SAP DMS Link to Inspection Lot QALS

Hi experts,
Can anyone tell me how to implement the Object Link to inspection lot.
Am using EHP 6.and found that there are some notes to be implemented note.
Does anyone have worked with the DMS Object link with Inspection lot.
request you to kindly let me know the solution at the earliest.
regards,
veeramani

Hi tilak Raj,
Thanks for the reply.
Can you please suggest me.
For Inspection Lot object link, i have seen some note .and there is a option to go ahead with the link that you have mentioned.
Can you please suggest me by which method i can achieve my requirement easily,since am going to use the Screen number 500 which is a dummy screen in DMS.
Also the attached Documents to inspection lot should visible in Results recording.
is there any standard switch or business Function for the DMS Object link to inspection lot  ???
Please suggest me ASAP.
Regards,
veeramani

Similar Messages

  • How to use SAP XI to get Inspection Lot IDOC when Insp. lot is created

    I want to create a 3rd party .NET app that gets an Inspection Lot IDOC when an inspection lot is created, gather the inspection results, then push the results back to SAP in an IDOC. How do I use SAP XI to do that? I developed an HTTP listener .NET app and configured a sender communications channel for the SAP System and a receiver connunications channel for the HTTP adapter in the XI integration scenario, but how do I configure the XI integration scenario to send my app an IDOC when an inspection lot is created, and what IDOCs do I use?
    Thanks,

    Hi Ed
    I think you can use
    IDOC TYPES : QALITY01, QALITY02
    in XI you can create
    IDOC to HTTP as a scenario
    IDOC need to be triggered from SAP system and you can import the IDOC metadata into XI from SAP
    Check this thread it will help
    Re: IDOC to HTTP
    Thanks
    Gaurav

  • Material document not updated in inspection lot QALS table

    HI
    The inspection lot created for 04 inspection type  during Goods Receipt.
    The material document is appearing in the inspection lot but found not updated in table entries.  i.e.., QALS -MBLNR
    When i checked other inspection lots it was found updated. How this happened ?
    Any Snote to be applied?
    Thanks

    Hi,
    Check the number ranges for material documents. (with year) for document type WE in OMBT transaction code.
    If same material document number repeats in the same calendar year,then document update will be terminated.
    As, document no. will be already existing in tables, system won't allow to update the same no. again.
    Thanks & Regards,
    Anand.

  • Inspection lot creation after receipt of certain quantities?

    Gurus,
    My user requires the creation of an inspection lot of 1 piece after the receipt of 200 pcs in stock as a kind of audit. This is not a goods receipt feom production as it will be done for each piece. .but was is needed is an event to create a lot woth piece for after receiving 200 pcs ( these receipts most provably will be on different days & in different material documents)
    Can I apply this requirement through sap standard or user exit ar abap?
    Thanks in advance,

    Hi,
    Rephrasing it,
    each piece will be assigned to a batch in a one to one relationship
    One piece represent one batch, Correct? And when GR is done against production for this batch, you get an inspection lot. QA personal do the inspection and material moves to Unrestricted stock.
    Beside, the goods receipt from production that will be performed as mentioned, the user may re-inspect one piece already present in the unrestricted use as a kind of audit. the user wants this auditing lot to be generated automatically for every 200 pieces instead of creating it manually.
    After the initial inspection is over and material is lying into Unrestricted, user would again inspect each of them and need automatic creation of inspection for every 200th piece/ batch. Correct?
    Is this what you are looking for?
    If that is the case, I don't think automatic lots can be created since there is no movement involved. User is simply doing retesting but nothing in system then how would SAP understand that an inspection lot is required?
    Even if some development is done to generate an inspection lot for every 200th batch received into Unrestricted, you would still need an inspection type to be activated against the material and some movement to be triggered.
    ntn

  • Goods movement with Inspection Lot

    Hi
    We would like to do a Material to Material posting including the earlier created inspection lots for the initial material?
    Is it possible in QM to transfer /link an inspection lot with batch from one material to another material?
    Ex: one material has inspection stock with assigned inspection lot/batch. we would like transfer posting this stock to other material. Is it possible by transfer the inspection lot from one material to other material with inspection lot/Batch?

