SAP solution for Wyoming Worker Compensation code being 6 digits

I am trying to determine what SAPs philosophy is around the state of Wyoming changing their worker compensation code to 6 digits. The standard workman compensation code on the positions and jobs is only 4 in length. I am unable to find any OSS comments around this issue.

Dear,
Just search with Wyoming Worker Compensation code
Check for appropriate one ... if not relevant and not changed with customization settings by someothers - raise a note.
Note 594574 - Wyoming Workers' Compensation Code changed for 2003
Regards,
Syed Hussain.
Edited by: Syed Hussain on Dec 4, 2009 2:53 AM

Similar Messages

  • SAP Solution for Mini steel plant with DRI Process

    Dear all,
    I am a metallurgist who spent couple of years in steel and process Industry and then moved to IT Consulting as SAP consultant / business analyst mainly working in the area of solution designing.
    Here i will like to describe SAP solution for Mini steel plant with DRI proces.
    u201CManufacture Productsu201D Description
    The series of operations performed upon material to convert it from the raw material or a semifinished state to a state of further completion. This includes the establishment and maintenance of a CAPEX plan, the planning, scheduling and execution of production activities, the dispositioning of produced goods, the maintenance of production data, the monitoring of production performance and the implementation of engineering changes.
    u201CManufacture Productsu201D Objectives
    M-010
    Compile 3-year CAPEX Budget     Establish the overall manufacturing goals and metrics that the organization will use to measure performance and progress towards objectives. These goals should be consistent with overall organizational strategy/value propositions. Develop long-term goals for production capabilities and manufacturing. These goals should align with the overall goals and objectives of the organization.
    M-050
    Perform Long Range Production Planning     u201CBudgetingu201D. Long range planning of production quantities based on planned available capacities and known or estimated customer demands. This process may include planning for different capacity and/or demand scenarios. Approved capital expenditures from the 3-year CAPEX budget may influence the budget. Range and frequency for budgeting is yearly.
    M-060
    Perform Medium Range Production Planning     Medium range planning of production quantities based on planned available capacities and known or estimated customer demands. This process may include planning for different capacity and/or demand scenarios.  Range and frequency for planning is quarterly.
    M-070
    Perform Short Range Production Planning     Short term planning of production quantities based on capacities and demands as previously planned in the longer terms, actual customer demand and actual capacities. The result from short range production planning will run into the operational plan for the current and following days.  Range and frequency for planning is monthly.
    M-080
    Schedule Production     This sub-process enables detailed scheduling by resources over the planning horizon. Planned orders that fulfill demands (Stock Transfer Requisitions, Sales Forecasts and Customer Orders defined by due-dates and due-quantities) come from the short range plan. This results in a feasible schedule, optimizing utilization of the production resources. It is based on production process constraints as well as labor resources in order to minimize production costs and also taking into account constraining raw materials availability.
    M-090
    Execute MRP     The purpose of this sub-process is to generate a Materials Requirements Plan (MRP) for all materials, which are produced or purchased. The MRP process involves looking at current material inventory, planned inbound material deliveries, requirements, lead times and stock levels to generate a detailed plan for future material requirements. The materials requirements will be generated with respect to the three planning horizons, short-term, medium-term, and long term. If an over stock of raw materials occurs as a result of a planning change production and marketing personnel will be informed. This would allow for the cancellations of any unneeded shipments.
    M-100
    Perform Setup / Changeover     Perform set-up and changeover activities on production equipment as necessary, to prepare for the production of specific materials/grades. Set-up and changeover activities will enable the production equipment to perform operations on materials, as per the specifications called out on the production order. Ensure time is allocated for first off inspection requirements after changeover.
    M-110
    Execute Production     Insure that the production plan is met by converting raw materials and component supplies into finished and semi-finished products. Batch/lot documentation will be created for individual production orders to provide traceability throughout the process. Each step of the production process is continuously monitored to identify mechanical, quality, and productivity issues and suggest solutions when problems arise. Data collection for performance and financial reporting enables management to take immediate action on manufacturing processes as well as conduct historical analysis.
