SAP IBP and SAP S&OP on HANA

I am trying to understand the relationship between SAP S&OP on HANA and SAP IBP.
I see the latest version of S&OP on HANA is 3.0 SP02. Is this actually the 'S&OP' part of the IBP 4.0 application suite, or does IBP 4.0 have a specific, different, S&OP component?
Thanks for any advice on this...

IBP for S&OP is the next version of SAP S&OP on HANA.
It is similar to our SAP APO and SAP SCM name change of next versions.
IBP is a Suite and IBP for S&OP is one of the component. You can subsribe along with IBP's other components or Stand alone.

Similar Messages

  • What is difference between SAP R3 And SAP IS Mills Product

    HI Friends
    What is difference between SAP R3 And SAP IS Mills Product
    What are the futures are availables in IS MIlls
    Regards

    Hi,
    SAP R/3 is the central enterprise version. It is not specifically designed for any inducstry sectors and it can cater many of the industry types.
    Is is developed for specific industries an for SMB's (small and medium business). It will have components specifically for the industry.
    The SAP Mill Products component adds sector-specific functionality to an ERP system to satisfy the complex requirements of mill industries (e.g. metal, wood, paper, textiles, construction materials, and cable sectors).
    These industry segments differ from others primarily in that the materials used have a large number of characteristics and variants. The materials in the segments listed above are also predominantly area-based (e.g. paper, textiles, plastic film) or length-based (e.g. cables, piping). Account must be taken of these material characteristics throughout the entire supply chain.
    To cater for the particularities of these industry segments, SAP Mill Products features processes and functions that cover the entire supply-chain cycle – from product design and configuration, through planning, order processing, capacity planning and production, to final delivery. Additional functions are available in costing and inventory management. SAP Mill Products are also integrated into Quality Management, Financial Accounting, and Controlling.
    Prase

  • Where do i find daily posted question on sap abap and sap webdynpro abap

    Hi
    where do we find Daily posted questions on sap abap and sap webdynpro abap in scn sap  so that i can go through the questions and answer them .

    Hi,
    Go to the Content tab of any space and click on discussions. Then you can sort them by date created or any other
    For ex: This link for WDA discussions: - Web Dynpro ABAP
    You can also click on Receive email notifications for any space to get updates on that space.
    hope this helps,
    Regards,
    Kiran

  • How to configure for GPlus Adapter with SAP Phone and SAP CRM

    Hi All Basis Adm,
                   Please consider as an urgent basis i need the information that how to configure  GPlus Adapter with SAP Phone and SAP CRM . My server is CRM 5.0 (kernel 7) with Oracle Database. This information is require to connect Webclient to Sap Phone with GPlus Adapter (Genesys Adapter 7.1).  If u have any document regarding mentioned above than that will be acceptable. 
    Regds,
    Govinda

    Hi Prasad,
    In you case, it's a file to file scenario.
    Go thro' this link for a solution:-
    /people/venkat.donela/blog/2005/03/02/introduction-to-simplefile-xi-filescenario-and-complete-walk-through-for-starterspart1
    /people/venkat.donela/blog/2005/03/03/introduction-to-simple-file-xi-filescenario-and-complete-walk-through-for-starterspart2
    Regards.
    Praveen

  • SAP PLS and SAP QM

    Dear sir,
      I want to know what is the differance between SAP PLM and SAP QM.
    Is there seperate certification course is available.
    Regards
    Sougata Das

    Dear,
    SAP Product Lifecycle Management is a complete and vast area in SAP. There are many functionalities covers in PLM. In simple word in whichever functionality directly involves in this process are can be a part of PLM like what you said QM also.
    The definition of PLM schould (or could) be:
    - Document Management (DMS)
    - cFolder and cProject (and PS)
    - CAD and Office Document integration
    - Task Management, Work Flow, Status Network etc.
    PLM can include modules: PS,PM,QM, PP, MM, CS, SD, Document Management etc..
    SAP QM is a separate module which you can implement with MM or wherever applicable.
    Regards,
    Syed Hussain.

