SAP PM - Task List Formatting

Dear PM Gurus,
I have a Task list in WORD format.
I copy and paste in IA05 (long text).
But , when i print preview from IA06, i dont get the same format I pasted from my word doc, instead it defaults to normal text.
please see attached docs.
1st : Is the word doc i copy and paste in IA05 long text option with columns.
2nd : Is the print preview format i m getting from SAP without any table formats.
Is there any way where i can get the same format as in word from SAP print preview.
PLease guide me on this...

If you don't have the possibility to go for an ABAP solution, then you could attach the Word document to the reference object of the maintenance item and indicate in the task list, that the technician shoud open the reference object and print it from the attachments.
It's quite simple, because you can store a link to a network drive & the technician can open/print the document needed.
Regards,
Patrick

Similar Messages

  • SAP PM Task List

    Dear Experts
    I have the following client requirement
    In the Instrumentation Department there are many Transmitters of different ranges(0-200, 0-300,0-10 etc). They will calibrate those equipments in the following manner
      let us take an example of transmitter of range 0-200deg
      First they will give the value of 0deg to the transmitter and check the output. it must be in the range of -1 to 2. next they will give the value of 25 deg and check the output It must be in the range of 23 to 26. In the same manner they will check for 50deg, 75deg, 100deg. Like that they will check for different equipments of different ranges. So How can i map this process in sap for calibration process. I am new to sap So I am requesting to help me.
    Thanks in advance
    Ravi

    Create MIC in QS21 for 0 deg, 25 deg, 50 deg, etc., such as wherever you want to check the reading. Keep description appropriately which shows the input degree. Maintain the lower limit, upper limit & target value for that MIC. MIC should be as Quantitative.
    Create Task List (IA01 / IA05) separately for different range equipment & mention one operation as Transmitter Calibration and assign the desired MIC to that operation. Mention Inspection Point as 300 in Task List header.
    Create Calibration Order type by assigning Inspection type 14 to that. OR use PM06 order type
    Create Calibration Order in IW31 & assign the task list created for that transmitter
    While releasing, Inspection lot will be created. Record the results in QA32.
    Note: There are many threads discussed about calibration process. So, search in google as "Calibration".

  • Upgrade to SAP Business One 8.8 - Legal List Format

    Hi All,
    I am currently experimenting with the upgrade process from 2007A PL46 to SAP Business One 8.8 PL5.
    On some company databases that I try I get the error Legal List Format - Failed during the database upgrade process.  Does anyone know what this refers to and how it can be fixed?
    Many thanks,
    Damian

    No it's a very clean installation in the sense that it is a database that has only run against the core SAP Business one.  the only add on that would have been used during the original set-up would have been copy-express and DTW.
    The company data i am using is a copy of our own corporate data, nothing fancy as we are an SAP partnership so no real inventory even.
    d

  • Error in solution manager; no active task list exists in sap change manager

    Hi,
    i have created a correction in Solution manager but when i want to set it in status in development i receive the message below
    No active task list exists in SAP Change Manager
    could you please help me?
    thanks
    C.

    cmarrone wrote:Hi,
    This says taht your ChaRM configuration is not complete. You need to rectify these errors to work in ChaRM.
    >
    > listed below the detail of the errors:
    > Error in background job for program RSGET_SMSY error message No active job found
    1. Please activate the Landscape fetch job for RSGET_SMSY from SPROSolution ManagerBasic Settings-- Schedule Bgd jobs.
    > No RFC connection for system CIA client '000'
    Please maintain a connection from solution manager to the transport domain system . I belive this is CIA.
    > No CTS projects found for project ARC_AM_001
    Recheck the transport configurations.
    Rajeev

  • Formatting descriptive task list

    Hi All,
    In version 9.3 we have option to format the task list font (like bold, change color, italics) and even insert a picture in it. But when i try to format a task list in 11.1.2, it does nto show the required result.
    In other words i am unable to format the task list in v 11.1.2 by using the same steps that are used in 9.3. Can somebody tell me how can i do it?
    Regards,
    Umair

    In version 11 they took the ability to add html commands away from the forms and task lists, it is because the instructions are now in a html textarea which do not allow html functions.
    Though saying that in a patch for 11.1.1.3 (11.1.1.3.03) it looks to be reverted back :- 9475065 – Users cannot use HTML commands in data form and task list instructions.
    It has not made its way to 11.1.2, maybe it will in a future release or patch.
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • How to import task list to sap from external system

    There is a external system used for maintenance the task list.