    M-120
    Perform Quality Management     Quality management refers to the entire supply chain process. Process activities are related to the evaluation and inspection of key characteristics of semi-finished and finished materials. These evaluations are recorded and acted on based on the results. Report/manage internal quality problems or issues. Install and manage quality control systems to insure product quality. For supplier or subcontractor based issues this data should be used as a performance measure during the vendor evaluation process.
    M-130
    Manage Product Disposition     This process ensures those semi-finished and finished products that do not meet quality requirements, are prevented from being used and distributed in good finished product to customer, or released for the next step of the production process. A semi finished product is any material that needs to have another operation on line before being shipped to the customer. Finished goods are defined as any material that can be shipped to a customer; in house produced finished goods, subcontracted materials and trading goods. The information required to make decisions regarding disposition comes from the Quality Management system of each production facility. The first step ensures that raw material and returnable goods are dealt with in another subprocess. The reason for the goods not meeting quality standards is recorded along with the results of any investigation to find the cause of the fault. Information is sent to all other parties who need to know: order fulfillment, inventory management and shipping. The process ensures that the most appropriate action is taken to either dispose of, or rework the goods. Disposal or rework may be either through the original materials supplier or subcontractor, or Mittal Steel Point Lisas.
    M-140
    Maintain Product Related Data     u201CMaterial Master Maintenanceu201D. The Sub-Process 'Maintain Product Related Data' is the list of activities that identify the steps and decision points related to the request for and performance of additions, changes, and deletions to the Material Master file or files. This sub-process begins when a need to create, change or delete a material is identified and ends when the request is either actioned or refused. The sub-process is intended to cover all material types, including finished goods, raw materials, bills of materials, equipment and service, POS, Sundry Items etc. In fact, any product which the company wishes to inventory or purchase. A number of key strategic decisions, including a clear definition of when we issue a new material, will affect this sub-process.
    M-150
    Maintain Production Related Data     u201CMaster Data Maintenanceu201D. This subprocess identifies the activities related to requesting changes or additions to production related master data. Once a need for master data maintenance is identified, a request is submitted for approval. Data defining production capacities and performance standards (e.g. line efficiencies, material yields, etc.) require Corporate level approval prior to maintenance. Other data that is more specific to internal planning functions are maintained at the plant level. Maintenance requests are returned to the originator whether the request is approved or not to improve communication throughout the system. This subprocess may be triggered by: annual operations budgeting process process/production equipment upgrade or replacement change in facility work schedule (i.e. planned hours or days) change in personnel required to operate process/production equipment new products, formulations, or packaging.
    M-160
    Operations Execution Reporting     Gather manufacturing information at various points in the production process. Prepare management reports both at the detailed level for plant management and summary level for senior operations management. Reports will be available on-demand and will include - volume, efficiencies (mechanical, line, and labor), yields, downtime, asset utilization, environmental, safety, quality, and financial data. A major goal of this sub-process is to define a consistent method of calculating operations metrics. Some plants will use line information systems and PCSs to collect information. Not all plants are equipped with these systems and the where they do exist, the level of sophistication varies.
    M-170
    Manage Process Reliability     Optimize capacity by reducing process downtime and ensuring compliance to quality expectations by the reduction of rejects. Install tracking systems to measure line time utilization, quality results, process settings. Conduct root cause analysis, and use the data to develop and implement improved operating procedures.

    Thank you for your prompt response. I'm assuming you are still proposing to use Sales order -> purchase order -> invoice verification -> Customer billing process flow. Is that correct?

  • An SAP Solution for capital planning and Budgeting of Capital Assets?

