SAP PS & SAP Project Management

Hi all of you,
Can any one give me clarity on the available functionalities in SAP Project Systems and that of SAP Project Management. My requirement is, my client is using one Project Management tool, where can get all the project monitoring and as well as Project cost and revenue with Dashboards. I am implementing PS to take the accounting data from the tool, to get integration with FI,CO, SD, and MM. In their Project Management tool apart from the cost management, they have Change Management, defects management, test management, process templates, life cycle templates, project goals with specific and project performance monitoring like dashboards. Actually, I am taking the interface part like WBS, Planned cost, Schedules, Resource cost etc.. I am unable to take the non accounting data to SAP PS.
My doubt is, can we implement SAP Project Management module to replace the tool, since in PS we have FI and CO data with schedules, for example. If I required the same things, non accounting data like Defects management track, change management, testing management, which SAP module we have to implement. More over, my client is also wish to discard the tool, if the same functionalities available in SAP.
Please correct me, if I am wrong and also suggest me how we can get the same things in SAP.
Thanks & Regards
Ramki
Edited by: Ramki on Oct 5, 2009 4:40 PM

you can use Claims available in SAP PS.
Transcript from SAP help:
Claims are used to:
Identify the persons or groups responsible for variances Defend against claims from third parties who your business responsible for a variance
Customizing is divided as follows:
Notification Customizing
In this section, you stipulate the most important aspects of a claim, such as:
Claim Management screen format
Claim partner
Catalogs and report profile for the claim
Priorities for the claim
Claim-specific Customizing
Codes for detailed long texts
Activating workflows for the claim
I hope this is helpful.

Similar Messages

  • SAP Project Management Certification??

    Is there a certification from SAP on Project Managemnt? NOT Product Lifecylce Mngmt(PLM)
    but something like PMP CERT etc.. authorising Project Managers in SAP area.

    Hi hruser,
    yes it is there.but it is not as a sparate one. it is included with some other topics also. pls chk theses links
    Project Management Professional
    Contents
    1 Overview
    2 Verification
    3 Eligibility Criteria
    4 Examination process
    5 CCR cycle
    6 External links
    Overview
    The PMI (Project Management Institute) has three levels of certification, starting with the CAPM (Certified Associate in Project Management) which is the basic level and is intended as certification for project team members. The PMP (Project Management Professional) is the second, higher level of project management and considered the standard of all PM certifications. Individuals who have passed the PMP certification test successfully and have met the PMI requirements for documenting their professional experience are entitled to use the abbreviation PMP with their names. A new certification, PgMP (Program Management Professional) has been introduced by the PMI in late 2007, for Program Managers.
    Verification
    Certification claims can be verified through the PMI's Web site at www.pmi.org/CertApp/Registry.aspx
    [ Eligibility Criteria
    A high school diploma is required to be certified. A Project Management Professional has also met specific education and experience requirements, has agreed to adhere to a code of professional conduct, and has passed an examination designed to objectively assess and measure project management knowledge. In addition, a PMP must satisfy continuing certification requirements (through professional development) or lose the certification.
    Requirements include a candidate to have completed a high school degree or equivalent, performed 7,500 hours in a lead role directing tasks, performed tasks associated with being a Project Manager over a period of 60 months within the past 8 years, and completed 35 hours of education specific to Project Management and aligned with PMI methodologies. Persons possessing a bachelor's degree only require 4,500 hours leading and 36 months of experience.
    The candidate is also required to pass a test to demonstrate his or her knowledge of Project Management. The test consists of 200 multiple-choice questions.
    Candidates who do not meet the minimum requirements for the PMP certification can apply for the Certified Associate in Project Management or CAPM examination.
    Examination process
    After a candidate's application is approved by PMI, he or she may schedule an examination at any of a large number of Prometric testing centers. A variety of times are available, including weekends and after "normal working hours." The examination is a multiple choice test, which can be taken either on a computer or in written form. Candidates must answer 200 questions in 4 hours (though 25 serve as trial questions and do not count toward the final score. Candidates will not know which ones are dummy when taking the exam - implies that candidate has to answer 200 questions to the best of their ability) and must have a success rate of at least 60.5% (106 out of 175 questions).
    CCR cycle
    The PMP status is granted for a period of three years (CCR Cycle, beginning January 1 after the exam). During this time, PMPs have to collect 60 PDUs (Professional Development Units) to maintain their professional accreditation.
    http://www.pmi.org/CareerDevelopment/Pages/Our-Credentials.aspx
    http://www.globalknowledge.com/training/certification_listing.asp?pageid=12&certid=431&country=United+States
    http://certification.about.com/od/projectmanagement/a/pmpcert.htm
    http://www.sap.com/industries/defense-security/projectmanagement.epx
    https://www.sdn.sap.com/irj/sdn/advancedsearch?query=projectmanagementcertification&cat=sdn_all
    thanks
    karthik
    <<Moderator: Soliciting for points is forbidden>>
    Message was edited by: Ravi Sankar Venna