  • SAP PA and SAP II Product Road Map

    Hello everyone,
    where can I find the latest SAP PA and SAP II product road map, based on the version SAP PA 1.17?
    The latest official product road map I found is from Dec. 2013.
    Thanks in advance,
    BJE

    Hello,
    The combined roadmap for II and PA is in its final elaboration phase.
    We will published it once approved.
    Regards,
    Didier

  • Course material for SAP TERP10 and SAP FICO

    please provide some study material and some guidance for certification exam of SAP TERP10 and SAP FICO as i am planning to sit for my certification exams

    Hello there!
    I found a cool website, that specialized in FICO:
    http://fico-forum.de/zertifizierung/zertifizierung.php
    if you cant read in German, I can advice you to use Google Translator

  • IDOC type for interface between SAP ECC and SAP F&R

    Hi Experts,
    I need SAP standatd IDOC type for interfacing between SAP ECC and SAP F&R [SAP Forecasting and Replenishment] using message type u201CFRE_LOC_SITEu201D.
    Please help me in finding the idoc type?
    Regards,
    Krishan

    Hi Denish,
    You have 2 ways of loading data from R/3 to APO.
    1. R/3 to BW cube to APO-BW cube to APO planning area
    or
    2.  R/3 to APO-BW cube to APO planning area   
    BW can be a enterprise BW system ( independent) or you can use the BW inbuilt in APO also referred to as APO-BW.
    The only difference between the 2 BW systems is APO-BW can not take the load of reporting where as the enterprise BW can.
    Unless your company policy requires the enterprie BW system, I suggest using 2nd way.
    You can load the data from R/3 to APO-BW cube using extractors either generic or standard depending on your data. You need to have a RFC connection setup between APO-BW and R/3. ( This is not CIF).
    When you load the data into the APO-BW cube, you just have to load the data from the cube to APO planning area using the transaction /sapapo/tscube.
    Refer to [DP Data Mart|http://help.sap.com/saphelp_scm50/helpdata/en/13/5ada58309111d398250000e8a49608/frameset.htm] for more information about the data transfer between APO-BW and APO.

  • Connecting SAP ERP and SAP XI via RFC (in cluster)

    Hi all,
    I have a strange problem with SAP ERP and SAP XI (production systems). Both systems are installed in cluster. I am trying to connect both systems via RFC, so I configurred TCP connection using SM59. But, when I try to test connection, I am always getting error "Program xxxx is not registered". When I register the program on the sender communication channel on different system (develop system - different machine), connection works fine. Configuration on both SAP XI production and development systems is identical. I just cannot understand, why production SAP ERP does not see registered program on production SAP XI. Has anybody experiences with this? Or any other ideas where should be the problem?

    Are you configuring the RFC Sender adapter with load balancing?
    what is the hostname you're using for ERP?
    Is it the message server's?
    Also, make sure the dispatcher is properly configured, sending the requisitions to the application servers.
    Regards,
    Henrique.

  • SAP XML and SAP IDOC XML

    Hi Friends,
    Can any one tell me what is the difference between SAP XML and SAP IDOC XML?
    Regards,
    Kumar

    Hi,
    Various XML standards are supported by SAP. It presents data according to an SAP specification either in IDoc-XML or BAPI-XML, the SAP XML extensions for IDocs and BAPIs. It uses preprepared representations of the SAP interfaces to XML Commerce Business Language (xCBL) messages to facilitate communication with the MarketSet marketplaces.
    Messages are stored in a generic envelope. This envelope contains metadata that controls, among other things, the routing of the messages. SAP supports two different standards for these envelopes - Microsoft BizTalk and a format similar to Simple Object Access Protocol (SOAP). Packaging SAP BAPIs in a standard envelope offers several advantages, including direct processing of messages by external applications and a uniform system of error handling.
    Regards'
    Aashish Sinha
    PS : reward points if helpful