    Hi,
    We can trasfer the stcok from one material to another material from Quality lot itself , but we cannot assign one lot to two materials. If you want inspection lot in receiving plant then activate 08 inspection type in Material Master and maintain inspection settings for 331 M.Type in SPRO.
    Regards,
    Vikas.

  • Linkage of inspection lot when the stock is posted to new material in UD.

    Dear QM Gurus,
        My client has the following requirement.
       The stock is sometimes posted to the new material whle Usage decision(Partially or completely)
        In this case the target  material has no linkage with the inspection lot of the material for which the Usage decision is done.
       The user has to manually create the inspection lot for the target material and record the same results once again for the record purpose.
       The requirement is to establish a link between the inspection lot original material and the target material  so that the additional step of creating the manual inspection lot and result recording  can be avoided.
      Is there any standard functionality through which I can link the inspection lot/result recorded to the target material or can it be acieved through some enhance ments.
      Please help.
      Regards
      Ankush

    Hi Ankush,
    I am not aware about the standard functionality for this link. But following work around may work for you. Possibly you may have to develop the ABAP report for this linkage. Try this if works.
    1.     When you do material to material transfer in QA11 it generates a movement in background with material document generation.
    2.     Pass the inspection lot through QAMB table and fetch all material documents
    3.     Pass these material documents in MSEG table and get the material
    4.     You may put several conditions for fetching these details.
    Best Regards,
    Anand Rao

  • Inspection lot summary after UD and stock posted

    lot summary level '2' had maintained in material record, when GR, lot summary work rightly.
    But after UD and stock post to unrestricted stock and new GR, no inspection lot generated and stock were posted to  unrestricted stock  directly.
    My question is ,why system does not generate new inspection lot?
    I also found it in document that , lot summart does not take place if "A previously created inspection lot has already been completely credited from the stock", is that means system will create new lot in this situation?
    Regards,
    Denis.

    Denis,
    After UD
            If the UD is accept, SAP will not create new inspection lot.
            If UD is reject SAP will create a new inspection lot.
    If UD is not made but 'Qty to be posted' is zero then also SAP will create new inspection lot for subsequent goods receipts.
    AKM

  • Cancel inspection lot when results already recorded

    Hi,
    I have an inspection lot created via the release of a process order, since the lot has been created the process order has been canceled and now there is a requirement to cancel the associated inspection lot also. However there are results recorded and confirmed against the inspection lot and the option in QA02 Functions ->Inspection lot -> cancel is no longer available? Any suggestions on how to cancel this inspection lot would be greatly appreciated.
    Regards,
    Gary

    Dear,
    You need to use transaction QA12. In the intial screen enter the Inspection lot number and enter. From menu bar "Usage Decision" ->Functions->Cancel Lot and then save the lot.
    Please refer this link,
    [ Cancel Inspection Lot |Re: cancel QM inspection lot]
    Regards,
    R.Brahmankar

  • Create inspection lot move data from mseg to qals

    hello.
    When SAP create inspection lot from MIGO,  I need to move mseg-ablad ( uploading point) to qals-yyfield.
    In Migo we can have more than one pos, then system create differents inspection lot.
    Is it possible ??? are there any user exit to do that ??? i see user migo's exist  and inspecion lot's create, but in both cases i don't see all data to read an and move it.
    Regards.
    Antonio

    Namastey
    In my case i have Migo with more than one position, and for each position the system will create a new inspecion lot.
    Do you mean there are more than one Items in PO and for each Item there will be different inspection lot?
    Then,
    You need to get Material document number for inspection lot number and get MSEG-ABLAD which will be QALS-YYFIELD (YYABLAD).
    I hope, I have understood your question!!
    Amol.

  • How to link a Delivery to an Inspection Lot a posteriori?