  • Looking for "Project Management" addon for SAP B1

    I am looking for an addon that will take care of companies who are into Project Execution.
    Kindly suggest some such addon & partner(preferably from India but not necessary) from where I can get this.
    Kush

    Hi Kush,
    Check the following thread
    Re: Does anybody can let me know about project managment addon?
    SAP & Project Management
    SAP & Project Management
    *Close the thread if issue solved.
    Regards
    Jambulingam.P

  • Searching for SAP certified project manager for project

    Please post a response if you know someone who has a BS or BA degree and has:
    General SAP Functional Knowledge and Experience
    8 - 10 years of previous experience as
    an SAP Project Manager with SAP, an SAP Partner, or large companies doing SAP
    implementation projects.
    A minimum of 5 full lifecycle
    implementations of SAP in a Project Manager role.
    Would prefer a candidate that is an SAP
    Certified Associate Project Manager, or have some other type of Project
    Management certification combined with significant SAP project and implementation
    experience on a number of different SAP implementation projects at different
    customers and in different industries. 
    Candidate should be certified in the
    use of SAP Solution Manager.
    Candidate should be certified in the
    use of ASAP Methodology.
    Candidate should be willing to provide
    two professional references.
    Required SAP Functional Knowledge and
    Experience Specifically for this Project:
    SAP Solution Manager
    Solution Manager Implementation
    (SMI210)
    Implementation Projects with SAP
    Solution Manager (SMI310)
    ASAP 8.0 Methodology for Implementation
    (ASA380)

    Hi,
    this might help you
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/40fde890-0201-0010-fa86-ee9a507bc62e
    Regards
    Agasthuri Doss

  • Regarding Project Managment Training and Certification

    Dear All,
    I am interested in Project Management Certification.
    Is there any different courses/certification available for Project Management related to SAP   or   I can get the training for PMP certification from PMI approved training institute and appear for examination.
    Request you all to please guide me for the same.
    Regards,
    Nirav Bhatt

    Good question. The C_PM_70 or Associate SAP Project Manager certification is geared specifically for practitioners that have existing industry certification (or work towards one - as most classes in the curriculum award PDUs). So the short answer is yes I would recommend you looking into this certification.
    As to your questions:
    1. Yes
    2. Currently the C_PM_70 course curricula is predominantly classroom. We are working on moving the courses to e-learning mode with our SAP Education teams. We should see key classes becoming e-learning based in 2013. We had used this model internally and have very good feedback from practitioners.
    3. We have seen some of our PMs prepare for the exam by studying the methodology directly by reviewing it in detail. The only publication that is in the market and discusses ASAP 7 is the book 'Real-world BPM in an SAP environment' by SAP PRESS. It provides overview and description of the methodology, but does not go into the detail you will need in the exam.
    4. The C_PM_70 curriculum is built for all experience levels and from our internal adoption I can say that key courses most experienced PMs needed were Solution Manager course and ASA380 as they cover the core of the exam. We also recommend to do either self study of Run phase if you have less experience in ALM and Operations topics.
    I hope this helps.

