SAP R/3 HW migration steps
Dear all,
We are purchasing new servers for our SAP R/3 environment, because current one's are almost five years old.
SAP R/3 4.6C on Oracle 9.2.0.5 on HP-UX 11.00
I was wondering about this procedure for SAP application and DB copy to the new server.
What do you think about the following steps on the new server:
1. HP-UX 11i v2 installed,
2. File systems for /oracle/SID...., /usr/sap/SID..., /sapmnt/SID... created.
3. users sidadm and orasid environment variables - copy the same from the source
4. Install Oracle 9.2.0 with the patchset 9.2.0.5 like the source databases,
5. /etc/passwd, /etc/services, /etc/group copy the corresponding lines from this files
6. rcp from current server to the new one the file systems:
a. /oracle/SID
b. /oracle/SID/sapdata*
c. /oracle/SID/mirrlog*
d. /oracle/SID/orriglog*
e. /oracle/SID/sapreorg
f. /oracle/SID/saparch
g. /usr/sap/SID
h. /sapmnt/SID
7. Change hostname on the SAP profiles, sidadm profile files, .profile, .login, .dbenv, .sapenv , orasid user profile files .dbenv_<host>.sh and .dbenv_<host>.csh in the home directory of ora<dbsid>.
8. /home/sidadm startsap_... stopsap_... scripts change the hostname for the new server
9. listener.ora and tnsnames.ora change
10. SAP license installation of temporary license, until the successful migration
Can I do the SAP system copy from one server to another like the above procedure?
Thank you all.
Many regards,
Ruzica
Dear all,
Can You PLS look at my planned steps for TMS reconfiguration?
Is this ok?
For QTS and DEV.
1. Logon to the target system as user " SAP* " in client 000.
- Run transaction SE06 and select the radio button "Database Copy" and
click on the "execute" pushbutton.
- source system of database copy = (the same SID)
- Answer "yes" to everything
- Change all objects from <sid> to <sid>
Ans "yes" for "Delete TMS configuration" & "Delete TMS transport route
NB.
Should I delete (with SE06) the TMS configuration for PRD also (the transport domain)?
2. STMS from DEV and QTS and delete all systems.
3. STMS from PROD (client 000) if I was deleted the TMS config now I should create three system landscape with ProdQTSDevelopment and create the transport routes manualy
I have saved the transport route config
4. From DEV and QTS client 000, STMS -> other config -> Include system in domain
5. From PROD STMS->Overview systems -> select DEV -> SAP System -> Approve
and also select QTS -> SAP System -> Approve
6. Should I delete the RFC connections
[email protected]_PROD [email protected]_PROD before deleting the TMS config in PROD?
THANK YOU in advace again
Regards to all,
Ruzica
Similar Messages
-
Document Splitting-Migration steps
Dear Consultant,
Any body is having documentation regarding Document splitting Migration Steps.It is very very urgent.
Please help us.
Regards,
KalpanaHi
You need to migrate from Classic GL to New GL. With New GL Document Splitting comes with.
The following notes would be helpful to you.
1070629 - FAQs: New General Ledger Migration
1039752 - New G/L migration: Restrictions and important information
1030497 - SAP ERP 6.0: Public sector scenarios in new general ledger
1014369 - NewGL migration: Availability of Development Support
1014364 - NewGL migration: Information, prerequisites, performance
1006320 - Expenditure Certification: Certifying Payment Amounts
966000 - mySAP new general ledger and Joint Venture Accounting
890237 - New GL with document splitting: Legacy data transfer
Also you can have more indepth at http://service.sap.com/GLMIG.
Regards,
Suraj -
Hello,
I will be soon starting OS/DB migration for one of our customer here.
We have new hardware in place and should be ready by this weekend.
Customer wants to perform OS/DB migration from Linux MaxDB to NTOracle.
We are also talking to SAP sales people to update our License for
Oracle database and should get new SAP software very soon.
I would like to know the next steps about SAP involvement and what other steps and precautions ?
Please let us know the next steps in involving SAP into OSDB migration.
Does anyone has done such kind of migration ? if yes, please share your experience /documents and risks / mitigation's.
