SAP - SEM-CPM (cockpit)

Hi all,
I have implemmented a SEM-CPM system in my company, what ussually was done in a 25 queries, now is done in a cockpit, but it lasts too much (around 8hours), and every user that wants to access to it, has to wait this time. Is there any way to keep these results for different users and sessions?
I know that it can be calculated evry logic view independiently, but I would like to execute every one at the same time, and keep this data for different ussers and sessions, so they can navigate throught a past calculation of results, and refresh these results as wanted. Is this posible?

Someone has suggested me "information Broadcasting".
But Information broadcasting is typically used to publish and persist reports for multiple users. Can this also be applied to SEM-CPM's results for the frames?
PLease, help me, it is quite important.
Thanks in Advance.

Similar Messages

  • Frame texts view via web in SAP SEM-CPM-MC

    Hi
    I have an error message when use the UMM_PRES_WEB transaction for Management Cockpit (BW-SEM-CPM-MC): there are hieroglyphs in frame title instead of normal cyrillic when i'm trying to view some frames via WEB in russian language, or when i'm using english language i see normal text but it does't have right format. Another texts view correct even in cyrillic.
    Version of system: SAP_BW 700 0016

    Hi
    I have an error message when use the UMM_PRES_WEB transaction for Management Cockpit (BW-SEM-CPM-MC): there are hieroglyphs in frame title instead of normal cyrillic when i'm trying to view some frames via WEB in russian language, or when i'm using english language i see normal text but it does't have right format. Another texts view correct even in cyrillic.
    Version of system: SAP_BW 700 0016

  • SEM-CPM  Cockpit  problem with tachomter chart: only one pointer shown

    Hello
    I'm using the CPM - cockpit design transaction , UMC_CPM_MEAS, to configure a cockpit frame with a TACHOMETER graph. When I use just one data series   and compare current period vs previous period for example, I get a correct graph presentation with the two pointers, but, when I use two data series in order to compare them (for example real vs plan) I'm not able to fill the second pointer measure in the graphic design window and obviously the graph shows just one pointer.
    Please, help me in customizing the graph correctly.
    Thanks in advance

    Hi Ludek,
    That is exactly what I was doing, but, the problem is that I can't assign a keyfigure to the sencond pointer in the Graphic Design step. Although, in Graphic Assigment tab I fill information for the second pointer, it is lost and never remains in the definition and of course it doesn't appears at graphic presentation.
    As Kai suggest, there is a way to set Use Categories and Data Index, but, where  can I do that?, following the step by step procedure to configure the cockpit frame, there is no a step to set up those properties.
    Thank you

  • Web Cockpit developent (SEM-CPM or VC or something else)

    This question is intended for SAP Development team or Product management team. We are looking to make a strategic decision about the tool set to build BI Cockpit on the Web.
    SAP has competing technologies, which can deliver the cockpit on the web and as a customer we need to make a choice that is right for at least next 3-5 years. We do not want to develop the cockpit using the technology that is not moving ahead with SAP development.
    Our current environment: BW 3.5, EP 5.0 system. Plan to upgrade EP 6.0 in next 3 month.
    As per my understanding, following are the tools that can be used for development of web cockpit.
    1)  Web Application Designer with or without any Java scripting.
    2) SEM-CPM (Corporate Performance Monitor).
    3) BSP (Business Server Pages) /HTMLB - 
    4) Visual Composer with EP.
    Customer’s business team has seen SEM-CPM and inclined to use that. As a IT team we want to choice the right tool set.
    Following are my questions:
    1) SEM-CPM: Does it have good foot print at SAP Customer base? Is it good tool to develop the Cockpits as primary tool set? Is SAP developing this technology in the future? I have not seen any updated white paper or documentations in service.sap.com after 2003.
    OR
    2) Visual composer is the right tool. Visual composer allows the BW and Non BW Data presentation. For our purpose, all data will be in BW and BW queries will be the only source for the cockpit.
    As IT team, we want to avoid using Java Script or other programming process because of the support & maintenance issues involve.
    Please help and provide comment or suggestions.

    Hi,
    SEM-CPM is not a very flexible tool. We have to live with its limitations. We cannot customise to suit client needs. There are limitations in chart types also. If customer uses excel based charts for metrics currently, check whether they are possible thro' CPM. Please also check the latest version of SEM-CPM.
    I would request to considering other alternatives as suggested ike Web cockpit based on Web Application Designer with or without any Java scripting.likes or BSP (Business Server Pages) /HTMLB or VC (not worked on this).
    reg,

  • SEM CPM - Management Cockpit

    Hi Guys,
    Currently we are working on creating SEM CPM management cockpit and the requirement is as follows,
    1.we need to diplay one of the query result directly in the dashboard.(without any graph)
    2.We need to create a table display with 3/4 KPI's which belong to different query(for the last 3 months). eg
         Month1  Month2  Month3
    KPI1        x                 x              x
    KPI2        x                 x              x
    KPI3        x                 x              x
    It would be great if you could help us on the same.
    Thanks,
    Suthakar M