    Hello,
    Have you checked the Business Object BUS1012 in Tx. SWO1?
    May be BAPI BAPI_ROUTING_CREATE will help you.
    Best Regards, Murugesh AS

  • Need Task list for starting a Rosettanet.

    Hi,
    Please let me know what are the intial steps to be done for setting up the  XI and RNIF systems from XI point of view. Please  reply with the task list.
    Thanks & Regards,
    Pragathi.

    Hi,
    1)First you need to identify which Rosettanet PIP messages your are going to use,identify and download the PIP messages from rosettanet org,already different version dtds available ,download the DTDs with version what you looking for.
    2)Identify the who is the receiver , how to transform thsi structure in tro receiver format,you already have any standas receiver formats use it like IDocs(id your receiver is SAP ).
    3)Thenu use Rosettanet adapter to read the message.
    remaining steps all are same,refer any sample scenario,you wil understand.
    Regards,
    Raj

  • Uploading Master Data for General Task List

    Hi gurus,
    I want to Upload General Task List through LSMW. It is displaying the Program name as IBIP instead of RIIBIP00 for the Object 0490.
    How to overcome it and how to "Maintain the Structure Relation".
    Help me out. Our's is ECC 6.0
    I have to upload this one in our Client's place. Very urgent.
    Points will we rewarded.
    Regards,
    Charles S.

    Hi,
    You should go ahead with IBIP.. Create ur struture in step 2 and step 3
    then finally in step 4 SAP will provide following str.. just mapping structre u created in step 2 here to respective one .
                                                                                    IBIPTLST IBIP: Task List header                                                
              The target structure IBIPTLST must be selected.                       
         IBIPTEXT IBIP: Long text line                                              
           IBIPTLOP IBIP: Task List Operation                                         
             IBIPTEXT IBIP: Long text line                                          
             IBIPTMAT IBIP: Task list component                                     
               IBIPPRTS IBIP: PRTs (production resources/tools)                       
                 IBIPTEXT IBIP: Long text line                                      
             IBIPMPAC IBIP: Maintenance Packages                                    
         IBIPBDCD IBIP: Direct BDCDATA: formatted BDCDATA: expert use
    You may provide mapping only for those str which u r going to use ...rest can be ignore...
    Enjoy SAP.
    Pankaj Singh.

  • SmartView Task List not opening FR report

    I am trying to open FR report from a Task List task in SmartView (using Planning provider). If I am already logged into my Planning application in browser, the report opens. But if I am not logged (e.g., browser is closed), an empty page opens in browser, and at the bottom is status "Done" but with the error icon.
    Is there a way (URL format) that would enable user to open report from SmartView Task List without having to log to Web client first?
    Environment: EPM 11.1.2.3.500, FRS 11.1.2.3.503.0917, browser: IE 8, Excel: Office Professional Plus 2010
    Thanks,
    M. Sladic

    Celvin, Ramkumar, thanks for your suggestions. My colleague, Soumyajit, discovered that the original method (URL) needed to be replaced.
    Here is the original URL we used (this one was opening report twice on first open, and didn't open report from SmartView unless user was already logged to Workspace):
    ** https://i<server>/workspace/WorkspaceLaunch.jsp?uri=module%3Dwksp.relatedcontent%26repository_path%3D%2FReports%2FStatement%2520of%2520Financial%2520Statement%2520-%2520Expandable
    Instead the right call is:
    https://<server>/workspace/index.jsp?module=tools.relatedcontent&repository_path=%2FReports%2FFinancial%20Statement%20-%20Expandable
    Using this other URL, the report:
    - when open from the Tasks List, opens only once even the first time;
    - opens in Workspace without additional login when opened from the Task List in SmartView
    Note: We are using variant of OAM, maybe that has some impact to it. Not my area of expertise, though...
    HTH,
    Milos

