SAP BPC 7.5 to EPM 10.0 migration

Dear Experts,
We are about to migrate our BPC application from Version 7.5 sp5 to EPM 10.0 as a part of a server upgrade.
Presently we have taken a backup of the AppSets (1 planning and 1 consolidation application- no scheduled loads, no master data update- a very humble and simple BPC with countable number of reports and input schedules) from our older system using UJBR.
Will the restore program (UJBR) handle the Appset restore into EPM 10.0.
I wanted to make sure if all the important points are touched before we give a go-ahead to bring our primitive server down.
I read in SDN that EvDRE reports wont function and there might be a probable MS Excel EPM 10.0 addin conflict. Other than this is there anything we should be aware of before hand viz., components to be backed up, pathces to be installed, etc.
I want to make sure we have a really smooth migration process. Your guidance is much appreciated.
Thanks a lot in advance

Hi,
**In BPC10 you can use same UJBR to restore appset from back up file.
**From BPC10 SP04  onwards EvDre is also supporting.
Thanks,
Raju

Similar Messages

  • SAP BPC MS 7.5 with Extended Analytic Analyzer and EPM connector

    Hi experts,
    I need your inputs regarding Extended Analytic Analyzer add ins.
    I installed the SAP Business Object Extended Analytic Analyzer hoping to integrate the Xcelsius in SAP BPC MS 7.5
    I am following the HTG to integrate but got lost.
    In EPM connector steps, I cannot find the option from OPERATION TYPE: Retrieve data using Analyzer Report.
    The only options available under operation type are
    EPM Report
    Retrieve Environments
    Retrieve Models
    Retrieve Dimensions
    Retrieve Dimension Members
    Input Data
    Retrieve Business Process Flows
    Retrieve Context
    Retrieve Members Property Values
    RetrieveText From Library
    It doesn't include the option Retrieve data using Analyzer Report.
    Im wondering if there are different version of the epm connector? Was my EPM connector differs from the HTG?
    And also in Excel under Extended Analytic Analyzer, the function =GETREPORTDEFINITION() is missing
    Please help me on this guys..
    Thanks in advance.
    yajepe

    It seems a very good oportunity to use FIM.
    FIM was designed especially for exchange data betweeen different SAP product.
    FIM will provide an easy way to do the conversion using wizards and also will assure you about data inetgrity and quality.
    This will be the way forward but more details has to be define during the implementation.
    I hope this will help you.
    Kind Regards
    Sorin Radulescu

  • Microsoft Excel slowing down and other problems when SAP BPC EPM Add-in is installed

    Hello,
    Our client is having some problems with Microsoft Excel (MS Office 2013) since the SAP BPC EPM Add-in was installed in their computers.
    They are suffering from Microsoft Excel slowing down, even when not connected to SAP BPC (10.0 NW version).
    For example, when opening two or more excel archives, not connected to SAP BPC, Microsoft Excel crashes and is restarted with errors.
    Have you experienced something similar in other installations?
    Thank you very much, and kind regards,

    In relation to the previous post , we have to emphasize that we have installed in ours PC's:
    MS Office 2010  14.0.7116.5000  32 bit,
    EPM add-on version 10.0  SP20  (10.0.0.8993).
    and our customer have installed in theirs PC's:
    MS Office 2013 15.0.4675.1001 32-bit.
    EPM add-on version 10.0 SP19 patch 1 .NET 3.5 compilation 936.
    Thank you very much

  • Hi Do we have tables for SAP BPC EPM Comments ? if we have what are they could you please explain some one.

    Hi Do we have tables for SAP BPC EPM Comments ? if we have what are they could you please explain some one.