    Hello Ashok,
    In my opinion, this tool cannot be used in Business Objects.
    Our [end user documentation|http://service.sap.com/~form/sapnet?_SHORTKEY=01100035870000713358&_SCENARIO=01100035870000000202&] does not have any comment. I recommend to post this query to the [BusinessObjects Enterprise Administration|BI Platform; forum.
    This forum is dedicated to topics related to administration and configuration of BusinessObjects Enterprise, BusinessObjects Edge, and Crystal Reports Server.
    It is monitored by qualified technicians and you will get a faster response there.
    Also, all BOE Administration queries remain in one place and thus can be easily searched in one place.
    Best regards,
    Falk

  • SEM CPM Management Cockpit in Business Object

    Hi,
    Can the Cockpit used in SEM-CPM module can be created using Business Objects?.
    if so, is there any documents or links which can give an idea?. I got an initial response from BO General forum that it cannot be done, but i would appreciate if this gets answered from this forum as well.
    Please let me know.
    Regards,
    Ashok v

    Hello Ashok,
    In my opinion, this tool cannot be used in Business Objects.
    Our [end user documentation|http://service.sap.com/~form/sapnet?_SHORTKEY=01100035870000713358&_SCENARIO=01100035870000000202&] does not have any comment. I recommend to post this query to the [BusinessObjects Enterprise Administration|BI Platform; forum.
    This forum is dedicated to topics related to administration and configuration of BusinessObjects Enterprise, BusinessObjects Edge, and Crystal Reports Server.
    It is monitored by qualified technicians and you will get a faster response there.
    Also, all BOE Administration queries remain in one place and thus can be easily searched in one place.
    Best regards,
    Falk

  • Integrating VDT with Managment Cockpit in SEM - CPM

    Hi ,
    I am working with Managment cockpit in SEM-CPM. I want to integrate my Value Driver Tree ( VDT ) to my Managment cockpit.  Can anybody tell me the procedure of the same.
    Thanks & Regards,
    MANDAR

    hi mander,
    follow this link.
    https://help.sap.com/saphelp_sem320bw/helpdata/en/1b/3131375fc9342ae10000009b38f839/frameset.htm
    look out at the cpm-vdt node of this link.hope it will provide you the information you need.

  • SEM-CPM  Execute a new Cockpit

    Hi Gurus,
    Im new one in SEM-CPM, i have created a new cockpit without any issue, but after i released and assigned into the hierarchie , How can i Execute it ?
    Regards

    I resolved by my own.

  • SEM-CPM: Autorizations for cockpit

    Hi friends.
    I have installed a SEM CPM for a client but I have a question: how can I conceed autorizations for a cokpit for some users?
    Thanks!

    You need to add the transaction to the cockpit in BW and than you need to make sure that the users are authorized to the authorization objects that are applied in the query that run in the cockpit.
    I hope this help.
    Antonino

  • Connect more than 1 external BI in SEM-CPM-BSC or SEM-CPM-MC

    Hello,
    I have seen the help.sap.com that helps me how to put a defined BI (but only one BI).
    Design -> Default BW System
    Design -> Access to SAP BW
    Design -> RFC Destination for Project System
    But what we have is 3 BI systems. Each one with one module (HHRR, FI, SD). We want to join those BI modules into the SEM CPM. But I don't see how to put those 3 external BI in my CPM.
    Please help me...
    Best Regards...
    Pablo Mortera.

    There're several ways:
    1.- Create remote Cubes where you get your queries. Then once the SEM system you will have a Cube that really is a "remote" cube in another system. This will also help by creating a MultiCube, related to the cubes created before...this way you have a big datamart (really a knowledge mart;-) ) that has all of the data/information related in one view.
    2.- In the local BW system, you may create local InfoProviders that are being fed by remote BW systems as InfoSources. (You'll have to create the InfoSources and copy the data loads in the local BW System)
    Hope this helps.
    Cheers.
    Jesus

  • SEM CPM

    Hi,
    I am new to SEM. I tried to search the forum for some documentation. Everyone referred to help.sap.com and service.sap.com/sem. In service.sap.com/sem I didn't find any documents for sem documentation. Help.sap.com doesn't have any examples.
    My first task on SEM CPM is to create dashboards.
    What is the best approach to learn CPM ?
    Thanks,
    GSM.

