SAP Solution Mgr with IS-Utilities

Hello SolMan Gurus
My client is currently in the process of upgrading their SAP CRM solution to integrate with IS-U. I have checked to see if there any accelerators such as IS-U templates but unable to find any. Can anyone assist?
I have tried to check the normal SAP note - 891616 but it appears to be locked
Raj
Edited by: RajContactSAP on Jan 14, 2012 6:11 PM

ST-ICO Sp31 contains the latest roadmaps. Sometimes there is a disconnect between the BPR content and the roadmaps available.
If you are dealing with IS-U I am assuming you are facing the same difficulties I faced back a year ago, CRM/UCES/Portal based Front End and ERP based backend etc, I recommend using the Service marketplace shortcut /roadmaps to obtain the newer version of ASAP/RunSAP roadmaps

Similar Messages

  • Install SAP Solution Manager with DEV instance in the same server (MCOD)

    Hello, i would like to install SAP Solutions Manager together with DEV ECC 6.0 in the same host, DEV is currently installed and working fine.
    I followed note 551915 to convert MS-SQL 2005 to MCOD (change of schema from dbo to dev) and worked fine. But when i am installing the SolMan through the sapinst i don´t see the option MCOD
    The only option i am confussed is
    MS SQL Server
    Database reuse  o - New Database (DBSID = SAPSID)
                             o - Use Existing Database
                                    Database ID (DBSID)
    Witch option should i choose to perform a MCOD installation? new db or use existing db (DEV)?
    Kind Regards

    Hi Merchan, if you want to use MCOD you need to select the option: o - Use Existing Database
    Database ID (DBSID) .
    Regards,
    Darwin C.

  • Connecting SAP Solution Manager with EMC Documentum

    Hello Gurus,
    I'm aware that SAP can be connected with EMC Documentum.
    However I wanted to know, whether SAP Solution Manager can be connected with Documentum?
    If yes, please let me know the process or documentation (if any).
    Thanks
    Gautam

    I wanted to bump this thread as well. Has anyone done this, either successfully or tried and was unsuccessful?
    Thanks!
    Lori
    Edited by: Lori Sanders on Oct 12, 2011 3:04 PM

  • Upload of Test Cases in SAP Solution Manager.

    Hello,
    I am trying to create a project and its component in SAP Solution Manager with 12 Test Plans. The Test Plans have different number of test cases. I do not have the Test cases now, but I shall have them in future. I currently have the following data.
    Test Plan ID
    Module
    Business Process
    Business Area
    Sub Business Area
    Test Case Description
    Test Case Details
    Transaction Codes
    Priority of Test Cases
    Can I create a structure of a project in the development system in which I have 12 Test Plans and n number of Test Cases under every Test Plan? The structure would have place holder for each test case in which I can upload the Test Cases later. Is that possible?
    Regards,
    Namrata.

    Hi Namrata,
    Yes, you can create project structure before using solar01 tcode. later once your test cases (either manual or automatic) are ready then you can upload them using solar02 on test cases tab,
    refer Link Test Case to Transactions/Reports - Configuration - SAP Library
    Assignments - SAP Solution Manager - SAP Library
    Thanks
    Jansi

  • License check error in sap solution manager

    Hi  All
    I m planing to configure sap solution manager.bt when i ltried to login to sap solution mager with user other than sap* it gives license check error.and whrn i checked in solution with tcode slicense its showing red  and validity date is upto 2007.and in command prompt when i checked with command saplicense - show it shows license expired.plzz suggest me what to do now.
    Edited by: pranav kumar on Sep 7, 2009 2:19 PM

    >>The license is expired.should i reinstall the license or update the license.plz do the needful
    This is a forum. We can only suggest you but this doesnot sounds good "plz do the needful"
    You need to install a new license. Go to Service marketplace and apply a new license for your system and when you will receive a new license as a text file, then install the license via SLICENSE
    Regards,
    Subhash

  • Is it possible to use variant configuration (with a Non-SAP solution) when creating ERP sales orders in SAP CRM WebUI

    Hello,
    our customer plans to use a Non-SAP solution for variant configuration (Camos) in SAP ERP (ECC 6.0) and in SAP CRM 7.0 EHP1 as well.
    ERP sales orders (and ERP quotations) should be created in SAP CRM (CRM WebUI).
    Is it possible to use variant configuration (with an external variant configuration tool) when creating ERP sales orders and quotations in the SAP CRM WebUI or do we have to implement SAP IPC for this?
    Thanks in advance.
    Regards,
    AEV

