SAP ECC 6.0 EHP4 Compatible with MDSD 3.0?

Hi Folks,
Is SAP ECC 6.0 EHP4 compatible with MDSD 3.0? I have read the documentation but its not clear for me if this would be possible.
It says that MDSD 3.0 is compatible with SAP ECC 6.0 EHP3, but i would like to know if compatible with EHP4.
Thanks for your help.
Regards,
Gilberto Li

Hi Gilberto,
yes, this should work fine. We just have one client who did the upgrade and he has not experienced issues up to now - even he is still in testing phase.
Regards,
Oliver

Similar Messages

  • SAP ECC 6.0 EHP4 installation with ABAP+JAVA stack

    Hi,
    I need to install SAP ECC6.0 EHP4 with ABAP+JAVA stack on windiws server 2008 with oracle.
    I have read that for this, we need to install ECC 6.0 EHP4 ready and then upgrade to EHP4 using ehpi installer.
    I have found the documents seperately for ABAP and JAVA stack and not for ABAP+JAVA.
    I need clarifications on these.
    1.Do we need to install ABAP and JAVA instances seperately with EHP4 and then upgrade(In that case I have to install both instances on single host)?
    2.Should we give seperate <SID> for both instances and create seperate databases?
    3.Hard disk requirement for this set up.(We have 150 GB including C drive)
    4.Steps to perform after installing ECC6.0 EHP4 ready
    5.Please send me the doc. if anyone has
    Anyhelp would be highly appreciated.
    Regards,
    Surya

    > 1.In the installation document for EHP4 ready for SAP ERP 6.0 ABAP.It is mentioned that this installation contains only basic EHP4 for ERP 6.0 and we need to install additional EHP4  functionality in the SAP ERP 6.0 -EHP4 ready system.
    > It states that atleast Support pacakge stack (SPS) 1 of SHP4 needs to be installed.So If I install this stack using EHPi installer in the post installation activities my SAP ERP 6.0 EHP4 will be in place?Please confirm.
    Yes..
    >
    > 2.Can I install SAP SR3 with dual stack and upgaradte it directly to EHP4 at a time?
    Yes you can do it.....as SAP still supports dual stack ERP systems to EHP4
    >
    > Any solutions or suggestions from others also welcome.
    Why do u want a dual stack ECC ystem?? any specific requirement???
    Regards,
    Nirmal.K
    Edited by: nirmal konchada on Feb 2, 2011 12:16 PM

  • Error in PHASE PREP_EXTRACT/PREIMP: Upgrade SAP R/3 4.7 to SAP ECC 6.0 EHP4

    Hello,
    I'm currently in upgrading a SAP R/3 4.7 system to a SAP ECC 6.0 EHP4.
    Therefore I followed the Upgrade Guide from marketplace - installation- and upgrade guides - SAP ERP - SAP ERP 6.0 - SAP Enhancement Package 4 for SAP ERP 6.0 - Upgrade Guide SAP ERP including EHP4 SR1 - Unix on MaxDB.
    I downloaded media from marketplace/swdc - Installations and Upgrades - SAP Application Components - SAP ERP - SAP ERP ENHANCE PACKAGE - EHP4 FOR SAP ERP 6.0 / NW7.01 - Upgrade.
    I'm starting upgrade with upgrade master DVD 51036889_1 and      51036889_2.
    Now upgrade breaks down in phase PREP_EXTRACT/PREIMP with error:
    Severe error(s) occured in phase PREP_EXTRACT/PREIMP!
    Last error code set: Single errors (code <= 8) found in logfile 'PREIMP.ELG'
    PREIMP.ELG says:
    ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
    R3trans preimport and RETURN CODE in R710VPE.REX
    ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
    2EETW169 no connect possible: "maybe someone set invalid values for DIR_LIBRARY ('/usr/sap/REX/SYS/exe/run') or dbms_type ('ADA')"
    Kernel is stored in /usr/sap/REX/SYS/exe/run and database is ADA (maxdb).
    File R710VPE.REX says:
    4 EPU201XBEGIN OF SECTION BEING ANALYZED
    4 ETW000 R3trans version 6.13 (release 640 - 17.02.10 - 13:07:00).
    4 ETW000 ===============================================
    4 ETW000
    4 ETW000 date&time   : 07.03.2011 - 15:28:36
    4 ETW000 control file: /usr/sap/REX/upg/abap/tmp/PREIMPTRANS.CTL
    4 ETW000 > import
    4 ETW000 > file='/usr/sap/REX/upg/abap/bin/R710VPE.SAP'
    4 ETW000 > safeandslow=yes
    4 ETW000 > buffersync =yes
    4 ETW000 > commit     =1048576
    4 ETW000 > importtruncated =yes
    4 ETW000 R3trans was called as follows: R3trans -w /usr/sap/REX/upg/abap/tmp/R710VPE.REX -u 1 /usr/sap/REX/upg/abap/tmp/PREIMPTRANS.CTL
    4 ETW000 active unconditional modes: 1
    2EETW169 no connect possible: "maybe someone set invalid values for DIR_LIBRARY ('/usr/sap/REX/SYS/exe/run') or dbms_type ('ADA')"
    4 EPU202XEND OF SECTION BEING ANALYZED
    Can anybody help me out here?
    Regards,
    Julia

