Scheduling is happning and hence order dates are getting changed automatically.
Automatic Scheduling Flag in OPU3 does not directly trigger CO02 change in order dates. Please check if mnaul scheduling is getting triggered in your case or some background job of COHV is running for order scheduling.
Check and revert,
Santosh Sarda -
Planned order start date & finish date
Dear All ,
I am running MRP for finished material ,
But i am getting Planned order start date & finish date are coming same (todays date ). But when i am converting the order then proper scheduled dates are coming .
Why for the Planned order the scheduled dates are not coming ?
RegardsHi Venky,
Pls try to understand how MRP works
After MRP planned orders are created for the requirement(in house)
In the planned order stage -basic dates are deteremined
For the determintaion of basic dates system check the in house production time/replenishment lead time maintained in the material master
For your requirement you maintain lot size dependent in house production data in the work scheduling view & check
You have to key in data in set up time,processing time ,base qty etc
Hope it is clear
Rgds,
SVP -
SNP Planned Order start date in past
Hi
After SNP run, for the past requirements it is giving avaiablilty data as today but the planned order start date is in past. Now this order fails in CIF as the production version in R/3 is valid from today.
In the strategy profile we have backward+reverse with infinite scheduling. In this case the start date should be todays date for past requrirements... am I correct?
Regards
Abhishek RaiHello Abhishek,
We are also facing the same issue. Did you find any solution to this issue?
We are on SCM 7.0 with EHP1.
Thanks,
Mangesh -
Planned order creation with PDS valid on only order start date and not finish date
Hi All,
We have requirement to allow creation of planned order manually if production version is valid on order start date and not finish date. This is because lead time of order is longer. I refered OSS notes 385602. I could find out solution for this is implementation of OSS note 694140 to change validity mode at activity level to consider start date of first produce activity in validity interval. Problem is even If I create order in APO by implementiong this note planned order is not transfered to ECC and it gets stuck with error production version not valid.
Is there any way in ECC to control this? Any config or customization?
Regards,
SantoshNilesh,
I think there is a simple procedural skip happening in your business process. You are right when a planned order is created after MRP it would default assign it to the first available production version. 2options available for us,
1. First use transaction MF50 and do the line loading and assign the quantites to the production versions/Production lines, so that the actual capacity planning is getting completed. This way you can have planned orders with both the production versions and matching to your actual line capacity.
2. Use Quota arrangement concept, to automatically split the Planned orders during MRP for a percentage based on individual production versions.
Now when backflush is performed S225 table is updated and Planned order qty also gets reduced.
Hope this helps....
Regards,
Prasobh -
Hello All,
I am facing a problem in a Production order.When I am trying to change the Production order Start date and saving the changes I am getting a termination error (program termination).
The error message is as below
Nested call of PERFORM ON COMMIT: NESTED_PERFORM_ON_COMMIT caller: SAPLMCEX program: SAPLMCEX form: MCEXLOG_WRITE_04_DIA
Regards
DhananjayHi
Check for the order scheduling parameters and confirm that the order in past are also allowed.
Krishna -
Set the dependant requirement dates to be scheduled to order start date
Dear Experts,
The components have been assigned to the relative operations in the routing.
During the lead time scheduling, is it possible to set all the required date of the components to the order start date instead of the operation start date? How to configure?
Thanks,
DawsonHi,
In lead time scheduling, the precise production times, that is, the target start date and the target finish date, are specified for materials that are produced in-house. Capacity Requirements are also created during lead time scheduling and the date that the components must be provided is also determined.
You have maintained the following parameters for lead time scheduling in Customizing for MRP by choosing Define scheduling parameters for planned orders:
Parameters for determining the routing
Parameters that determine if and how scheduling is carried out
Parameters that indicate if and how basic dates are to be adjusted
Then
You have assigned a scheduling margin key in the material master record.
You can define the scheduling margin key in Customizing for MRP by choosing Define floats (scheduling margin key).
If You Assign BOM components to the first Operation then all the components are provided on the Basic start date of the production considering all the floats
OR
In a situation where different operations are assigned with different BOM components then we define Lead time off set(+ve on u2013ve value) to have material provision on the basic start date of production order
pavan -
can i restrict apple mail client from downloading all emails...and allow it to pick a start date for gmail mail to sync? i am flooded with old emails, thousands on them ...eating hard drive space of my macbook pro and un necessary overhead
The genius bar technicians can check your MBP for possible hardware problems and specific software issues that you may have. The diagnosis will be free. Any extensive repairs will not be free.