    Is there an SAP Solution for the Planning and Budgeting of Capital Assets?
    A solution that provides planning, budgeting, and tracking for capital assets through the entire life cycle of each asset, from the initial request through the final disposal.
    The solution needs to be able to run “scenarios.” A scenario contains equipment that may potentially be purchased. Scenario items are used to help determine cost, capacity, and cash flow feasibility.

    Hi
    What you suggested is the ideal approach...
    However, if they say that the budget allocated to capital purposes (70%) applies to both capital projects and expenses and they would like to control it together, but have reports separately, it is not possible with standard SAP...
    If they want to have just one IO for both cap and exp, You can suggest them a work around to capture CAPITAL or EXPENSE in a ref field (XREF1 in BSEG) and you can run KOB1 with XREF1 displayed in it....
    In standard KOB1, XREF1 is not displayed, you have to use Exit COOMEP01 to include the fields you want... Add XREF1 to the Structure CI_RKPOS and write your code in the include ZXKAEPU01 of EXIT_SAPLKAEP_001
    Without an identifier @ the time of booking the transaction in the system (Either by way of IO or a ref field), you wont be able to generate reports later on
    Regards
    Ajay M

  • Any closer to a solution for apn in personal hotspot being fixed using 7.1

    Any closer to a solution for apn in personal hotspot being fixed using 7.1

    all three =)
    http://www.adobe.com/devnet/flashmediaserver/articles/protecting_video_fms.pdf
    regards
    Leonardo França
    Adobe Certified Expert Flex 3 with AIR
    Adobe Certified Expert Rich Internet Application Specialist v1.0
    Adobe Certified Expert Flash CS3 Professional
    Certified Professional Adobe Flex 2 Developer
    Adobe Certified Professional Flash MX 2004 Developer
    http://www.leonardofranca.com
    http://twitter/leofederal
    Manager AUGDF - Adobe User Group do Distrito Federal
    http://www.augdf.com.br
    http://twitter/augdf
    sfister escreveu:
    Hello,
    Our scenario is that we have an Adobe ColdFusion8 server running a portal application which will serve up SWF content from a FMS3 installation. We need to protect the SWF content from being a) downloaded to a users local machine and b) being accessed without being logged into the portal application.
    Please correct me here if I am wrong - it looks like the combination of RTMPE + SWF Verification are the minimum necessary, but I am confused as to these other practices and which ones to use (or can be used on FMS and not FMIS):
    1) Refererr and pageURL check validation
    OR
    2) IP Address validation
    OR
    3) White list domains
    Any suggestions on the best method to accomplish this using RTMPE + SWF Verification + (1, 2, or 3)?
    Thank you,
    Steve
    >

  • Regarding SAP solutions for mobile business

    Hi,
    Please let me know of any document summarizing all the SAP solutions for mobile business.
    Regards
    Raja Sekhar

    Hi Rahul,
    Thanks for the reply.
    I cudnt find the drop box 'Related Technology topis...'.
    I got the doc thru some other means.
    Thanks anyway
    Raja Sekhar

  • How can i request the actual time code of digital video recorder, i am using RS232 interface for asking actual time code of digital video recording

    how can i request the actual time code of digital video recorder, i am using RS232 interface for asking actual time code of digital video recording

    If you have an RS-232 interface to the digital video recorder, it may be that you can send a command to the video recorder in order to get the time code sent back to your application - you would then read this as a string and then incorporate this data into your program.
    The best source of help will be any documentation you have relating to the serial (RS-232) interface with the digital video recorder. This documentation should have commands that you can send to the recorder and expected response strings that you should get back from the device. This task should be straightforward but can often be frustrating without documentation about the video recorder. This will not be something that you can "guess" - past experience in writing serial communication ap
    plications has shown that a good manual is your best friend.
    Failing this if you have any source code for example programs that have already been written to communicate with the recorder, you might be able to extract the relevant ASCII strings and use them within your application. This is true whether you are using LabVIEW or a text-based language.
    Jeremy

  • Tyre Manufacturing SAP Solution for production Planning PP-PI OR PP-Rep???