Thanks and Regards,
Nikhil.Hi Nikhil,
did you have a look at the SAP note "82478 - R/3 OS/DB migration" it also drives you to http://service.sap.com/osdbmigration
regards
Barthez -
Document Management System for sap mm point of view steps
Hi All.
Document management system for sap mm point of view steps required.
Thanks in advance for all sap mm forum members.
Regards.
ParameshwarHi,
Customizing settings can be collected by processes into Business Configuration Sets (BC Sets). BC Sets make Customizing more transparent by documenting and analyzing the Customizing settings. They can also be used for a group rollout, where the customizing settings are bundled by the group headquarters and passed on in a structured way to its subsidiaries.
BC Sets are provided by SAP for selected industry sectors, and customers can also create their own.
When a BC Set is created, values and combinations of values are copied from the original Customizing tables into the BC Set and can be copied into in the tables, views and view clusters in the customer system. The BC Sets are always transported into the customer system in which Customizing is performed.
Advantages of using BC Sets:
1. Efficient group rollout.
2. Industry sector systems are easier to create and maintain.
3. Customizing can be performed at a business level.
4. Change Management is quicker and safer.
5. Upgrade is simpler.
To create BC sets follow the below step:
Choose Tools ® Customizing ® Business Configuration Sets® Maintenance in the SAP
menu, or enter the transaction code SCPR3 in the command field.
Choose Bus.Conf.Set ® Create. -
Weblogic to JBoss Migration Steps Needed
Hi,
I am migrating from Web-logic 10.0 to JBoss 6.0. What are the migration steps I need to take care?
Any links is highly appreciated. I am looking at the following points:-
Code Organization
Deployment Descriptors
Security
JNDI (DataSource, JMS, etc)
EJB migration
Third Party Libraries
Clustering support
Thanks.Guys any response for this?
-
What are the steps to create sap apo ..plz send step by steps plzzzzzzzzzzz
what are the steps to create sap apo ..plz send step by steps plz. Iam new for these ?
what are the steps to create sap apo ..plz send step by steps plz. Iam new for these ?
-
ASO cube Migration Steps from Backend
Hi Gurus,
What would be the Essbase ASO cube migration steps from the Backend.
Edited by: Hkag on 18-Apr-2013 04:11found answer
Edited by: Softperson on 19/8/2010 17:53 -
Unable to login to SAP B1 after database migration
I would like to know how to login to SAP B1 after database migration. I export data from MSSQL 2005 and import data to MSSQL 2008 which is located in different server. I failed to login to SAP B1 with both current password and default password. It will prompt me the error 'User code or password is incorrect'. Is there any other login ID(current user ID is manager) or how I can change the password? Or is there any other way to transfer or migrate the database to a new server?
hi,
i am afraid your database is corrupted, try to make a full database backup from your SQL 2005 then restore it to your SQL 2008. also you can try another method, by detaching your Database from 2005 then copy the .MDF and .LDF then copy this 2 files in your new server, put it in your desired directory, then from your SQL 2008, attached the Database.
also, have one question, is your SA account in 2008 and 2005 have the same password? it must be the same.
regards,
Fidel -
Migration steps for moss 2007 to sharepoint 2010 and sharepoint 2013
Hi,
I need to learn migration steps from moss 2007 to sharepoint 2010 and sharepoint 2013.Can any one please explain the step by step procedure for this.What are the migration tools available.Please reply.
Regards,
PraveenHi Praveen,
This link describes the process:
http://www.winwire.com/moss-2007-to-sharepoint-2013-migration-using-database-attach-method/
Some paid tools for migration:
https://www.harepoint.com/Products/HarePoint-Content-Workflow-Migrator/Default.aspx?gclid=CM2l1v3m28MCFRVxvAodpq0AVA
https://www.avepoint.com/sharepoint-migration-download/?gclid=CPK17_fm28MCFQ1xvAodekAA8w
Thanks,
Nadeem
Please remember to up-vote or mark the reply as answer if you find it helpful. -
Needed SAP 4.7 installation guide step by step
Hi,
Please help me. I need SAP 4.7 installation guide step by step..
its urgent for me..Pelase send me .. i am requesting all of you.
my email id : [email protected]
Thanks
shrawanHI,
1: My laptop has Windows XP Media Centre Edition installed, Is SAP compatible with this OS?
