Samyak Veera - What is Windows 10 exact release date and its futures?

Hi All,
My name is Samyak Veera and I am waiting for Window 10. Can Anyone know the exact relaesing date of window 10? I read it some of futures but I want to know complete info about it, is this window is prespective to businesses also
Thanks
Samyak Veera

Hi,
Yeah, we don't know the exact release time but I recommend you subscribe to our Windows Blog
http://blogs.windows.com/windows-blog-directory/
and
Windows IT Pro Insider
to get latest news about Windows 10 (TP)
At this moment, I'd like to share the following links with you for your convenience:
http://blogs.windows.com/bloggingwindows/2015/01/21/the-next-generation-of-windows-windows-10/
http://blogs.windows.com/bloggingwindows/2015/01/23/january-build-now-available-to-the-windows-insider-program/
And if you have any suggestion on the preview build version, please submit the suggestions via "Windows Feedback App"
Yolanda Zhu
TechNet Community Support

Similar Messages

  • HT5714 Why did I pay $19 for Start Trek Into Darkness pre-order, if Apple KNEW they were going to release a bundle on the release date and I could have got the other Star Trek movie for just $5 more?  What the heck Apple, I feel completely ripped off.

    Why did I pay $19 for Start Trek Into Darkness pre-order, if Apple KNEW they were going to release a bundle on the release date and I could have got the other Star Trek movie for just $5 more?  What the heck Apple, I feel completely ripped off.
    I didn't even have time to cancel the preorder as that processed a couple minutes before the bundle was posted.
    Pre-orders are apparently not worth my time ever again.  

    Go here:
    http://www.apple.com/support/itunes/contact/
    and follow the instructions to report the issue to the iTunes Store. Perhaps there will be something they can do for you.
    Regards.

  • What is RID in non clustered index and its use

    Hi All,
    I need help regarding following articles on sql server
    1) what is RID in non clustered index and its use.
    2) What is Physical and virtual address space. Difference in 32 bit vs 64 bit Virtual address space
    Regards
    Rahul

    Next time Please ask single question in a thread you will get better response.
    1. RID is location of heap. When you create Non clustered index on heap and
    lookup happens to get extra records RID is used to locate the records. RID is basically Row ID. This is basic definition for you. Please read
    this Thread for more details
    2. I have not heard of Physical address space. I Know Virtual address space( VAS)
    VAS is simple terms is amount of memory( virtual )  'visible' to a process, a process can be SQL Server process or windows process. It theoretically depends on architecture of Operating System. 32 bit OS will have maximum range of 4 G VAS, it's calculated
    like a process ruining on 32 bit system can address max up to 2^32 locations ( which is equivalent to 4 G). Similarly for 64 bit max VAS will be 2^64 which is theoretically infinite. To make things feasible maximum VAS for 64 bit system is kept to 8 TB. Now
    VAS acts as layer of abstraction an intermediate .Instead of all request directly mapping to physical memory it first maps to VAS and then mapped to physical memory so that it can manage request for memory in more coordinated fashion than allowing process
    to do it ,if not it will  soon cause memory crunch.Any process when created on windows will see virtual memory according to its VAS limit.
    Please read
    This Article for detailed information
    Please mark this reply as answer if it solved your issue or vote as helpful if it helped so that other forum members can benefit from it
    My Technet Wiki Article
    MVP

  • Adding Release Date and Descriptions to Video

    I've been reading in other threads in 5G iPod that there is no way to put the release date to videos you've done. For instance, I downloaded to my computer The Office episode using 3rd party software, converted to ipod Mp4 and in the "GET INFO" section there is no place to add the "Release Date" and Descriptions on the Video, but if you download videos from iTunes it adds this info.
    Anyone been able to do this and if so, using a 3rd party application, what did you use. TIA

    Wouldn't this question be more appropriate for the iTunes forum? Since you don't edit info like that directly on your iPod nano, I might suggest you post your question in the iTunes forum. I can confirm that with iTunes, 7.4, for the Mac, I can see a "Release Date" but I can't find any option to change it.
    -Doug

  • What is the Sequence of Master data and Transaction data R/3 to APO

    Hi guys,
    What is the Sequence of Master data and Transaction data R/3 to APO  through CIF?