    Tyre manufacturing in SAP solution does it require to use PP-PI and/or PP-Repititive or PP-Descrete.Pl share if any one implemented SAP for tyre manufacturing with Process flow and which are the PP Components needs to be used.
    Thanks
    Ram

    Dear Girish,
    Thanks for the info and I think you are right,but some times if customer wants the answer from Consultant,what is best suggested or recomended ?? ,then it requires some expert judgement or based on previous experience,if you have any case study to share with me would be greatly appreciated.means which company uses what process ,are they benifitted from the solution if not what are the pain points and how are they managing it etc...
    Thanks
    Ram

  • Solution for job work material

    Dear All,
    Please provide me what is the best solution or procudure for job work material (for production), also confirm me what effect of component price in Bom.
    Thanks

    Hi vivek!
       Thanks for your reply..
    But what is the need of creating PO's.. I am simply receiving the material(non-valuated) form the customer and do some service in it and send it back to him.. I will process this via sales.. But my question is whether should i create a material master for each time i receive a new material since its one time job and weekly we r receiving around 100 new materials.
    Thanks,
    Raj.

  • SAP Solution for customer crosscheck

    Hi.
    For security reasons one of our customers wants to crosscheck customers with an external database located in Switzerland.  Does someone have an idea whether or not SAP has a standard solution for this?
    Basically it entails reading the customer details from sales order/inquiry, blocking the order/inquiry while sending the details to an external database, receiving the reply and whether good or bad then releasing/discarding aforementioned order/inquiry.
    Sincerely
    Ryan

    NA

  • SAP solution for patent management

    Is there a SAP solution which helps manage patents including patent filing, alerts on due dates, costs etc?

    Dear Anand,
    www.sap.com/solutions/solutionextensions/businessprofit/index.epx
    www.sap.com/industries/lifesciences/midsize/solutions/index.epx
    Do let me know in case of any queries.
    Hope this helps you.
    Regards,
    Rakesh

  • Solution for connecting a handheld code scanner to SAP

    hello experts,
    my question is on what technology one can use to connect an existing handheld device to SAP which is used a scanner to scan bar codes on boxes and transport the file from the wireless device of the scanned objects into the SAP.
    What solution and technology one need sto use to set this up.
    Thanking you

    Hi,
    There are three ways in which your requirement can be fulfilled:
    1) SAPConsole: Basic idea is to convert the SAP GUI screens into text screens which are then accessed by mobile devices through telnet server
    2) ITSMobile: ITSMobile is a new application introduced by SAP in 2007.
    3) Mobile Webdynpro: Webdynpro Java (SAP Netweaver) can offer the capability to fulfill your requirement.
    Thnks
    ITSMobile Can be Used:
    http://help.sap.com/saphelp_nw04/helpdata/en/47/b2c674f1f33b8be10000000a421937/frameset.htm
    Edited by: Yogesh Bhatia on Jan 30, 2009 6:21 PM

  • SAP Script for PO works in test mode but changes are not shown on PO

    Hi,
    I've modified the sapscript for the Purchase order.When I go to se71 and print test it the chage is visible.But when I actually see the attachment in mail  chages are not visible.
    Thanks
    Venkat

    Hi Venkat,
    Plz activate the debugger & check if the window where you have made ur changes (text element & texts) is getting executed or not. Debugging will help you to know whether or not the change is triggered.. & Also as to know why its not triggered.. (may be there are some codes above thats working differently when you display the PO at runtime.
    To debug the script.. on the tcode SE71 ---> Utilities --> Activate Debugger
    Let me know if you have questions.
    Thanks
    Geetha