    Hello,
    we need to created Inspection Lots and make the analysis before the delivery. Thus we use Inspection Type Origin '89'.
    Afterwards, however, we would like to update the Inspection Lot and link it to the actual delivery. This would help in the reporting for example.
    Do you now how we could do that?
    Thank you in advance and regards,
    Didier

    Thanks but it does not fit our process.
    Here are more details:
    We create a sales order
    The sales order is sent to an external shipping system
    The truck driver check-in in the external shipping system
    A sample of the load is sent to the lab for analysis
    The analysis is carried out and gives its visa
    The truck driver can check-out in the shipping system and leaves
    The shipping is sent to SAP and a delivery is created
    The lab manager, at the end of the day would like to assign the delivery number to the inspection lot.
    This would help in administring/reviewing the inspection lot status, etc.
    Do some useful reporting with the actual quantities, truck id, etc.
    regards,
    Didier

  • Use of SAP DMS & SAP Archive Link both together

    Dear DMS Experts,
    I am little bit new to DMS and have very less idea about functionalities and capabilities of SAP DMS & Archive Link.
    I have got few questions:
    1. Is it possible to use both SAP DMS & SAP Archive link togther.
    For example, there are certain objects like GRN, Invoice, Employee etc which are not supported in standard DMS.
    However, they are supported in archive link.
    But at the same time, there is requirement of setting and resetting of some statuses of the documents attached with PM notification or with PR / PO. This functionality is available with SAP DMS.
    So I want to know, is it possible to use SAP archive link for few objects and SAP DMS for other objects.
    2. In case of SAP archive link configuration, we need to define link between Object Type, Document type and content repository
    in node "Edit Links" under "Basic Customizing" under "ArchiveLink".
    Here we can not use all the content repository which we have created normally. But we can use only limited content repository ID.
    How does system decides, which content repository id can be used.? Where can i define that.?
    3. With SAP archive link, can i store my documents in the same content repository in which I am storing my all the documents with SAP DMS. I mean to say, both the SAP DMS & Archive link, can share the same content repository.
    We are having a seperate content server and requirement is to store all the documents in content server only.
    Would request you all to please help.
    Thanks & Regards,
    Mihir Popat

    ..is it possible to use SAP archive link for few objects and SAP DMS for other objects...
    Yes,you may use Archivelink for static documents that would be required purely for reference while DMS can be configured to handle documents that are more dynamic in nature (that require status change,version,revisions et-al)
    ..both the SAP DMS & Archive link, can share the same content repository.We are having a seperate content server and requirement is to store all the documents in content server only...
    Yes,you may store DMS and Archivelink documents can reside on the same Content Server.Content repository is a logical area/partition,hence you may create one content repository for DMS and another for Archivelink(on the same Content Server).
    Regards,
    Pradeepkumar Haragoldavar

  • QM with HUM- HU linked inspection lots

    Dear All,
    Here is the issue I am facing.
    I am using QM with WM and HUM. My handling unit has multiple batches. Thus, system creates as many inspection lots as there are batches.
    My questions are:
    1) Is it possible to create one inspection lot for one handling unit? I think not.
    2) Is it possible to record results for all HU linked inspection lots in one screen?
    3) Is it possible to make a usage decision for complete HU with all linked inspection lots in one screen?

    Hi,
    Not possible to do result recording based on HU, but you can check with QE72 for result recording and UD for all inspection lots at a stretch.
    Regards,
    Naveen.

  • SAP PLM link with SAP DMS

    Hi, Gurus
       Please tell how we link SAP PLM C-folder & SAP DMS?
       If there is any link please for this.
       how we integrate SAP PLM -C-Folder with SAP DMS?
       if anyone know answer if give me solution.
    Ravindra

    Hi,
    1. Create RFCs between SAP PLM and SAP DMS servers using by tcode 59.
    2. Once connection established, then you can transfer tha data from PLM- cProject suits to DMS.
    3. You can also transfer tha data from cProject suite to DMS or vice versa through web.
    You can ask to your BASIS team.
    Regards,
    Srini Nookala

