Sample management with in-process inspection

i need to know why must we assign inspection points when we use sample management in an in-process inspection ?

Hi,
[Kindly refer the link herewith|Inspection point] wherein the importance of inspection point is mentioned.
In simple words, inspection point determines what system should do to proceed the inspection.
I mean if you will enter 100 (STD SAP), system will plan the inspection, UD , Quality score procedure etc etc according to the freely defined inspection points.
Now say if you enter 200 (STD SAP) there, then system will go in the direction of Samples, means will generate Physical Sample (Numbers), Samples size, will fetch these data to UD and stock posting screen also, then calculate the Quality score, etc etc.
If you will enter it time based inspection point then system will drive the entire inspection lot accordingly.
Now these is the straight and written explanation to your answer.
Means If there is inspection point as 200--->there will be need  of SDP, Sampling procedure, etc
But in same manner it is applicable in reverse order also, i.e. If you wanna go with SDP,Sampling procedure (SAMPLE Mgmt) then,inspection point there must be maintained accordingly.
Regards,
Shyamal

Similar Messages

  • COA's with In-process Inspection & w/o Batch Management

    Hi Folks,
    We are doing in-process inspection in our system, for production. Also, we donot use batch management. Yet, we've COA's that need to be generated on our finished products before their dispatch to the customers.
    I've previously used COA's in a Batch Managed & GR Inspection (type 04) scenario. Not sure if COA's can be generated for my scenario (in-process inspection & no batch mgmt). Would like to take suggestions from you experts on how do I approach this.
    Thanks
    Anand

    I believe you should be able to generate COA's using the 03 inspection results, but... I've never tested it or tried to do it.  But in using 03's there are some issues that you'd have to check on and test out.
    I don't think you'll be able to have the same test in the inspection lot more then once.  This can happen if you run the same test at different operations of the process.  Such as water content which might be tested several times during production. You might also have some issues if you use inspection points.  I think it will use the last test result regardless of inspection points.  But I'm not 100% sure on that.
    You will also to need to make sure there are UD's on the inspection lot.  You'll probably want to run the Auto UD for production lots and have it close all lots where the order has a TECO status.
    Other then those cautions, it should work similarly to reporting results from an 04 inspection lot.
    Craig

  • Quality Inspections Using WM Without Physical Sample Managment

    I have configured the system to not use physical sample managment.  Warehouse Management is being implemented.  When the WM personnel perform a goods receipt and subsequently confirm open transport orders using LT04, a pop-up window to Process QM Inspection Lot requesting where to place the sample quantity appears.  The business wants the sample quantity to always remain with the stock.  How can I get rid of this request to specify where the sample quantity should be placed when I am not using physical sample management?

    hi allen,
    why don;t you directly put the materail in final detination after goods receipt .
    after goods receipt matl will be placed in interim storage type 902 and after confirming the transfer order the material will be placed in final destination .
    In the system (stock overview) material will be shown in under inspection but material will be lying in the same location .
    the sample should be removed from final destination and after perform the UD. after comletion of UD if material is ok then accept the material which will change the status of the material from quality inspection to unrestricted stock in the system but material will be lying the same location .
    in this case you don;t have to keep the material in quality interim storage location for the sample approval.which will definitely save your time ,space & effort.
    manish

  • QM In-Process Inspection for Batch Managed Material

    Hi,
    I have a issue related to UD of In-Process inspection for batch managed material. The production process is discrete manufacting for a cold rolling mill. A production order can have mutiple coils as per the production amount. To track the individual coil , batch management has ben activated. We have both in-process as well as inspection after production here.
    For inspection after production we are fine as we are doing partial confirmation after every coil and have separate inspection lot having different batch number.
    But for in-process I can have only one inspection lot for the production order (created on release of the production order). I can do the result recording but while trying to do UD u2013 it is asking for a batch number as the material is batch managed. W/o entering the batch number system is not allowing me to do the UD.
    Is there any solution/work around of this problem.
    -Regards
    ashim

    Hi Ashim,
    you raised a very good question? i am helpless here to execute same scenario,
    but i disussed with my QM guy here, he said, once the material is batch managed then it has to ahve batch in UD.
    so i discussed ur case, which is very much valid for heavy ind like cement and all,
    so what i suggest, u create a dummy batch in the UD for in process (no inventory posting)
    and at confimation give ur usual batch (if system propose the dummy batch which u give in the UD for inprocess, try to change there--- i hope it should allow)
    i would really like to here answer from u for this.
    try to do as suggested, and let me know the results.
    REgards,
    Pravin mukkawar

