Sample management during inwarding

Hi,
I am having a scenarion where MM and QM integration is needed. I am inwarding a material with batch management and along with each batch, I will receive a fixed quantity of sample in separate box. There will be separate sample box for each batch of that inwarding material.
Also I need to track that sample separately and needs to store it for future reference. I mean, sample for all batches I received for that above said Material. How can I do this?
Example:
Material- ABC,
Batches are ABCX1, ABCX2, ABCX3..
Thanks
Vineeth Varghese

For this you can also use Physical sample ( inspection type 15) .
Sample management :The Quality Management (QM) application component includes comprehensive functions for processing and managing physical samples during  goods receipt and  production. The Sample Management component supplements the existing QM functions for processing samples by allowing you to:
Identify physical samples on the basis of unique, client-wide keys
Record inspection results for physical samples
Manage the physical-sample data in the system
store and retail sample for a duration.
After you process/receive sample from vendor you can create manual lot of origin 15 in QPR1.
Explore !!

Similar Messages

  • Sample Management during goods receipt

    Hello All,
    I have a scenario where a goods receipt inspection is active for material X. Inspection type 01 can be activated and material goes to inspection stock.
    But instead of moving all the quantity can i move sample from the quantity..?
    Ex: good receipt- X material 100 kg and i want only 30 gm to come to inspection stock for quality check (to avoid blockage of 100 kg)
          I have maintained inspection type 15 for material X, but how to calculate 30 gm sample..?
    Please help me
    Regards,
    Santosh

    Hello Santosh,
    There are many examples in the following threads:
    Sampling Scheme
    Sampling scheme
    Physical sample
    Physical sample
    sample drawing procedure - Auto sample calculation.
    Kind regards,
    Natália

  • Sample management & Sample determination

    Hello Experts,
    What is the difference between Sample determination and Sample management in Quality Management?
    Please explain this with the simple example for better understanding.
    Thanks in advance,
    Anitha Pauline

    Sample determination we define the following parameters,
    Sampling types - Rules for determining the sampling instruction, The sampling type defines the basic conditions for determining the sample size for each inspection characteristic. A distinction is made between certain basic forms, such as:
    100% inspection
    Fixed sample
    Percentage sample
    Sample according to the sampling scheme
    Adapt Rules for Sample Determination :To define or adapt the rules for determining samples, integrate the function module responsible for determining the sampling plan in your system. These rules form part of the function that supports the sampling type and are therefore dependent on the same parameters as this sampling type.
    Sampling ProcedureA sampling procedure defines the rules that specify how the system calculates the sample size and it contains information about the valuation of an inspection characteristic during results recording (attributive, variable, manual, etc.).
    Sampling procedures are usually used at characteristic level of a task list or material specification. You can however determine the sample size, without reference to task lists. To do this, you define a sampling procedure in the settings at plant level or for the inspection type in the material master.

  • Cannot find the maps stored in import manager during port creation

    Hi All,
    I am unable to find any maps that i saved in import manager during port creation ,the maps are not showing in dropdown list during port creation in console.Do i need to store the maps that i have in import manager in specific place under mdm server,so that i can see them during port creation.
    All i need to do is assign my import map during inbound port creation,but i cannot find any maps in console.
    Could I know whether i am storing my maps some where other than default location.
    Thanks
    Aravind

    Hi Aravind,
    First of all check the remote system assigned to ur Port. After that go to import manager. When u logon to the import manager, u get a window "Connect to source". Mention the same remote system over there.Select the file type.Browse the file and map the fields,values,field matching and save the map. then unload the repo and assign the map to the port.
    Second way is, u create the port first and give any particular remote system to it. Put the file (u want to use for mapping) in the ready folder of that port and in connect to source window select the type as port, remote system(ame as used port port) and port.then map and save. unload the repo and assign the map to port. Ready folder will be in ur server at location: C drive or D drive->SAP MDM 5.5 ->server->distributions->repo name->inbound->port code->ready. For this option, Ur port type should be manual. After assigning the map u can change it to automatic or keep it manual as per ur requirement.
    Hope this solves ur problem.
    Regards,
    Dheeraj.
    Edited by: Dheeraj Kumar on May 6, 2008 9:16 AM

  • Slightly OT: Audio File Engineering Sample Manager

    Hi All,
    This is slightly OT, I've been looking for a better SRC converter, and did some research and found http://www.audiofile-engineering.com/sample_manager.php Sample Manager. It uses iZotope 64-bit SRC http://www.izotope.com/tech/src/ for sample rate conversion, indications are that it is better than Peak Pro, and in fact is so clean in its conversion from 96 to 44.1 it's scary.
    I wanted to know if anyone here has used it. I would like to use it for sample conversion when I get some tracks ready for CD. I don't want to do the sample conversion in WaveBurner I've seen the reports on its aliasing and the results are kinda scary. I do want to use WaveBurner to glue the final pieces together before I send it to mastering house.
    Your thoughts on this converter are appreciated. They only want $70.00 for it for a short period of time. It works incredibly well on Intel Macs, seems to use all processors to do its sample rate convert. Uses Automator so you can batch convert a bunch of stuff and even apply various AU plugs if you want as well.
    Thanks in advance for indulging me
    R