  • SAP Archive Link and DMS integration configuration

    Hi SAP Gurus,
    I have always come across that SAP DMS is very well integrated with SAP Archive link, is that means SAP Archive link can be used as an storage location for storing original application files, in normal DMS check in original CV01N transaction.
    does this Archive link appear as an option to be selected to store the original application file at CV01N Transaction, just like we get DMS_C1_ST (default SAP) or any ZDMS_SC01/02 (customised Storage catagories for checking in originals.)
    another side iam also comming across SAP Archive link is an entierly different Module and involves different transactions to store documents and original.and no where related to DMS.
    iam not able to draw at any conclusion weather to suggest Archive link as an storage medium for DMS check in originals, as i have not used it earlier in DMS.
    Can this SAP Archive Link server be used as an sole and single original applicaion file storing system for DMS?
    if so will it support all the DMS funtionalities, if not what is this fully integrated means, is it limited to make an copy / transfer of excess DMS files in SAP Archive server from existing DMS server? iam confused
    please clarify.
    Points awaiting for clarification.
    Thanks and regards,
    Shanti

    Dear Hill,
    Thanks for your response,
    but my confusion is not yet solved.
    let me put it in a better way,
    1) You can store a document against a DIR with the GOS icon instead of in the originals area (called Document Archiving), i did not understand this solution please eloborate. where is this GOS icon in DIR,
    2) There is one thing in menu path: Environment / check in archive.
    so can we store originals in a Archive server directly by going in to the CV01N transaction.(iam not speaking about transferring Original already stored in a content server)
    3) we are having a single archive server to Archive SAP data, can This SAP Archive  server be used as an sole and single original  file storing system for DMS Also?
    4) if so will it support all the DMS funtionalities, if not what is this fully integrated means, is it limited to make an copy / transfer of excess DMS files in SAP Archive server from existing DMS server? iam confused to suggest this solution, as the client is not kneen on buying a separate server to store DMS files.
    please clarify.
    Thanks and regards
    Shanti

  • Link SAP DMS to Content Server

    Hi all, 
    Im user in SDN community, i saw you responding some question about SAP DMS, i have the following scenario :
    1.- I use SAP DMS in this moment and attach files from the server file.
    2.- Actually i have KM in the company, here have many document for common use to the company. for instance quality control specification documents.
    I need link SAP DMS to KM (Content Server), How can i attach files content in km to SAP DMS from transactions CV01N and CV02N. What´s customizing activitys i need apply?
    Best Regards,
    Jhonny Mogollón
    Consultor SAP
    Infogesa

    Hi Jhonny,
    in the standard of transaction CV01N or CV02N you see the original area at the bottom tab ‘Document Data’ or you can navigate directly to tab ‘Originals’. Both times you find the same small icons. To add an original you can use whether the ‘CREATE’(white sheet) or ‘OPEN’ button. If you choose CREATE a pop-up window appears where you can enter all original related data (workstation application, description, …). In the path field you can enter the path to the original manually or you can browse for it using the F4 help.  Since you select the correct file on your PC or Server please press OK and the path will be entered in the pop-up field automatically.
    After you entered all this data and confirm you will return to the CV01N or CV02N screen and see that the original file is added. However the displayed lock sign is still open which means that the original is not checked in at the moment. Please use the small green CHECKIN icon and select a suitable storage category on the next screen. After confirming your selection and saving the document the original is checked in correctly.
    Regarding the customizing I would kindly ask you to check the following settings:
    1. Storage category:
    Please check if a storage category is maintained in your system. I would recommend you to use the Content Server (KPRO) storage type. Therefore please go to transaction DC10 and choose the
    relevant document type. Display its details and you will find a flag called ‘Use KPRO’. Please flag it to use the KPRO storage type which is recommended by SAP. You can manage your storage categories and KPRO settings by transaction CSADMIN.
    2. Workstation Application:
    To store originals in DMS it is necessary to have some workstation applications defined in transaction DC30. These applications are necessary to handle originals correctly. Please maintain a workstation application for each file format to avoid problems in the future. For all further information please see the blue information button in transaction DC30.
    Best regards,
    Christoph