    Hi GSM,
    Refer the links below
    http://help.sap.com/saphelp_sem40bw/helpdata/en/1f/3131375fc9342ae10000009b38f839/frameset.htm
    https://websmp203.sap-ag.de/sem -->
    In Strategic Enterprise Management node --> Media Library -->  Presentations --> SEM CPM (and also Literature section)
    Hope it helps,
    Sree

  • SEM-CPM-MC: Creating CPM variables

    Hi,
    I know this is probably not the right place to post it, but I couldnt find a better place.
    I trying to create a variable in SEM-CPM-MC, but no matter what I do, I'm only able to create a runtime variable with selection type P - Variable for single value. I can select the other values, but when I save the variable SAP automatically corrects it to Singe value again. I can also create a design variable with the other types, but not a runtime variable. How do I create a variable for which you can enter an interval?
    In the documentation it also says, that you should be able to create variables on a frame level. I don't see any button where I can create a variable on a frame level. I've done exactly as it says on help.sap.com, but I don't have a button to create a new variable on a frame level. How do I do that?
    Any help is appreciated and will be rewarded generously :o)
    Thanks,
    -J

    hi Yaj,
    yes, there are business content, sap measure catalog, measures, strategy tempates, bw infocubes, etc.
    you can activate single or mass, go to sap measure catalog, e.g you can activate node 'financial measures' for mass activation or specific measure only under that catalog.
    to activate infocubes etc, you can use rsa1(administrator workbench)->business content, detail steps see sap help
    http://help.sap.com/saphelp_bw33/helpdata/en/80/1a66d5e07211d2acb80000e829fbfe/frameset.htm
    CPM business content, see
    http://help.sap.com/saphelp_erp2005/helpdata/en/7a/72663ca0a9272ae10000000a11405a/frameset.htm
    hope this helps.

  • SEM-CPM Demo

    Alright guys
    I am looking to see if anyone knows of any eLearning or demos for SEM-CPM, just to give me a an idea of how it works. New to SEM, but I am looking to learn CPM for a client of ours.
    Thanks in advance.
    Scott

    Hi Scott,
    Well man
    i am giving some info regarding the SEM
    SAP Strategic Enterprise Management (SAP SEM) delivers end-to-end capabilities to support performance management life cycle, including:
    •     Consolidated financial reporting -- With SAP SEM, you can generate consolidated financial and managerial reports for a globally distributed business or entity. The application can aggregate financial data from SAP and non-SAP systems into a single analytical reporting environment, enabling you to monitor the financial performance of individual subunits.
    •     Planning, budgeting, and forecasting -- SAP SEM helps enables you to model various planning options and use preconfigured planning software to get a quick start on operational planning tasks such as cost center planning and sales planning. The application supports traditional budgeting and rolling forecasts as well as collaborative planning.
    •     Corporate performance management and scorecards -- With SAP SEM, you can develop KPIs that support a number of popular scorecard methodologies, including balanced scorecard, economic value-added, and activity-based costing methods. You can link operational and strategic plans and develop scorecards and performance measures based on financial and non financial data.
    •     Risk management -- SAP SEM helps you identify, quantify, and analyze business risks within individual business units and manage risk-reducing activities.
    ALL the very best
    -Rakesh

  • SEM-CPM docs

    Hi,
    Can anyone provide me with any docs related to SEM-CPM module. I am actually looking for some documentation which explain WITH EXAMPLES.
    Thanks in advance,
    Points are assured.

    Hi,
    You can check this link
    http://help.sap.com/saphelp_nw04/helpdata/en/7a/72663ca0a9272ae10000000a11405a/frameset.htm
    Regards,
    Praveen

  • SEM CPM - Dump when i tried to assign a variable

    Hi Gurus,
    Im working with SEM-CPM and i facing the following issue:
    When i tried to assign a CPM variable in design mode it show up the following DUMP (during the preview of the Frame) :
    "MESSAGE_TYPE_X" C- "ADD_DATA_TO_BUFFER"
    Does anybody knows how can i fix this ?
    Regards

    Hola Marco,
    Estoy desarrollando en Management Cockpit unos frames y me está pasando el mismo error que en tu caso.
    Podrías ayudarme en como solucionarlo?
    Saludos

Maybe you are looking for

  • Display images in report

    Hi, we have stored students images in a directory i.e 'D:\pics'. now I want to display the images of student on a reports dynamically, the name of image files are same as student id. I do not want to store them in data base tables. Any soltuion??

  • Nwds build error

    Hi, I am trying to apply a oss note on ess application using nwds, I have imported the development configuration perspective. When I rebuild ess-au-addr application (without any changes yet) I am getting the error (see below). Please help, thanks. 5/

  • The power consumption of iPhone 4s becomes very fast after upgrading IOS to 7.1

    Who has the same problem? is there any method to solve this problem?

  • Pooling Prepared Statement and Resultset

    Is their any mechanism in Weblogic by which we can pool prepared statements and resultset.

  • Cdc states from ILEND to ILEND through ILUPDATE

    Hi Everybody, I am starting with CDC and I have a problem. After Initial Load, I have to run the Incremental Load several times to capture changes. I noticed that in the cdc_states table, the state after the Initial Load package goes from ILStart to