    Hi Narahari,
    Yes, we have tables for SAP BPC EPM comments and it is stored in backend BW.
    Please follow the below steps to see it -
    1. Go to RSA1 and find the infoprovider name for the application/cube that contains the comments For example, the infoprovider name is /CPMB/VZIKG4O
    2.  Then Go to SE16 and enter the comment table name.  The comment tables are generated tables.  You can determine there name by using the following rules:
      a.  The table name always starts with '/1CPMB/'
      b.  The rest of the name is derived from the infoprovider name - it is the first two characters after the second '/' + the fourth, fifth and sixth characters + CMT (for comments) or CMTA (for archived comments). In my case the comments table name would be "/1CPMB/VZKG4CMT" and the archived comments table would be "/1CPMB/VZKG4CMTA".
    3.  Hit 'F7' or click the table contents button.
    4.  Enter the criteria for the comments you wish to export.
    Hope this helps.

  • BusinessObjects EPM V10 安装错误:SAP BPC 10和SAP PCM 10安装后的客户端错误

    版主好!大家好!
    公司正在进行SAP BPC 10和SAP PCM 10的安装测试并进行项目前期准备。在安装之后发现,EPM Add-in for Microsoft的PC和PCM版本安装之后,本来在Excel里的u201CData Manageru201D菜单消失了。也许是PCM和BPC的Add-in不兼容。
    第二个问题是使用Web版本的客户端时,PCM和BPC针对IE浏览器的Add-on有冲突。安装了PCM之后就不能够再链接BPC了。是否是ActiveX的问题?
    谢谢!
    附:
    SAP BPC: SAP BusinessObjects Planning and Consolidation
    SAP PCM: SAP BusinessObjects Profitability and Cost Management

  • Questions on SAP BPC 10.1

    Dear Friends,
    I have some basic questions as below, could you please answer?
    1) Can we create Excel Reports from Excel interface (EPM Add-in)?
    2) Once we create the Unified model, can we see this unified model in BW? as a cube?
    3) How to make Unified model in to Auditable status? Currently my unified model is showing RED dot under Auditable status. Will it show GREEN if its Auditable ?
    4) I am trying to create Input Template. I have navigated through "LIBRARY"-->"Input Forms" and then I have given input form name and Model name. But the "next" button is disabled because..its shows empty "No Data" for Name: and InforProvide. Its has "Search", "History", "All" options.
    What should I do here?
    5) Can we write a Script logic / BADI to perform a calculation in Unified model? Do we have Data Manager Packages in 10.1?
    6) How give Security access like Task Profiles, Member access profiles?
    Thank you so much in Advance.

    For information on how to create a unified model please follow below link
    SAP BPC 10.1 'unified' live demo: Chapter 03 - BPC model
    Auditable Feature
    SAP BPC 10.1 'unified' live demo: Chapter 06 - Auditing
    To create an input form check
    SAP BPC 10.1 'unified' live demo: Chapter 07 - Input form

  • Xcelsius in SAP BPC 7.5 MS

    Hi experts,
    I have a couple of questions with regard to xcelsius in sap bpc 7.5 ms
    I am using SAP BPC 7.5 MS AND Xcelsius 2008 sp5.
    I already installed the required extended analyzer and EPM connector.
    Now here are my questions
    1st. I have a file named BPCDATAGRID.XLX, is it the same add ons that mentioned on the HTG? i tried adding this add on but everytime i add this file my xcelsius freeze. in short it was unsuccessful. Could you please teach me or tell me where or how to download the BPCDATA grid that was mentioned in the HTG?
    2nd. Since i installed the extended analytic analyzer. im wondering why the function =GetReportDefinition() wouldn't work.
    when i check the available functions of IDPrj.AnalyzerFuncs, it includes only two functions, namely AnalyzerOLAPMember and ButtonActionFormattingSheet. Will you please please please teach me how to deal with this.
    Thanks in advance.
    yajepe

    Hi Sorin,
    according to the guidlines, SAP posted in the wiki, for connecting SAP BPC to Xcelsius via XML connection I have to connect the XcelsiusService.dll via .NET framework 1.1.4322.
    This might not be the correct way anymore, but there is no other guide on how to connect BPC and Xcelsius.
    Can you provide info on a other way of connecting BPC to Xcelsius?
    Thanks in advance,
    Harmen

