A few questions regarding the feature of job documentation in Solution Manager Job Management.
When doing a mass import of the jobs by RFC we had the following issues:
    1 - The import process takes a lot of time, there are thousands of queries to DMDattribute table. I'm only importing 190 jobs that took around 15-30 minutes. Do you know any note or configuration to fix this?
    2 - Because import took a lot of time, the first time we had a timeout of 600s in ICM, and the import process was interrupted. How can we massively delete the jobs documentation? I know that the standard procedure is not to delete, but to change the jobs status to 'DELETED', but still if I could really deleted them and redo the import from scratch would be a lot better. If mass delete is not possible, is there a way of doing a mass update of the job status, from "IN PROCESSING" to "DELETED"?
Thanks in advance and hope to hear from you soon,
Daniel Garrido

Hello Daniel Garrido,
did you find an answer to this question? I`m facing the same situation and do not know how to delete hundreds of jobs.
I would be very happy to hear from you.soon
Alexandra Berner

Similar Messages

  • Standard SAP periodic job to schedule import of requests in target system?

    Hello Folks,
                       Is SAP standadard job available to schedule periodic import of requests available in the target system. I know it is not advisable to do something like this, but i remeber some one telling me there is one available.
    Regards,
    Prashant

    Thanks for you replies folks... so...there's no standard job available. Its got be scripts at OS level, and ofcourse scheduling "import  all" options....
    but as we agree, this is not a recommended option.
    Have a good day...
    regards,
    Prashant

  • SAP Job Documentation from BC-XBP Interface

    Does BC-XBP or any other interface provide access to SAP side job documentation (that is visible in SM37 transaction) for third party applications?
    Thanks,
    Parag

    Hello Daniel Garrido,
    did you find an answer to this question? I`m facing the same situation and do not know how to delete hundreds of jobs.
    I would be very happy to hear from you.soon
    Alexandra Berner

  • Import status- import running does not change during the mass import of TR

    Dear All,
    I have successfully imported single requests in my newly installed SAP ECC EHP4 PRD system but when I have tried to import 8 transport requests(Mass Import) then the Import status is not changing from import running (Truck button still appears).
    But the effect of the request is seen in the production system but the status does not change.
    I have checked the logs and found that all the requests have been imported successfully but the Truck status does not change.
    I have restated the system but no use still the same.
    Thanks in Advance...
    Latha

    Import Running for a long time on ECC 6.0
    The background job RDDIMPDP is running on client 000 as well as the relevant client.
    Below is the TP System Log:
    WARNING: System CC6. Warning. 20090914042136 :
    WARNING: Background job not running properly. Function: G Jobcount: 04512801 Status: S.
    Please check the system. Use transactions SM21, SM37, SM50.
    WARNING: (This warning is harmless if no further warnings follow.)
    As per NOTE: 26966, it could be b'cause the background job process slots are occupied,
    Regards
    Vikas Nagar

  • JSM - Creating Job Documentation from Job Request itself

    Hi all,
    I am still exploring JSM, and I know its possible to create Job Request (Job Req) from Job Documentation (Job Doc).
    But is it possible to create the reverse (Job Doc from Job Req) ?
    This will be great, if the user is creating Job Req from "Detailed" version (compared to "Basic"), which has similar entries and tabs, as Job Doc.
    I did read somewhere that its possible, but I never find any documentation or SCN/blogs on this.
    Thanks in advance
    Regards
    Shahul

    This was answers below, in the comment area by Volker.
    How to configure SAP's standard Job Request form - Part 2
    Hi Shahul,
    the user triggers the Job Doc creation from within the Incident or Change Request in the JSM assignment block, but then the data from teh Job Request is automatically taken over for the Job Document.
    So starting the creation and pushing the save button is manual work, but the filling out the Job Doc is done automatically.
    Kind Regards
    Volker
    Regards
    Shahul

  • Wants to build caree in SAP BPM

    Hi,
    I have 5 years of experience as a PLM Consultant. I have involved in configuring and customizing of PLM solution to suit to various business needs for various customers.
    I would like make my career in SAP technologies. I see SAP BPM would be the right tool for my career transformation. Please suggest what are the technologies do i need to look into to be a SAP Consultant.

    Hi,
    From where u hv learned all these SAP Stuff ? R U still looking for job ?? If so keep on trying it may take some time but definitely u will get it .  But at the same time if u get some job in non  SAP platform then try  to get that n t later on u can try for better oppurnity .
    Try to apply online in  TCS / WIPRO/ IBM/ CTS/SATYAM / ITC etc ....
    Good Luck.,
    Cheers.

  • ARIS - SAP BPM Integration

    Hi Experts,
    I am new to SAP BPM and ARIS, and was wondering if anyone can help answer this.
    If processes are designed using ARIS, how would you import them in NWDS (BPM Process)?  Is this the right way to do it? What is the best practice regarding this?
    I know there is integration between ARIS and SolMan, but this is with SAP BPM.  Any help would be appreciated.
    Thanks,
    Rahim.