  • Usage of Sampling Procedure with Inspection Points

    Hi Experts,
    Does any one have an idea whether we can use sampling procedure with free inspection points apart from In-Process Quality Inspection (Inspection Type 03)?
    Thanks in Advance,
    Arun
    Edited by: Arun Mann on Dec 11, 2008 11:11 AM

    hi
    check the links canhelp you
    http://help.sap.com/saphelp_47x200/helpdata/en/b5/c4db38a91b11d1bd610000e829fdb3/frameset.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/2d/350c26448c11d189420000e829fbbd/frameset.htm
    -ashok

  • How to install Oracle BPEL Process Manager with the BEA WebLogic

    Hi ,
    I will install Oracle BPEL Process Manager with BEA WebLogic 9.2(MP2). I have download orabpel_10133_WebLogic.zip ,then Modify the following mandatory installation properties in the orabpel_10133_WebLogic\bpelDomain.properties file:
    # BEA_HOME is the path where Weblogic is Installed
    BEA_HOME=/opt/bea
    # JAVA_HOME is the path of jdk folder inside your weblogic
    JAVA_HOME=/opt/bea/jrockit90_150_10
    # DOMAIN_HOME is the path where you wish to create your domain called BPELDomain
    DOMAIN_HOME=/opt/bea/user_projects/domains
    # APPS_HOME is the path where you wish to copy your applications and adapters that are required for oracleBPELServer
    APPS_HOME=/opt/bea/user_projects/apps
    # BEA_HOME is the path where BPEL PM is Installed
    BPEL_HOME=/home/oracle/bpel/product/10.1.3.1/OraBPEL_1/bpel
    # DRIVER_TYPE is the datasource class that installable use to create a datasources for oracleBPELServer
    DRIVER_TYPE=oracle.jdbc.xa.client.OracleXADataSource
    # DB_URL is the url to connect to orabpel schema
    DB_URL=jdbc:oracle:thin:@16.157.134.17:1521:orcl
    # DB_USER is the user Id for orabpel shema in database
    DB_USER=ORABPEL
    #DB_PASSWORD is the password for orabpel schema in database
    DB_PASSWORD=bpel
    #BPEL_SERVER_NAME is the server i.e. to be created under BPELDomain
    BPEL_SERVER_NAME=oracleBPELServer
    #PROXY_HOST is the Host name of the proxy server
    PROXY_HOST=www-proxy.us.oracle.com
    #PROXY_HOST=
    #PROXY_PORT is the Port where the proxy server is running
    PROXY_PORT=80
    #PROXY_PORT=
    #NON_PROXY_HOST is the list of non proxy hosts that are divided by a | symbol
    #NON_PROXY_HOST=*.oracle.com|*.oraclecorp.com|localhost|127.0.0.1|stbbn10|stbbn10.us.oracle.com
    NON_PROXY_HOST=*.oracle.com|*.oraclecorp.com|localhost|127.0.0.1|stbbn10|stbbn10.us.oracle.com|16.157.134.135
    When I run the setup.sh , it will report
    BUILD FAILED
    /opt/software/WL_Installables/build.xml:131: Traceback (innermost last):
    File "./wl_scripts/bpelDomain.py", line 22, in ?
    File "./wl_scripts/createGroupsAndUsers.py", line 4, in ?
    weblogic.management.utils.AlreadyExistsException: [Security:090267]Group BpelGroup
    Actully ,there is no BpelGroup in Weblogic. Does anybody know how to solve it ?

    MAke sure you have not set ANY environment variable related to Oracle / BEA / Java / LD_library path. Use the following script to unset / set the initial settings:
    #!/bin/sh
    unset ORACLE_BASE ORACLE_HOME ORACLE_SID ORACLE_TERM
    unset LD_LIBRARY_PATH LD_LIBRARY_PATH_64
    unset CLASSPATH JAVA_HOME
    export PATH=.:/usr/sbin:/usr/bin:/usr/local/bin:/opt/VRTS/bin
    export BEA_HOME=/appl/oracle/products/9.2/weblogic
    Marc
    http://orasoa.blogspot.com

  • JDeveloper 11g with BPEL process Manager 10.1.3.1.0

    Hi,
    Here is my requirement.
    To develop a simple web application which talks to a Business work flow developed using BPEL.
    The Setup I wanted to work on
    JDeveloper 11g.
    BPEL process Manager 10.1.3.1.0.
    Now the problems seems to be is that JDeveloper 11g doesnt seem to be having BPEL Designer ,is there is plugin for me to get BPEL Designer in my JDeveloper 11g.
    Could some body tell me if i can use JDeveloper 10.1.3.1.0 with BPEL process Manager 10.1.3.1.0 if yes then
    how do we configure the JDeveloper 10.1.3.1.0 to point to BPEL process Manager 10.1.3.1.0.
    Regards
    Harish

