SAP PLM, ERP, PPM relationships

Hi PLM experts,
I have some questions about the SAP PLM products as below, would you share your insights? Thanks.
1. Most of PLM sub-modules are the functions of SAP ECC components as I see. So what's the relationship between SAP PLM and SAP ECC?
2. SAP PLM can be installed as an independent instance or as an integrated instance with SAP ECC as I read from document. Is it correct?
3. I read SAP PPM can be installed as an independent instance as well, what's PPM relationship to SAP PLM?
4. Most PLM user interface is using Web UI. Is it based ABAP webdynpro or Java webdynpro? Someone told me it's based on FPM framework in ABAP wedynpro. If you know, please share me your idea as well.
5. Any workflow function in SAP PLM? If user requires workflow to manage R&D process in SAP PLM, is it using similar ABAP workflow technology as in SAP ECC? Or java-based workflow as in BPM?
Appreciate your expert share.

Hi Justin,
see responses below:
1. Most of PLM sub-modules are the functions of SAP ECC components as I see. So what's the relationship between SAP PLM and SAP ECC?
SAP PLM capabilities are an integral part of SAP ECC, some are natively available like SAP GUI based BOM Management, Classification, Variant Configuration, Engineeering Change Management, etc., some , especially those in the PLM Web UI, need to be activated through Business Functions made available in various standard SAP ECC Enhancement Packages and partially licensed, like e.g. Engineering Record, Product Structure Synchronization, Access Control Management.
2. SAP PLM can be installed as an independent instance or as an integrated instance with SAP ECC as I read from document. Is it correct?
Yes.
3. I read SAP PPM can be installed as an independent instance as well, what's PPM relationship to SAP PLM?
SAP PPM is a a standalone product with its own license. It integrates into SAP ERP/PLM and other legacy and Business Suite solutions.
4. Most PLM user interface is using Web UI. Is it based ABAP webdynpro or Java webdynpro? Someone told me it's based on FPM framework in ABAP wedynpro. If you know, please share me your idea as well.
PLM Web UI is ABAP WebDynpro.  And yes, it uses Floor Plan Manager.
5. Any workflow function in SAP PLM? If user requires workflow to manage R&D process in SAP PLM, is it using similar ABAP workflow technology as in SAP ECC? Or java-based workflow as in BPM?
SAP Business Workflow is leveraged in SAP PLM. Anyone can feel free to use SAP BPM as well, especially if workflows are crossing applications, and need to be orchestrated accordingly.
Hope this helps.
Ulf.

Similar Messages

  • Tables used in sap plm

    hi all
    can somebody  give me <b>some imp. tables used in sap plm.[/b
    regards.
    subhasis.

    Hi Subhasis,
    You can refer the following tables related to the modules PS, MM, SD, PM, CO
    Regards,
    Harisha
    AFAB       Network - Relationships                                  
    AFKO       N/W Header details
    AUFK       Orders/networks headers
    AFRV       Confirmations pool                                       
    AFVC       Activities assigned to WBS elements
    AFVU       DB structure of the user fields of the operation
    AFVV       DB structure of the quantities/dates/values in the operation
    AUFK       Sales order details (N/W)
    CATSDB   CATS: Database Table for Time Sheet
    CATSPS   Cross-Application Time Sheet (CATS): Transfer to PS
    CKIP          Unit Costing: Period Costs Line Item
    CKIS          Items Unit Costing/Itemization Product Costing
    CKIT          Texts for CKIS
    COBRA       Settlement Rule for Order Settlement
    COBRB       Distribution Rules Settlement Rule Order Settlement
    RPSCO        Project info database (cost, revenues)
    RPSQT        Project info database (quantities)
    COSP          Cost totals for external postings
    COSS          Cost totals for internal postings
    COSB         Total variances/result analysis
    COEP          Line items, actuals
    COOI          Line items, commitments
    COEJ           Line items, planned orders
    BPGE            Budget, overall cost
    BPJA             Budget, annual values
    QBEW             Project stock valuation
    MSPR              Project stock (incl. non-valuated)
    LFINF      Delivery information Project System                      
    LFINFX     Assignment delivery information to Project System objects
    MLST       Milestone                                                
    MLTX       Milestone Description                                    
    MSET       Standard milestone set                                   
    NHPRPS     Number history for reorganization of WBS elements        
    NPTX       PS Texts (Network)                                       
    PA0001    Person responible details in HR (Emp. No., Name, etc.,
    PA0002    Person responible details in HR (Emp. No., Name, etc.,
    PA0003    HR Master Record: Infotype 0003 (Payroll Status)
    PLAB       Relationships                                            
    PLTX       PS Texts (Library Network)                               
    PRHI       Work Breakdown Structure, Edges (Hierarchy Pointer)      
    PRHIS      Standard WBS, Edges (Hierarchy pointers)                 
    PROJ       Project definition                                       
    CI-PROJ   Project structure                                   
    RCJ_PRPSUP      Superior WBS element (for validation/substitution)
    PRHI       Work Breakdown Structure, Edges (Hierarchy Pointer)          
    PROJS      Standard project definition                              
    PRPS       WBS (Work Breakdown Structure) Element Master Data       
    PRPSS      Standard WBS Element (WBS element) - Master Data         
    TJ02         System status
    JEST        System/ User Status by object number (WBS and Network)
    TJ02T       System status texts
    JCDS - history of System/ User Status by object number JEST (WBS and Network)

