SAP HR- Project Preparation- ECC6
Hi Gurus,
Please can you help.
My company already have ecc5, and now want to upgrade to Ecc6.
What issues do I have to look into for this? technical and business minded.
Will the be anything to consider, discuss, change?
I am a junior, and have been giving the oportunity to start on this. I need all the help I can get.
Many Thanks
Hi Janesh,
You need to take business transaction codes from business and test in the ECC 6.0 TST client.
do unit test and integration test, if every thing goes right then u r basis will upgrade to ecc 6.0
Surya
Similar Messages
-
Follow up activities after SAP (CU&UC) upgrade from SAP 4.6c to ECC6 EHP4
Dear Friends
We have completed SAP (CU&UC) upgrade from SAP 4.6c to ECC6 EHP4.
We refereed the upgrade guide for follow activities and we required confirmation before performing the activities.
Could you please help us what needs to be done immediately after upgrade.
Regards,
BharathiDear Nils,
Thanks for the support.
Yes, we are following the same document 'CUUC46C_to_NW701SP07' for unicode conversion after the upgrade from the note 928729.
Please suggest us in that document which are the steps should be carried out after ECC6.0 EHP4 upgrade,
1. Preparation
2. Unicode Preconversion Phase in SAP Basis 4.6C
3. Upgrade Process
4. Unicode Conversion Phase
5. Unicode Conversion Completion Phase
6. SAP Notes
Regards,
Bharathi -
Roles in Project preparation phase ?
hii
Some body explain me on their real time exeperiance of 1st phase implementation.??
What will be the major roles and reponsibilities of MM consultant in 1st and second phase ???
How we should do the AS-IS study in client place ????
Some body explain me in depth and detailed of their own experiance in implementation project.
And additionally ,as MM consultant where we shlould not be lack of knowledge for any implementationss??
ThanksIn project preparation phase, all the details of the projects are set, who will be the project manager from implementors side and from client side, then the whole team is selected of both sides, some times there are interviews of consultants as well from the client, where client desides which consultants they want for there implementation.
Then usually sign up of the project is done and sometimes presentation on every module is given as well if sign up and project start has big difference in dates.
Then in blueprint phase, for AS-IS, you MM consultant and powerusers from client sit down and you jott down all the current settings of the client, here its decides and researched how there current system is configured, and what necessary settings are required for SAP i.e. how many plants, how many purchase organisations,groups, how many material groups, what number ranges master record will follow, how many document types for PR,PO,contract, which additional processes are required i.e. Framework order, source lists, which type of mrp, subcontract, consigment process etc.
Once you get all the data in AS-IS, you create blueprint based on this information which will contain every info, i.e. how many plants will be created, what numbers, how many storage locations with names and numbers for each plant, how many purchase organisation with details, purchase groups, document types of prs, pos, with number ranges, release strategy, and total process flow in this documentation and what can and what cant be configured in SAP, thus the TO BE stage. Here client views your document and if there are any reservations they are pointed out, if any deletion addition is needed to the document they are notified to the consultants, necessary changes are made to the blueprint and this up/down in changes keeps on going, until the blueprint is signed.
Same above described process happens for all other modules as well, and once all module blueprints are signed, then begins the realization phase. Usually the blueprint phase in 6 months implementation last for 2 months.
Edited by: Afshad Irani on Aug 30, 2010 3:55 PM -
Hi Experts,
I need some inputs to do SAP upgrade from 4.& to ECC 6.0.
Generally the steps involved in the Upgrade project?
What is the role of ABAPer in Upgrade project?
What us the role og Functional consultant in project?
How the configuration kind of stuff take care?
Can anyone send me the best document to understand the process..?
Regards,
Sekhar.JHi,
Upgrade Overview
The objective on SAP Technical version upgrade would be to bring in enhanced SAP functionality while retaining the custom development in the original system. The enhanced functionality is not necessarily implemented during the upgrade. The upgraded system is tested for all the functional scenarios existing in the original system and the custom objects are tested for its functioning as in the original system.
Upgrade project consists of 5 phases:
1. Project Preparation
2. Blueprinting
3. Realization
4. Production Preparation
5. Go Live & Support
ABAPer Role
a) Syntax Correction
b) Upgrade Correction (Replacement of obsolete statement)
c) BDC Program correction
d) BDC to BAPI conversion
e) Unicode testing using UCCHECK transaction
Functional consultant role
Unit Testing
Test Scripts preparations for Changes
Regards
Praneeth -
Regarding Project Preparation , Requiremnts Gathering, User Training
Hai
Please send the documents for Project Preparation , Requirments Gathering, User Training Urgently to [email protected]
regards
andreaHi Andreas ,
The BW Project guidelines can be as follows ,
Stages in BW project
1 Project Preparation / Requirement Gathering
2 Business Blueprint
3 Realization
4 Final Preparation
5 GO Live & Support
Project Preparation / Requirement Gathering
Collect requirement thru interviews with Business teams /Core users / Information Leaders .