    Huh? In the subject you're talking about BPEL 10.1.3.x and now you're asking for 10.1.2?
    Anyway, you need the corresponding JDeveloper version to develop the BPEL workflow, ie JDev 10.1.3.4 for BPEL 10.1.3.4 or JDev 10.1.2. for BPEL 10.1.2.
    You can install as much as possible JDeveloper versions on your machine. As long as they are installed in a different home. I usually have three to six installations.
    Develop your workflow in the JDev matching the BPEL version and develop your UI in JDev 11g calling the BPEL as a WebService.
    --olaf                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               

  • Can I use Oracle BPEL process manager with other AS and DB

    Can we user oracle bpel process manager with jboss application server and postgresql database.. is it possible..
    and what will be the price.. per licencse when i go to just purchase Oracle BPEL process manager

    MAke sure you have not set ANY environment variable related to Oracle / BEA / Java / LD_library path. Use the following script to unset / set the initial settings:
    #!/bin/sh
    unset ORACLE_BASE ORACLE_HOME ORACLE_SID ORACLE_TERM
    unset LD_LIBRARY_PATH LD_LIBRARY_PATH_64
    unset CLASSPATH JAVA_HOME
    export PATH=.:/usr/sbin:/usr/bin:/usr/local/bin:/opt/VRTS/bin
    export BEA_HOME=/appl/oracle/products/9.2/weblogic
    Marc
    http://orasoa.blogspot.com

  • How to process Fisacl year change for Investment Management with Project?

    How to process Fisacl year change for Investment Management with Project as measure

    hi
    check this menu path
    Accounting  --> Investment Management  --> Programs  --> Periodic Processing  --> Fiscal Year Change

  • In process inspection related with PRT maintenance

    Hello SAP QM gurus,
    I have one issue of In process inspection related with maintenance of PRT. The detail is as follows.
    I have an inspection plan for SFG (Semi Finished Goods) with 15 parameters to check. For production of this SFG material we are using a Production Resource Tool (PRT). After 2000 pieces of SFG production the PRT is to be taken out for maintenance. I have maintenance plan for this PRT and system gives me maintenance order after every 2000 pieces of SFG production.
    My client wants to check the 15 parameters of SFG just before and after of PRT maintenance. After the PRT maintenance and when the production is OK then for every next lot client wants to check only 3 critical parameters and to skip remaining 12 parameters. How to map this scenario?
    Will the DMR (Dynamic Modification Rule) be effective in this case, or else any workaround ?
    Please guide.
    Sanjay

    Dear QM gurus,
    One correction in my thread,
    15 parameters to check SFG is in routing of SFG and not the inspection plan.
    Please guide me.
    -- Sanjay

  • Integration of BPEL Process Manager with Oracle Plociy Automation(OPA)

    Hi,
    Can any one tell me how to integrate the BPEL Process Manager with Oracle Plociy Automation(OPA).

    Hi,
    Can any one tell me how to integrate the BPEL Process Manager with Oracle Plociy Automation(OPA).

  • Sample management during inwarding

    Hi,
    I am having a scenarion where MM and QM integration is needed. I am inwarding a material with batch management and along with each batch, I will receive a fixed quantity of sample in separate box. There will be separate sample box for each batch of that inwarding material.
    Also I need to track that sample separately and needs to store it for future reference. I mean, sample for all batches I received for that above said Material. How can I do this?
    Example:
    Material- ABC,
    Batches are ABCX1, ABCX2, ABCX3..
    Thanks
    Vineeth Varghese

    For this you can also use Physical sample ( inspection type 15) .
    Sample management :The Quality Management (QM) application component includes comprehensive functions for processing and managing physical samples during  goods receipt and  production. The Sample Management component supplements the existing QM functions for processing samples by allowing you to:
    Identify physical samples on the basis of unique, client-wide keys
    Record inspection results for physical samples
    Manage the physical-sample data in the system
    store and retail sample for a duration.
    After you process/receive sample from vendor you can create manual lot of origin 15 in QPR1.
    Explore !!