  • Business Process Expert General Discussion Forum and Sap Solutions ERP- MM

    Hi Experts,
    Can somebody explains me difference between Business Process Expert General Discussion Forum and Sap Solutions-->ERP-MM. Also tell me where I can get QM Module forum.
    Full points, if helped.
    GR.
    Edited by: G R on Mar 7, 2008 9:26 AM

    Hi
    You can visit " Product life cycle management (PLM)" for QM related issue posting.
    Regards
    YMREDDY

  • SAP PLM 7.0

    Hi,
    My understanding of the SAP PLM is that base PDM R/3 modules like ECM, DMS and CAD Desktop have been made available on portal making it more efficient, other than this, does it have adiditonal features related to xPDD, xRPM,cProjects and cFolder etc..
    if any of you folks have worked in SAP PLM 7-0 could you ps summarize the feature available. thanks.
    Thanks
    Pugazh
    Edited by: Pugazhenthi Shanmugam on Apr 26, 2011 12:07 AM

    Hello Pugazh,
    Your understanding is right to most extent. ECM has been completely changes and revamped from previous versions. They are now role based and are available on NWBC client.
    On the other hand xPDD, xRPM,cProjects and cFolder etc.. are PPM capabilities and are distinct from PLM 7.0 the latest version on PPM is PPM 5.0 They do not come as part of the standard PLM 7.0
    There are lots of presentations, release documents power points available please SEARCH through ASUG and SAP sites.
    regards
    N K

  • SAP PLM

    Hi Guys
    I am have working on PDM(Team center), VPM(Enovia DPM) and Catia V5 since 2 years now and I am planning to change to SAP PLM. Can any one help me Do i need to Have knowledge in any other things other then PDM, VPM to start up with SAP PLM.
    If I want to take p my certification in SAP PLM where can i get it,( Do i need to contact Siemens for it or i can try with some other place)
    Your help will be Appreciated
    Pradeep