    From the wiki posted by Ann Rosenberg
    Link: [http://wiki.sdn.sap.com/wiki/display/ModHandbook/ProcessModelingNotations]
    It seems there is no way to import BPMN diagram from ARIS to NW BPM.  One will have to redraw the models.
    Rahim.

  • Job for mass comparision ?

    Hi all,
    Why we need to do the  "Job for Mass comparison" and what is the use from this?
    (T Code: PFCG  Menu: Utilities  Mass comparison  Schedule or check Job for full reconciliation  Implement (F8):)
    Would be appriciated any input.
    Thanks and regards
    Harish

    Hi Harish,
    Mass comparison we have different options. each option have specific purpose.
    Profile comparison: Start the profile comparison immediately after profiles are generated or imported. If you use time-dependent role assignments, we recommend that you schedule this daily as a background program. The authorization profiles are compared with the user master records; that is, profiles which are no longer current are deleted from the user master records, and the current profiles are added to the user master records.
    Composite Role Comparison: Start the composite role comparison, if you are making changes to a composite role definition (that is, adding or deleting single roles to a composite role), or importing a change. The single role assignments are compared with the composite role asisgnments to the user here. If you have added single roles to the composite role, the single roles are assigned to those users that have an assignment to the composite role. However, the single role assignments are deleted for usrs, if the single role has been removed from the composite role.
    HR Comparison: Start the HR comparison if you are making changes to the HR-Org model that affect the indirect role assignment. You can onl select thsi processing mode, if HR-org is active. To do this, the swtich HR_ORG_ACTIVE must be set to YES in table PRGN_CUST.
    Cleanups: Perform cleanups if you generate or import profiles. Generated profiles for which no roles exist are deleted.
    Thanks
    Ravi

  • CPS Job documentation

    Hi,
    In solution manager work center, after the change document is created  the job documentation is to be generated. One of the steps to create job documentation is assigning the logical component. I'm facing an issue with this step. The logical components aren't getting displayed thus the job documentation is not getting created. What could be the possible solution to this?
    Regards,
    Esha

    Hello Esha,
    if I understood your issue correctly your creating the Job Documentation from the Job Chaneg Document, so you are using the ChaRM integration?
    In that case you'll have to check IBase assigned to the Job and Change Request. The IBase has to point to a production system.
    The program also filters for logical components, which have the (logical) System, i.e. combination of System ID and Client, the IBase is pointing to, assigned in the role production.
    So you need an logical component which includes the selected system in role production.
    BTW: Please use the Solution Manager forum for JSM related questions and visit our new FAQ http://wiki.sdn.sap.com/wiki/display/SM/FAQJobScheduling+Management
    Regards,
    Martin
    Please follow us on SDN:
    http://www.sdn.sap.com/irj/scn/weblogs?blog=/pub/u/25168834 [original link is broken] [original link is broken]
    /people/martin.lauer/blog
    and SAP Service Marketplace:
    http://service.sap.com/jsm

  • SAP Standard Jobs are getting canceled

    Hi Basis Gurus,
    In our Quality BW 3.5 system the SAP Standard jobs are getting canceled.
    The jobs are as follows
    SAP_APPLICATION_STAT_COLLECTOR
    SAP_CCMS_CPH_HRCOLL
    SAP_CCMS_MONI_BATCH_DP
    SAP_COLLECTOR_FOR_JOBSTATISTIC
    SAP_COLLECTOR_FOR_NONE_R3_STAT
    SAP_COLLECTOR_FOR_PERFMONITOR
    SAPCONNECT ALL SEND
    SAP_REORG_ABAPDUMPS
    SAP_REORG_SPOOL
    SAP_RSICFDLT
    In SM37 when i click on the job log for the above mentioned jobs the system is promting a message saying as "Error reading job log"
    Please let me know how can troubleshoot it and resolve this issue.
    Our is qulaity BW 3.5 system
    Solaris OS
    Oracle Database
    Please help me.
    Regards,
    Anil.

    Hi ,
    For log display reason, try the note suggested. Jobs cancel reason may be due to that the user who schedule that job are locked or not exist on that client. Or other reason will be clear only after log display.
    Ankit

  • How to Schedule SAP background job at OS Level

    Hi All,
    Can Anyone tell me how to Schedule SAP background job at OS Level (unix).
    Regards,
    Anil

    Hi Anil,
    I donu2019t know your requirements, anyway itu2019s possible to setup your SAP job in order to start after an event, and after that you can get the event triggered from the Operating System in the following way:
    - log into you Operating System with the SIDadm user id (at the Operating System level) and go to directory /usr/sap/SID/SYS/exe/run
    - Run the SAPEVT executable as follows:
    sapevt YOUR_EVENT -t pf=/usr/sap/SID/SYS/profile/DEV_DVEBMGS00_server001 nr=01
    This will raise the event, and cause the job scheduled within SAP to execute.
    You can periodically execute this job with crontab.
    Thanks,
    Federico Biavati

  • I am creating a catalog and need a way to mass import tables from excel into indesign.  Any ideas?