  • Start Of Ramp-Up for SAP Portfolio and Project Management 5.0

    Start Of Ramp-Up for SAP Portfolio and Project Management 5.0
    Starting with this new release, the application SAP Portfolio and Project Management 5.0
    replaces both the SAP Resource and Portfolio Management (SAP RPM) application and the
    Collaboration Projects (cProjects) application.
    Start of ramp-up for SAP Portfolio and Project Management is 19th of April, 2010. The end
    of ramp-up is currently scheduled for 19th of October, 2010.
    Functional Innovations And New Features
    A detailed description of all new and/or enhanced functional innovations and features can
    be found in the Release Notes:
    [http://service.sap.com/releasenotes |http://service.sap.com/releasenotes]
      -> SAP Solutions
        -> Release Notes SAP Portfolio and Project Management
    There are some SAP Notes which are in general very important for SAP Portfolio and Project
    Management 5.0 and which also serve as central points of entry to find import information:
    SAP Note [1377104|https://service.sap.com/sap/support/notes/1377104]      FAQs - SAP Portfolio and Project Management 5.0
    SAP Note [1402912|https://service.sap.com/sap/support/notes/1402912]      PPM 5.0: Supported Browsers, Java versions, etc. 
    SAP Note [1411953|https://service.sap.com/sap/support/notes/1411953]      PPM 5.0: Configuration Content
    SAP Note [1436778|https://service.sap.com/sap/support/notes/1436778]      SAP Portfolio and Project Management 5.0: Restrictions
    Kind regards,
       Florian

    Thanks very much for taking the time to post the info Florian. I will update this thread as well if I run into any new information.
    Do we have any idea on SAP's direction for Product Definition? PD is still version 2.0 and I heard that PD functionality will be incorporated into PPM 5.0 which does make a lot of sense. I very briefly went through the notes and config doc in this post and did not get the impression that PPM has any idea and concept management capabilities.

  • Project management in SAP Solution Manager (SOLAR_PROJECT_ADMIN and RMMAIN)

    Please help me to understand this better u2013 whether this is a gap in the functionality of the SolMan, whether I expect too much, whether it is expected to work in a different way.
    In transaction SOLAR_PROJECT_ADMIN one can create a project.
    In transaction RMMAIN one can create a roadmap u2013 this is a more or less detailed project plan that can even be exported to MS Project. Via RMDEF and RMAUTH it is possible to create a custom specific roadmap. This specific roadmap can then be assigned via SOLAR_PROJECT_ADMIN and RMMAIN to the newly created project.
    However, it is not possible to modify the roadmap once assigned in SOLAR_PROJECT_ADMIN and created in RMMAIN.
    This means, as a consequence, that it is not possible to use the Solution Manager as the one and only project management tool.
    To specify this further. Usually, in a project, once you have created the roadmap and the overall framework you add all the detailed steps, and all single tasks that are required. As this is not possible in SolMan one needs to use other tools (MS Project) for this. But on the other side the SolMan project plan and roadmap has to be updated frequently to be able to keep track of the progress. So this ends in double work. Manual effort is required to keep this consistent. And it also hardly makes sense to create a new roadmap just to add these small details. With all this in mind itu2019s hard to convince our customers that the SolMan is really a that big benefit for implementation or upgrade projects.
    - have I overseen something?
    - has SAP designed this in a different way?
    - or does SAP oversee this need?
    Many thanks & best regards,
    Peter Müller

    Hi
    1) Is deleting older documents is definitely going to improve response time of searching. You said 'yes' but just wanted to double sure.
    Yes
    2) This program deletes all unsed and de-linked document. I can understand 'De-linked' but not 'Unused'
    i meant the samething
    3) Deleting documents based on user id is big problem. We have almost 800 Users in SolMan, who has used this project form last 5+ years. So all these 800 users have to go into multiple selection of user id
    Try giving *
    4) I tried this on our sandbox (SP19 Level) which has shown all unused documents which can be deleted. But this deletion has to be done one-by-one. In our production, if we have 10K+ documents, i assume almost thousand or more will be residing as de-linked in KW
    Try giving *
    5) Any Documentation available on this program.
    Learnt by experience but you can check some sapnotes below
    Note 1124579 - Using SOLMAN_UNUSED_DOCUMENTS to delete unused documents
    Note 1377997 - SOLMAN_UNUSED_DOCUMENTS: No deletion conf. for each doc.
    Hope above clarifies
    Regards
    Prakhar

  • Project Management Add-on  for SAP Business One.

