SAP HR- Upgrade to ECC6- Project preperation

Hi Gurus,
Please can you help.
My company already have ecc5, and now want to upgrade to Ecc6. I am soon starting the project preperation.
What issues do I have to look into for this? technical and business minded.
Will the be anything to consider, discuss, change?
I am a junior, and have been giving the oportunity to start on this. I need all the help I can get.
Many Thanks

Hi
from the business perspective also look into the topic "enhancement packages" (see also the separate community here). Basically you can upgrade to SAP ERP 6.0 + implement enhancements from these packages in one step.
Recommended reading
- service.sap.com/erp-ehp (in particular the functional spaces there)
- Must Know Guide from /erp-ehp
- Master Guide for the highest Enhancement package (at current enhancement package 3) from service.sap.com/erp-inst
For the upgrade to SAP ERP 6.0 refer to the Upgrade (Master and Component) Guides from /erp-inst
regards
Andreas R

Similar Messages

  • Follow up activities after SAP (CU&UC) upgrade from SAP 4.6c to ECC6 EHP4

    Dear Friends
    We have completed SAP (CU&UC) upgrade from SAP 4.6c to ECC6 EHP4.
    We refereed the upgrade guide for follow activities and we required confirmation before performing the activities.
    Could you please help us what needs to be done immediately after upgrade.
    Regards,
    Bharathi

    Dear Nils,
    Thanks for the support.
    Yes, we are following the same document 'CUUC46C_to_NW701SP07' for unicode conversion after the upgrade from the note 928729.
    Please suggest us in that document which are the steps should be carried out after ECC6.0 EHP4 upgrade,
    1. Preparation
    2. Unicode Preconversion Phase in SAP Basis 4.6C
    3. Upgrade Process
    4. Unicode Conversion Phase
    5.  Unicode Conversion Completion Phase
    6. SAP Notes
    Regards,
    Bharathi

  • SAP 4.7 to ECC6 EHP5 Upgrade inc.OGSD - "/ICO/MOC_NEW_GUI" nametab error

    Hello all,
    I'm currently running a SAP upgrade from 4.72 to ECC6 EhP5 SPS6.
    This upgrade include OGSD upgrade from4.72 SP12 to OGSD 6.10 SP5.
    Duing phase upgrade phase RUN_RSPTBFIL_DEST, I have the following error message : Could not read nametab "/ICO/MOC_NEW_GUI".
    According to OSS note 1377262, I download fix A61000INOGSD.SAR and extract file A-61000INOGSD.SAP in <upgdir>/cofiles (and also in <transdir>/cofiles).
    Phase RUN_RSPTBFIL_DEST is still in error when I repeat it.
    I note that content of A-61000INOGSD.SAP file is a little bit different regarding my error message:
    Inside file:
    I 2EETW109 table "/ICO/MOC_NEW_GUI" does not exist in nametab.
    My error message:
    2EETG011 "[DESTINFO] Could not read nametab""/ICO/MOC_NEW_GUI"
    Many thanks for your help & feedback,
    Chris

    Hello Chris,
    we experienced the same issue as you.
    After discussion with the SAP Support team, it appears that this migration path is not the good one.
    The right procedure is now to upgrade to ECC6 EhP5 with OGSD 6.10 SP0 and then to apply manually the SPs you want on OGSD add-on.
    I think they are currently updating the corresponding OSS Notes.
    I hope it will help.
    Vincent

