SAP Reference IMG, IMG Information, Project Analysis

Hi Experts,
SAP Reference IMG is use for Configuration or customizing purpose, why do we use IMG Information and IMG Project Analysis.
in real time. please reply
Thanks in advance
Regards,
Raj

Well IMG information is used for analysis of the sepecific project for which you have generated the IMG .
Here you can decide the scope of the project and assign the same to the IMG along with responsible head.
For eg. if you are running 2 simultaneous projects in a co. then you can generate 2 IMG for diffrent projects , so you have a track of the same .
Regards ,
Dewang

Similar Messages

  • Difference between SAP Reference IMG & Project IMG...

    Hi SAP Gurus,
              Can anyone explain me about the difference between
              SAP Reference IMG & Project IMG...
    Thanks in advance,
    Praveen.

    Hi !
    The SAP Reference IMG contains alle the customizing functionallity of SAP.
    Within a Project IMG you can restrict the availible customizing function.
    Thinking about having an MM project. When you create an "MM" Project IMG you will only "see" MM relevant customizing functions in your project IMG.
    Regards
    Rainer
    Some points would be nice if that helped.

  • Adding custom nodes in SAP reference IMG and accessing them using SM30

    I was able to successfully add an IMG node and few activities under the node (for our custom configuration table data entry) in SAP reference IMG. (using transaction SIMGH).
    However, when I execute transaction SM30, enter the name of the custom table and hit the button customizing, it does not take me to the appropriate node in IMG. It simply doesn't do anything.
    For any SAP table or view, this works like a charm (wherever SAP has configured the nodes). But when we create custom nodes for custom tables, it does not work.
    What steps am I missing?
    I will really appreciate any help you can provide.
    Jitendra Mehta

    Hi Sree:
    I assume you have either created your view maintenance for Z tables or you have created transaction attaching calling SM30 for view maintenance of your Z table.
    You may go in transaction SIMGH and in SAP reference IMG, create a main node (wherever your end client wants you to put it) and under this node, you can create sub-node for each view maintenance with a suitable description of sub-node.
    Once you save and activate, you are done.
    Then you can execute transaction SPRO and you should see your custom nodes wherever you attached them in the tree.
    I hope I understood your problem and have answered it.
    If not, please let me know and we can discuss it further.
    Thanks.
    Jitendra Mehta

  • Can't find voice in SAP reference IMG

    Hello,
    We are currently upgrading to Release ECC 6.0 and we need an help about the treasury conversion. The User Guide say that before we can begin with the conversion we must do some settings. For example "Valuation classes", the guide say that are maintained in the SAP reference IMG under:
    Transaction Manager
    -> General Settings
    --> Accounting
    ---> Settings for Position Management
    ----> Define and Assign Valuation Classes
    But if we search this voice in SPRO transaction we can't find it. Where we wrong? We need to install something?
    Thanks in advance for your help
    Regards

    Jupp... the path is correct I just verified.
    So just some guessing here:
    Guess 1: Complete Path starts with: "Financial Supply Chain Management" --> "Treasury and Risk Management" --> "Transaction Manager" --> "General Settings" --> "Accounting" --> "Settings for Position Management" --> "Define and Assign Valuation Classes"
    Have you started with right path with "Financial Supply Chain Management"??
    Guess 2: Your system is still technically NOT upgraded? (< Enterprise 2.0). Well then you might first need to:
    a) technical upgrade
    b) Customization (see migration guide)
    c) Conversion with transaction: TPM_MIGRATION
    This is why it's advisable to have some "dry-run" migrations to check everything is working correct as expected.
    However when you struggle with these settings it's very much advisable to include SAP Consultant (or SAP Partner) that have experience in this process and can give important recommendations. As the guide points out: this are very important setting that can not be changed after conversion, but they determine on how the systems position position management code will work after migration.
    So please watch out!

  • Add own Customizing in SAP Reference IMG

    Hi all,
    i want to add some of my own customizing into the SAP Reference IMG Tree.
    I created with transaction SIMGH a new structure for my things.
    But how will i get this structure into the SAP Reference IMG  Tree?
    I want to have it under the node "Logistic Execution->Shipping->Picking"
    I want to do this in my developing system, and transport it to customers.
    When i use transaction S_IMG_EXTENSION , it warns me that i will do a modification, is this the right way ?? can i transport this modification to customer systems?
    Regards
    Steffen