    Hello,
    I run 'R3trans -x' command, but there was no problem - connection to database was working.
    Problem was following:
    Before starting the sdt service on host, I set environment variables JAVA_HOME and LD_LIBRARY_PATH for sidadm. That's not neccessary and that was the problem. Without setting these variables it is working now.
    Thanks,
    Julia

  • Install SAP Baseline Colombia v 1.603 over SAP ECC 6.00 EHP4 Ready SR1

    Hi everyone,
    I had already installed SAP Development Sysem with the media "SAP ERP 6.00 EHP4 Ready SR1" (SAP Note 774615 - Support Package levels of ERP/ECC installations/upgrades).
    Currently we are analyzing with funcitional consultants to install SAP Baseline Colombia v 1.603 over "SAP ERP 6.00 EHP4 Ready SR1" installation, is this scenario correct? Or which installation media should I use?
    In SAP Note 1083533 - Installation of Enhancement Package 3 on SAP ERP 6.0, it states that "For Enhancement Package 3, you require the Support Packages of ERP 6.0 Stack 08" so the installation media that is more close to stack08 is "SAP ECC 600 Support Release 2", please confirme me if is this correct?
    Best Regards,
    Franklin Cedillo
    Basis Consultant

    > I had already installed SAP Development Sysem with the media "SAP ERP 6.00 EHP4 Ready SR1" (SAP Note 774615 - Support Package levels of ERP/ECC installations/upgrades).
    > Currently we are analyzing with funcitional consultants to install SAP Baseline Colombia v 1.603 over "SAP ERP 6.00 EHP4 Ready SR1" installation, is this scenario correct? Or which installation media should I use?
    You need to use Solution Manager, create a task in the maintenance optimizer and get the correct packages.
    Since your system is already on EHP4 (or EHP4-ready) you can forget about the notes of EHP3 and EHP2.
    Markus

  • SAP ECC error:'Migration Monitor' exits with error code 103.

    Hi All,
    I am doing SAP ECC installation for windows 32 bit with MAXDB as backend.
    I am stuck at the import ABAP.Getting error
    ERROR 2008-08-08 16:10:53
    CJS-30022  Program 'Migration Monitor' exits with error code 103. For details see log file(s) import_monitor.java.log, import_monitor.log.
    1) imort_monitor.java.log-->contains
    java version "1.4.2_12"
    Java(TM) 2 Runtime Environment, Standard Edition (build 1.4.2_12-b03)
    Java HotSpot(TM) Client VM (build 1.4.2_12-b03, mixed mode)
    Import Monitor jobs: running 1, waiting 0, completed 18, failed 0, total 19.
    Loading of 'SAPVIEW' import package: ERROR
    Import Monitor jobs: running 0, waiting 0, completed 18, failed 1, total 19.
    2)import_monitor.log
    ERROR: 2008-08-08 16:10:36 com.sap.inst.migmon.LoadTask run
    Loading of 'SAPVIEW' import package is interrupted with R3load error.
    Process 'D:\usr\sap\EC6\SYS\exe\uc\NTI386\R3load.exe -i SAPVIEW.cmd -dbcodepage 4103 -l SAPVIEW.log -nolog -c 0' exited with return code 2.
    For mode details see 'SAPVIEW.log' file.
    Standard error output:
    sapparam: sapargv( argc, argv) has not been called.
    sapparam(1c): No Profile used.
    sapparam: SAPSYSTEMNAME neither in Profile nor in Commandline
    INFO: 2008-08-08 16:10:52
    All import packages are processed.
    WARNING: 2008-08-08 16:10:52
    1 error(s) during processing of packages.
    INFO: 2008-08-08 16:10:52
    Import Monitor is stopped.
    3)SAPVIEW.log
      error message returned by DbSl:
    (IMP) INFO: a failed DROP attempt is not necessarily a problem
    (DB) ERROR: DDL statement failed
    (CREATE VIEW "Z_T_CO_BW" ( "KOKRS" , "KOSTL" , "VERSN" , "KSTAR" , "WOG001" , "MEG001"  ) AS SELECT T0002."KOKRS", T0002."KOSTL", T0001."VERSN", T0001."KSTAR", T0001."WOG001",  T0001."MEG001" FROM "COSS" T0001, "CSKS" T0002 WHERE T0002."MANDT" = T0001."MANDT")
    DbSlExecute: rc = 103
      (SQL error -942)
      error message returned by DbSl:
    (DB) INFO: disconnected from DB
    D:\usr\sap\EC6\SYS\exe\uc\NTI386\R3load.exe: job finished with 3108 error(s)
    D:\usr\sap\EC6\SYS\exe\uc\NTI386\R3load.exe: END OF LOG: 20080808174211
    Only SAPDB: SAPSID srvice of SAP DB is only up.
    No other services of database are  up.And i am not able to up the other services also.
    Is it required to up the other services?
    If not?
    Why this error is occuring?
    Any help will be appreciated.
    Thanks&Regards
    Manisha das