    Hi,
    Master data,
    Material Indipendent data can be sent without any dependency.
    Material Dependent data sequence is as follow.
    Plant,
    MRP areas,
    Supply area,
    Material,
    MRP area material,
    planning material,
    ATP check,
    Purchase info recards,
    schedule agg,
    PPM or PDS (But before PPM or PDS  work center should send to apo) If PDS is sending then BOM should send before PDS.
    Transaction data.
    As per the business requirement what is planning in apo.
    Regards,
    Kishore Reddy.

  • What are function modules used in alv,and its explanation

    what are function modules used in alv,and its explanation

    hi..
    The important function modules are
    Reuse_alv_fieldcatalog_merge
    Reuse_alv_list_display
    Reuse_alv_events_get
    Reuse_alv_grid_display
    Reuse_alv_commentary_write.
    <b>REUSE_ALV_FIELDCATALOG_MERGE</b>
          This function module is used to populate a field catalog which is essential to display the data in ALV.
          If the output data is from a single dictionary table and all the columns are selected, then we need not exclusively create the field catalog. Its enough to mention the table name as a parameter (I_structure_name) in the REUSE_ALV_LIST_DISPLAY. But in other cases we need to create it.
    Note : Fieldcatalog can be filled manually also by filling up all the required details into the internal table     
    The important parameters are:
       1. Export:
            a. I_program_name     : report id
            b. I_internal_tabname     : the internal output table     
            c. I_inclname     : include or the report name where all  
                                                 the dynamic forms are handled.
        2. Changing
           ct_fieldcat     :    an internal table with the type 
                                      SLIS_T_FIELDCAT_ALV which is declared in the
                                      type pool SLIS.
    <b>REUSE_ALV_LIST_DISPLAY</b>
    This is the function module which prints the data.
    The important parameters are:
    1. Export:
          I_callback_program            : report id
          I_bypassing_buffer             : ‘X’
          I_buffer_active                    : ‘ ‘
          I_callback_pf_status_set     : routine where a user can set
                                                             his own pf status or change the
                                                             functionality of the existing pf status.
          I_callback_user_command : routine where the function codes are
                                                               handled.
          I_structure name     : name of the dictionary table
          Is_Layout          : structure to set the layout of the report
          It_fieldcat          : internal table with the list of all fields and their
                                                 attributes which are to be printed (this table
                                                 can be populated automatically by the function
                                                 REUSE_ALV_FIELDCATALOG_MERGE
          It_events          : internal table with a list of all possible events
                                                 of ALV and their corresponding form names.
    2.  Tables:
         a. t_outtab     : internal table with the data to be output
    <b>REUSE_ALV_EVENTS_GET: </b>
          Returns table of possible events for a a list type
    1. Import:
          Et_Events      :
          The event table is returned with all possible CALLBACK events for the specified list type (column ‘NAME’). For events to be processed by the Callback, their ‘FORM’ field must be filled. If the field is initialized, the event is ignored. The entry can be read from the event table, the field ‘FORM’ filled and the entry modified using constants from the type pool SLIS.
    2. Export:
        I_list_type:
              0 = simple list REUSE_ALV_LIST_DISPLAY
              1 = hierarchical-sequential list                                           
                    REUSE_ALV_HIERSEQ_LIST_DISPLAY
              2 = simple block list                                                        REUSE_ALV_BLOCK_LIST_APPEND
              3 = hierarchical-sequential block list
                    REUSE_ALV_BLOCK_LIST_HS_APPEND
    <b>REUSE_ALV_GRID_DISPLAY</b>
      A new function from 4.6 version, to display the results in grid rather than a
      preview.
      Parameters : same as reuse_alv_list_display
    <b>REUSE_ALV_COMMENTARY_WRITE</b>
    This is used in the Top-of-page event  to print the headings and other
    comments for the list.
    It_list_commentary : Internal table with the headings of the type
                                             slis_t_listheader.
        This internal table has three fields:
        Typ : ‘H’ - header, ‘S’ - selection, ‘A’ - action
        Key : only when typ is ‘S’.
        Info : the text to be printed
    <b>plz reward pts if helpful.</b>
    regards
    vijay.