  • In-process  inspection for rework operation

    Hi all,
    i have a production order to which the in-process inspection characteristics are assigned in routing. when a production order is released, an in-process inspection lot is created. Inspection is carried after the end of an operation.  During which rework will be carried out if the product is rejected.   Rework operations are trigged through trigger points assigned to the production order. A reference operations set indicating the rework operations is assigned to the trigger point. rework operation in the reference opeation set is also assigned with inspection characteristics.  But during the results recording, the rework inspection characteristics are not displayed for results recording.....
    pls explain the possible solution.
    regards,
    sravan kumar v

    Hello
    I think that the process can be mapped in one of these ways:
    - according to what you describe this is closer to a good receipt inspection and not to in-process inspection, as the trigger for the inspection is the GR and not the release of the order. So, why dont you give a chance to a 04 inspection type, with inspection lot creation for every GR ? Check the indictor in MM02, QM view for "04" inspection, and uncheck the "Stock in quality", so you dont get caught by the stock in quality and resembles in process "Non-stock relevant" inspection
    - alternatively you can define the use of inspection points ? So you are adding new results as new confirmations are made. Disadvantage: you can only give one usage decision to the inspection Lot, irrespective of the number of samples you have analyzed.
    Regards

  • Repetitive mfg - In-process inspection

    Hi,
    Can we do in-process inspection in repetitve mfg. 
    Regards,
    Sravan Kumar

    Dear,
    Inspection Type 13 Repetitive Manufacturing: Production lines produce the same product in an unlimited number over a longer period of time. Example: Screws M8 x 40 mm (Mass production). In this case inspection plans need a relation to either time, numbers etc.
    In the material master record for the finished product, you must set the indicator for quality inspection in the Quality Management view. Moreover, in the QM inspection data, you must also select and activate an inspection type with the origin 13 (repetitive manufacturing).
    Regards,
    R.Brahmankar

  • In process inspection for partial confirmation of production order

    Hi QM Guru,
    how i will do in process inspection for partial confirmation of production oder
    Senior is this  I have maintain inspection type 03 in finish material u2026..suppose production order quantity 20 kg..there are 2 operationu202610 and 20.. I have maintained MIC on operation 20u2026after release the production order  lot are generatingu2026but when they confirm operation 10 they do partial confirmation for 10 kgu2026.then again when do confirmation 20..they checku2026for quality resultu2026
    Then I do the result record ok of 10 kgu2026then they confirm 20 operationu2026.
    Now. again he do the confirmation of rest production order 10 kg..opration 10 ok..but in operation 20..system does not check for qualityu2026..
    Again I want to do the quality inspection of 10kg on 20 operationu2026
    How I will do. kindly suggest me
    Regards
    Aqueel

    Hello
    I think that the process can be mapped in one of these ways:
    - according to what you describe this is closer to a good receipt inspection and not to in-process inspection, as the trigger for the inspection is the GR and not the release of the order. So, why dont you give a chance to a 04 inspection type, with inspection lot creation for every GR ? Check the indictor in MM02, QM view for "04" inspection, and uncheck the "Stock in quality", so you dont get caught by the stock in quality and resembles in process "Non-stock relevant" inspection
    - alternatively you can define the use of inspection points ? So you are adding new results as new confirmations are made. Disadvantage: you can only give one usage decision to the inspection Lot, irrespective of the number of samples you have analyzed.
    Regards

Maybe you are looking for

  • Having problem with Premiere CS2 not recognising AVI from a still Camera?

    Wow, My first time back to the forum in 3 month and it's all new! Since I found "the" answer to a new problem I've encountered I'd like to share it. I filmed part of a wedding with a little canon still camera (S3IS) on a 4 gb SD card and when I tried

  • Troubles with tomcat 4.0.3

    i'm new to servlets and can't get tomcat 4.0.3 to work for the life of me. i was wondering it someone out there would be able to give me a hand. no matter how i've tried to add the JAVA_HOME variable, i keep getting this error when i try to run start

  • CF8 - Ajax Form Post and Document Type

    I'm having a problem trying to figure out how to get a form post to return a PDF document using CF8. I can't seem to get CFDOCUMENT to deliver a PDF through the form. I have a form inside a CFDIV... <cfdiv id="mydiv"> <cfform action="myscript.cfm" me

  • Decentralize WMS

    Der all, I have a question with regards to decentralize warehouse. Presently we have two sides which are setup as decentralize WMS. In another side A  is using a SAP system (a third party logistic provider using their own SAP  system), and side b is

  • Re-install OS over factory install?

    I have read in various places that some users like to wipe the drive on a new computer and re-install the OS from the Restore disks. They seem to think that they have fewer or no problems compared to a factory install. I am expecting a new Mac and am