    I did look at WE as well, and it doesn't have batch processing, I am not so much interested in audio editing, the facilities in logic are enough for what I do right now, at least I'm used to it and logic does it well.
    I do want to use Wave Burner once I do my sampling rate conversion, I think Wave Burner is first class for everything except sampling rate conversion.
    Here's wishing apple will license SRC in the future from iZotope and include it in any updates which may happen. I fact I am going to go post the suggestion right now.
    R

  • Sample management with in-process inspection

    i need to know why must we assign inspection points when we use sample management in an in-process inspection ?

    Hi,
    [Kindly refer the link herewith|Inspection point] wherein the importance of inspection point is mentioned.
    In simple words, inspection point determines what system should do to proceed the inspection.
    I mean if you will enter 100 (STD SAP), system will plan the inspection, UD , Quality score procedure etc etc according to the freely defined inspection points.
    Now say if you enter 200 (STD SAP) there, then system will go in the direction of Samples, means will generate Physical Sample (Numbers), Samples size, will fetch these data to UD and stock posting screen also, then calculate the Quality score, etc etc.
    If you will enter it time based inspection point then system will drive the entire inspection lot accordingly.
    Now these is the straight and written explanation to your answer.
    Means If there is inspection point as 200--->there will be need  of SDP, Sampling procedure, etc
    But in same manner it is applicable in reverse order also, i.e. If you wanna go with SDP,Sampling procedure (SAMPLE Mgmt) then,inspection point there must be maintained accordingly.
    Regards,
    Shyamal

  • Changing sample rate during acquisitio​n

    I need to programmatically change sample rate during acquisition: My application involves sampling at slow rate most of the time but during "region of interest" I need to change sampling rate to fast (close to max rate of board).

    I think it's also possible to use the same (high) sample rate during your
    complete acquisition, but in the case you need the 'slow' rate only take
    from the array sample 0, 10, 20 etc. or any number you prefer.
    In the end I think you want to make sure your computer doesn't have to work
    that hard all the way, or if you want to save the data, it's not that big...
    If I'm wrong, please tell me.
    Ron@ld
    Lancer schreef in berichtnieuws
    506500000008000000DF570000-1027480788000@exchange.​ni.com...
    > I need to programmatically change sample rate during acquisition: My
    > application involves sampling at slow rate most of the time but during
    > "region of interest" I need to change sampling rate to fast (close to
    > max rate of board).

  • Serial number in sample management

    Dear gurus
    Can I use serial number in sample management to maintain the uniqueness of the sample.
    Kindly help
    Thanks
    MK

    1.In the task list
    a) define the sample drawing procedure.In sample drawing procedure you have to define the type of sample you needed.
    b) in the header below sample drawing procedure ,define the Inspection point based on the sample mgt.
    c)At the char level define the sampling procedure for each char/mic.
    Now activate the serial number profile in the Material master as per normal procedure.
    Make sure that you active the serial number tick in the inspection setup.
    This will create the samples &  you can do the RR ,defect recording as per the serial number & sample mgt.
    I hope this will add some value
    Regards
    Sujit

  • Quality Inspections Using WM Without Physical Sample Managment

    I have configured the system to not use physical sample managment.  Warehouse Management is being implemented.  When the WM personnel perform a goods receipt and subsequently confirm open transport orders using LT04, a pop-up window to Process QM Inspection Lot requesting where to place the sample quantity appears.  The business wants the sample quantity to always remain with the stock.  How can I get rid of this request to specify where the sample quantity should be placed when I am not using physical sample management?

    hi allen,
    why don;t you directly put the materail in final detination after goods receipt .
    after goods receipt matl will be placed in interim storage type 902 and after confirming the transfer order the material will be placed in final destination .
    In the system (stock overview) material will be shown in under inspection but material will be lying in the same location .
    the sample should be removed from final destination and after perform the UD. after comletion of UD if material is ok then accept the material which will change the status of the material from quality inspection to unrestricted stock in the system but material will be lying the same location .
    in this case you don;t have to keep the material in quality interim storage location for the sample approval.which will definitely save your time ,space & effort.
    manish

  • Quality Management During Goods Receipt (Inspection Lot)