  • Discoverer release dates and versions

    Hi,
    Can someone give me the release dates and version numbers of the various Discoverer releases up to now ?
    I'm trying to get a feel for the maturity and get accurate dates, thanks !
    Cheers,
    Baber

    Discoverer is a very mature product in the BI standpoint. These are the dates I remember from memory. I'm sure the disco team or some of the other members have more accurate dates
    3.1 May 1998
    4.1 December 2000
    9.0.2 April 02
    10g aka 9.0.4 January 04
    10.1 (aka Drake) January 05
    10.1.2 September 05
    There were also many smaller patch releases along the way. Let me know if you need anymore assistance or help with your evaluation
    Matt Topper
    TUSC, The Oracle Experts.
    [email protected]

  • HT5654 I am unable to update latest version of Itune, I get error R6034 C runtime library incorrect. My windows are up to date and I have been able to access itune until today and now I don't have it.

    I am unable to update latest version of Itune, I get error R6034 C runtime library incorrect. My windows are up to date and I have been able to access itune until today and now I don't have it.

    Go to Control Panel > Add or Remove Programs (Win XP) or Programs and Features (later)
    Remove all of these items in the following order:
    iTunes
    Apple Software Update
    Apple Mobile Device Support (if this won't uninstall move on to the next item)
    Bonjour
    Apple Application Support
    Reboot, download iTunes, then reinstall, either using an account with administrative rights, or right-clicking the downloaded installer and selecting Run as Administrator.
    The uninstall and reinstall process will preserve your iTunes library and settings, but ideally you would back up the library and your other important personal documents and data on a regular basis. See this user tip for a suggested technique.
    Please note:
    Some users may need to follow all the steps in whichever of the following support documents applies to their system. These include some additional manual file and folder deletions not mentioned above.
    HT1925: Removing and Reinstalling iTunes for Windows XP
    HT1923: Removing and reinstalling iTunes for Windows Vista, Windows 7, or Windows 8
    tt2

  • Pick list release date and picked date

    Hello, I need to prepare a query where I need to select the b1 pick list release date and pick list picked date.
    Does b1 store these pick list dates somewhere in the system?
    Thanks

    I don't think that the APKL or the ADOC store the the release date. And I also have seen that the pick date is not changed after the user picked the goods and update the pick list. I keep seen the pick date in the OPKL = to the create date in the OPKL. And the update date we can't really relly on it because after picking the goods some days after the user can update for example a UDF and then save the pick list and this field is updated again...
    Any ideas?

  • What is the Difference Between Sys Date and Effective Date ??

    Hi Gurus,
    Can any one pls let me know What is the Difference Between Sys Date and Effective Date ??
    with regards
    User600722

    EFFECTIVE DATE usually refers to a date-tracked record (although not exclusively).
    Date-tracked records in Oracle HR have an EFFECTIVE START DATE and an EFFECTIVE END DATE. The record is 'EFFECTIVE' between these dates. In reports, you often use SYSDATE to compare to these two dates to find the CURRENT effective record, e.g. SYSDATE BETWEEN EFFECTIVE START DATE AND EFFECTIVE END DATE.
    When you make changes to a HR record, you can choose between DATE TRACKING options, such as CORRECT or UPDATE (there are others too). CORRECT will overwrite the record and replace the data with your changes. This is normally used when you need to correct something that is wrong. UPDATE will create a new version of the record from the EFFECTIVE START DATE you choose. It will also set the EFFECTIVE END DATE of the previous record to the day before your new record's EFFECTIVE START DATE. That enables a history of records to be maintained so you can see what your data looked like at ay one point in time.
    Regards
    Tim
    Edited by: TimW on Sep 23, 2008 2:37 PM

  • What is the difference between Release process and Prchase order process?