  • Plug in compatability between BW plugin in R/3 and BI - R/3 upgrade to ECC6

    Hello,
    we are running SAP NetWeaver BI 7.0  Release 700 Patch 19.
    Our underlying R/3 system is still 4.6C with plugin 2004_1_46C ( yes, I know it is time )
    We are upgrading R/3 to ECC6 with plug in P701 Patch 3.
    Questions:
    1.) I would like to know where exactly I can see which ECC6 plugin is copmpatible with our BI Version.
    2.) Did anyone who has upgraded to ECC6 experience any particular issues when upgrading the plugin?
    3.) Sense check of approach - so far the simplistic idea from a BW perspective is:
    New R/3 system has been created and connected to BW :
    1.)     In BW ACTIVATE SOURCE SYSTEM
    2.)     In source system connection option : Replicate datasources and activate
    3.)     Transfer global settings u2013 first simulate then update tables u2013 no rebuild should be necessary
    Before the Plugin P 701 in the R/3 ( ECC6 ) system can be upgraded the BW delta queues need to be cleared in the source system ( R/3.)
    4.)     Clear out V3 queue either via BW as part of the jobplan ( or manually via RSA7 but would mean loss of data )
    5.)     After run of batch schedule during posting free period check in RSA7 for entries in delta queue - should be empty    
                         now.
    6.)     Does the clearing of the delta might need to be run twice to clear the queue completely ?????
    8.)                 Deactivate logistics cockpit via SBIW ...LEBW ( is this mandatory ? )
    9.)                 If delta queues are empty and the logistics cockpit is deactivated then upgrade the plug ins in R/3
    10.)               Then repeat step 1-3 and reactivate the logistics cockpit again
    Is this it?
    Many thanks for advise on this.
    Regards
    ChrisAC

    SAP Note : 153967 and
    https://service.sap.com/r3-plug-in should give some information on plug in compatibility...
    8.) Deactivate logistics cockpit via SBIW ...LEBW ( is this mandatory ? )  - I think you just need to desachedule the collection jobs alone and not deactivate the LO Extractors and activate them once again...
    Edited by: Arun Varadarajan on Oct 9, 2009 11:43 PM

  • Step by step procedure for Upgrade to ECC6.0

    Hi,
    I gained a lot from this forum . Can someone please mail me at
    [email protected]
    step by step procedure for upgrade .
    Will award full points for helpful documents..
    With regards,
    Mrinal

    SAP defined a roadmap for upgrade.
    1) Project Preparation
    Analyze the actual situation
    Define the objectives
    Create the project plan
    Carry out organizational preparation for example identify the project team
    2)Upgrade Blueprint
    The system and components affected
    The mapped business processes
    The requirements regarding business data
    3)Upgrade Realization -- In this phase the solution described in the design phase is implemented in a test environment. This creates a pilot system landscape, in which the processes and all their interfaces can be mapped individually and tested on the functional basis.
    4)Final Preparation for Cutover -- Testing, Training, Minimizing upgrade risks, Detailed upgrade planning
    5)Production Cutover and Support
    The production solution upgrade
    Startup of the solutions in the new release
    Post processing activities
    Solving typical problems during the initial operation phase.
    SAP expects at least 2 to 3 months for Upgrade and that again depends on project scope and complexity and various other factors.
    STEPS IN TECHNICAL UPGRADE
    •     Basis Team will do the prepare activities. (UNIX, BASIS, DBA).
    •     Developer need to run the Transaction SPDD which provides the details of SAP Standard Dictionary objects that have been modified by the client. Users need to take a decision to keep the changes or revert back to the SAP Standard Structure. More often decision is to keep the change. This is mandatory activity in upgrade and avoids data loses in new system.
    •     After completing SPDD transaction, we need to run SPAU Transaction to get the list of Standard SAP programs that have been modified.  This activity can be done in phases even after the upgrade. Generally this will be done in same go so that your testing results are consistent and have more confident in upgrade.
    •     Run SPUMG Transaction for Unicode Conversion in non-Unicode system. SPUM4 in 4.6c.
    •     Then we need to move Z/Y Objects.  Need to do Extended programming check, SQL trace, Unit testing, Integration testing, Final testing, Regression Testing, Acceptance Testing etc.,
    The main Category of Objects that needs to be Upgraded is –
    •     Includes
    •     Function Groups / Function Modules
    •     Programs / Reports
    •     OSS Notes
    •     SAP Repository Objects
    •     SAP Data Dictionary Objects
    •     Domains, Data Elements
    •     Tables, Structures and Views
    •     Module Pools, Sub Routine pools
    •     BDC Programs
    •     Print Programs
    •     SAP Scripts, Screens
    •     User Exits
    Also refer to the links -
    http://service.sap.com
    http://solutionbrowser.erp.sap.fmpmedia.com/
    http://help.sap.com/saphelp_nw2004s/helpdata/en/60/d6ba7bceda11d1953a0000e82de14a/content.htm
    http://www.id.unizh.ch/dl/sw/sap/upgrade/Master_Guide_Enh_Package_2005_1.pdf
    Hope this helps you.