    Hello Steffen,
    Ofcource you can add your own customizing in SAP Standard IMG.
    If you want to do any changes in SAP delivered IMGs, then you should do it using enhancement ID. The transaction for this is S_IMG_EXTENSION..
    If you do any changes in standard SAP customizing and if you later apply any SP or upgrade, then there are changes that your changes will be over-written by the standard SAP IMG again. But if you do it through enhancement ID then these changes will remain even after system upgrade. Enhancement ID (also known as Extension ID) can be used to encapsulate your changes to the standard objects.
    If it helps then please reward points.
    Best regards
    Mayank

  • SAP Implementation Guide (IMG)

    Hi everyone, please assist me. I am failing to Maintain Evaluation Paths by accessing the SAP Implementation Guide (IMG) on the system. Where can i find the (IMG) tab

    IMG--> Personnel Management --> Organization Management --> Basic Settings --> Maintain
    Evaluation Path

  • With reference to contract Purchase Order Analysis report.

    Hi,
    I need SAP Standard " With reference to contract Purchase Order Analysis report"
    Regards,
    Priya.

    Hi,
    there is no standard report to get the PO list wrf to contracts,
    but you can get through SE16 from the table EKPO, where you have to pass the contract numbers ( get through ME3L,ME3M or ME3C ) in the field KONNR,
    lakshmi reddy

  • Project Analysis Workbench

    Dear Experts,
    Greetings to one and all.
    I am using the transaction CNPAWB (Project Analysis Workbench). After executing the transaction i am exporting the file to my local system in the excel format. I edit some values in the exported file and try to import it back to the SAP system.
    However when i am trying to import the edited file system is throwing an error as "OBJNR is missing in the uploaded file". I tried changing the layout of the screen in SAP with the object number being displayed, exported it to the local system and then edited the file again in my local system. Still when i try to upload the edited file system is throwing the same error " OBJNR is missing in the uploaded file".
    Request all the experts to kindly help out in solving this issue asap since this is an important component in our implementation exercise.
    Thanks & Best Regards,
    Gokul

    Hi Gokul,
    Plz refer this it may give u some inf:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/db/7c2d8d7a3541d998e8dd56a36e21fc/content.htm
    Importing and Exporting Data 
    Use
    You can export the data that you have called up in the progress analysis workbench to Microsoft® Excel, where you can change it before importing it back into the progress analysis workbench.
    Exporting Data
           1.      Call up the data for your project objects.
           2.      Choose Progress Analysis ® Export ® Excel.
           3.      Choose the required view (table or pivot table).
           4.      Choose Enter.
    The system displays the data in Microsoft Excel, where you can change the following values:
    ¡        For WBS elements and activities:
    §         Percentage of completion
    §         Customer-defined fields
    §         User fields
    §         Dates (actual and forecast dates for activities; basic and actual dates for WBS elements)
    ¡        For milestones:
    §         Percentage of completion
    §         Dates (basic, forecast, and actual)
    Importing Data
           1.      On the initial screen for the progress analysis workbench, choose Progress Analysis ® Import ® Excel.
           2.      Select the Microsoft Excel file that you want to import.
    The system imports the data into the progress analysis workbench, and updates the changed values in the SAP system.
    You can only upload project objects that have a number.
    Dates must have the format: mm-dd-yyyy.
    Regards
    chandra

  • Issue with user mapping and SAP reference system

    Hello Gurus,
    I have this strange system behaviour when preparing my system for single sign-on using user mapping.
    Case 1.
    In the user management property category, I have the following defined.
    Authentication Ticket Type - SAP Logon Ticket
    Logon Method - UIDPW
    User Mapping Fields  -
    User Mapping Type - admin, user
    In the alias editor, I defined the default alias as SAP_PRD
    Result= when I go to identity management to assign the reference system (the default alias - SAP_PRD)...I do not see the system alias there.
    Case 2:
    In the user management property category, I have the following defined
    Authentication Ticket Type - SAP Logon Ticket
    Logon Method - SAPLOGONTICKET
    User Mapping Fields  -
    User Mapping Type - admin, user 
    In the alias editor, I defined the default alias as SAP_DEV
    Result, when I go to the identity management to assign the refernce system (the default alias - SAP_DEV), I see it there.
    What might be my issue? Does it mean I can't assign SAP reference if I am using UIDPW as logon method?
    Please help me.

    Hi Mahesh,
    Thanks for the feedback. I am relatively new to EP...so please I won't mind if you can guide me on how to go about this.
    This is what I did...
    I chose System Administration > Permissions
    In the PCD, I located my system with the alias, SAP_PRD
    It opened up the permission assignment area.
    Now I have these permissions set
    Administrator - Full Control
    Administrators - Full control
    com.sap.caf.eu.gp.roles.superuser - Full control
    Everyone (built in group) - Full control
    Everyone (Everyone role)- Full control
    super_admin_role - Owner
    For all the above End User box is checked.
    I can't find anyone end user group .
    Once I pick UIDPW, the alias disapperars from the reference system list.
    Please help.