  • Error in executing process from the UWL task list

    Hi,
    I have created a process and assigned different users to different steps. For administrator, Overseer and Owner, i have kept role as initiator only. For the actions of the process, set the value as Initiation defined and in Default Roles tab, have assigned different users to each of the actions. From the URL generated on instantiation, i created a web dynpro iview and assigned it to a role R.
    The UWL has also been configured. The initiator of the process is assigned the role R.
    Now the issues are:
    1. When the process initiator opens this role R, an error is displayed " Page not found or not available", but the process gets initiated since an entry for the same is made in the UWL task list.
    2. Even when I click on the task entry in the UWL task list, i get the same error message.
    3. Presently if i click on the role R, then only entry is displayed in the UEL task list. Is there a way in which task may automatically appear in the task list of the initiator of the process without him/her having to click the role and then initiate?
    I am not able to figure out why this is happening. Can anyone please help me in this regard.
    Thanks & regards,
    Anupreet

    Hello Anupreet,
    Refer to these SAP notes
    1104652, 1131403 or 1026119.
    This should fix the issue.
    Let me know if this works.
    Cheers,
    Mandrake

  • Solman Change Request Management Issue - about create task list

    Dears,
        We are now using Solman ChangeRM. I have created a maintainance project and maintained its logical component and IMG project. when I want to create a task list for this project, a message"The project is not released. Hence cycle can not be created" poped. The message no. is /TMWFLOW/CONFIG_UI017. Where can I release the project?
    Thanks
    Roger

    Hi,
    Pls click the check button(next to activate button)
    see the SLG1 log generated remove the errors shown in red.
    One it is done u press the refresh button & thn u cn create the task list
    chk
    https://websmp202.sap-ag.de/~sapdownload/011000358700000657692007E/ECTS_CHARM_SP12.PDF
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    http://help.sap.com/saphelp_sm32/helpdata/en/0c/5b2160f6fa4b83a3674a210b1cdeb0/content.htm
    Regards
    Prakhar

  • Change Request Management  "There is no task list for this project"

    Hello!
    I would like to use the functionality of CharM in SOLMAN 4.0.
    When I enter the Tcode /n/tmwflow/proj I receive the waring/error "There is no task list for this project" (/TMWFLOW/TRACK_N114)
    If I create my own task list via Task list --> create
    I get the warning "You cannot change task lists in the SAP namespace"
    What are the steps to define task list for my project?
    Do I need to configure SPRO ... --> Extended Configuration --> Schedule Manager?
    The second warning I get: "NO CTS projects created yet" or
    "The Solution Manager project does not have an active CTS project yet".
    How can these warnings/errors be corrected?
    Thank you very much!
    regards

    Hi,
    Pls click the check button(next to activate button)
    see the SLG1 log generated remove the errors shown in red.
    One it is done u press the refresh button & thn u cn create the task list
    chk
    https://websmp202.sap-ag.de/~sapdownload/011000358700000657692007E/ECTS_CHARM_SP12.PDF
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    http://help.sap.com/saphelp_sm32/helpdata/en/0c/5b2160f6fa4b83a3674a210b1cdeb0/content.htm
    Regards
    Prakhar

  • Error while creating task list

    Hi All,
    I am configuring change management , i have created project and assigned logical component for that when i create task list it gives below error .
    For object /TMWFLOW/M , number range interval 01 does not exist
    Message no. NR751
    Diagnosis
    The database table NRIV has the delivery class 'C', i.e. the SAP default settings are only in client 000.
    Procedure
    Create the missing number range interval in customizing.
    Transaction code:
    I have already  maintained number ranges.
    Thanks
    Santosh