If you have minor software problems, you essentially will have to deal with them yourself. Examine these two comprehensive documents for possible problem definition and solutions. If you encounter problems that you are unable to cope with, start a new discussion and there will be persons willing to assist you in solving them.
https://discussions.apple.com/docs/DOC-3521
https://discussions.apple.com/docs/DOC-3353
Ciao. -
How do I change the start date for the week from Monday to Sunday on my iPhone 5?
How do I change the start date for the week on iCal from Monday to Sunday on my iPhone5?
Yes. On my new iPhone 5 the iCal week begins on a Monday not a Sunday and does not give me the option to edit in settings on the phone
-
Is it poosible to control the start date for an assort idoc on the erp sise
is it poosible to control the start date for an assortment list idoc on the erp sise
Hi rodeofive,
As per my understanding, the issue is a performance issue. And it is caused by there are thousands of values in the drop-down list of parameters in the report.
To work around this issue, I suggest you should make some changes in the report. For example, we can add additional two parameters with multiple keywords ahead, one for the dropdown contains 95k options, another for dropdown contains 24k options. Then all
of available values which are begin with the keywords will display in the parameter list. In this scenario, we can create cascading parameters. One is a keyword parameter, and the other parameter is the drop-down list that based on the keyword to display the
available values.
For more details about the method, please refer to the following FAQ:
http://social.msdn.microsoft.com/Forums/sqlserver/en-US/8de6c783-9cb4-4b95-9be8-b59bc0049866/forum-faqhow-do-i-add-a-search-feature-in-the-parameter-with-long-drop-down-list?forum=sqlreportingservices#8de6c783-9cb4-4b95-9be8-b59bc0049866
Hope this helps.
Thanks,
Katherine Xiong
Katherine Xiong
TechNet Community Support -
Request for detailed acts to upload Work center, BOM, Routing data in LSMW
Hello PP ANgels,
Request for detailed actions to upload Work center/Resource, BOM, Routing/Recipe data in LSMW.
Thanks in advanceSanjay,
In the forum I found that you had used some "drops", that require a password to view.
In these forums, the only links I post are public (help.sap.com) and from SAP support (service.sap.com/support). SAP Support is mostly available only to customers and partners of SAP. If you meet these criteria, and need a login for the SAP support site, contact the license administrator for your company's SAP licence (this is usually a Basis person). If you cannot locate this person in your company, contact Service Marketplace directly (service.sap.com/mp). Alternatively you can contact your local SAP Sales office and speak to your account administrator.
Maybe it would be a better idea to group all standard solutions in one place.
I expect it will be so...in Nirvana. Here, life still entails suffering.
With respect to your detailed questions, I would have a hard time answering, I have never used recordings in LSMW to create work centers, I always use standard batch/direct input. I suspect that the VGEXX items are the units of measure from CRHD, I suspect LARXX items are activities from CSSL, and I couldn't comment on FORXX items without doing some research.
This is the SCM PP forum. You might get more answers posting this in the ERP PP forum SAP ERP Manufacturing - Production Planning (SAP PP) , since work centers/routings/recipes/BOMs are more or less irrelevant in SCM.
Sorry I couldn't be of more assistance.
Best Regards,
DB49 -
How come I have to off my Cellular Data for my Wi-Fi to work??
How come I have to off my Cellular Data for my Wi-Fi to work??
Off is off.
If you want the alrm to go off, the iphone must be on. It will be in sleep mode which saves battery.
The blackberry was simply on standby mode, not off. If it was off then the alrrm would not go off either.
Feel free to leave feedback for Apple. Let them know you want a stand by feature -
Parallel processing in the same work center
Dear Guys,
There is a routing sequence in which some 2-3 operations will occur parallely & those operations will belong to a same work center,How to map those operations in the routing,do i need to maintain parallel processing ,if so then how to go aboutParallel Sequence
Definition
A linear sequence of operations that is parallel to a sequence of operations in the standard sequence.
Use
A parallel sequence enables you to process several operations at the same time. A parallel sequence is carried out at the same time as the corresponding section in the standard sequence. It is a special form of overlapping operations.