>> SAP not recommends Windows XP Media Center Editions, probably someone has installed this but i would never prefer this if i install SAP 4.7 or any other versions .
2: I have a external hard drive of 80 GB. Is is possible if i install windows 2003 first on this external hard drive and then install SAP on that? And is 80 GB HDD is enough for installation requirement of Windows 2003 and SAP 4.7.
>> Yes it is possible to install windows2003 in external harddisk but you cannot believe on external harddisk during Sap insallation may be you are able to install successfully or may not be so i never prefered that, but 80 gb is enough for 4.7.
3: I tried to access the link provided by you to see the step by step installation process of SAP- but i am not able to access it as it is asking for the user credentials.
>> As you know you need a user id and password to login into that site, if you dont have software and installationguide then how will you install??
Note:As per my understanding
With Regards
Subhash -
Testing of SAP BW system after migration from OS Unix to windows
Hi Experts,
I am working on a project wherein testing of BW system is required after migration from OS Unix to Windows.
If any one has done same set of activities in past or has any idea of this, please share all major test steps required after migration.
Thanks in advance.
Regards,
NeerajHi Neeraj,
I will paste the list we used for our upgrade from 3.1 to 7.0. I removed some company specific details. Sorry for the "lay-out", it is copied from excel, this messes up the whole message.
best regards, André.
Preparation PHASE 1
Review New Functionality Review BW section on SAPNet for latest information on new release
Confirm Upgrade Timing (First Sat)
GUI Upgrade Install GUI's for Upgrade Test persons
"Check Prerequisites -Operating System
-SAP Kernel
-DBMS
-Disk space
-R/3 plugin
-BW software version and SP
Citrix.."
"Check Compatibility Reqs with other systems APO
ECC6.0"
Check Compatibility Reqs with 3rd party software ?
"Test Team 2004s Delta Training To
have idea on new functionality
not have confusion if looks different.."
"End User Communication: upgraded system and changes e.g. right vs left click
- send out communication twice"
End User Communication: several "look and feel" sessions NOTE: incorporate WISBECH !!!
Setup Portal connected to BW QA for testing once upgraded Setup Portal connected to BW DEV for testing once upgraded
Check best go live date - based on assuption 2 days needed
Determine test set - based on input BS / KU
Estimate resources Business for testing
BluePrint PHASE 2
Check/CleanUp Development Objects Check all open and not-released developments for release prior to upgrade
Prepare System Setup Prepare (if needed) flat-files for test loads
Check OSS for release notes on objects Each functional area should check out OSS for release notes on objects (for changes etcu2026, new functionality)
"Prepare (detail) list of objects to be tested Complete list of objects to be tested, special attention to custom/non-standard programs, enhancements. List of:
- extractors
- process chains
- reports"
"Setup delta mechanisms (create transaction data) BackEnd Test: Financial Extraction and load, process chains
u2022tbd
u2022
u2022 "
Verification / creation of process chains Check existence of to-be-tested process chains; if none, create 'sample' process chains
Realization PHASE 3
Prior to Upgrade: Install any necessary frontend software
Prior to Upgrade: Install any necessary frontend software (end-users)
Prior to Upgrade: Complete any extraction - suspend V3 and scheduled BW jobs
Create Sandbox
Connect Sandbox to external systems (connections/BDLS)
Pre-upgrade steps
Perform Upgrade of BW
Check connection with R/3/APO
Perform system backup
"BackEnd Test: Logistics extraction and load, process chains
u2022 Z_example_CHAIN
u2022 2lis_03_BF and 2lis_03_BX Test:
- Extractor within process chain preferably otherwise mimic behavior (drop index, load, rebuild, aggragate etc)
- Delta extraction"
"BackEnd Test: Sales Extraction and load, process chains
u2022 Z_SALES_1
u2022 all lis extractors:
u2022 12_vcitm
u2022 13_vditm
u2022 11_vaitm
u2022 11_vahdr
u2022 11_v_ssl
u2022 11_vasti
u2022 12_vcscl
u2022 selection of z-extractors
Test:
- Extractor within process chain preferably otherwise mimic behavior (drop index, load, rebuild, aggragate etc)
- Delta extraction"
"BackEnd Test: Financial Extraction and load, process chains
u2022 0FI_GL_4
u2022 NOTE: no further extractors are chosen for testing
u2022 tbd Test:
- Extractor within process chain preferably otherwise mimic behavior (drop index, load, rebuild, aggragate etc)
- Delta extraction"
"BackEnd Test: Master Data... Extraction and load, process chains Test:
- Extractor within process chain preferably otherwise mimic behavior (drop index, load, rebuild, aggragate etc)
- Delta extraction"
"BackEnd Test: Zxxx Extraction and load, process chains
u2022 Z_TRANSACTION_DATA
u2022 Zxxx
u2022 Zyyy Test:
- Extractor within process chain preferably otherwise mimic behavior (drop index, load, rebuild, aggragate etc)
- Delta extraction"
"BackEnd Test: Plant Maintenance Extraction and load, process chains Test:
- Extractor within process chain preferably otherwise mimic behavior (drop index, load, rebuild, aggragate etc)
- Delta extraction"
BackEnd Test: PP Extraction and load, process chains Test: load from Zxxx
"BackEnd Test: Purchasing Extraction and load, process chains Test:
- Extractor within process chain preferably otherwise mimic behavior (drop index, load, rebuild, aggragate etc)
- Delta extraction"
"BackEnd Test: APO Extraction and load, process chains
u2022 ZAPOxxx
u2022 ZAPOyyy
u2022 others can be tested, but were not included in de testset Test:
- Extractor within process chain preferably otherwise mimic behavior (drop index, load, rebuild, aggragate etc)
- Delta extraction"
BackEnd Test: Regular Schedule - Production
BackEnd Test: Flat file upload Test: 2 types from server and PC
BackEnd Test: Test Admin Workbench: creation of objects, change existing Test the Admin Workbench: creation of infoobjects, change infoobject, create/change hierarchy, create cube,u2026
BackEnd Test: Test Bex: creation of queries (kf etc...); change existing Creation of new query/ change query, create condition, calculated/restricted kf, variables,..
BackEnd Test: Issue handling
Development box issue fixing - on forehand apply fixes based on issues BWQ
FrontEnd Test: Run Logistics Reports (log results in Reports tab) Run reports, execute various navigation steps, make sure to execute each item of menu paths,validate no loss of functionality, report new functionality. Run few managed bookmarks
FrontEnd Test: Run Sales Reports (log results in Reports tab) Run reports, execute various navigation steps, make sure to execute each item of menu paths,validate no loss of functionality, report new functionality. Run few managed bookmarks
FrontEnd Test: Run Supply Chain Reports (log results in Reports tab) Run reports, execute various navigation steps, make sure to execute each item of menu paths,validate no loss of functionality, report new functionality. Run few managed bookmarks
FrontEnd Test: Run Financial Reports (log results in Reports tab) Run reports, execute various navigation steps, make sure to execute each item of menu paths,validate no loss of functionality, report new functionality. Run few managed bookmarks
FrontEnd Test: Run Controling Reports Run reports, execute various navigation steps, make sure to execute each item of menu paths,validate no loss of functionality, report new functionality. Run few managed bookmarks
FrontEnd Test: Run Master Data and Special Reports (log results in Reports tab) Run reports, execute various navigation steps, make sure to execute each item of menu paths,validate no loss of functionality, report new functionality. Run few managed bookmarks
FrontEnd Test: Run PM Reports (log results in Reports tab) Run reports, execute various navigation steps, make sure to execute each item of menu paths,validate no loss of functionality, report new functionality. Run few managed bookmarks
FrontEnd Test: Run Purchasing Reports (log results in Reports tab) Run reports, execute various navigation steps, make sure to execute each item of menu paths,validate no loss of functionality, report new functionality. Run few managed bookmarks
FrontEnd Test: Run APO Reports (log results in Reports tab) Run reports, execute various navigation steps, make sure to execute each item of menu paths,validate no loss of functionality, report new functionality. Run few managed bookmarks