    Dear AEV,
    I think LORD (lean orders) should work with variant configuration as well. In the note 1236015 there is not restriction listed. However you need lord2 activated in ECC, and ECC system should be on EHP4.
    Best regards
    Rene

  • Crystal Reports access to SAP/CRM 6.0 with Integration with SAP Solutions

    Hello,
    we are running Crystal Reports 2008 with SAP CRM 6.0.
    To boost productivity or Report writeing we need especially access to:
    - Function Modules
    - the CRM Business Objects Repository (Transaction SW01).
    What kind of SAP/CRM  ( or SAP / ERP )  Objects can be accessed with the Integration for
    SAP Solutions ?
    The BO Documentation  [BusinessObjects XI Integration for SAP Solutions User's Guide|http://help.sap.com/businessobject/product_guides/boexir31SP2/en/xi31_sp2_bip_sap_user_en.pdf]  does not give a clue if this is possible.
    However,  Ingo Hilgefort stated in his book that it is at least possible to access  ABAP Functions, SAP Querries and SAP InfoSets.
    What is the minimum product portfolio and the necessary Version - Can I install the following products stand alone ?
    Crystal Reports 2008
    Integration for SAP Solutions
    Tomcat / Jaco
    or
    Must I need at minimum BO Edge  and must install the CMS Server ?
    Thank You
    Martin

    HI,
    What kind of SAP/CRM ( or SAP / ERP ) Objects can be accessed with the Integration for
    SAP Solutions ?
    here is also a blog about this:
    /people/ingo.hilgefort/blog/2008/03/23/businessobjects-and-sap-part-4
    However, Ingo Hilgefort stated in his book that it is at least possible to access ABAP Functions, SAP Querries and SAP InfoSets.
    >> correct. It is also in the Installation Guide / User Guide for the SAP Integration kit. You can use ABAP Functions, ABAP / SAP Queries, InfoSets, Tables
    What is the minimum product portfolio and the necessary Version - Can I install the following products stand alone ?
    Crystal Reports 2008
    BusinessObjects Integration for SAP Solutions
    BusinessObjects Edge or BusinessObjects Enterprise
    Ingo

  • SSO All SAP solution with windows Active directory

    Dear Experts,
    We have multiple sap solution like
    SAP ERP EHP7
    SAP BW
    SAPBO
    SAP EES/MMS
    SAP Solution Manager
    And all solutions based on Operating system AIX and database is DB2
    We want to configure SSO ( using windows 2012 active directory users ) with all above systems and it's clients.
    Kindly guide me how to achieve SSO using Windows 2013 active directory users.
    DO we need LDAP between Active directory and all servers ?
    we need additional SAP license
    please guide me
    Regards

    Hello
    You can use SAP Single Sign-on 2.0 solution by SAP to integrate all your systems with SSO. The solution contains all what is required for configuring SSO in SAP ABAP and Java Systems. To know more, you may refer:
    1. SAP NetWeaver Single Sign-On 2.0 – SAP Help Portal Page
    2. Implementing SAP NetWeaver Single Sign-On 2.0 Based on Kerberos Tokens 1/4 - YouTube
    3.Implementing SAP NetWeaver Single Sign-On 2.0 Based on Kerberos Tokens 2/4 - YouTube
    4.  Implementing SAP NetWeaver Single Sign-On 2.0 Based on Kerberos Tokens 3/4 - YouTube
    5. Implementing SAP NetWeaver Single Sign-On 2.0 Based on Kerberos Tokens 4/4 - YouTube
    You will have to buy license for SAP Single Sign-on 2.0.
    Regards,
    Tapan