  • What are the consultant roles in Upgradation or migration project

    Hello ,
    Would you please any dody help me to provide the role & responsibilities of consultant in SAP upgradation or migration project.Thanks.
    Regards,
    Sampally

    Dear Sampally,
    SAP defined a roadmap for upgrade.
    1) Project Preparation
    Analyze the actual situation
    Define the objectives
    Create the project plan
    Carry out organizational preparation for example identify the project team
    2)Upgrade Blueprint
    The system and components affected
    The mapped business processes
    The requirements regarding business data
    3)Upgrade Realization -- In this phase the solution described in the design phase is implemented in a test environment. This creates a pilot system landscape, in which the processes and all their interfaces can be mapped individually and tested on the functional basis.
    4)Final Preparation for Cutover -- Testing, Training, Minimizing upgrade risks, Detailed upgrade planning
    5)Production Cutover and Support
    The production solution upgrade
    Startup of the solutions in the new release
    Post processing activities
    Solving typical problems during the initial operation phase.
    SAP expects at least 2 to 3 months for Upgrade and that again depends on project scope and complexity and various other factors.
    STEPS IN TECHNICAL UPGRADE
    • Basis Team will do the prepare activities. (UNIX, BASIS, DBA).
    • Developer need to run the Transaction SPDD which provides the details of SAP Standard Dictionary objects that have been modified by the client. Users need to take a decision to keep the changes or revert back to the SAP Standard Structure. More often decision is to keep the change. This is mandatory activity in upgrade and avoids data loses in new system.
    • After completing SPDD transaction, we need to run SPAU Transaction to get the list of Standard SAP programs that have been modified. This activity can be done in phases even after the upgrade. Generally this will be done in same go so that your testing results are consistent and have more confident in upgrade.
    • Run SPUMG Transaction for Unicode Conversion in non-Unicode system. SPUM4 in 4.6c.
    • Then we need to move Z/Y Objects. Need to do Extended programming check, SQL trace, Unit testing, Integration testing, Final testing, Regression Testing, Acceptance Testing etc.,
    The main Category of Objects that needs to be Upgraded is –
    • Includes
    • Function Groups / Function Modules
    • Programs / Reports
    • OSS Notes
    • SAP Repository Objects
    • SAP Data Dictionary Objects
    • Domains, Data Elements
    • Tables, Structures and Views
    • Module Pools, Sub Routine pools
    • BDC Programs
    • Print Programs
    • SAP Scripts, Screens
    • User Exits
    Also refer to the links -
    http://service.sap.com
    http://solutionbrowser.erp.sap.fmpmedia.com/
    http://help.sap.com/saphelp_nw2004s/helpdata/en/60/d6ba7bceda11d1953a0000e82de14a/content.htm
    http://www.id.unizh.ch/dl/sw/sap/upgrade/Master_Guide_Enh_Package_2005_1.pdf
    Hope this helps you. Please let me know in case of any specific queries.
    Regards,
    Rakesh

  • Activation of Parallel currency while upgradation of ECC6.0

    Hi Experts,
    We are useing SAP 4.7E Version along with IS OIL .  SAP went Live on 01.04.2006 . Company code currency is INR . *We have not activated Parallel Currencies i.e Hard Currency or Indexed Currency .*
    1. Is it possible activation of parallel currency while upgradation to ECC6.0
    2. If activated , what are the complications of clearing the Past documents
    Best Regards,
    Lakshman

    Dear,
    Use transaction OY01, where going in to your country there is a field Hard Currency. Put currency here which you want it to be the hard currency.
    This is customizing object which will not allow you to make changes in production instance as NO CHANGES ALLOWED is set for the client in SCC4. Better do this in development and transport it to production.
    Regards,
    Chintan Joshi.

  • Sap Abap Upgrade

    hi all
    i am working on SAP ABAP Upgrade and facing problem with a data type RAW which is incompatible in
    ECC6.0. Can anyone suggest a replacement for this data type.
    Thanks a lot.

    Hi,
    You can use Char type if the data is in characteres or you can use  HEX type if it contains numbers.

  • SAP Bunisess Connector 4.8 -Can support SAP 4.6C and ECC6 at the same time

    Hi All,
    I am upgrading Busniess Connector 4.0 to 4.8 .
    I have sap 4.6C systems and ECC6 systems in Landscape.Will Business Connector 4.8 support both (SAP 4.6C and ECC6) simultaneously ?