    Hi all,
    >>>>>>>>>>>>
    REQUIREMENT
    <<<<<<<<<<<<
    I have a requirement that i need to write an interface program which will receive a file from external agency (manufacturer) and process goods receipt until inspection results. The following steps need to be taken care of;
    1) Create a equipment (Utilities - It is an unique identifier for each unit of the material).
    2) Do Goods Receipt for the PO with the equipment numbers created.
    3) Create Inspection Lot for the material document created during the GR for each equipment number.
    4) Execute Inspection Result.
    >>>>>>>>>>>>
    INFO NOW
    <<<<<<<<<<<<
    Inspection lot can be created from MIGO directly by SPRO config and MM master data maintenance.
    >>>>>>>>>>>>
    DONE
    <<<<<<<<<<<<
    Called BAPI to create Equipment.
    Called BAPI to create Goods Receipt.
    Inspection Lot Settings to create lots during MIGO
    1) New Inspection Type Created as SG1 at SPRO->QM->Quality Inspection->Inspection Lot Creation->Maintain Inspection types. The maintenance is a copy of type 01.
    2) Assign Inspection Type to Lot Origin at SPRO->QM->Quality Inspection->Inspection Lot Creation->Maintain Inspection Lot Origins and Assign Inspection Types. SG1 is maintained against lot origin 01 with variant 01.
    3) Set Default values for SG1 at SPRO->QM->Quality Inspection->Inspection Lot Creation->Define Default Values for Inspection Type with parameters same as for 01.
    4) In Material master for the record set the inspection setup in the quality management tab. put SG1 as active and preferred. Also set Post to insp Stock, Insp with task list, Auto Assign, Skips allowed, Serial Numbers poss, Control Insp lot as For each Material Doc Item.
    I have to kow how to select the Inspection Plan for the lot and thus set the status of lot to released and get it ready for results.
    I also have BAPI ready for Inspection Result.
    >>>>>>>>>>>>
    TESTING
    <<<<<<<<<<<<
    I have tested it and was working fine till last thursday. I have the above mentioned settings even now in the system. Can there be anything else which the functional consultants would have change that affected the process. Anyways now the inspection lot is not getting created for the Inspection during MIGO and I am really struggling to find the exact reason.
    For your info, I am working mostly on Utilities and so do not have much idea about the quality management stuff.
    >>>>>>>>>>>>
    QUESTION
    <<<<<<<<<<<<
    Why the inspection lot is not getting created during MIGO for my scenarion?
    How to select the inspection plan in the program?

    deleted

  • JSF 1.2 DataTable management during view creation

    Hi all, I have a question on how JSF 1.2 manages DataTable exactly. Consider this table (suppose that tableList.persone has 3 items):
    <h:dataTable id="tablePersone" value="#{tableList.persone}" var="item">
    <h:column>
              <f:facet name="header">
              <h:outputText value="STATO" />
              </f:facet>
              <h:inputText value="#{item.stato}" />
         </h:column>
         <h:column>
              <f:facet name="header">
              <h:outputText value="CODICE" />
              </f:facet>
              <h:inputText value="#{item.codice}" />
         </h:column>
    </h:dataTable>
    I read that jsf iterates over the items of the list during the render response phase, in fact, "item" is not available when the view is built.
    Does it means that jsf does not duplicate the content of the table for each item in the list when creating the tree component?
    In the table above, each row has 2 inputText. If jsf does not create a couple of inputText objects for each row, how jsf handles all the 6 request parameters when the form is submitted (in particular during the apply request values phase).
    Thanks a lot,
    Nico

    I could be really mean right now in my answer.
    I did not even have to post anything, i choose to use MyFaces 1.2.1 and scraped JSF 1.2_06 SUN RI out of my projects lib folder.
    Sorry dude that's the reality, the exceptions the SUN RI threw does not help me in trying to work on real life applications.
    You know i have read that Sun RI implementation is probably best out there since work began on the 1.2 spec way before Apache MyFaces started, hence potentially less buggy.
    I picked up the latest code from SUN RI and encountered at least 3 exceptions that are very low level and hard to mitigate.
    While without any JSF pages modifications i plugged in MyFaces 1.2.1-Snapshot and not a single NullPointerException or a failure.
    I just want to reflect here on this situation because i have been always defending SUN and it's work against other packages
    but my situation with upgrading from 1.1 to JSF 1.2 really puts a dent in my conviction
    specially where UI is such a risky business for us developers in the Web industry.
    this Forum probably is taking me longer then if i just logged the issue against RI.
    But my point is that when such frameworks are being developed they should be tested against real large applications under many industry problems.
    I am after getting this point across, because right now i don't care if you these exceptions are being fixed i dumped your packages anyway.
    Now i know MyFaces have their own problems, but at this moment they are not my issues, my project works using their implementation and that's the story .