  • SAP Solution for Mini steel plant with DRI Process

    Dear all,
    I am a metallurgist who spent couple of years in steel and process Industry and then moved to IT Consulting as SAP consultant / business analyst mainly working in the area of solution designing.
    Here i will like to describe SAP solution for Mini steel plant with DRI proces.
    u201CManufacture Productsu201D Description
    The series of operations performed upon material to convert it from the raw material or a semifinished state to a state of further completion. This includes the establishment and maintenance of a CAPEX plan, the planning, scheduling and execution of production activities, the dispositioning of produced goods, the maintenance of production data, the monitoring of production performance and the implementation of engineering changes.
    u201CManufacture Productsu201D Objectives
    M-010
    Compile 3-year CAPEX Budget     Establish the overall manufacturing goals and metrics that the organization will use to measure performance and progress towards objectives. These goals should be consistent with overall organizational strategy/value propositions. Develop long-term goals for production capabilities and manufacturing. These goals should align with the overall goals and objectives of the organization.
    M-050
    Perform Long Range Production Planning     u201CBudgetingu201D. Long range planning of production quantities based on planned available capacities and known or estimated customer demands. This process may include planning for different capacity and/or demand scenarios. Approved capital expenditures from the 3-year CAPEX budget may influence the budget. Range and frequency for budgeting is yearly.
    M-060
    Perform Medium Range Production Planning     Medium range planning of production quantities based on planned available capacities and known or estimated customer demands. This process may include planning for different capacity and/or demand scenarios.  Range and frequency for planning is quarterly.
    M-070
    Perform Short Range Production Planning     Short term planning of production quantities based on capacities and demands as previously planned in the longer terms, actual customer demand and actual capacities. The result from short range production planning will run into the operational plan for the current and following days.  Range and frequency for planning is monthly.
    M-080
    Schedule Production     This sub-process enables detailed scheduling by resources over the planning horizon. Planned orders that fulfill demands (Stock Transfer Requisitions, Sales Forecasts and Customer Orders defined by due-dates and due-quantities) come from the short range plan. This results in a feasible schedule, optimizing utilization of the production resources. It is based on production process constraints as well as labor resources in order to minimize production costs and also taking into account constraining raw materials availability.
    M-090
    Execute MRP     The purpose of this sub-process is to generate a Materials Requirements Plan (MRP) for all materials, which are produced or purchased. The MRP process involves looking at current material inventory, planned inbound material deliveries, requirements, lead times and stock levels to generate a detailed plan for future material requirements. The materials requirements will be generated with respect to the three planning horizons, short-term, medium-term, and long term. If an over stock of raw materials occurs as a result of a planning change production and marketing personnel will be informed. This would allow for the cancellations of any unneeded shipments.
    M-100
    Perform Setup / Changeover     Perform set-up and changeover activities on production equipment as necessary, to prepare for the production of specific materials/grades. Set-up and changeover activities will enable the production equipment to perform operations on materials, as per the specifications called out on the production order. Ensure time is allocated for first off inspection requirements after changeover.
    M-110
    Execute Production     Insure that the production plan is met by converting raw materials and component supplies into finished and semi-finished products. Batch/lot documentation will be created for individual production orders to provide traceability throughout the process. Each step of the production process is continuously monitored to identify mechanical, quality, and productivity issues and suggest solutions when problems arise. Data collection for performance and financial reporting enables management to take immediate action on manufacturing processes as well as conduct historical analysis.
    M-120
    Perform Quality Management     Quality management refers to the entire supply chain process. Process activities are related to the evaluation and inspection of key characteristics of semi-finished and finished materials. These evaluations are recorded and acted on based on the results. Report/manage internal quality problems or issues. Install and manage quality control systems to insure product quality. For supplier or subcontractor based issues this data should be used as a performance measure during the vendor evaluation process.
    M-130
    Manage Product Disposition     This process ensures those semi-finished and finished products that do not meet quality requirements, are prevented from being used and distributed in good finished product to customer, or released for the next step of the production process. A semi finished product is any material that needs to have another operation on line before being shipped to the customer. Finished goods are defined as any material that can be shipped to a customer; in house produced finished goods, subcontracted materials and trading goods. The information required to make decisions regarding disposition comes from the Quality Management system of each production facility. The first step ensures that raw material and returnable goods are dealt with in another subprocess. The reason for the goods not meeting quality standards is recorded along with the results of any investigation to find the cause of the fault. Information is sent to all other parties who need to know: order fulfillment, inventory management and shipping. The process ensures that the most appropriate action is taken to either dispose of, or rework the goods. Disposal or rework may be either through the original materials supplier or subcontractor, or Mittal Steel Point Lisas.
    M-140
    Maintain Product Related Data     u201CMaterial Master Maintenanceu201D. The Sub-Process 'Maintain Product Related Data' is the list of activities that identify the steps and decision points related to the request for and performance of additions, changes, and deletions to the Material Master file or files. This sub-process begins when a need to create, change or delete a material is identified and ends when the request is either actioned or refused. The sub-process is intended to cover all material types, including finished goods, raw materials, bills of materials, equipment and service, POS, Sundry Items etc. In fact, any product which the company wishes to inventory or purchase. A number of key strategic decisions, including a clear definition of when we issue a new material, will affect this sub-process.
    M-150
    Maintain Production Related Data     u201CMaster Data Maintenanceu201D. This subprocess identifies the activities related to requesting changes or additions to production related master data. Once a need for master data maintenance is identified, a request is submitted for approval. Data defining production capacities and performance standards (e.g. line efficiencies, material yields, etc.) require Corporate level approval prior to maintenance. Other data that is more specific to internal planning functions are maintained at the plant level. Maintenance requests are returned to the originator whether the request is approved or not to improve communication throughout the system. This subprocess may be triggered by: annual operations budgeting process process/production equipment upgrade or replacement change in facility work schedule (i.e. planned hours or days) change in personnel required to operate process/production equipment new products, formulations, or packaging.
    M-160
    Operations Execution Reporting     Gather manufacturing information at various points in the production process. Prepare management reports both at the detailed level for plant management and summary level for senior operations management. Reports will be available on-demand and will include - volume, efficiencies (mechanical, line, and labor), yields, downtime, asset utilization, environmental, safety, quality, and financial data. A major goal of this sub-process is to define a consistent method of calculating operations metrics. Some plants will use line information systems and PCSs to collect information. Not all plants are equipped with these systems and the where they do exist, the level of sophistication varies.
    M-170
    Manage Process Reliability     Optimize capacity by reducing process downtime and ensuring compliance to quality expectations by the reduction of rejects. Install tracking systems to measure line time utilization, quality results, process settings. Conduct root cause analysis, and use the data to develop and implement improved operating procedures.