    Hello gaurav,
    I have tried re-installing.
    I am able to open the web-admin and also all the links except the ones in the adapters section.
    I have checked the installation document, adapter guide for BC 4.8 but i couldnt find anything useful.
    I was just wondering if it has got anything to do with the OS.
    lemme know if you have come across anything like this.
    thanks for the help.
    Sreejith

  • AFAB transaction SAP 4.6 x ECC6

    Hello everybody
    In SAP 4.6 we have a substitution rule for AFAB transaction. It works well. Now, we are in Upgrade to ECC6.
    In SAP 4.6, the AFAB generates a RABUSCH folder to be execute in SM35. These rules were executed this moment.
    ( ( SYST-TCODE = 'ABF1' ) AND ( BKPF-BLART = 'AF' )
    AND (  BSEG-HKONT = '0423013001' ) AND ( (
    BSEG-KOSTL = 'ACI' ) OR ...
    many others KOSTL
    In ECC6, there in no more RABUSCH folder and the accountin is using a new TCODE: AFAB. So, my rules in ECC6 are:
    ( ( SYST-TCODE = 'AFAB' ) AND ( BKPF-BLART = 'AF' )
    AND (  BSEG-HKONT = '0423013001' ) AND ( (
    BSEG-KOSTL = 'ACI' ) OR ...
    Substitution rules: change 0423013001 to 0513013001in BSEG-HKONT to some KOSTL.
    But it doesn´t works anyway in ECC6!!!
    I saw the debbuguing session and the substitution rules are OK (the accountins are changed in real time), but after this point something happening not happened (not chaged to correct accounting when I go to end of DBG)...
    Please, help me with something. Does anyone knows this process? There are another TCODE?
    OBS.: Rules are active in GGB4 and I run the program RGUGBR00
    Thanks in Advanced...

    Hi~
    Thanks for your attention.  I tried to substituted the cost accounts of depreciation according to the category of cost center, such as category  L(management), F(production) which would use a different account when doing AFAB.
    I used the standand user exits under OBBH, and it didn't work. In DBG mode, it showed account can be replace, but nothing happened in the real run.
    I had double checked the following, and the account can be replaced if I do the same thing in FB01.  (not in AFAB)
       IF bseg-hkont EQ '0066009999'and bseg-kostl <> ''.
        SELECT SINGLE * FROM csks WHERE kostl = bseg-kostl.
        IF sy-subrc = 0.
          if csks-kosar = 'L'.
            P_hkont = '0066020201'.
          elseIF csks-kosar = 'V'.
            P_hkont = '0066010201'.
          elseif csks-kosar = 'E'.
            P_hkont = '0066020801'.
          elseif csks-kosar = 'F'.
            P_hkont = '0051010201'.
          ENDIF.
        ENDIF.
      ENDIF.
    I just wondering why it works under DBG mode, and never work in real run?
    Can you kindly help me to solve this. Thanks in advance.
    Sincerely
    Locke.Zhang

  • Can any one explain about the SAP Testing process in Implementation Project

    Can any one explain about the SAP Testing process to be carried out by BW Consultant in an Implementation Project which is in Testing Phase..

    hi bharat,
    Two types of testing is possible in bw
    unit testing
    integration testing
    Integration testing - It is the phase of software testing in which individual software modules are combined and tested as a group. It follows unit testing and precedes system testing.
    Integration testing takes as its input modules that have been checked out by unit testing, groups them in larger aggregates, applies tests defined in an Integration test plan to those aggregates, and delivers as its output the integrated system ready for system testing.
    Unit testing - One part or the whole part of transfer rules , update rules, etc..
    Integration testing - The whole data flow cycle to be tested
    This link will give u detailed description
    http://en.wikipedia.org/wiki/Software_testing
    Stress testing in BI..
    /people/mike.curl/blog/2006/12/05/how-to-stress-test-bw-the-easy-way
    REFER THIS REG CATT
    http://help.sap.com/saphelp_erp2005/helpdata/en/d7/e21221408e11d1896b0000e8322d00/frameset.htm
    Check this doc on Unit Testing
    unit testing
    Look at the threads below :
    Testing Methods in BW
    Unit Testing in BW
    How to do testing in BW
    Hi...BW testing
    Re: Hi...BW testing
    Hi...BW testing
    Pls refer following links...
    http://help.sap.com/saphelp_nw04/helpdata/en/d7/e210c8408e11d1896b0000e8322d00/frameset.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/3c/aba235413911d1893d0000e8323c4f/frameset.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/d7/e2123b408e11d1896b0000e8322d00/frameset.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/d7/e2123b408e11d1896b0000e8322d00/frameset.htm
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/721d6a73-0901-0010-47b3-9756a0a7ff51
    https://service.sap.com/upgrade-bw
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/7dc0cc90-0201-0010-4fa7-d557f2bd65ef .
    https://websmp204.sap-ag.de/~sapdownload/011000358700009385902004E
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/67acb63d-0401-0010-b685-b1b87dd78892
    Hope it helps you!
    ****Assign Points If Helpful****
    Regards,
    yunus