  • Transport management during implementation

    Hi,
    The landscape for our implementation project is SM 7.0 SPS 15 with ECC 6.0 D, Q and P as satellites. We use SM for Blueprinting and Config management. Considering the short duration of the project CHaRM is not implemented in SM. We use SCC1 for intra-client transports and across D,Q and P by standard TMS.
    My question is - in the abscence of CHaRM in SM, is there any way we can record/manage/document transports in SM during configuration phase?   
    Thanks.
    Mike
    Edited by: Mike Sikorsky on Jul 23, 2008 6:05 PM

    Hi Mike,
    One Solution would be to have OS level Script which would record all the Transports across your ECC 6.0 D, Q, P ..but, for this the person
    must have in-depth knowledge of internal architecture of  TMS and the OS as well. This is quite complicated .
    Usually, the Unix Scripting can handle this, but if you have the Windows I am not sure if the Batch File can do this or not.
    Hope this helps.
    Thanks,
    Regards,
    - Rupen

  • Sample Management

    Hi,
    I have to create a number of physical samples based on quantity entered. The materials are managed in PZ (UM). In particular, the rule is:
    2-50 pz -> 2 fisical sample
    51-500 pz -> 3 fisical sample
    501 - 35000 -> 5 fisical sample
    > 35000 - 8 fisical sample
    Each sample must have the sample size 1 PZ.
    Example:
    GR = 40 pz --> I have to create 2 samples:
    200000375 - sample size 1pz
    200000376 - sample size 1 pz
    GR= 65pz --> I have to create 3 samples:
    200000377 - sample size 1 pz
    200000378 - sample size 1pz
    200000379 - sample size 1 pz
    I tried using sempling scheme but I can only set sample size and not the number of samples. As with Sample-drawing procedures I can't define a correct formula for this case.
    You can help me to solve this problem?
    Thanks!
    G

    Hi,
    I created the following Sample scheme : code: TXT
    Valuation parameters: without valuationPars
    Sampling tables for: Insp. severities
    Inspection severity 004
    sampling Plans:
    Lot size     |   Sample Size
    50                  2
    500                3
    3500              5
    99999999      8
    Then I assigned this Sample scheme TXT to Sample-Drawing procedure:
    Tab primary sample:
    Acc to sampling scheme TXT
    inspection severity: 004
    If I make an goods Receipt of 50 pieces, The system successfully created 2 samples, each 1 piece.
    But if I receipt 60 pieces, the system creates 2 samples as the previous case ( the number correct is 3 sample). The same with 200 pieces.
    This solution does not solve my problem.
    G.

  • Sampler splitted during import

    Hi
    during importing Sampler CD in my iTunes the complete Album is seperated into an Album for each Track. Do you know what I'm doing worng?
    Thx
    Andy

    You may find this discussion thread useful
    https://discussions.apple.com/thread/4478384?tstart=0

  • Error in creation of sample database during installation of Oracle8

    I am trying to install Oracle8 for Intel Solaris8. Near the end of installation - running database configuration assitant, the creation of the sample database failed by an alert:
    ORA-03114: not connected to ORACLE
    I also tried to run database configuration assistant in custom mode separately, "ORACLE not available" message came up.
    I think ORACLE should be connected and running before creation of the sample DB, like installation of Oracle in Windows.
    Anyone has the same problem or can give me a help?
    The Oracle(8.1.7) CD comes with Solaris8 (07/01) package.
    Thanks.

    I would guess that your kernal parameters have not been set. Check you oracle install guide for the appropriate additions to /etc/system for semiphores and shared memory segments. If you have not made these changes, the database will not come up.
    ...jcd...

Maybe you are looking for

  • BlackBerry Messenger version 7.0.1.23 Fault

    I have a BlackBerry 9360 (3G, Wi-Fi), 7.1 bundle 1717 (v7.1.0.569, Platform 9.6.0.86), BlackBerry Messenger version 7.0.1.23 The team originally had the version of BlackBerry OS 6 operating system, for months to upgrade to the latest available for th

  • How do I create custom subject lines for form responses?

    We want our forms to be able to generate a custom subject line--each time someone puts in a request. Gmail threads everything together with the same subject line so when we get e-mail notifications when someone submits a form we often miss these beca

  • How can I take aout the virus coupondropdown from my mac?

    I need to know how to remove a coupondropdown from my mac? It is in all the blogs that I open

  • I accidentally washed my iPod nano. Is there any hope for it?

    I stuck my iPod nano in my pocket, and yes, forgot to take it out before my sister washed our clothes. Right after it got washed, I plugged it in to my computer, and it did turn on, just with a little distortion on the screen. It has been about a mon

  • Need ABAP code for Datasource Enhancement

    Hi All, I need no Enhance the WBS Element(PS_PSP_PNR) to2 LIS_02_ITM Datasource the table EKKN Having WBS element From EKKN Table We have to take the filed Append to the2LIS_02_ITM datasource Please any one give me ABAP code which is write in CMOD Th