  • SNC between SAP BO and SAP BW for MS Advanced Analysis

    Hy experts, i have configured the SNC between SAP BO and SAP BW but for any user i have this issue:
    when the user launch a Bex Query by MS Advanced Analysis, this error message occurs:
    No applicable data found.
    On the SAP BW system, on ST22 there is this runtime error:
    CALL_FUNCTION_SEND_ERROR.
    An error occurred when executing a Remote Function Call.
    "SNCERR_INVALID_FRAME#A received frame is invalid/truncated or is no SNC-frame"
    What happened?
    "CPIC-CALL: 'ThCMSEND' : cmRc=6 thRc=766#General SNC error "
    An error occurred when executing a Remote Function Call.
    An error occurred when executing a Remote Function Call.
    "CPIC-CALL: 'ThCMSEND' : cmRc=6 thRc=766#General SNC error "
    Status of connection.... "CODE=CM_SECURITY_NOT_VALID CM_SEND_RECEIVED
    CM_COMPLETE_DATA_RECEIVED SAPCODE=766 CONV=91584639"
    Internal error code.... "RFC_IO5"
    There is an error in the communication system. To clarify
    and resolve the error, contact your system administrator.
    Last error logged in SAP kernel
    Component............ "SNC (Secure Network Communication)"
    Place................ "CPIC (TCP/IP) on host ANDREA_13"
    Version.............. 5
    Error code........... "-12"
    Error text........... "SNCERR_INVALID_FRAME#A received frame is
    invalid/truncated or is no SNC-frame"
    Description.......... "SncProcessInput"
    System call.......... " "
    Module............... "sncxx.c"
    Line................. " "
    The error reported by the operating system is:
    Error number..... " "
    Error text....... " "
    User and Transaction
    Client.............. 100
    User................ 00000015
    Language Key........ "E"
    Transaction......... " "
    Transactions ID..... "6A3E22E031EEF13395AE0019BBCB620C"
    Program............. "SAPLRSBOLAP_BICS_PROVIDER"
    Screen.............. "SAPMSSY1 3004"
    Screen Line......... 2
    Information on caller of Remote Function Call (RFC):
    System.............. "########"
    Database Release.... 720
    Kernel Release...... 720
    Connection Type..... "E" (2=R/2, 3=ABAP System, E=Ext., R=Reg. Ext.)
    Call Type........... "synchron and non-transactional (emode 0, imode 0)"
    Inbound TID.........." "
    Inbound Queue Name..." "
    Outbound TID........." "
    Outbound Queue Name.." "
    Client.............. "###"
    User................ "############"
    Transaction......... " "
    Call Program........."C:\Program Files\Microsoft Office\Office1"
    Function Module..... "BICS_PROV_GET_INITIAL_STATE"
    Call Destination.... "GBP_boe_Default"
    Source Server....... "ANDREA_13"
    Source IP Address... "10.101.3.80"
    Additional information on RFC logon:
    Trusted Relationship " "
    Logon Return Code... 0
    Trusted Return Code. 0
    Note: For releases < 4.0, information on the RFC caller are often
    only partially available.
    Information on where terminated
    Termination occurred in the ABAP program "SAPLRSBOLAP_BICS_PROVIDER" - in
    "BICS_PROV_GET_INITIAL_STATE".
    The main program was "SAPMSSY1 ".
    In the source code you have the termination point in line 1
    of the (Include) program "LRSBOLAP_BICS_PROVIDERU13".
    Could you help me?
    Thank's a lot and best regards.
    Andrea Maraviglia

    Ciao Andrea,
    just a couple of hints:
    - Did you already tried to skip logon to BOE and instead directly select BW system? this should avoid to involve snc and then BEx query should be accessible. This would be a further confirmation that issue is the SNC, even if the log you posted is pretty clear about that.
    - Do you have snc installed even in local PC running MS Advanced Analysis? I Think it is necessary for the described workflow (page 24 of Admin Guide): 
    "With SAP BusinessObjects Enterprise as the BI platform, single sign-on works if the following conditions
    are true:
    u2022 BusinessObjects Enterprise XI 3.1 is configured correctly for single sign-on. For more information,
    see u201CConfiguring SAP authenticationu201D in the Integration for SAP Solutions Install and Admin Guide
    at http://service.sap.com/bosap-instguides SAP BusinessObjects Business Intelligence (BI) >
    Integration for SAP Solutions > XI 3.1.
    u2022 Secure Network Communications (SNC) is installed on each client PC. For more information, see
    SAP Help Portal at http://help.sap.com SAP NetWeaver > SAP NetWeaver Library > SAP
    NetWeaver by Key Capability > Security > Network and Transport Layer Security > Secure
    Network Communications.
    u2022 Each end user has a user account in the connected BW system."
    Furthermore, if I rember correctly, there could be restriction in license using SAP Cryptographic Library (client connection is not supported: SAP notes 597059 and 397195), so you should check your SNC software.
    Hope it could hep.
    Regards.
    Roberto.