Study & analyze KPI 's (key figures) of Business process .
Identify the measurement criteria's (Characteristics).
Understand the Drill down requirements if any.
Understand the Business process data flow if any .
Identify the needs for data staging layers in BW (i.e need for ODS if any)
Understand the system landscape .
Prepare Final Requirements Documents in the form of Functional Specifications containing :
Report Owners,
Data flow ,
KPIs ,
measurement criterias,
Report format along with drilldown requirements .
2 Business Blueprint
Check Business content against the requirements
Check for appropriate
Info Objects - Key figures & Characters
Check for Info cubes / ODS
Check for data sources & identify fields in source system
Identify Master data
document all the information in a file follow standard templates
Prepare final solution
Identify differences (Gaps) between Business Content & Functional
specification. propose new solutions/Developments & changes if required at different levels such as Info Objects ,Info cube , Data source etc . Document the gaps & respective solutions proposed follow standard templates
Design & Documentation
Design the ERD & MDM diagrams for each cube & related objects
Design the primary keys/data fields for intermediate Storage in ODS
Design the Data flow charts right from data source up to Cube .
Consider the performance parameters while designing data models
Prepare High level / Low level design documents for each data model.--- follow standard templates
Identify the Roles & Authorizations required and Document it follow standard templates
final review of design with core BW users .
Sign off the BBP documents
3 Realization
Check & Apply Latest Patches/Packages ...in BW & R/3 systems.
Activate/Build & enhance the cubes/ODS as per data model designs...maintain the version documents .
Identify & activate Info objects / Master data info sources / attributes ,prepare update rules
Assign data sources .prepare transfer rules , prepare multi providers . prepare Info packages .
perform the unit testing for data loads .both for master data & transaction data .
develop & test the end user queries .
Design the process chains ,schedule & test
create authorizations / Roles assign to users ..and test
Apply necessary patches & Notes if any .
freeze & release the final objects to quality systems
perform quality tests .
Re design if required . (document changes, maintain versions)
4 Final Preparation
Prepare the final check list of objects to be released .identify the dependencies & sequence of release
perform Go Live checks as recommended by SAP in production system
keep up to date Patch Levels in Production system
Test for production scenarios in a pre-production system which is a replica of production system .
Do not Encourage the changes at this stage .
freeze the objects .
5 GO Live & Support
keep up to date Patch Levels
Release the objects to production system
Run the set ups in R/3 source system & Initialize Loads in BW
Schedule Batch jobs in R/3 system (Delta loads)
schedule the process chains in BW .
Performance tuning on going activity
Enhancements - if any
You can get some detailed information in the following link.
http://sap.ittoolbox.com/documents/document.asp?i=3581
Try to go to ASAP implementation roadmap.
https://websmp103.sap-ag.de/~form/sapnet?_SHORTKEY=01100035870000420636&_SCENARIO=01100035870000000202
Check the links below that gives you brief overview of the above steps .
https://websmp201.sap-ag.de/asap
http://www.geocities.com/santosh_karkhanis/ASAP/
ASAP
https://websmp201.sap-ag.de/asap
http://www.geocities.com/santosh_karkhanis/ASAP/
https://service.sap.com/roadmaps
https://websmp104.sap-ag.de/bi
***Please reward if useful.**
Hope these links helps you.
Regards
CSM Reddy -
Hi Expert,
I need help in terms of what all document has to be prepared for initial stage of project preparation.
This is for payroll project implementation, where no there HR module is impleted.
regard
AshishHello Ashish,
For New project Implementations, we need to discuss with client about their requirements & according to that we need to create BPML Document followed by Business Blue Print & Key Data Structure & Configuration Document. Once you done with configuration after that you have to create User Manuals to teach/show client how SAP process will work after configuration of your module.
In addition to this, these are the basic documents which needs to maintain... in this it could + or - of documents according to project & company's requirement. i.e. Functional specs. or any other Document.
Hope this will make addition to your knowledge.
Regards.
Shalini -
SAP Enterprise Project Connection 2.0 in SAP ECC 6.0 EHP6
Hello experts,
Before describing any think let me tell u that i am very new to this field.
We are configuring SAP Enterprise Project Connection 2.0 in our SAP ECC 6.0 EHP6 .I have already installed ABAP add on for EPC in ECC system.