    Hi Pradeep,
    1.As you have worked in PDM (Team Center), and other CAD packages, you will be knowing the Functional processes/activities involved in the PLM which is very much required to learn and give solutions in SAP PLM.
    2. As you must have worked with BOM, Documents, workflows, Organizational hierarchies, Roles & Responsibilities (Draftsmen, Junior/Assist Design Engineer, Design Engineer, Project Manager etc  etc) and their authorizations.
    3. So with these things it is very easy to learn & work with SAP PLM, if you are currently working in non-sap or any functional domain, you can join any SAP implementation company as a Trainee or Fresher and get trained on SAP
    or there are many training institutes which train SAP even for 25-30K without certification. (You will get a fare idea about what SAP is )
    Even SAP PLM starts with PDM Objects like, Material Master, Document Managment System, Engineering Change Managment (Versioning/Revisioning for BOM, MM, DIR), Bill of Materials, Classification System (Classes, Characteristics, Object Dependencies etc) all this are PDM Objects in SAP.
    And there is Collaboration Projects, Collabortion Folders and CAD Integrations. etc these all together constitutes a SAP PLM
    For Certification on SAP PLM below mentioned are details. and follow the link as well
    https://websmp203.sap-ag.de/certification
    SAP Consultant Certification
    Solution Consultant PLM - Project Management with mySAP ERP 2005
    Software components: SAP ERP Central Component 6.0
    Certification exam is included in course TPLM22 and is also offered in separate certification events at many SAP locations.
    Certification ID (Booking code):
    C_TPLM22_05
    Certification duration: 3 hours
    Number of certification questions: 30
    Required certificates for participation in this certification test: None
    Consultant Academy courses for certification preparation: TPLM20 (Project Management I), TPLM22 (Project Management II (Case Study))
    Alternative Project Team Training courses for certification preparation:
    PLM
    200 (Project Management), PLM210 (Project Management - Structuring), PLM 220 (Project Management – Logistic), PLM230 (Project Management – Controlling), PLM240 (Project Management – Reporting)
    Please note that you are not allowed to use any reference materials during the certification test (no access to online documentation or to any SAP system).
    The certification test Solution Consultant PLM – Project Management with mySAP ERP 2005 verifies the knowledge in the area of the mySAP Product Lifecycle Management for the consultant profile Project Management. This certificate proves that the candidate has a basic understanding within this consultant profile, and can implement this knowledge practically in projects.
    The certification test consists of questions from the areas specified below:
    Topic Areas
    1. Project Structuring (+++)
    Basic data in PS: work breakdown structure, network and activities, milestones, PS texts, documents
    Project Builder and project planning board
    Project simulation
    Standard work breakdown structure, standard network
    Assembly processing
    2. Dates (+)
    Time scheduling and scheduling (network scheduling, project scheduling, overall network scheduling)
    Actual dates
    3. Resources (+)
    Work center
    Capacity planning and capacity evaluation
    Workforce planning to HR resource
    Confirmation and working time sheet
    Internet scenarios
    Workflows in PS
    4. Material (+)
    Work breakdown structure BOM
    BOM PS interface
    Component assignment in the network
    Material procurement through in-house production or external procurement
    Collective stock and project stock
    Requirements grouping
    Progress tracking
    ProMan
    Delivery from the project
    5. Costs and Budget (++)
    Cost planning in the work breakdown structure
    Network costing
    Assigning orders to the project
    Budgeting and availability control
    Commitment and actual costs through account assignment and order assignment
    6. Revenue and Payments (+)
    Revenue and payment planning in the project
    Sales pricing and quotation creation
    Resource-related billing
    Milestone billing and down payment processing
    7. Period-End Closing (+)
    Template allocation
    Application of overhead
    Interest calculation
    Progress analysis and Progress Analysis Workbench.
    Results analysis
    Incoming orders
    Settlement
    8 Miscellaneous (+)
    Exernal service and service activities
    Organizational units in SAP ERP
    Info systems in project management
    Field selection
    OpenPS
    Amount of questions by topic (as percentage of test):
    + = 1 - 10%
    ++ = 11 - 20%
    +++ = over 20%
    No responsibility is taken for the correctness of this information. Copyright © SAP AG 2006.
    Very Important:
    http://mysapbi.blogspot.com/2007/01/sap-help-in-pdf-files.html
    Regards
    Rehman
    Reward Points if Useful

  • SAP PLM Study matrial

    Dear,
             This is Felix from India.
    I am working as a Design engineer in India.I am using PLM software(MatrixOne).
    I would like to study SAP PLM.
    Please help me,if you have any study material about SAP PLM.
    i want to know, what are all the basic needs to enter in SAP PLM field?.
    please help me.
    Thanks
    Felix

    Hi,
    Go through the following website, you may get some PLM stuff.
    http://service.sap.com/plm
    You should have to learn under PLM
    1. DMS
    2. Cprojects suite
    3. PPM
    4. xRPM
    The above chapters are sufficeint for learning based.
    Thanks,
    Srini Nookala

  • Download file from SAP PLM or Content Server?

    Hi all,
    I learned that the VEG server download the originals from content server and then started the conversion process.
    In my case, I have an error below, it is strange that the IP 153.95.192.93:443 is the ip of SAP PLM server, can anyone tell me is my configuraton right?
    thanks
    Job 42 (Workflow 'KPRO Retrieve') report
    Startup Parameters
         FilesPerTask = '5 '(Integer)
         InputFilePath = '\ \ NBHXVEG02 \ DSShare \ Workspace \ JM_JOB41 \ KProRetrievalRequest.xml' (String)
         OutputFilePath = '\ \ NBHXVEG02 \ DSShare \ Workspace \ JM_JOB41 \ KProRetrievalResponse.xml' (String)
    Step 'validate input'
       Completed Action 'enter a valid'
    Step 'Download'
       CompletedWithWarnings Action 'can not download all the files'
         Info Message 'document retrieval tasks to be addressed: 1'
         Warning Message 'first task failed to retrieve a file (of 1): Unknown error (warning)'
           jmp_KproRetrieve (Task 39)
           Warning Message 'file' A00021876_20130819.CATProduct 'unable to download: Unable to connect to the remote server: Since the connected party did not properly respond after a period of no response or a host connection, the connection attempt fails. 153.95.192.93:443 '