FrontEnd Test: Issue handling
FrontEnd Test: Make before image of reports - Production Run reports; save of before image to compare once upgraded
FrontEnd Test: Run All Reports - Production Run reports, execute various navigation steps, compare with 'before image' taken in prevous step
Test Security Test security with various end-user roles/IDS other than BW developer (usually has * ALL)
Test Portal integration Test portal with various end-user roles/IDS other than BW developer (usually has * ALL)
Edited by: A. Nagelhout on Feb 12, 2010 10:50 AM
Edited by: A. Nagelhout on Feb 12, 2010 10:50 AM
Edited by: A. Nagelhout on Feb 12, 2010 10:52 AM
Edited by: A. Nagelhout on Feb 12, 2010 10:52 AM -
Migration Steps - Crystal Reports 2011 to Crystal for Enterprise
Hi All,
I am trying to collate steps for migrating Crystal Reports 2011 to Crystal for Enterprise. I tried to hunt for a suitable document on this forum which will give me a detailed steps or an overview of what steps are involved in doing the migration, however i am unable to get the required information (My searching skills may not be good enough). May i request to assist in finding a document / steps for the migration.
Regards,
Yogcheck this link.
http://scn.sap.com/docs/DOC-39423 -
Any course on BW on HANA SP3? and Migration steps from BW to BW on HANA.
SAP Provide any course for BW 7.3 on HANA 1.0 SP3? Any Idea about - RBWHDB ? Any information ( Steps ) for Migration from Bw to BW HANA?
Hi All,
1. Can you Pl provide me information ( Steps ) for Migration from Bw to BW HANA?
2. From BW data modelling perspective what are the additional efforts required after the migration?
3. And what abt the existing old BW objects like data cubes, DSOs, reports, process chains after migration to BW on HANA?
Thanks in advance,
Priya. -
SAP BW on HANA Migration for Process , Bex Queries and system Copy
Hi All ,
Can you please let me know the steps for migrating Process chains , BW queries and System copy for BW on HANA .
If you have examples from real time scenarios it would be good .
Thanks in advanceHi,
for Systemcopies see also - SAP First Guidance - BW Housekeeping and BW-PCA
for the overall process - SAP First Guidance - Migration BW on HANA using the DMO option in SUM
Best Regards Roland -
Hi experts
We are going to do livecache migration from 64 bit [platform to 32 bit platform. and our SAP version is APO 3.1 and Livecache is 7.4.2.30( used for Planning area). What are the steps is involved in the migration for the Livecache. If it is success what are the steps there are to check the data and if it fails what are the steps there to revert back to the old one. what is the time calculation we can take for the migration and down time time required and time rate for the data transfer. i need clarification both in techinical and functional way.
please help.
Regards
balahi
Please anyone can help in this issue.
regards
bala
Maybe you are looking for
-
AirPlay no longer recognized by iOS devices. Is recognized by OSX devices.
I've trolled the discussion forums but to no avail. Airplay was working last night on my iPhone and iPad, but it no longer is recognized: I don't have the AirPlay icon in the doc or in the volume controls within the apps that it used to appear in. It
-
Push Notifications and slowness
Has anyone been experiencing general slowness on some applications with push notifications enabled? I was complaining to one app support person about how slow their application loaded but found out that if I disabled the push notifications, the app l
-
Two TOs got created for a single Posting Change
Dear All, A material document with movement type 309 got posted in a plant where WM is active.Here the material is moving from one batch to another batch. The material document has 100 items.For each item when this movement happens a Posting Change w
-
All my photos are missing in iphoto 4.0.3.
All the photos are missing in my iphoto 4.0.3. The files are on the side under source but the screen also stays blank in every file. What to do?
-
Features missing in production server
Hii, I have an application where i have file upload and download features.The features of file upload and download is visible in development server but not in production server. Any clues on this ??