  • SAP BPC 7.5 to BPC 10.0 upgrade, problem CPMBPC_800

    Hello,
    We are currently upgrading BPC 7.5 to BPC 10.0. We want to do an upgrade of our existing BPC 7.5, and not an 'clean' installation of BPC 10.0.
    Right now we are having some issues with the´basis part of the upgrade.
    We have installed the POASBC 100_730 SP01 (POASBC ABAP component) with no problems
    and now we want to install the EPM content in the download package 51040691 (Server components).
    In the download package 51040691 - there are two folders 'upgrade' and 'installation'
    The files have been uploaded into SAP BW 7.3 and the problem now is in 'saint' - we can see the CPMBPC_800 package, but the type is 'INSTALLATION' and there is not an option to choose 'UPGRADE'
    Is 'INSTALLATION' the same as a clean installation - or will the package detect the existing SAP BPC 7.5 and do upgrade instead of an installation ?
    All help is appreciated
    Thank you,

    Hello,
    we are facing the same issue. Did somebody solve this problem? Is INSTALLTION the same as UPGRADE?
    Kind Regards
    Waldemar Brill

  • Xcelsius 2008 on top of SAP BPC

    Hi Experts,
    I am trying to use Xcelsius 2008 on top of SAP BPC.
    I want following functionality in my dashboard:
    1. There is a drop down in the dashboard for Year-Month selection.
    2. Based on that selection, the BPC query to be refreshed for the selected month and my dashboard will show data for the selected month. While integrating with WebI using LiveOffice, we used to do this by binding the prompt to a cell in excel and selecting on demand refresh option. Can we do the similar thing while integrating with BPC ?
    3. Can we create multiple BPC reports in the same excel file to build the excel model for my dashboard ?
    Can these requirements be achieved by using Xcelsius on top of BPC using EPMConnector.xlx ?
    Many thanks,
    PASG

    Hi Sanjay,
    You need to use different operation types of the EPM Connector for this.
    Have a look at this how to guide:
    http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/8034121d-8419-2e10-229a-99ec678b64c5
    http://wiki.sdn.sap.com/wiki/display/BPX/Enterprise+Performance+Management+%28EPM%29+How-to+Guides
    HTH,
    John

  • HOW TO STOP A SCHEDULING A PROCESS CHAIN IN SAP BPC

    Hello Expert,
    Can Any 1 tell me  how to stop a scheduling of a process chain in sap bpc ??

    Hi Neeraj,
    Your question is not clear.
    If you are asking - How to delete a schedule which runs a process chain/DM package from EPM, then please go to Data Manager -> click View Status arrow -> select view schedule status -> select the schedule, right click and choose delete schedule.
    Neha

  • SAP BPC NW version with SAP Dashboard Design (No Local Connection)

    Dear ALL,
    I'm working on SAP BPC NW version 10.0 and I'm trying to build some dashboards on it using SAP Dashboard Design.
    So, I follow some links online and I failed to proceed at the very beginning stage:
    To create a "Local" connection in Excel EPM Add-in.
    From the drop down box for the available connection types, I can just see Planning and Consolidation versions for both MS and NW, but nothing called "Local" as referred in those web.
    Any ideas?
    BR,
    Antony

    Hi Antony,
    Go through the SAP Note 1730125.
    Check the attached doc "SAP Business Planning and Consolidation 10.0, version for SAP NetWeaver" in the note
    for more details.
    Regards,
    Javed

  • Opening SAP BPC report on server from Dashboard 4.0

    I would like to know if it is possible to open SAP BPC report/excel on server from dashboard. We should have it embeded in dashboard so that if we click on dashboard....then it should take to the underlying BPC report on server.
    If it is possible the please share the ideas and process.
    Thanks!
    Asif AKram