  • SNC between SAP BO and SAP BW

    Hy esperts, i have configured the SNC between SAP BO and SAP BW but for any user i have this issue: 
    when the user launch a Bex Query by MS Advanced Analysis,  this error message occurs:
    No applicable data found.
    On the SAP BW system, on ST22 there is this runtime error:
    CALL_FUNCTION_SEND_ERROR.
    An error occurred when executing a Remote Function Call.
    "SNCERR_INVALID_FRAME#A received frame is invalid/truncated or is no SNC-frame"
    What happened?
    "CPIC-CALL: 'ThCMSEND' : cmRc=6 thRc=766#General SNC error "
    An error occurred when executing a Remote Function Call.
    An error occurred when executing a Remote Function Call.
    "CPIC-CALL: 'ThCMSEND' : cmRc=6 thRc=766#General SNC error "
    Status of connection.... "CODE=CM_SECURITY_NOT_VALID CM_SEND_RECEIVED
    CM_COMPLETE_DATA_RECEIVED SAPCODE=766 CONV=91584639"
    Internal error code.... "RFC_IO5"
    There is an error in the communication system. To clarify
    and resolve the error, contact your system administrator.
    Last error logged in SAP kernel
    Component............ "SNC (Secure Network Communication)"
    Place................ "CPIC (TCP/IP) on host ANDREA_13"
    Version.............. 5
    Error code........... "-12"
    Error text........... "SNCERR_INVALID_FRAME#A received frame is
    invalid/truncated or is no SNC-frame"
    Description.......... "SncProcessInput"
    System call.......... " "
    Module............... "sncxx.c"
    Line................. " "
    The error reported by the operating system is:
    Error number..... " "
    Error text....... " "
    User and Transaction
        Client.............. 100
        User................ 00000015
        Language Key........ "E"
        Transaction......... " "
        Transactions ID..... "6A3E22E031EEF13395AE0019BBCB620C"
        Program............. "SAPLRSBOLAP_BICS_PROVIDER"
        Screen.............. "SAPMSSY1 3004"
        Screen Line......... 2
        Information on caller of Remote Function Call (RFC):
        System.............. "########"
        Database Release.... 720
        Kernel Release...... 720
        Connection Type..... "E" (2=R/2, 3=ABAP System, E=Ext., R=Reg. Ext.)
        Call Type........... "synchron and non-transactional (emode 0, imode 0)"
        Inbound TID.........." "
        Inbound Queue Name..." "
        Outbound TID........." "
        Outbound Queue Name.." "
        Client.............. "###"
        User................ "############"
        Transaction......... " "
        Call Program........."C:\Program Files\Microsoft Office\Office1"
        Function Module..... "BICS_PROV_GET_INITIAL_STATE"
        Call Destination.... "GBP_boe_Default"
        Source Server....... "ANDREA_13"
        Source IP Address... "10.101.3.80"
        Additional information on RFC logon:
        Trusted Relationship " "
        Logon Return Code... 0
        Trusted Return Code. 0
        Note: For releases < 4.0, information on the RFC caller are often
        only partially available.
    Information on where terminated
        Termination occurred in the ABAP program "SAPLRSBOLAP_BICS_PROVIDER" - in
         "BICS_PROV_GET_INITIAL_STATE".
        The main program was "SAPMSSY1 ".
        In the source code you have the termination point in line 1
        of the (Include) program "LRSBOLAP_BICS_PROVIDERU13".
    Could you help me?
    Thank's a lot and best regards.
    Andrea Maraviglia

    Hi Ingo,
    the runtime error occurs in this scenario:
    1) Launch MS Advanced Analysis
    2) Logon on SAP BO
    3) Select the System connection for SAP BW where the SNC has been configured
    4) Select  the bex Query
    5) The system response with this message: No applicable data found.
    On ST22 , on SAP BW, there is the runtime error: CALL_FUNCTION_SEND_ERROR with the message:
    "SNCERR_INVALID_FRAME#A received frame is invalid/truncated or is no SNC-frame".
    Thank's a lot.
    Best Regards.
    Andrea
    Edited by: Maraviglia Andrea on Jan 24, 2011 6:02 PM

  • SAP SCM and SAP APO: Best practices, tips and recommendations

    Hi,
    I have been gathering useful information about SAP SCM and SAP APO (e.g., advanced supply chain planning, master data and transaction data for advanced planning, demand planning, cross-plant planning, production planning and detailed scheduling, deployment, global available-to-promise (global ATP), CIF (core interface), SAP APO DP planning tools (macros, statistical forecasting, lifecycle planning, data realignment, data upload into the planning area, mass processing u2013 background jobs, process chains, aggregation and disaggregation), and PP/DS heuristics for production planning).
    I am especially interested about best practices, tips and recommendations for using and developing SAP SCM and SAP APO. For example, [CIF Tips and Tricks Version 3.1.1|https://service.sap.com/form/sapnet?_FRAME=CONTAINER&_OBJECT=011000358700006480652001E] and [CIF Tips and Tricks Version 4.0|https://service.sap.com/form/sapnet?_FRAME=CONTAINER&_OBJECT=011000358700000596412005E] contain pretty useful knowledge about CIF.
    If you know any useful best practices, tips and recommendations for using and developing SAP SCM and SAP APO, I would appreciate if you could share those assets with me.
    Thanks in advance of your help.
    Regards,
    Jarmo Tuominen