    Like both processes are used to replenish, but than whats the need of both the processes.One of the process can be used to come up with request.Correct me if i am wrong.Kindly explain with an example

    Hi Nandan,<br>
    In purchase Order we have fixed date , quantity  and schedule on which supplier has to deliver the items .<br>
    Example:PO with Item A:<br><br>
    to be deliver on 12-May-2010 20 quantity<br><br>
    to be deliver on 12-Jun-2010 40 quantity<br><br>
    In Release process we have quantity/price schedule agreement of item between supplier and customer.it specifies certain amount of quantity of the products that a supplier is to deliver to the customer in a specific time period. Customer uses MRP run at regular intervals and determines what exact requirement quantities are to be released from the scheduling agreement on certain dates.this schedule lines then releases to SNC to inform supplier about current demand<br><br><br>
    In schedule agreement schedule lines have the following status :<br><br>
    1)Fixed dates and quantities:Quantity and date of the schedule line are fixed and will remain unchanged. The schedule line belongs to a delivery-relevant release. The supplier can deliver the quantity without waiting for another acknowledgement or the customeru2019s request.<br><br>
    2.Production and material go-ahead:The schedule line belongs to a forecast delivery schedule that is not relevant for delivery and is in the production go-ahead period. The supplier can, therefore, procure the materials for manufacturing the ordered products and start with production. If the customer cancels a schedule line, the supplier can invoice the material and production costs.<br><br>
    3.Material go-ahead:The schedule line belongs to a forecast delivery schedule that is not relevant for delivery and is within the material go-ahead period. The supplier can, therefore, procure the materials that s/he requires for production. If the customer cancels a schedule line, the supplier can invoice for the material costs. <br><br>
    4.Preview:The schedule line belongs to a forecast delivery schedule that is not relevant for delivery. The schedule line is not binding and may possibly change. The supplier can use the data for his or her own planning, however.<br><br>
    Exmaple:We have schedule agreement of 1000 quanity for Item A and time period start date:30-Apr-2010 end date:1-May-2011<br><br>
    Customer runs MRP/planning from he gets following schedule line with status as mention above<br><br>
    quanti ty 100 with schedule line status Fixed dates and quantities which means Quantity and date of the schedule line are fixed and will remain unchanged. The schedule line belongs to a delivery-relevant release. The supplier can deliver the quantity without waiting for another acknowledgement or the customeru2019s request.<br><br>
    quanti ty 200 with schedule line status Production and material go-ahead which means schedule line belongs to a forecast delivery schedule that is not relevant for delivery and is in the production go-ahead period. The supplier can, therefore, procure the materials for manufacturing the ordered products and start with production. If the customer cancels a schedule line, the supplier can invoice the material and production costs.<br><br>
    quanti ty 300 with schedule line status .Material go-ahead which means schedule line belongs to a forecast delivery schedule that is not relevant for delivery and is within the material go-ahead period. The supplier can, therefore, procure the materials that s/he requires for production. If the customer cancels a schedule line, the supplier can invoice for the material costs. <br><br>
    quanti ty 500 with schedule line status Preview which means The schedule line belongs to a forecast delivery schedule that is not relevant for delivery. The schedule line is not binding and may possibly change. The supplier can use the data for his or her own planning, however.<br><br>
    Note that total quantity of product is 1000.,Depending upon schedule line supplier can plan his/her activity.<br><br>
    Summary: In Purchase order supplier has to deliver fix amount of quantity on fixed date and time to the customer .
    In Release process supplier can deliver the product depending upon schedule line status as mention above so advantage  of using release process we fixed period and fix quantity  in that period  customer can send his demand to supplier whenever customer requires in schedule agreement time period.<br><br>
    Thanks,
    Nikhil

  • Why can't "release date" and other info be edited?