  • Help for Sap BW upgrade from 3.5 to 7.0

    Hi All
    Please can anyone help me in sap bi upgrade from 3.5 to 7.0.
    Please send me helpful documents and if anybody have already worked into similar projects please send ur email id.
    Willl appreciate the quick repsonse with points.
    Regards and Thanks
    Dheeraj Dua

    Hi Dheeraj,
    Check this- how to on BW 3.x Upgrade Checklist
    https://www.sdn.sap.com/irj/sdn/docs?rid=/webcontent/uuid/ee14e25d-0501-0010-11ad-8eb2861a7ec0 [original link is broken]
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/biw/g-i/how%20to%20bw%203.x%20upgrade%20checklist
    Please check this link and you will find all Upgrade guides
    https://websmp209.sap-ag.de/instguides
    Also Check this,
    http://help.sap.com/saphelp_nw2004s/helpdata/en/a4/1be541f321c717e10000000a155106/content.htm
    this is a good PDF on Upgrade from BW 3.5 to BW 7.0
    latest on upgrade tp BI7.0
    http://help.sap.com/saphelp_nw04s/helpdata/en/a4/1be541f321c717e10000000a155106/frameset.htm
    https://www.sdn.sap.com/irj/sdn/developerareas/bi?rid=/webcontent/uuid/e78a5148-0701-0010-7da9-a6c721c6112e [original link is broken]
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/2e8e5288-0b01-0010-2ea8-bcd4df5084a7
    http://help.sap.com/bp_epv170/EP_US/Documentation/How-to/Planning/Master_Guide_NW2004s.pdf
    You can seek more information on BI 7.0 in the SAP NetWeaver2004s Ramp-Up.
    /community [original link is broken]
    Hope This Helps.
    Regards,
    Ravikanth

  • PA20 reports "No Authorization to read" after upgrade to ECC6

    Hi Everyone,
    We recently upgraded our system from SAP 4.6C to ECC6.0 SR3.
    After the upgrade, when we try PA20/PA30, we get the message "No authorization to read data".
    The user IDs we use already have SAP_ALL and SAP_NEW profiles assigned to them.
    Is there anything that we need to do regarding this?
    Thanks.

    HI JLJ,
    T COde: SU53. This will check the authorization for the last transaction. If your are not getting the desired result, then acess T.Code: SM01. IN this check, if any T Code is locked.
    If found usefule award points
    Regards,
    Madhu Sudhanan

  • Upgrading to ECC6.0

    Hi,
    Our SAP consultants have advised us to upgrade to ECC6.0; however they state the we will not be able to continue to use our CE.NET based hand held scanners and we should 'upgrade' the terminals to WM2005. Apparently we cannot upgrade the terminals, hence we will need to buy brand new WM2005 terminals!
    This does not sound correct to me, if it works on WM it should work on CE.NET?
    Is this true? Do we need to buy new hand held scanners if we upgrade to ECC6.0?
    Thanks
    David.

    Hi David,
                     It's a good idea to move to ECC6.0 from 4.7 because it's entering into Extended maint. from March 2009. I have not much exp. in working with scanners, what you can do is place acustomer message to SAP by http://service.sap.com.
    If possible find out is there any chance to get this product supported from next Service Release ?( like SR1, SR2current .... of ECC6.0)
    I hope this solve your problem,
    Hari.