    Hi Asif,
    We can get BPC data to Dashboard  using EPM add in/Extended Analyzer depending on BPC version.But going directly to BPC report from Dashboard is not possible.
    Regards,
    Javed

  • ABAP  dump during workstatus chaning in SAP BPC 7.5

    Hi, Experts
    We are working with SAP BPC 7.5 Ramp-up version. We faced a problem - during changing workstatus the system generates ABAP Dump.
    We checked ST22 with ABAP Dumps. It contains the following:
    What happened?
        Error in the ABAP Application Program
        The current ABAP program "CL_UJW_WORK_STATUS_DAO========CP" had to be
         terminated because it has
        come across a statement that unfortunately cannot be executed.
    ABAP errors are created in the following code:
    FIELD-SYMBOLS:
            <fs_line> TYPE ANY.
      CREATE DATA lr_line TYPE (i_tabname).
      ASSIGN lr_line->* to <fs_line>.
      l_where = 'APPSET = i_appset'. "#EC NOTEXT
      LOOP AT it_dim_mem INTO ls_dim_mem.
        CONCATENATE
          l_where ' AND ' ls_dim_mem-dimension ' = ''' ls_dim_mem-member ''''
          INTO l_where RESPECTING BLANKS.
      ENDLOOP.
      *SELECT SINGLE * INTO CORRESPONDING FIELDS OF es_lock_info FROM (i_tabname) WHERE (l_where).*
    *  fill lock information
      CLEAR ls_ujw_statcode.
      CALL METHOD me->read_status_code(
                   EXPORTING i_appset = i_appset
                             i_status = es_lock_info-status
                             i_spras  = 'E'
                   IMPORTING es_ujw_statcode =  ls_ujw_statcode ).
    ABAP dump says that in "SELECT SINGLE * INTO CORRESPONDING FIELDS OF es_lock_info FROM (i_tabname) WHERE (l_where).*"  exist a dynamically specified column name which is unknown.
    Does somebody have the same problems?
    Regards,
    Pavel

    Hi Pavel,
    This is obviously a bug and it looks like from the code block you copied into the forum that there is an issue with the actual select statements dynamic where clause. I haven't specifically seen this bug but I recommend you do an SAP Note search on the following component EPM-BPC-NW-WS (for work status) in your search criteria put the class name that you found in the dump. This should help you find whether or not a correction has been created (i.e. an SAP note) that solves your issue.
    Cheers, Scott

  • SAP - BPC (balance carryforward)

    Hi all,
    I have a question about SAP u2013 BPC.
    How are the balance carryforward executed and is the document inversion automatic as in SEM-BCS?
    The question is, when I enter in SAP u2013 BPC at 001.2009 will I have the balance carryforward from 2008 automatically? Or do I have to do something extra?
    And is the document inversion automatic?
    Thanks for your help.
    Best regards

    Hi,
    this is not the place for SAP BO PC.
    Please check the BO forum.
    There is a howto : "How To Build the Carry Forward and Account Transformation Business Rules".
    Search for it here: [https://www.sdn.sap.com/irj/scn/articles-epm-all|https://www.sdn.sap.com/irj/scn/articles-epm-all]
    or.... get the direct link here:
    [https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/b026be43-40cf-2b10-6cae-ed8900ace7f9|https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/b026be43-40cf-2b10-6cae-ed8900ace7f9]
    BR

  • SAP BPC NW 10 KEY FIGURE LENGTH OPTION

    Hi Experts
    We have installed SAP BPC 10 801 NW SP 05, we want to create a model with large Figure Length  but this option doesn´t appear
    I´ve attached an image of what we have to see in Option when creating a Model
    Thanks for your answer,
    regards

    Hi,
    What is your EPM Add-in version?
    I think you might have gone through following note:
    1829297 - Large Key Figure support for Planning and Consolidation 10.0
    Thanks,
    Raju

Maybe you are looking for