I have also installed trial version of primavera6 in another system.So now how can i connect my ECC system to Primavera6 through Enterprise Project Connection(EPC). I have gone through the installation guide for SAP Enterprise Project Connection 2.0 SP2.But i could not get any clear idea.
Any reply is helpful for me..
Thanks
DebasisHello Debasis,
Post EPC installation,you need to perform configuration of EPC through portal.You can see it listed under configuration--> configuration scenarios-->EPC.
During configuration you will be asked to define path of you primavera installation and a user on that system with sufficient permissions. This user is called APS user.
Try to do a mock configuration run on sandbox/dev system and then you can follow the guide.
Regards,
Hetal -
SAP Retail Project - Assembly Order configuration
Dear all,
We are into SAP Retail Project, as per the process we have to generate an assembly order to our internal workshop to assemble the product.
this assembly order has to generate from sales order. Articles required to assembly will be maintained in workshop only.
we are not implementing Production module, we are trying to create a purchase requisition from sales order. but the BOM main items purchase requisition is not getting generated and there is no communication between sales order and workshop regarding Assembly process.
I am expecting an expert advice, with config steps to map this process into sap. Your suggestions will be highly appreciated.
Thank you
Raghu ram.Hi Mohan,
Thanks for the useful link you shared.
But I am looking for specific configuration and master data set up required for store order creation scenario where " Warehouse stock is created if stock exists else third party order is created"
This option is activated in POS interface inbound profile for store order control by selecting document categorydefault as "A - Warehouse order if stock exists, otherwise third-party order"
Just wanted to understand how this option works by requiring what kind of configuration and master data settings.
Any further suggestions will be really helpful.
Regards,
Debraj -
SAP Bunisess Connector 4.8 -Can support SAP 4.6C and ECC6 at the same time
Hi All,
I am upgrading Busniess Connector 4.0 to 4.8 .
I have sap 4.6C systems and ECC6 systems in Landscape.Will Business Connector 4.8 support both (SAP 4.6C and ECC6) simultaneously ?Hello gaurav,
I have tried re-installing.
I am able to open the web-admin and also all the links except the ones in the adapters section.
I have checked the installation document, adapter guide for BC 4.8 but i couldnt find anything useful.
I was just wondering if it has got anything to do with the OS.
lemme know if you have come across anything like this.
thanks for the help.
Sreejith -
SAP CRM Projects Implemented or Done in India Required Urgent and Important
hi, friends and experts
I wish u could send me SAP CRM Projects done in india with information including, Clients Name Operations, Duration and Location as soon as possible. Its urgent and important. Pls send the details.
thanking you
with regards
PRAVEENThere are several potemtial root causes.
+ NetWeaver Mobile/DOE is not setup
+ DOE -> CRM should be Trusted RFC
+ CRM application user ID should be in DOE -
Role of a Security Consultant in an SAP implementation Project
Hi All,
What is the role of a Security Consultant in an SAP implementation Project and the stages in which he is involved?Hello Mohammed,
The role of a Security consultant in any SAP product implementation (not just GRC) is wide enough and it's hard for anyone to sum up on a single forum post. Still I can give you some pointers.
Security consultants come from different backgrounds, some from networking, database administration, infrastructure and even development like me. They contribute enormously to any product implementation from scratch (landscape design) to go-live (and continuous maintenance) so they are active on every phase of the implementation.
Following are some of the activities they may perform (or participate)
-System Landscape Design (work closely with BASIS and DBAs)
-Check Infrastructure feasibility from security perspective (For Portals exposed to internet or extranet work closely with network providers for firewall security, VPS etc.)
-Propose security guidelines, access policies, disaster recovery plan, business continuity roadmap (work closely with information security consultants and internal auditors or risk management teams)
- Implement SAP solution specific Security measures (involves almost every SAP solution) for example: SAP R/3 security, GRC, BW/BI, HR, FI, Portal security etc.
- participate in application integration for example: LDAP, IDM, SAP UME, shared directories etc (User master records security is on high priority).
- Check for any possible backdoor access vulnerabilities (ex: open RFCs, function modules like ping_rfc), and it involves almost all SAP solutions and there are special procedures to analyze such vulnerabilities.
there are many such activities that a security consultant perform on day to day basis. Please do not interprete the above mentioned activities (entirely) as a criteria for any security consultant profile. There are many many possibilities for a security consultants to work from pen testing to SoD violation remediation. That's why I said it's not easy to sum up security.
Always remember, Security and GRC are two sides of a coin they work together. however GRC is more of a combination of policy, regulation, events and involves management participation whereas security is a purely technical practice.