    HI Fergal.
    I changed the IIS port to XX443(XX means instance number), the https service is also started in the ECC server.
    but I got below errors:
    Startup Parameters
         FilesPerTask = '5 '(Integer)
         InputFilePath = '\ \ NBHXVEG02 \ DSShare \ Workspace \ JM_JOB115 \ KProRetrievalRequest.xml' (String)
         OutputFilePath = '\ \ NBHXVEG02 \ DSShare \ Workspace \ JM_JOB115 \ KProRetrievalResponse.xml' (String)
    Step 'validate input'
       Completed Action 'enter a valid'
    Step 'Download'
       CompletedWithWarnings Action 'can not download all the files'
         Info Message 'document retrieval tasks to be addressed: 1'
         Warning Message 'first task failed to retrieve a file (of 1): Unknown error (warning)'
           jmp_KproRetrieve (Task 122)
           Warning Message 'file' A00021876_20130819.CATProduct 'unable to download: The underlying connection was closed: Could not establish trust relationship for the SSL / TLS secure channel. : According to the verification process, the remote certificate is invalid. '

  • Creating ofBOM & Material SAP PLM  instead of R3

    Dear All
      Please tell me
    what is the benefit of creation of  BOM & material in SAP PLM Instead of R/3?
    waitnig for reply
    thank you
    Ravindra Saraf

    Hi Ravindra,
    The benefits are manyfold.
    1. You can easily track the development cycle of a product right from its concept development to its productionization.
    2. Many development centres are outsourced in recent times, so in absence of R/3 installation the data can be well created, maintained and utilized through PLM portal.
    3. Seamless integration of ERP and PLM, taking it upto SCM.
    4. Reduced dependency on other stakeholders creating the same data with different access.
    Hope this answers your query.
    Regards,
    Nishit

  • SAP PLM Web UI: Document functionality working very slow or timing out

    Dear Experts,
    In the SAP PLM Web UI, when we open any existing document or try to create a new document system continues to process with out any error for long time before getting timed out.
    Even Descriptions tab or any other tab and attached originals do not open.
    Is this got something to do with the whitelist? I havent generated any whitelists so far for this system.
    We are on ECC 6.0 EHP 6 and PLMWUI SAPK-70206INPLMWUI.
    Thanks and regards,
    Shashikumar BS

    Hi Shashikumar,
    it is quite hard to find out the reason for anybody without system access... I think the best and quickest would be for you to raise an OSS to SAP: http://service.sap.com/incident
    Best regards
    Tamas

  • NPD process in SAP PLM

    Hi,
        Can anyone give me an idea about mapping NPD (New Product Development) process in SAP PLM.
    For better understanding, NPD process steps are listed below.
    - Project portfolio alignment
    - Strategic resource management
    - Phase gate & Project management
    - Idea management
    - Prototyping & rampup
    - Product development
    - Sourcing & Supply planning
    - Marketing resource mangament
    - Market launch management.
    Reply is awarded with full points.
    Prasanna

    Hi prasanna,
    Follow this link
    <u>http://help.sap.com/bp_imcv1500/IMC_DE/HTML/E77_ProdDesEng_EN_DE.htm</u>
    Regards
    Rehman
    <b>Reward Your Points</b>

  • Credit Control Area - SAP ISU FICA or SAP Finance (ERP) ???

    Hello Experts,
    I was reading about credit control area which is basically - organizational unit that represents an area responsible for granting and monitoring credit. One control area can corresponds to many company code (though vice versa is not true).
    So my question is, in term of work order planning should I consider Credit Control Area as a part of SAP Finance (ERP) or SAP - ISU?
    Please let me know best reason to put it into any side. I want this information for planning purpose. Kind of vague question, my apologies for that.
    Thanks.

    Yes, you will be dealing with new transactions and with a different customizing, for example:
    Functional:
    Financial Supply Chain Management ->Credit Management->Rule for Scoring and Credit Limit Calculation and Check Rule
    Customizing:
    Financial Supply Chain Management->Credit Management->Credit Risk Monitoring
    FSCM Credit management is far more complete functionality than AR Credit management.
    Best regards,
    Cristobal.