    Hi Jarmo,
    Apart from what DB has suggested. you should give a good reading on the following.
    -Consulting Notes (use the application component filters in search notes)
    -Collective Notes (similar to the one above)
    -Release Notes
    -Release Restrictions
    -If $$ permit subscribe to www.scmexpertonline.com. Good perspective on concepts around SAP SCM.
    -There are a couple of blogs (e.g. www.apolemia.com) .. but all lack breadth.. some topics in depth.
    -"Articles" section on this site (not all are classified well.. see in ECCops, mfg, SCM, Logistics etc)
    -Serivce.sap.com- check the solution details overview in knowledge exchange tab. There are product presentations and collaterals for every release. Good breadth but no depth.
    -Building Blocks - available for all application areas. This is limited to vanilla configuration of just making a process work and nothing more than that.
    -Get the book "Sales and Operations Planning with SAP APO" by SAP Press. Its got plenty of  easy to follow stuff, good perspective and lots of screen shots to make life easier.
    -help.sap.com the last thing that most refer after all "handy" options (incl. this forum) are exhausted. Nevertheless, this is the superset of all "secondary" documents. But the maze of hyperlinks that start at APO might lead you to something like xml schema.
    Key Tip: Appreciate that SAP SCM is largely driven by connected execution systems (SAP ECC/ERP). So the best place to start with should be a good overview of ERP OPS solution overview, at least at the significant level of depth.). Check this document at sdn wiki "ERP ops architecture overview".
    I have some good collection of documents though many i havent read myself. If you need them let me know.
    Regards,
    Loknath

  • Want to know about SAP course and SAP modules

      I am Sandeep, done BBM and have 3 years experience as Medical Representative(Pharma sales), and i'm perusing MBA in Sikkim Manipal University Distance Education, i came to know that SAP course has lot of scope in major industries, so that want to know about SAP course and SAP modules available and which module is suitable for me and details about the cost, duration of course please guide me
    Message was edited by: Colleen Lee - moving from Careers space to Training and Education.Also removing the bold text formating

    Ashok,
    Hi! Excellent that you are take the next steps in your education and applying them to work experiences.
    The best approach in taking SAP-related courses is to contact the university and confirm their approach. View SAP UA member schools here - http://uaaroundtheworld.informatik.tu-muenchen.de/overview(bD1lbiZjPTEwMQ==)/start.htm
    ...and assess the ones in the UK which does include Brunel.
    Ask if they provide SAP-related curricula (or supplements) and hands on SAP software in this course or others that you can take in your program.
    Best regards,
    Richard

  • Difference between Business Analyst SAP SD and SAP SD consultant

    Hi friends
    I need openion about what is difference between Business Analyst SAP SD and SAP SD consultant.
    Raj

    Both the roles are more likely the same, In consulting companies like IBM, Deloitte , TCS and others SAP functional anlayst is a more popular term but if you work directly with a SAP client - SAP Business Analyst is what they refer to a functional anlayst. Most of the responsibilities are same but they are some roles which require more of ANALYST person who can gather requirements, GAP Analysis, IS - TO BE and etc and less of configuration or customization in SAP therefore they sometimes call it SAP Business Analyst but in both cases the configuration knowledge and experience about specific modules is required.
    Thanks

Maybe you are looking for

  • Report likeMB5B

    Hai Guys, My requirement is a report like MB5B to show opening and closing stock with value as MB5B does not show value but only quantity. Kindly suggest your ideas Regards R.Senthil

  • Macbook Pro Not Connecting

    Well, explain to me this, the MBPs will not connect to my external network drive.  Yesterday everything was fine, but now nothing.  My Windows machine connects to it fine and connects to the Internet wirelessly.  My TV's & Bluerays connect to Netflix

  • Why Do I Have To Wait?

    Gingerbread is out, tech support and store reps state I should be able to get the update... I am concerned with all the negative posts about the update.... Verizon is suspsosed to be super huge and awesome network....what makes some people more eligi

  • Old Mac OS 8.5 configuring to use cable as internet connection

    I gave my sister a old imac OS 8.5 and she is on Road Runner Cable we tried to hook it up to her internet connection and it siad she needed a 8.6. What do we do now? MAke it simple cause we are not computor smart. I installed extra memory on the imac

  • Why are L&R outputs uneven w/ Space Designer?

    Hi, In tweaking my studio setup, I took this approach to balancing my monitors: I loaded the TestOsc plugin - which gave a balanced L & R output within Logic as expected; I then adjusted the amps of each monitor speaker so as to properly balance them