    Dear All,
    I am looking for a project management  add-on for SAP Business One that can be used  by any company in services sector or an NGO to manage their projects.
    Thanks

    Hi,
    We have a addon for Project Management in phase of certification for SAP Store.
    For further informations please send e-mail [email protected]
    Regards,

  • Project management tool in SAP itself like Microsoft Project planner

    Hi Experts,
    I need to have information on the project management tool available within SAP.
    Is there any project management tool like microsoft project planner available within SAP.
    I heard that SAP solution manager does it. Please let me know whether it is right or not?. If correct could you please provide the relevent document or let me know how could I do that in the SAP BI 7.0 or in the solution manager.
    Your help would vve appreciated.
    Thanks

    Hi,
    Yes..Solution Manager is a tool in SAP whichcan be used for Project Management.
    You can check SAP Help for details on solution manager.
    Regards.

  • SAP Portfolio and Project Management: u201CCustomer Connectionu201D

    SAP Portfolio and Project Management: u201CCustomer Connectionu201D
    SAP Portfolio and Project Management is one of the first focus topics of the [Customer Connection initiative|https://service.sap.com/influence].
    The related developments are delivered by SAP Notes and/or by Support Package (SP) only (in case delivery by SAP Note is not possible). Target releases are 5.0 (for all points) and 4.5 (for those points where it is technically possible and reasonable to downport).
    [Composite SAP Note 1631964 |https://service.sap.com/sap/support/notes/1631964]collects and links all SAP Notes released for Customer Connection for SAP Portfolio and Project Management. It also includes a PDF file giving an overview of all released Customer Connection PPM developments as well as a PDF file with details about each released Customer Connection PPM development.
    An overview about all influence channels for customers can be found under [https://service.sap.com/influence|https://service.sap.com/influence].
    Kind regards,
       Florian

    Hi
    Thanks for your Valuable information -Customer connection PPM.
    Regards
    PP

  • General Availability of SAP Portfolio and Project Management 5.0

    Hi,
    SAP Portfolio and Project Management 5.0 is now in unrestricted shipment (GA). The unrestricted shipment is based on SP04 of SAP Portfolio and Project Management 5.0. See also SAP Note [1377104|https://service.sap.com/sap/support/notes/1377104] (FAQs - SAP Portfolio and Project Management 5.0).
    Kind regards,
       Florian

    Thanks for update...
    So its now available for download...
    PlayStation PPM available, better and improved..
    Niranjan

  • SAP Certification - Project Manager - C_PM_70

    Dear Friends,
    I m apprearing for SAP Certification exam - C_PM_70 for Associate Project Manager, in a couple of weeks and have not had any luck in finding study material yet. I request, if you have any related material, please pass it on to - "xxxxx@gmail dot com". It'll be a great help...
    Related courses -
    ASA 380 Implementation Methodology
    SMI 310 Implementation with Solution Manager
    SMI 210 Implementation with Solution Manager Methodology Overview
    OCM 100 Organizational Change Management Fundamentals
    BPM 100 Business Process Management Methodology
    E2E 040 End to End Solution Operations
    Thanks much!
    Edited by: Jan Musil on Feb 21, 2011 3:39 PM
    Removed e-mail address from the thread.

    Hello Nancy, Satish,
    I'm glad you are planning your certification exam. The material codes listed in your mail are actual SAP training courses offered by SAP education. You should be able to find them in the local training catalogue in your country. The SMI210/SMI310 have been offered for several years and only have been updated to ASAP 7 level. The new course ASA380 has been rolled out last year as part of introducing the ASAP 7 to the market. It is ASAP in detail course walking throuhg all the phases of ASAP and focusing on specific deliverables of each work stream in the methodology. The remaining courses are standard SAP training courses that are recommended as preparation for exam (e.g. OCM, E2E, BPM).
    Jan

  • Does somebody have experience to manage SAP project with solution manager?