  • Credit Control Area - SAP ISU FICA or SAP Finance (ERP) ??? and why?

    Hello Experts,
    I was reading about credit control area which is basically - organizational unit that represents an area responsible for granting and monitoring credit. One control area can corresponds to many company code (though vice versa is not true).
    So my question is, in term of work order planning should I consider Credit Control Area as a part of SAP Finance (ERP) or SAP - ISU? nd then in that case does it contols credit limit of end customers (ISU) or vendors (ERP)?
    Please let me know best reason to put it into any side. I want this information for planning purpose. Kind of vague question, my apologies for that.
    Also, it would be of great help if you give me any example explaination. Anything will do.
    Thanks.

    Yes, you will be dealing with new transactions and with a different customizing, for example:
    Functional:
    Financial Supply Chain Management ->Credit Management->Rule for Scoring and Credit Limit Calculation and Check Rule
    Customizing:
    Financial Supply Chain Management->Credit Management->Credit Risk Monitoring
    FSCM Credit management is far more complete functionality than AR Credit management.
    Best regards,
    Cristobal.

  • New to SAP PLM ( I need advice pls)

    Hi,
    I will appreciate some advice please.
    I'm interested in SAP and plan to gain certification in SAP PLM (Project Management Modules), but I've not got any SAP experience. I've got under 3yrs experience in Project Administrator, Support and Coordinator type roles, got my Certification in PRINCE 2 Practitioner level, Managing Successful Programmes (MSP) Practitioner level, PPSO and ITIL foundation level.
    Where will you advice I place myself looking for a SAP role, Iu2019m not looking to get a consultancy type role or anything like that, just something that will get me into the SAP career path with my project background.
    Also is SAP PLM the best or only focus for me given my Project background?
    Finally, any advice on companies that will consider someone with my profile?
    Thanks,
    Fumi

    Hi Fumi
    Here PLM stands for Product Lifecycle Management. Forum is to discuss and get solution on the problems faced while implementation.
    Sorry forum members may not answer for the subject
    Regards
    Atul

  • SAP PLM DMS Connector - Read Only

    I've a very simple question.
    Using SAP PLM DMS Connector can I upload documnents into repositories configured for DMS?
    I read the documentation and it looks like a read only connector.
    Thanks and Regards,
    Prasanna Krishnamurthy

    Hi,
    It is a read only connector, confirmed by SAP.
    Cheers,
    Tuval

  • ROLE OF ABAPERS IN SAP-PLM DEVELOPMENT

    HI EXPERTS,
    I am having 3 yrs of exp in sap - abap. I got an offer to work with sap-plm, please let me know the <b>role of abapers in sap-plm development</b>. If any document u  can send me to [email protected]
    Thanks&Regards.
    B.SRINIVASULU.
    09916308002.

    Hi Bysani,
    As ABAP guy in SAP-PLM project you be working mostly on Enhancements, Field exist, user Exists and Reports.
    There is nothing worry about SAP-PLM, the work you may get is based on customer requirement & scenarios but you will receive the Detail Funcitonal Specification from the PLM Functional Consultant.
    As i mentioned the ABAP work is mostly on Field Exists to make some fields mandatories, User Exists, Functional Modules, Enhancements & Reports.
    For details queries you can write in SDN, you will get the replies.
    Best of Luck for your new assignment.
    Regards
    Rehman
    Mark Useful Answers

Maybe you are looking for

  • Why can't I access my ringtone downloads to change my ringtone?

    I have downloaded songs which I would like to use as ringtones, through the ringtone option on the settings but although the songs are listed in my downloads on itunes, I can't seem to access them from the settings menu.

  • Oracle Forms Builder in Windows Vista

    Hi. I have Windows Vista and when treatment to connect to me with Forms Builder vers. Forms [32 Bit] Version 9.0.4.0.19 generates to me east error according to the tests that I did has something to see with OCI_7 can help me please. The error is: ORA

  • Best Way To Setup SGD With RSA Authentication

    At the moment, I've got RSA Authentication working with SGD 4.60-911. Now under my setup, I've manually created a user profile and assigned a couple of Terminal Server sessions to it and everything is working. I'm not sure if this is the best or, mor

  • Extending ASYNC BPEL EXECUTION TIME

    Hi, I have a Async BPEL process that is calling same webservice several times and each invocation to that webservice results in wait time of 45 secs. so when i invoke the webservices as a partner link from BPEL, the service works fine till first 6 in

  • Mystery()

    what does the method mystery() do?