You may also be interested to know what it takes to become a forensic security specialist. Take a quick look at [http://amudee.com/?p=378|http://amudee.com/?p=378]
Best Regards,
Amol Bharti -
hi guru.
in sap plm projects is this necessary , to generate the reports,scripts.
what is exactly sap plm projects,give some idea briefly.because just recently
i got offer for working in sap plm development projects.
help me.
thanks& regards
subhasisHi Subhasis,
Are you a Technical/Functional i.e. ABAP/Functional please let me know?
If you are a Technical (ABAP) then you no need to worry about your work in PLM
your work remains same as of ABAP. i.e. you will be working on Function Modules, User Exits, Field Exits, Report Design, Scripts & enhancements etc.
The Objects/Area which you will be dealing are : Document Managment System (DMS), Engineering Change Management (ECM), & CAD Integration yes i forget to mentioned you will be working on "Interfaces" too. and rest in PS or CProjects & CFolders based on the Scenarios/Requirements of your Project.
If you are a Functional:
Then working in PLM is still easy if you have a experience of working in SAP,
First part of your PLM is PDM (Product Data Managment) which deals with
DMS, ECM, CAD Integration, Material Master, BOM etc
Basically you have to integrate all these objects or business objects precicely speaking to all the modules of the SAP R/3.
Welcome to the board.
If you have any specific questions, you can write at SDN, SDN team will help you at maximum, no need to worry.
Best Regards
Rehman
<b>Mark Useful Answers</b> -
Syntax error. SAP 3.1 version - ECC6
Friends,
Following statement given syntaxt error in ECC6.
It is working fine in SAP 3.1.
I need to copy the code from SAP 3.1 to ECC6.
DO VARYING l_char FROM l_text2+99
NEXT l_text2+98.
Please help me in this regard ASAP.
Thanks in advance.I was able to get the following to work:
DO 100 TIMES VARYING l_char FROM l_text99(1) NEXT l_text98(1) RANGE l_text.
ENDDO.
I had to add the "100 TIMES" or the loop continued beyond the range of the variable and short-dumped.
Hope this helps,
Mark S. -
Function Point Analysis for SAP BW Projects
Hello All,
Have been assigned a task to come up with Function Point
analysis for SAP BW projects.
Any help will be appreciated.
Thanks,
MainakHi Mainak,
Function Point Analysis is independent of technology, methodology or platform, so there is no function point analysis specific for sap bw, rather you should familiarize with the fundamentals of FPA.
And as you might know, FAP is used to determine whether a given a tool, an environment or a language is more productive when compared to others.
I can send you good links if you can give me your email-id.
Hope this helps...
Thanks,
Raj -
TIME on ESS/MSS with the SAP Portal, release ERP2005 ECC6.
Hello,
I need to implement TIME (Leave request) on ESS/MSS with the SAP Portal, release ERP2005 ECC6.
Any informations about the customizing for a proof of concept would be appreciated.
All the back-end (R/3) as allready been customized.
Thanks for your responses.
OlivierHello,
If you already have all the templates and such configured then its easy. We don't have ESS and only one MSS scenario. However we support the web environment via BSP HAP_DOCUMENT. You can include our list pages in an Iview and assign that to the ESS or MSS scenario in the portal.
They also run stand alone, so you can test it as well without configuring the portal.
See also <a href="/people/sap.user72/blog/2007/02/20/objective-setting-appraisals-the-web-environment bloggy</a> on OSA and the web Environment, especially the last part will be of interest for you.
Regards and Groetjes,
Maurice
Maybe you are looking for
-
How do I turn off the extra cursor on the lasso tool?
I'm hoping somebody here knows a way to revert the icon for the lasso tool to its old self... or at least turn it into a simple cursor. The lasso tool in this new Photoshop version suddenly forces you to see a double image: both the original lasso an
-
I have a i tunes card why do i need a credit card
i have a i tunes card that i thought i could use with out having a credit card is there someway i can use it with out one
-
Gurus, using APEX can we develop Charts and dashboards. if so can you help me find like/documentation regarding this? thanks
-
Hi Gurus, I am working on COPA cube and trying to load data but load ends in following error. 'the unit/currency source unit vvesu_me with the value space is assigned to the key figure SOurce key Fig VVESU with the value 1.000' Any idea. I tried to s
-
I recently bought a BB Curve and have the $29.99 unlimited data plan. I was wondering if it costs extra to send pictures through Blackberry Messenger? I'm pretty sure it costs extra to send them through texting, but wasn't sure about BBM. Thank you!