    Hi friends,
    I will implement new project for my client. As I know, solution manager is already part of SAP Netweaver. To install SAP NetWeaver, solution manager must be installed. Meanwhile, solution manager provides a project management tool, for example, the business process definition, blueprint...
    But I never use it to manage project. Could somebody share experience in this area?
    Regards,
    Watson

    Hi Ragu,
    Thanks for your posting. I will implement a SAP APO project. What I need is the methods to use solution manager, for example, configuration manual, step by step guide. I'm also interested in the advantages of SAP solution manager.
    Regards,
    Watson

  • Question about elearning - OKP SAP Commercial Project Management

    Hi Gurus,
    i have a question about an e learning course which SAP offers-
    Course Name- OCPM10-
    OCPM10 - OKP SAP Commercial Project Management 1.0 | SAP Training and Certification Shop
    It's an e learning course for 20 hours, below are my questions-
    Since its an e-learning course, is it to be completed in a specified time (within 2-3 days) or we can have access to it throughout the year but duration of course is 20 hrs
    What kind of documentation is provided to me as part of this course.  

    1. C_TPLM22_05 - SAP Certified Solution Consultant PLM - Project Management with SAP ERP 2005   
    It includes SAP PLM 235 course material along with PLM 200, 210 220, 230,
    2. C_TPLM22_60 - SAP Certified Application Associate - Project Management with SAP ERP 6.0
    It is not including the PLM 235 course.
    This is the basic difference between  it.  IN Certification there are  6 -7 areas , in each of them you have to score more than 70 % , there many few multiple answer questions as well. Finally over score will come it should be higher than 70 %.  So, I ideally weight all the topics equally,
    With Regards
    Nitin P.

  • SAP REACh Compliance Project Management Capabilities

    Dear experts,
    Do you have any list of the report names is SRC that can be used for project management? (i.e. Endpoint coverage, Status of registration at Substance level...)
    Many thanks and best regards,
    Alberto

    Dear Alberto
    Here are the list of report names relevant for REACh
    End Point - Information
    End Point - Gap Matrix
    Endpoint - Coverage Check
    Besides Reporting, you also have couple export capabilities
    Legal Process - Export Registrations
    Substance Management -Costs
    Substance Management - Export Internal and External Organization
    Substance management - Export Priorities
    Substance Management - Export Roles and Volumes (Quantities)
    This is just a addition  to SRC reporting capabilities -
    If you want to make use of Compliance Workbench capabilities - here's the list
    i) Compliance Status for Products
    ii) Compliance status for Substances
    iii) Product - Pure Substance Analysis
    iv) Product - Chemical Data Analysis
    v) Displaying pure substance lists for review.
    Thanks
    Jayakumar
    Edited by: Jayakumar Indracanti on May 21, 2009 11:45 AM

Maybe you are looking for

  • Is there a way to reference the property node value of a control in another VI?

    Let's say that I have a situation like the one shown in the attached image. I have an interlock system which is basically a bunch of booleans If for example the "RF Enable" button in the "interlock VI" is true, then I should be able to flick the ON s

  • Idoc using EDI for purchase order

    hi all, could someone explain me all  the steps required in generating purchase order idoc  using EDI butnot using ALE. i want all the steps to be in detail. thanks in advance suma sailaja pvn

  • Checkbox Size

    Hi all, I've scoured the internet far and wide, and have found nothing about changing the size of a checkbox in Flash CS3. I'm not talking about the bounding box size or the label size - I mean the checkbox itself. I'm developing an application that

  • Cleanup UCM folders (temp/vault/weblayout)

    Hello, On my UCM instance, There are some files in vault folder (/ucm/cs/vault/), temp folders (/ucm/cs/vault/~temp/) and weblayout folders (/ucm/cs/weblayout/) which take a lot of space and are not used anymore (they still exist in vault but the mat

  • Problem with S1PS61

    I install portal server 6.1 in solaris 9, after finish, i can access identity server's consloe, but i can't access portal server,the error messages in /var/opt/SUNWam/debug/amSSOProvider is 09/10/2003 02:15:37:984 下午 CST: Thread[Thread-189,5,main] ER