Integration
You can create parallel sequences in routings and rate routings. You cannot create them in reference operation sets or reference rate routings. Creating a Parallel Sequence
Call up the sequence overview.
Choose Edit ® New entries.
The Choose Sequence Category dialog box appears.
Select Parallel sequence and press Continue.
The Sequence Details screen is displayed.
Enter the necessary data.
Select Operation overview to create operations for the parallel sequence.
so particularly in your case
WORK CENTRE OF 10, 20, 30 ,40, 50 ASSUME TO THERE
OPERATION OF THE SEQU : 1,2,3,4,5
SUPPOSE 3,4 ARE PARALLEL SEQUN AND THE WORK CENTRE 30,40 ARE SAME TYPRE TO OPR SAME
YOU MAY DESIGN AS
WC-30
(OPN3)
W.C 10 WC 20 WC50
(OPN1) (OPN2) (OPN5)
WC 40
(OPN4)
OR
WC-30
(OPN4)
W.C 10 WC 20 WC50
(OPN1) (OPN2) (OPN5)
WC 40
(OPN3) -
Ability to set same Start date for two different discrete Job in ASCP
We have two ATO Items and these to be built & shipped together which have different leadtimes, How we can have achieve same start date when we release from ASCP.
E.g: ATO_Model1*24234 SO Line 1, the rolled up LT=10Days
ATO_Model2*325325, the rolled up LT=3
So, under normal scenario ASCP will suggest two different release dates based on LT. So, I would like to start both Job togther considering the max leadtime.
Hoping for your expert advice.
Thanks
Edited by: user604737 on Nov 10, 2010 9:55 AMHi,
964188 wrote:
It is a date
Such as
10/31/2012 11:55:03 PMThen, as Hoek says, you don't want TO_DATE. For example:
WHERE TRUNC (start_datetime) = TRUNC (SYSDATE - 7) or the more efficient
WHERE start_datetime >= TRUNC (SYSDATE - 7)
AND start_datetime < TRUNC (SYSDATE - 6)Also, it doesn't look like the EXISTS sub-query is corelated to the main query. That's almost certainly a mistake.
If you're still having trouble, post your revised query, a little sample data (CREATE TABLE and INSERT statements). Point out where that query is givimg the wrong results, and explain how to get te right results.
See the forum FAQ {message:id=9360002} -
How to achieve same start date for two ATO Items- req to built together
We have two ATO Items and these to be built & shipped together which have different leadtimes, How we can have achieve same start date when we release from ASCP.
E.g: ATO_Model1*24234 SO Line 1, the rolled up LT=10Days
ATO_Model2*325325, the rolled up LT=3
So, under normal scenario ASCP will suggest two different release dates based on LT. So, I would like to start both Job togther considering the max leadtime.
Hoping for your expert advice.
ThanksHi,
Please check Vendor Master data: FK02 ->company code data -> Payment transaction accounting: unflag 'individual payment'.
Make a test and let me know if it's okay.
regards
Maybe you are looking for
-
External window Hardrive for Mac Os 10.6
Hi All, I need to use the following software in my Mac Os 10.6 http://shop.sage.co.uk/accounts.aspx?utm_source=sagecouk&utm_medium=sagecouk&utm _campaign=sagecouk_home but unfortunately its designed for "Window Microsoft" . I know how to split my h
-
Change of Source Structure for Partial Settled WBS elements - CJ02
Hi As per standard SAP, the change of source structure under settlement perameters of WBS element is not supported when the settlement of WBS element is done either partial / full. However, the client needs this change by doing any Z-Development as o
-
Did anyone get Thursday night's show? I just re-upped my pass and got the one for the 12th but nothing for the 13th. I also had no idea that there were no new shows last week and just figured I had wasted my money. I wish Apple would send an email no
-
Aperture 3 library 3x larger than iPhoto 09.
My Aperture library is sitting at about 4.5 gigs. Not really a big deal as I only have aprox 2000 photos. My question; If I kept my original photos on an external drive, would the Aperture library on my main drive use less space? Thanks, Ed
-
How to apply blending modes to a gif in CS6?
Hello everyone! I am in need of a tutorial or at least a how-to-step-through on how to apply the different blending modes on a gif. For this specific situation, I have a gif with a black background and a white semi-glowing scope, but I just want the