  • SAp Solution for revised IAS 23 - Borrowing Costs

    Does SAP has any solution to adopt/adhere to the revised IAS 23 which requries to capitalize the borrowing costs.This is effective from 01.01.2009.
    I can devide the required activities into below.
    1.
    Determine borrowing cost u2013
    Specific borrowings (we can capitalize interest on borrowings specific to asset)
    General borrowings u2013 calculate capitalization rate based on weighted average of borrowing costs except the specific borrowings as mentioned above.
    Borrowing costs - interest, finance charges on leases, exchange differences etc.
    Classifying borrowings into specific / general needs to be done by management.
    2.
    Identifying qualifying assets u2013
    Though we can use asset class as definition, there are various exceptions set by the standard.
    The standard allows management to exercise  judgement.
    3.
    The standard also defines when to start capitalizing the B costs and when to seize.
    What is the best way/approach for this?
    Does SAP has any solution to capitalise the borrowing costs?
    Please give your pointers/suggestions.
    thanks,
    ganesh

    Hi Ganesh,
    To my knowledge there is not SAP standard functionality to capture borrowing costs.
    But you may be able to create a workaround by making the account assignment to the borrowing specific asset at the time of accounting in SAP.
    This procedure would be very much manual, though.
    Regards,
    ~Vishal.

  • I lost my Blackberry and I need a solution for preventing informatio​n from being seen.

    HELP! I lost my business BB Curve 8320 the other day. It was supposedly found and the person was going to mail it to me, but I haven't heard from him in 2 days. Is there any way to prevent him from looking at business classified emails on my phone? I do not have a password on the phone and called T-Mobile (my carrier) who says I am out of luck. Can you delete an email address or anything? I really don't want my information in the wrong hands.
    Thanks for any help anyone can provide!!

    Hi
    Sorry to hear your trouble. maybe its in the mail as we speak.
    If you have a BIS account, you could log-in on PC and edit/delete it. If you run on BES, your admin will need to sort it.
    Blackberry Best Advice - Back-up weekly
    If I have helped you please check the "Kudos" star on the right >>>>

  • Solutions for these 'OCR' error codes:

    Hi,
    I have a labview application, but it doesn't work properly because it has errors (see nierror.doc)
    If anybody knows how to solve these problems, we will be gratefull, becuase we can not solving them.
    Thanks
    Attachments:
    nierror1.doc ‏52 KB

    Hi,
    Ok, but the file exits and it is in the correct place. Because it appears on the front pnel, I mean the same name that the file that vision builder has done in the migration.
    My aplication is migrated from vision builder to labview. It doen´t run poperly when I build an aplication. But it does when I run my main.vi. It only does not work when I use it like an aplication.
    I have done everything that I was supposed to do to build it, but the OCR does not find a file and does not open the session.
    I post some pictures that explain the error, I´m sorry because it is in spanish, but you can see where the problem is.
    Thanks
    Attachments:
    Depurado.doc ‏1540 KB

Maybe you are looking for

  • KM links not functioning through Webdav repository view

    Hi All, I have a somewhat complicated setup here which is causing some strange issues. We have an EP instance and a BI portal instance setup. Currently we broadcast reports to our BI portal KM instance, and use ICE to replicate the data from BI porta

  • Adjusting canon G10 raw in elements 8

    I'm using the trial version before I buy.  The Camera Raw plugin in the program is 5.5.0.97.  I can open the raw file in editor, but it doesn't bring up the raw editing sliders.  Is it because I'm using the trial version, or do I need to do soemthing

  • What's your setup with the Zen Tou

    I've had my Zen Touch for a couple of months and so far so good - only two freezes and thats all. I've been using WMP0 to organise my music and rip tracks from CD's, but have used Creative mediasource to transfer everthing over to the touch. Big prob

  • Is INDIRECT() function supported

    I see some other postings but still no answer if INDIRECT function is supported in Xcelsius?  What SP?  It is listed as being supported in SP3 documentation.  Anybody have any work-arounds?

  • Music from pod to comp

    Recently my father has wiped out all memory on my comp for god only knows why. Anyway all the music that was on my itunes is gone, and most of the cds i got for the itunes are long gone as well. so if i want to get any new music on my ipod it says i