    Thank you for your prompt response. I'm assuming you are still proposing to use Sales order -> purchase order -> invoice verification -> Customer billing process flow. Is that correct?

  • SAP Solution Manager SR1 with MSSQL on W2K3 IA32 - Problem with Kernel

    Hello,
    we are implementing a sandbox in order to test the SAP Solution Manager 4.0 SR1 with MSSQL on W2K3 IA32. Therefore we ordered the installation CD for the above mentioned configuration. Instead of getting the SAP NETWEAVER Kernel SR1 we got SR2. Now we have the problem, that the installation program SAPINST is requesting the SR1- Kernel.
    Unforunately the SR1-Kernel seems no longer available in the download section.
    It would be fine to get a suggestion how to solve the problem.
    Thanks
    Best regards
    Ralf Richter ([email protected])

    Hi Andreas,
    thanks for the hint, I have already checked the LABEL.ASC. I have no LABEL.ASC-Key for the SAP Netweaver 2004s SR1, so it would be a possibilty to substitue this key. But neverhteless, I think, there should be another official procedure in order to use the SR2 instead of the old SR1. I have contacted Klaus Billing at SAP as recommended in the OSS Note 918078. Best regards. Ralf R.

  • HP QTP 11 with intergration to SAP Solution Manager version 7.1

    Hi All
    I am using HP QTP 11 with intergration to SAP Solution Manager version 7.1 and been stumped on this for about two days and unable to find refrence to this anywhere.
    When I record a test Script and set the parameters the Test/action Parameter option does not display. the only option I have is adding the parameter to the data table.
     Test/Action Parameters Selection not displayed
     me. 