  • Exporting projects that reference images in other projects

    Hello, all. I'm wondering if anyone out there has had luck exporting projects that reference images in another project. I've just given this a try, and I get empty images (dotted gray outlines that can't be multi-selected and can't be "managed" as referenced files, even though it knows where the original file should be).
    Here's how I have things set up:
    1. main project with referenced images
    2. secondary project with an album that references images in the main project (secondary project shows 0 images, but album in secondary project shows N images)
    I export the secondary project, and import it into another Aperture instance. All images show up as dotted outlines.
    Furthermore, if I go into list view, the Activity Monitor does something bizarre. It shows the # thumbnails remaining as a moving target. See the video below for an example.
    Any help would be greatly appreciated. Thank you!
    Screen captures:
    Missing images as dotted outlines:
    http://echeng.com/temp/aperture-missing-images.png
    Small video of thumbnail creating bug:
    http://echeng.com/temp/aperture-thumbnail-bug.mov

    I do this sort of thing constantly and things a whole lot more complicated. It works fine on all three of my laptops and my macpro. I actually just tried to simulate the exact conditions you describe and I will tell you what happened.
    1)Create new empty project in library A called "export"
    2)Create new empty album in that project.
    3)Dragged multiple images from different projects (all referenced) into that new album.
    4)Used file->export project with the consolidate images checked. Imported that project into a new/different library.
    All of the images showed up and they all showed up as managed masters as expected. So I then relocated the masters from that project and did the same thing in reverse, back to the old library. I ended up with another project called "export (1)" with all of the images referenced and having nothing to do with the original project or the original referenced masters - as expected.
    I did the testing not to figure it out but to validate that nothing had changed or broken since the last update.
    You are either not doing what you think you are doing or your library/library is forked - you may want to try a rebuild or just create a brand new set of libraries and try to validate that it will work with a brand new set of libraries to try to isolate the issue to 1 - your existing libraries or 2 - your installation.
    RB

  • SAP-BO SPM VS Ariba Spend Analysis

    Hi friends,
    I have a question here..
    Can someone help me to explain, what is the difference between SAP-BO SPM and Ariba Spend Analysis?
    Thank you very much.
    Theresa

    Hi Syed,
    I agree with Waman comments and would like to add few more points to it.
    As you may already know, IT systems are divided into OLTP and OLAP. SAP ERP falls into OLTP which is live. and BI falls into OLAP which is historical.
    Though you are not using COPA for forecasting and planning purposed I don't think you can completely eliminate it.
    More over as as Waman said, You can't use COPA only for reporting purposed without posting to it first.
    Hope it explains.
    Regards,
    Sudhakar*

  • Want to do PhD in SAP /ERP System / Managment Information System

    I want to Full time PhD in SAP / ERP System / Management Information System in SAP Related Area with scholarships.I have done Master of technology in Information technology from Jadavpur University ( india).I have 2 years I.T experience in I.T and Academics if you can give any helpful information on that I will be grateful to you.
    Thanks
    Sayanta Mallick

    Hello,
    As an active UA member, we are interested in supervising PhD students in SAP related areas (Business Intelligence in my own case). Please be aware that, as a student, your PhD would need to have a focus on the challenges and issues in the area (many are noted in both the threads on the Community Network) and not on SAP technology per se - though you may well use SAP technology or additions to it to develop/demonstrate solutions to issues and challenges.
    We offer full and part-time study options and details can be found at the following URL:
    http://www.brunel.ac.uk/about/acad/siscm/disc/pg/phd
    I do not mean to use this as an advert for my institution in particular - as noted in other posts there are many choices open to you.
    Mark Lycett
    Professor of Information Systems Development
    School of Information Systems, Computing and Mathematics
    Brunel University, UK.

  • How to find business process diagrams of SAP reference model

    hello guys,
      I am reading book 'SAP R/3 Business Blueprint: Understanding Enterprise Supply Chain Management' recently. In this book, the author shows many EPC process diagrams of SAP reference model,but how could I find the process diagrams in SAP system.
      I google this 'SAP Reference model', and find transaction: SB09 Business Navigator-Process view. But I can not find this transaction in IDES4.7or ECC6 IDES.
    Thanks.
    Edited by: Justin on Jul 2, 2009 10:20 AM

    Hi RK v ,
    I really don't know what your actual requirement is , but if you want to know the objects as per the modification , then transport request will be much help to you .
    Have a look into table E070 and E071 .
    Regards ,
    Yogendra Bhaskar

  • Sap-ps peoject and microsoft project transfer?