    Hello Manisha,
    The one of the possible reasons for this is due to lack of H/W.
    Increase your RAM size to atleast 2GB and utilise the same while you are installing ECC in database parameters step..
    If the issue is with H/W, then this should fix the issue.
    Hope it helps,
    Regards,
    Satish.

  • Old Appraisal System (SAP R/3 4.7 ITS) upgrade to SAP ECC 6.0, Ehp4

    Hello experts,
    We are currently on SAP R/3 4.7 (using ITS) and will be upgrading to ECC 6.0, Ehp4 (using Netweaver Portal). This upgrade will be purely technical, no changes to existing talent modules.
    Our employee performance appraisals are currently accessed via ITS using the Old Appraisal System. Can you tell me if it is even possible to link the old appraisal system to the NW portal?
    If yes, what kind of changes are required here? Which iviews will I need to activate?
    All of your advice is greatly appreciated. Thank you in advance.
    Dina

    hi,
    THe old appraisal system runs on ITS , true .
    In the new ECC 6 , there is a built in ITS , which should allow you to still run the old services . But it makes sense to explore the newer functionalites offered in EHP4.
    Regards
    sameer

  • SAP ECC 6.0 IDES connectivity with internal BI server

    Hell All,
    We have a connectivity issue for SAP BI with ECC. we have a sap ECC6.0 EHP3 instance running in the customer landscape used for training requirement. In the ECC 6.0 we do also have SAP BI server in the same instance. Now customer want to use the same BI server which is in the same SAP ECC 6.0 IDES without installing an additional instance just for training purpose. As a part of the acitivty we do need to know whether we can configure the BI to R/3 data extraction for this instance. ECC have 800 client and BI also works in the same 800 client. Can we configure the SAP ECC to BI source system configuration and do the R/3 to BW data extraction scenarios. also want to know whether we can do the Process chains and other stuff for training requirements.
    Hemanth

    Hello colluges/friends,
    any suggestions on this?
    Hemanth

  • Maintain SAP ECC (R/3) Master Data with backend validation

    Hi,
    I would like to maintain SAP ECC (R/3) Master Data via the Visual Composer. As far as I understand the functionality, it should be possible, if the ECC provides a BAPI to do that.
    The BAPI must be able to do the same validation that we have, using the backend itself.
    Now the question is whether it is possible, that the BAPI returns the result of the validation back to Visual Composer, because of course the user wants to know whether his action was successfull or not (because of invalid values for example).
    Does anybody has expierences with such a requirement? Can a BAPI return something to the Visual Composer and how can I integrate such a return result in VC?
    Thank you in advance.
    Best regards,
    Johannes

    It is possible to captured BAPI's return parameters in VC.
    Steps:
    1.Add a Form and BAPI to the story board.
    2.Now connect the OUT port of a BAPI to the IN port of FORM , this you can do by
       just drag(BAPI Out port) and drop( FORM in port).
    3.Add a Expression Box in FORM.
    4.Display the values returned by BAPI in the expression box(Use formula)

  • Configure ECC 6.0 EHP4 in SAP Solution Manager SP15

    Hi all,
    I just upgrade a system from R/3 4.6c to SAP ECC 6.0 EHP4 NW 7.01. I want to configure the system in SAP Solution Manager just upgraded to SP15. But I don't understand how I must to configure the system and to assign a logical component. It seems not to be the same possibilities between System configuration and Logical configuration.
    For system configuration I can choose product version EHP4 FOR SAP ERP 6.0 / NW7.01 and a full list of usage type
    For logical component I only found product SAP ERP ENHANCE PACKAGE and a very short list of version and usage type (??)
    Is someone know if it is normal or if it is necessary to patch solution manager ?
    Is ther a documentation existing to configure ERP EHP4 systems ??
    Thanks for your answer.
    Regards
    Gerard