    Hi,
    re-check if the 7.4 system is correctly registered in the solman SLD system.
    Re-check LMDB definition for your 7.4 as JAVA system. you have to manually created the Product system. Ensure all the Component and definitions are correct.
    Also do a verrification run within the LMDB. This will confirm whether all the information is correctly defined.
    Please note - SLD -> LMDB -> SMSY.
    So, if the first 2 don't have the correct information, you wont have much joy with smsy.
    Rgds
    Deepak

  • Update SAP Solution Manager 7.0 to EHP 1 with SP 19

    Hi!
    We use SAP Solution Manager 7.0 (SP 17) on Linux with Oracle
    and would like to update this system to EHP1 SP19.
    First of all I installed ST-ETP Add-On via SAINT to call the system "Enteprise Edition"
    Now I have few questions about the further procedure:
    1) can this update from SP 17 --> SP 19 be implemented via SAINT and with one step?
    2) what is the documentation of this process?
    3) are there any restrictions about Linux and 32 Bit?
    Thank you very much!
    regards

    check this Note #1276022, it contains all crucial information you will need

  • Configuration Guide Job Scheduling Management with SAP Solution Manager

    Dear Gurus
    Could you please help me with the configuration guide of the Job Scheduling Management with SAP Solution Manager
    Best Regards

    Hello Luis,
    the configuration activities can be accessed via the "Implementatiopn Guide" by calling transaction SPRO in your SAP Solution Manager system.
    In SPRO navigate to -> SAP Solution Manager -> Scenario-Specific Settings -> Job Scheduling Management -> Standard Configuration and execute the following two activities.
    1. Activate Solution Manager Services
    2. Set Up Work Center for Job Scheduling Management
    Make sure that your user has role SAP_SM_SCHEDULER_EXE (or_ADMIN) assigned.
    Afterwards you should be able to access the Job Management Work Center and to create Job Documentation or to import Jobs from a Managed System into new Job Documentations.
    The following SAP notes might be usefuly as well:
    1054005  - FAQ on Job Scheduling Management
    1117355  - Work Center roles
    Kind regards,
    Martin
    http://service.sap.com/jsm

  • Compatibility in SAP solutions with Intel Montecito Processor

    Hello,
    I need to know if SAP solutions are compatible with the new Dual-Core Intel® Itanium® 2 “Montecito” processor.
    Where can I find more information?
    Best regards,
    Luis Barrera

    Hi Narottam.
    No, I don't. But, if you have troubbles setting up this environment, I could suggest you to use SUN VirtualBox. Is easy to set up and use. Also it should run with Intel Atom Procesors.
    I am using this virtual environment with all the programs you ask: SB1 2007 A PL 49 (Server & Client), SQL Server Express and MS Office 2007.
    If interested, please read documentation and download it from: [http://www.sun.com]
    Regards.

  • SAP MMC Java with Solution Manager

    Dear experts,
    i have installed a SAP Solution Manager 7.0 in WAS ABAP + JAVA in Windows Server 2003 SR2 Enterprise Edition 64 bits + MS SQL 2005.
    I try to connect to the SAP MMC in Java (http://localhost:52113/) but i have a message error:
    Your browser is completely ignoring the <APPLET> tag!
    I already installed the jdk for SAP and x64 (J2sdk version 1.4.2.17 version x64) on http://java.sun.com/j2se/1.4.2/SAPsite/download.html
    How can i access?
    Thank you in advance
    Best regards.
    Pascal.

    Hello,
    i found my error: i have installed a jdk but didn't a jre...
    Sorry for this thread.
    Thank you.
    Pascal.

Maybe you are looking for

  • Web.Show_document issue in Reports6i

    I am submitting a report through a form(in Oracle Apps), the report completes successfully. The status is shown as 'finished'. But the when I use the web.show_document to display the report, it says that the page does not exist. The report works fine

  • Premiere Elements 11 Download - Write Disk Error

    Hello, I purchased Adobe Premier Elements 11 from Amazon.com the day before yesterday and keep getting a Write Disk Error during the download. I have tried repeatedly to download, and to 2 different computers but have gotten this error (and 'invalid

  • Lenovo support - options for recovering Windows 8 on new X230

    Hello, I recently purchased x230 with Windows 8. I installed Ubuntu 12.0 (attempting to dual boot).  Unfortuantely, Windows 8 is no longer accessible(UEFI error comes up on boot), the restore partition is also corrup ("required partition cannot be fo

  • Synch call to split in synch and asych

    Hi Guys, we got a new request to split a synchronous interface to asynchronous and synchronous realtime. SENDER (Service Interface Synchronous Outbound )              > SYSTEM A  (Service Interface Synchronous Inbound                                 

  • Why is my mac discontecting from the wireless router

    My wifi disconnects for no reason, seems to be connected one minute then it disconnects.  The router is in the same room so the signal is strong and stable.  Phones etc connected to the router do not have this issue.