  • Execution of Reports phase error during SAP EHP4 upgrade with EHPi

    I started getting an error message in the "Execution of reports after put" phase
    (within the Downtime phase) during the SAP EHP4 upgrade with Enhancement
    Package Installer.
    ***** LIST OF ERRORS
    AND RETURN CODES *****
    ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~XPRA ERRORS and RETURN CODE in SAPRB70104.OPQ
    ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~1AETR012XProgram terminated (job: "RDDEXECL", no.: "09064300") Long
    text: Cause Program "&V#&", which was started in the background, was
    terminated abnormally. System Response The system created a job log for
    the terminated program. What to do Proceed as follows: Log onto the
    system in which the program was executed. The system is specified at the
    beginning of the transport log. Then call transaction SM37 to display the
    job log. Enter "&V#&" as job name and "DDIC" as user name. Restrict the
    starting date to the starting date specified in the transport log. For
    the other selection criteria, select only jobs with the status
    "cancelled". Then press <LS>Execute</>. A list of the jobs satisfying the
    selection criteria is displayed. You can display the log by pressing
    <LS>Job log</>. If the list contains several jobs, you can select the job
    with the ID " &V#&" with <LS>Display</> -> <LS>Job details</> or define
    further details for the selection criteria in the initial screen of
    transaction SM37. If the ABAP processor reports cancellation,
    double-clicking on the corresponding message in the job log branches to
    the display of the corresponding short dump. 1AEPU320 See job
    log"RDDEXECL""09064300""OPQ" 1 ETP111 exit code : "12" >>> PLEASE READTHE REPORT DOCUMENTATION OF THE REPORTS MENTIONED ABOVE <<< XPRAs are
    application reports that run at the end of an upgrade.
    Most XPRA reportshave a report documentation that explains what the report does and how
    errors can be corrected. Call transaction se38 in the SAP system, enter
    the report name, select 'Documentation' and click the 'Display' button.
    >>> The problematic XPRAs are mentioned in messages of type PU132 above
    <<<
    I tried to follow the instructions in note 1269960, but the enhancement spot
    CLASSIFICATION_TOOL was already active. I activated it again and reran the phase
    but got the same error. Also, I couldn't implement the note using SNOTE because it is
    the middle of the upgrade process.
    I also found the following long text in ST22
    "Internal error during syntax check: ("//bas/710_REL/src/krn/gen/scsymb.c#11"
    Processing had to be terminated because an internal error
    occurred when generating the ABAP/4 program
    "CL_CLS_BADI_CHARACTERIZATION==CP".
    The internal system error cannot be fixed by ABAP means only."
    I am on a 64 bit System with CentOS Linux. 8 GB RAM, 250 GB HD with 20 GB free space.
    So far, I could not find any information on this. Any help would be greatly appreciated!
    Thanks,
    Victor

    Hi Victor,
    Go to SM37 and put in the username as DDIC and see the job log.
    Also check  Sm50 and see whether you have BTC processes available.
    Last but not the least check your filesystem space  usage too.
    Gerard

Maybe you are looking for

  • How to send a word and excel attachments with a 8830

    I am trying to figure out, how I can send a new message with an attachment (doc or xls) from my media card using my 8830 . I have tried to compose a new message, tried to attach file option but cannot select the doc file on my media card or my blackb

  • Error occurred while preloading classes of security providers from jre/lib/

    Hello all, We are Upgrading our BW Production System with EHP1 Package. on the Step DEPLOY_ONLINE_DEPL the Upgrade stops and we get the error message Error occurred while preloading classes of security providers from jre/lib/ext folder: java.util.zip

  • Pricing communciation strutures.

    Hi, can any body explain how pricing happens at table/structure level. For instance we maintain condition records in VK11. which condition table/structure do the data maintained in vk11 goes to. how does the data matained in condition records gets co

  • Graph Theory Algorithm-All possible paths between 2 vertices w/ constraints

    Hi all, I have a project I'm working with. I need to find all possible paths between two vertices on a graph. I realize this will be NP-complete or worse, but right now i'm looking for a brute force method to do this via algorithm/pseudocode Given: c

  • Illustrator CS3 and Intel Core2

    I am having problems saving my files. Some files take 35 mins to save. I have many layers and a placed JPG in my file. The file is 2.4KB. I have similar file sizes and they take about the same time to save as well. I am using: Dell Optiplex GX745 Int