    Hi,
    I think creat a link from sap-ps peoject to microsoft project transfer or from microsoft project transfer to sap-ps peoject ,
    include operate creat/change/delete etc.
    I hope to gain this user manual ,how can I creat  in two system.
    Thanks!

    Hi,
    SAP-PS & MSP interface can be obtained through Open PS. SAP has provided Open PS for downloading & uploading projects from MSP to SAP-PS & vice versa. Open PS can be downloaded from service.sap.com. Please follow the URL to know more details on same. http://help.sap.com/erp2005_ehp_02/helpdata/en/4c/22698846e611d189470000e829fbbd/frameset.htm
    You can also refer various threads on Open PS posted in this group.
    Hope this will help you.
    Regards,
    Rakesh Pradhan

  • Question about Managing SAP ERP 6.0 Upgrade Projects

    Hi experts,
      Some questions in this link(google: Managing SAP ERP 6.0 Upgrade Projects and download PDF)
    http://www.google.com.tw/url?sa=t&rct=j&q=Managing_SAP_ERP_60_Upgrades_SAP_PRESS_sample&source=web&cd=4&ved=0CDgQFjAD&url=http%3A%2F%2Fmedia.techtarget.com%2FsearchSAP%2Fdownloads%2FManaging_SAP_ERP_60_Upgrades_SAP_PRESS_sample.pdf&ei=vTsVT7PKI4T6mAXL0czcAw&usg=AFQjCNFq83vYG3k14xC5tcoYy96PfllYFw
    1. Is figure 5.3 in page 165 correct?
    I think it should be
    Temporary system: DEV 6.0
    Productive system: DEV' 4.6C -> QAS 4.6C -> PRD 4.6C
    2. Is this transport route possible?
    "During this phase, you continue dual maintenance of the development
    systems. You also transfer changes that you make in DEV' to DEV, and
    transport changes to both quality assurance systems."
    DEV' 4.6C -> DEV 6.0 -> QAS 6.0 -> QAS' 4.6C
    If we modified some standard programs and transport between two different SAP versions, I think the programs can't work, right?

    > 1. Is figure 5.3 in page 165 correct?
    > I think it should be
    > Temporary system: DEV 6.0
    > Productive system: DEV' 4.6C -> QAS 4.6C -> PRD 4.6C
    >
    > 2. Is this transport route possible?
    > "During this phase, you continue dual maintenance of the development
    > systems. You also transfer changes that you make in DEV' to DEV, and
    > transport changes to both quality assurance systems."
    > DEV' 4.6C -> DEV 6.0 -> QAS 6.0 -> QAS' 4.6C
    > If we modified some standard programs and transport between two different SAP versions, I think the programs can't work, right?
    Here, you need to do manual replication between both development system. No transport is possible because of different versions. I am not sure about the document that you posted but same is explained very well in upgrade guide. Please check there.
    Thanks
    Sunny

Maybe you are looking for

  • Hard disk drive doesn't appear on home screen

    I have a external hard disk drive in NTFS. I have there a lot of data I need to transfer to my new Mac, so I can't erase nothing from there. I installed MacFUSE and Paragon 9 to correct the issue, but after that, the drive just didn't appear anymore

  • I cant upgrade to Snow Leopard 10.6.3 from 10.5.8

    I've recently done a complete clean install on my imac and run Mac OS X 10.5.8 (233 Ghz Core 2 Duo) (2 GB) - The computer is now running very very well and fast. Prior to the re-install I was running Lion 10.7 I am now trying to re-install Snow Leopa

  • Extended Rebate Agreements

    HI All Gurus, We are using the SAP ECC 5.0 Version. My Client Requires certain features which can be handled through Extended rebate agreements. As per the documentation. Can Anyone help in how to activate the Extended Rebate Agreements. Thanks in Ad

  • İphone-itunes music sync problem

    İ bought an iphone 5c yesterday.My old 4s has got lots of music.And i had an clear itunes now.İ want to transfer 4s s musics to itunes.So i can transfers 4s musics to 5c.Can someone help me?

  • How can I get data from an incomplete back up?

    There is an 18GB incomplete backup on my icloud storage. The phone was lost and I need to retrieve at least some of the data, files, pictures, etc? Howe can I get access to the data inside of an incomplete backup?