    I have not seen any document to configure EHP4 systems specfically.
    I do not think, Solman SP15 should create any problem in that. But, since you are upgrading your landscape to EHP4, so why leave solman to SP15 instead of Ehp1 (SP18/19/20)...
    You might want to have a glance over some notes
    Note 1283307 - SMSY: Product version cannot be determined correctly
    Note 1301106 - SMSY: Enhancements and errors in Enhancement Package 1
    Note 1320545 - Updating the product version in SMSY

  • SAP ERP 6  system and compatibility with BW systems.

    Hi All,
    An upgrade to a ECC 6.0 system form 4.6C or 4.7 system is fine. But however, in an integrated environment - the 4.6C system is usually integrated with other SAP Products as well.
    The question I have is is a ECC 6.0 system compatible with BW 3.5 or lower versions of BW - i.e. when I upgrade my system to an ECC 6.0 system can these systems still talk in between themselves, or I have to plan a upgrade for this?
    If the answer is yes - is it mentioned in any SAP Note/ Website or Document as because I also need an artifact to support the answer.
    Thanks, Dibya

    Hi Dibya
    the component lists (from service.sap.com/scl) document for each release, which product instance is needed for which process (i.e. ECC and NW - BI). This source includes information about old releases as well, but not about mixtures between releases.
    In the Upgrade Dependency Analyser will you find information about these mixtures (see for instance: SAP Network Blog: New Tool for Planning Your Upgrade: The Upgrade Dependency Analyzer : New Tool for Planning Your Upgrade: The Upgrade Dependency Analyzer)
    regards,
    Andreas R

  • Loadind transaction data from SAP ECC 6.0 system failed

    Hi!
    I have SAP ECC 6.0 IDES system with the following clients:
    100 DEV client
    200 BI client of SAP 6.0
    Now I would like to load the transaction data from InfoSources 0FI_AR_6 and 0FI_AR_4 from SAP ECC client 100.
    The extraction process has been frozen in status "yellow" and after a while changed the status to "red" with the following information
    Errors while sending packages from OLTP to BI
    Diagnosis
    No IDocs could be sent to BI using RFC.
    System Response
    There are IDocs in the source system ALE outbox that did not arrive in the ALE inbox of BI.
    Further analysis:
    Check the TRFC log.
    You can access this log using the wizard or the menu path "Environment -> Transact. RFC -> In source system".
    Error handling:
    If the TRFC is incorrect, check whether the source system is fully connected to BI. In particular, check the authorizations of the background user in the source system.
    The users BWREMOTE and ALEREMOTE seems to be ok and have the suitable authorization.
    The tcode SM58 does not show any entries.
    The tcode BD87 shows that the IDocs was sent (source system) and has been received on target system.
    Question:
    How can I solve my problem?  Please give me some technical information (tcode, report).
    Thank you very much!
    regards

    Walk through your basis set up and  check out
    https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/c0751ba5-b7a8-2b10-6d97-e91e85c0fafa
    pts appreciated.

  • Upgrade SAP ECC 6.0 with SPS 12 to EHP4

    Hi!
    I would like to update a SAP ECC 6.0 system with EHP4. 
    I am on Windows 64 Bit with Oracle.
    My current SP stack of SAP ECC 6.0 is 12.
    The questions are:
    Does the SPS 12 of SAP ECC 6.0 fullfil the requirements for the SAP EHP4-Upgrade?
    If not what is the strategy to upgrade SAP ECC 6.0 system with SPS 12 to EHP4?
    Any helpful information will be very appreciated!
    Thank you!

    Hi
    You can check the below notes
    Note 1143022 and 1134872 - Installation of SAP Enhancement Package 4 on SAP ERP 6.0
    Regards
    Uday

  • Is Adobe Interactive Forms compatible with SAP-PM in ECC 6 ??