    In iTunes 9 for Mac, I've noticed a new information field called "Release Date". However, that field is not in the info tab when editing the file info. Clicking on that field does not make it editable either. Does not matter which song. What is wrong? Why is this field not in the edit info tab?

    You can't.
    They did this for a reason, as part of FairPlay.
    There's no way to get around this.....
    If the information on the purchase content is wrong (like wrong release date), contact Apple, and they might be able to correct it.
    Message was edited by: Kento Ito

  • Alchemy 2 release date and the pre-release

    Hi,
    All has gone quiet about Alchemy 2 .. what is happening? ... is there any kind of release date yet?
    I want to convert my new game to IOS with stage3d, totally stuck until there is an Alchemy 2 version of Box2d Alchemy.
    And speaking of Box2d Alchemy (also WCK) The creator of the port Jesse Sternberg (known as mayobutter) has tried to get in the pre-release program and failed.
    http://box2d.org/forum/viewtopic.php?f=19&t=7877&start=20
    For the good of the community he should be one of the first on the list!

    We've just released a beta version, join the pre-release and try it out: http://gaming.adobe.com/technologies/flascc/

  • T-Code of DN release date and SA date

    hi,
    whats the T-code to show a list includes the date of delivery note creating and releasing, better also includes the SA date.
    Thanks

    Hai
    If you want a report of sales order wise - Requested delivery date and Actual delivery creation date
    As a functional member, Create a SQVI report by joining the Sales order and Delivery order table
    LIPS-VGBEL = VBAP-VBELN
    By this, you can prepare a ALV report with sales document and other dates in the selection screen and in the report sales order and Delivery order related details can be listed.
    Then ask your system administrator to create a T code for the SQVI program and provide the T code authorization for the required users.
    Any development please update.
    Regards,
    Mani

  • File window not updating modif. dates – and mysterious parallel universe discovered

    The day started innocently enough when I tried to edit some <meta> content on a site I'm building and then saved my work. Little did I know...
    DW's "File" window refused to update the "Modified" column of the files I worked on.  Open and closing the files shows that my changes have been recognized and incorporated into the HTML, and the files show up with correct modification dates in Finder (I'm on a Mac). They just won't change date in DW.
    When I upload the modified-but-not-redated-in-DreamWeaver files to my remote site, they appear with the incorrect dates on the server, but a text comparison in DW shows that my local and remote files are synched.
    Now for the truly weird part: when I run the site in Safari (after flushing its cache), a Source check shows the old code is still operational.  (I also changed the titles of the pages in question to quickly confirm which version was being displayed. This check shows the old title displayed.)
    Here's the site address:  http://www.bearriverbooks.com/index.html
    Now for the truly, truly wierd part.  I have a parallel site ( http://www.queen-of-the-northern-mines.com/index.html ) which contains copies of the bearriverbooks.com files. These files, too, show the wrong modification dates in DW's "Files" window and on the remote server – but they display correctly. Anyone who wants to check can compare page titles, which are longer in the later pages with correct code.
    I checked the remote site addresses in the "Manage Sites..." center.  I have not crossed my wires there (though I can smell a few arcing badly in my brain.).
    The players:  2.8 GHz Intel Core i5 27" iMac running Mac OSX 10.6.7  /  Dreamweaver CS5 v.11.0 Build 4964
    Thanks in advance,
    Richard Hurley
    Grass Valley MultiMedia

    I am having the same issue on a Mac 3.4Ghz i7 running Mac OS 10.7.  I have Dreamweaver CS 5.5 v.11.5 Build 5344.
    I have a linux webserver, running ProFTPD v.1.3.1
    Both my mac and my linux server are set to the correct date and time.
    And ls on the linux servers tells me the files have the correct modified date and time, but this is getting lost in translation to dreamweaver when I view the remove server in the File tab.
    Any help appreciated.

Maybe you are looking for