    Hi ,
    Make sure you maintain the number range interval to be no. "01" and not "1" or anything else. I kept getting the "Error reading information for number range object /TMWFLOW/D" (and /M/ and /V) even though I had added the number range interval as described in the manual. As soon as I deleted the interval "1" and put it back with "01" that check passed and I could create a task list.
    Thanks
    Abullais

  • Use of user define field in Task list

    Hi,
    Please give the solution for the strange requirement of the client as:
    My client wants to define the operation for preventive maintenace in two parts like
    check temperature  :  45 deg celcius.
    check temperature should be like operation and rest what he has to check to be defined in other field  i.e. both should not be together.
    so i find the solution as user defined fields in the task list where i can define this second parameter.
    But the problem is that system is not proposing this second field in the preventive order, only operation field is proposed.
    Please suggest some solution, how can this requirement can be mapped.

    Both operations of the inspection lot will need to be completed at some point.  They are in the same lot so they belong together.  Both operations should be available to the user.  (Unless you used workcenters and security to limit users to specific workcenters).
    Once set up, it will only be available to new inspection lots.  Few things in SAP are retroactive.
    Craig

  • How to fin the Workcenter after getting Task list type

    Hi all ,
           I got the fields PLNTY(Task List Type ) , PLNNR(Key for Task List Group) , ZAEHL(Internal counter ) and VORNR (Operation/Activity Number)   from PLPO table .
    I need to get the work centers names . I saw the work centers are in CRHD table .
    May i know how to get the name of the work centers after getting the task list type details .
    I  found the routing details of a give finished/semi finished material .
    my next step is to find the work centers.
    Any suggetions from you are appreciated .
    Regards
    Raj

    Hi Jan,
    Yes, sa38 makes it possible indeed to execute in background into immediate mode a job but
    the user have to know the name of the program to be carried out ...
    The user knows only the name of these transactions trade. For example, IW38.
    In the menu of this transaction, SAP gives the possibility to execute in background :
    Program --> Execute in Background --> display of Start Time screen for the type of start condition :
    Immediate, Date/Time, After job, After event, or At operation mode).
    It is at this time there that we want that the user can only choose the "immediate" mode.
    We must thus prohibit the other choices (Date/Time, After job, After event, or At operation mode) ... and
    and we don't know how to restrict these other options in this screen "Start Time screen for the type of start condition".
    Thank you.
    By.

Maybe you are looking for

  • Audio on my MacPro is no longer working.

    How can I tell if my internal sound card is dead? Are there settings/drivers that I may be missing? If it is dead, is replacing it an option? A few weeks ago my primary hard drive failed. When the drive was failing I noticed for the first time that t

  • Item Category N (non-stock item) in BOM creation - Preq Generation

    Hi All I have a material component that is planned in APO and not in ECC6. We would like to keep the one BOM for the finished good. Problem is that when we perform the backflush in ECC6, the system wants to backflush the material and causes errors du

  • Creation of DMR and CMR from the archived billing document in EHP3 system

    Hi all I read somewhere that one of the functionality in EHP3 is we can create sales document like debit memo request and credit memo request from the archived billing document. I am working on EHP3 system only but i am not able to create the sales d

  • CD drive won't recognize C3 Uprgrade disk...

    This is the 2nd disk I've received from Adobe. The first acted the same way and Tech. help determined it was a bad disk. I'm running Windows XP Professional Version 2002 Service Pack 2. I currently have Illustrator 10 operating on this system and rec

  • [Apache 2] Critical error mod_rewrite: Could not set permissions on rewrite

    Hi, Well I had a look around to this problem and it seems it is specific to mac os system on intel machines, so I send my post here. I had installed the apache 2 server from www.serverlogistics.com and it seems to start. However it is impossible to l