    Hi experts
    My question : is Adobe Interactive Forms compatible with SAP-PM in ECC 6 ??
    Thanks

    Hello,
    I can recommend you to search sap official documents for the standard-SAP-delivered-Adobe-forms and maybe there are some for the PM module. Would that help? Or you´ve learnt Adobe yourself? Regards, Otto

  • Upgrade SAP from ECC 6.0 EHP4 to ECC 6.0 EHP7

    Dear all,
    We are using ECC 6 ERP 4 SP5 with oracle 10.2g and Netweaver 7.0 EHP1.
    Other system release
    CRM 7.0 SP5 & CRM JAVA Release – NW 701 SP3
    BI Release – NW 701 SP5 BI CONT 7.04 & BI JAVA Release – NW 701 SP3
    We are planning to upgrade ECC 6 ERP4 SP5 to ERP 6 ERP7 SP1, Could you please suggest for compatibility version for CRM & BI with ECC6 EHP7
    And any document for EHP7 up gradation procedure and what is the impact or change made in system after upgrade from EHP4 to EHP7
    Regards,
    Ajay

    Hello
    The nightmare is going on... this point has been discussed a year ago (Re: Comapatability between EHP7 and SAP Netweaver BI 7.0 EHP1) and the conclusion was that you only need to upgrade HUB satellite systems... and a BW system is not an HUB.
    The only possible issue would be if the java stack of the BW system is used directly by the ECC system.
    Did not find any information on the necessity to upgrade the CRM, so I think you should keep it as it is.
    This are even getting worst because sometime sap support (OSS) are not able to provide clear answers (Interoperability btw ERP 6.0 EhP7 and SAP NW/BW 7.0)
    Best regards
    Strategy beyond SAP Business Suite 7 Innovations 2011 - Landscape Governance - SCN Wiki
    1388258 - Version Interoperability within the SAP Business Suite
    In order to use the new JAVA EE 5 capabilities and benefit from the improvements of SAP NW 7.3 the version interoperability range has been moved upwards for SAP Business Suite core applications with Release to Customer (RTC) from 2013 onwards.
    This means that SAP NetWeaver Systems 7.30 or higher are required if SAP Business Suite applications are based on or operating with those central Systems (Enterprise Portal, Business Warehouse, Process Integration).
    Customers wishing to utilize SAP Business Suite applications with RTC from 2013 onwards, that require one of these central SAP NetWeaver Systems, will have to upgrade their central NetWeaver Systems to 7.30 or higher before upgrading e.g. to SAP Enhancement Package 7 for SAP ERP 6.0.

  • Error while uploading Transport request from SAP ECC6.0 EHP4 to SAP ECC 5.0

    Hi friends,
    Error while uploading transport request to the transport directory,
    we downloaded the transport request from one sap system which have a set of developments(contains screen programs)
    for example downloaded all co files and data files
    control file: K900470.SAD and Data file: R900470.SAP from transport directory.
    we are trying to upload the transport to another Sap system
    we have
    Uploaded the controlling file K900470.sad to the location  /usr/sap/transpad/cofiles/
    Uploaded the controlling file R900470.sad to the location  /usr/sap/transpad/data/
    we tried to add in the import queues using TCODE: STMS and trying to import.
    During import we get the below error:
    HALT: unknown dynpro format: d021s_length() returned 0 Please contact the SAP support.
    End with rc : 16
    Please help me on this
    We are trying to copy from ECC 6.0 EHP4 to SAP 5.0 and SAP 4.7EE
    Thanks & Regards
    Murali Papana

    Did you see that you tried to transport to an older release!! You should have expected such a result.
    Before doing such a thing, you should have looked at SAP notes to see SAP recommendations, if any. And you're lucky, there are ones: [Note 1090842 - Composite note: Transport across several releases|http://service.sap.com/sap/support/notes/1090842]. You need to know that ECC6 corresponds to SAP Basis 7.0, and ECC5 corresponds to SAP Basis 6.40.

Maybe you are looking for

  • At a glance what is new in Safari 5

    This should give a little in sight: http://lifehacker.com/5557731/first-look-at-whats-new-in-safari-5

  • Retraction Cost Center Plan Data into SAP R/3

    Hi All, I am working on Integrated Planning and we have a requirement to retract the Cost Center Plan data to SAP R/3. Can anyone tell me how to do it in SAP BI-IP envirinment. Regards keyrun

  • Password protecting a single folder

    I have a question about permissions for a single folder. Here is what I want to be able to do: I want to password protect access to a single folder. I want to be able to double click on it... input a password and be granted access to it. Also, when t

  • Need help about xcode 6 in-house distribution.

    I have enrolled developer enterprise program, download developer and distribution certificate, add two certificate to keychain. I created a single view app, app id is com.test.idonotknow. created app id using wildcard(just like: com.test.*),created a

  • Simulations looping in Captivate 7

    I developed a course using Captivate 7 that includes training simulations. I published it without any LMS settings as the course needs to be approved by a list of approvers. Here's the issue. Half of the approvers viewed the course without any proble