    I am creating a catalog and need a way to mass import tables from excel into indesign.  Any ideas?

    Third-party plugins for InDesign can automate the process. Here's a thread from InDesignSecrets.com forums:
    http://indesignsecrets.com/topic/plugins-for-automating-catalog-production

  • Can we prioritise in SAP BPM

    In SAP BPM,  can we priotirize the process at runtime to hold one process and allow my critical process to run first and the other next.
    Thanks
    Prabhakar
    Edited by: VenkataPrabhakar Teegavarapu on Jul 19, 2011 12:09 PM

    Here is the API link:
    http://help.sap.com/saphelp_nw73/helpdata/en/24/6a325944854629adcfd73c2cc0fa60/frameset.htm
    But we can only read the current priority using the API, we cannot change the priority.
    TaskInstanceManager taskInstanceManager = BPMFactory.getTaskInstanceManager();
    Set<TaskAbstract> myTasks = taskInstanceManager.getMyTaskAbstracts(statuses);
    Priority taskPrio = myTasks.getPriority()
    Thanks
    Abhilash
    Edited by: Abhilash Gampa on Aug 2, 2011 10:52 AM

  • Notes and Attachment in SAP BPM

    Hi,
    In SAP BPM, the users that are completing a task can add some notes or attachment. These items will be visible by the other users who will execute the next tasks. However, when the process is complete, I'm not able via the SAP NWA to retrieve the attachment or view the notes that have been inputted during the execution of the process.
    Does somebody know how to view this information once the process is completed?
    Thanks
    Martin

    Hi Martin,
    You might have some access issues.
    In a nutshell:
    Prerequisites
    You have administrator rights for the portal content, that is, the content administrator portal role is assigned to you.
    Procedure
           1.      Log in your portal as a content administrator.
           2.      Choose the Content Administration tab page.
    The portal content catalogue is displayed.
           3.      In the portal content catalogue, choose Portal Content  ®  Content Provided by SAP ® End User Content ® Standard Portal Users ® Pages ® Universal Worklist ® Universal Worklist.
    Alternatively you can search for pcd:portal_content/com.sap.pct/every_user/general/pages/com.sap.km.pages/com.sap.netweaver.bc.uwl.uwl_page.
           4.      In the context menu of Process List Viewer, choose Open ® Related Links.
           5.      In the portal content catalogue, choose Portal Content ® Content Provided by SAP ® End User Content ® BPEM ® Pages ® Process List Viewer.
    Alternatively, you can search for pcd:portal_content/com.sap.pct/every_user/com.sap.bpem/com.sap.bpem.pages/com.sap.bpem.ProcessListViewer.
           6.      In the context menu of Process List Viewer, choose Open ® Related Links.
           7.      Confirm the Add Related Link dialog box with OK.
           8.      Save your settings.
    Next time when you open your universal worklist (Home ® Work), in the left hand panel under Related Links the Process List Viewer is displayed.
    Hope this helps,
    David

  • How to delete Job Documentation in JSM Solution Manager

    Hi,
    I am trying to define some job documentation in "JSM Solution Manager", how can I delete unwanted Job Documantation there.
    Don't see any remove button.
    Thanks for help
    sahmad

    Hello,
    We too are facing same issue. Can you please share your solution.
    Regards,
    Mudasir.

Maybe you are looking for

  • Bug in the copy cluster roles wizard - CSV reparse points cannot have names with spaces

    Hi All, I have identified a bug in the copy cluster roles wizard in 2012 R2, which is preventing me from migrating my clusters from 2008 R2 & 2012 to 2012 R2. The bug surfaces when you attempt to copy a VM role from a 2008 R2 or 2012 cluster that has

  • Photoshop elements on Windows Vista

    Hello, I have Photoshop Elements version 2.0 and I will have a new computer with Windows Vista. I would like to know if I will encounter difficulties during the installation and later.

  • How to use 2 primary key in 1 table

    Hi, When i creating the table,in this the following are the columns Name,Street,City,Pin in this they give some rules the column Name & City as Primary Key. But when type the query it shows the error table contains one primary key, how i do this? Tel

  • Application not found error message

    Everytime I try to download a purchased or free ebook (e.g. from Digital Editions site) I get the same error message: it lists the folder name of my temporary internet files\Content.IE5\Y9BKTFY\URLLink[22].acsm then it says Application not found. The

  • Hi, all good people

    Hi, Please help me !!!!!!!!!! How deactivate Adobe Premiere Elements 13 ? I tray everithing but I can find Thank You very, very much for help...