SAP Standard Followup Action for Material Movement at the time of UD.

Does anyone know if SAP offers a standard Followup Action that once completing the Automatic Usage Decision, it will perform a Material to Material movement at the same time. 
Exampe: I have two Materials with different Inspection types and Inspection Plans that will get processed and made into CP14.
1) CP14H - Incomimg Inspection Type Z01
2) CP14.B1 - Inprocess Inspection Type Z04
Both materials get assigned to the correct plan.  They are then tested for required characteristics.  If all are in Spec, an auto Batch Job complete the UD.  At the same time I want to do a Material to Material movement to CP14 Unrestricted Stock for both inspection lot types.  Right now to do the Material to Material movement I have to complet a MIGO transaction manually.

Look at FM QM06_FM_TASK_GOODS_MOVEMENT.
It is a standard function module that is used in the action boxes in a quality notification to perform a goods movement.  It is meant to be interactive with the user so it won't work as is, as a follow-up action to a UD.  But you might be able to have your programmers copy this FM and use it as a basis to create your own custom code for your follow-up action.  It might save you some time.
FF

Similar Messages

  • Movement types for material movements in refurbishment process

    Hi,
    I require some clarification about the movement types to be used when posting material movements in the standard refurbishment process.
    I am mentioning the standard refurbishment process below. Please correct me if I am wrong or if I missed anything.
    1) Dismantle a defective spare part from the machine.
    2) Take this defective spare to a storage location for unserviceable stock. (Materials movement-post GR)
    3) Withdraw a new or repaired spare for the above material. (Materials movement-post GI)
    4) Install the the above new or repaired spare to the machine.
    5) Repair the defective spare.
    Now I am confused and what I require to know is that for steps 2 and 3 what transaction to use for goods movement and what standard movement types are recommended for this GR and GI?
    Thanks and regards,
    Abhijit Dutta

    Abhijit Dutta
    The standard Refurbishment process does not involve the initial move into the warehouse/stock. That is part of the standard maintenance processes.
    The Refurbishment takes defective item from the warehouse (goods issue), repairs them, and returns the, back to stock (goods receipt). Usually these items are valuated stock.
    [SAP Help|http://help.sap.com/erp2005_ehp_04/helpdata/EN/5b/ae3bf14b8611d182ba0000e829fbfe/frameset.htm]
    PeteA

  • Link Material Document generated for material movement due to production

    Hello Expert,
    I am creating a zreport for Material Consumption during Production. I am assuming Confirmation entry in PP module as a base of this report and linking to Material Movement data in MM Module. But I am not able to link this data from tables.
    Can you pls guide me how to link Material Document generated for material movement due to production confirmation entry and actual production confirmation entry.
    Thanks
    Shailendra

    Hi Shilendra ,
    You can create a report with the logic. That all the materials which are created due to backflushing confirmation are created with movement type 131 and the component material are consumed by movement type 261.So you can create the report with this logic.
    Dont forget to award Points if it helps.
    Lekhram

  • Output Determination for Material movement

    Hi All,
    I am configuring output Determination for Material movement.
    In my case, am doing the config when the movement type is 311, we want to generate IDoc.
    i have configured everything, output type,output Determination schema..
    When i am trying to maintain the condition record for the same through MN21,
    here i am facing one problem on Partner Function.
    Here what partner functuion i'll give.
    waiting for all valuable response.
    Regards
    Indrashish

    Hello Indrashish,
    Maintain that output type as partner independent.
    This will help.
    Regards
    Arif Mansuri

  • SAP Standard script name for Goods reciept.

    SAP Standard script name for Goods reciept.

    Check this,it may help u
    Program:SAPM07DR
    Form: WESCHEINVERS3
    Regards

  • SAP Standard Field Attributes for ME21n and ME

    Hi,
    Can anyone suggest me where i can see all the display,Hidden,Mandatory, optional SAP Standard field attributes for ME21N and ME51N.
    I looking for Configuration settings
    Thanks
    Venki

    Hi ,
    All i see is Field Label                    Reqd.entry  Opt. entry  Display for ME21N and ME51N
    I want to see what SAP Standard Fields are Hidden for these T-codes.
    I want to use and Non Used Field ( Hidden SAP Field) for new Enhancement instead of creating a custom Tab
    Thanks
    Venki

  • SAP standard File formats for payments

    Hi Gurus,
    Can any one of you kindly provide the SAP standard file formats for "Check" and "WIRE" payments for the bank interface?
    With the SAP standard file formats I need to contact my client's bank to know whether they can support the standard format for the interface.
    Early response will be appreciated.
    Thanks for the help.
    Regards,
    SP

    Hi,
    Good evening and greetings,
    Please go through the following link
    http://help.sap.com/saphelp_erp2005vp/helpdata/en/70/42753ced012a49e10000000a11402f/frameset.htm
    Please reward points if found useful
    Thanking you
    With kindest regards
    Ramesh Padmanabhan

  • SAP Standard BI extractor for EhP4/5 Performance Management Solution

    Hi,
    Are they any SAP Standard BI extractors for Performance Management Solution EhP4/5? Could you please be so kind to tell me where can i find the info about it?
    ...Naddy

    [here|http://help.sap.com/erp2005_ehp_05/helpdata/EN/3e/80d8cd269142db93cdcffeecfa2a93/frameset.htm] is the BI Content foe EhP5 Perf.Mgt,

  • Icoc for material movement

    What is the IDoc for Material Movement?
    thanks

    Janice,
    Check this michals weblog:
    /people/michal.krawczyk2/blog/2006/09/19/aii-material-movements-to-erp-r3-via-the-xipi
    Also WMMBID01 idoc is used for material movement.
    ---Satish

  • I rented a movie on my iPad. It downloaded fine but would only play 36 minutes, 5 seconds worth of the movie; although the time kept running for the length of the movie. Can this be fixed or do I need to get a refund?

    I rented a movie on my iPad. It downloaded fine but would only play 36 minutes, 5 seconds worth of the movie; although the time kept running for the length of the movie. Can this be fixed or do I need to get a refund?

    You can try a rest:
    Reset iPad:  Press and hold the On/Off Sleep/Wake button and the Home
    button at the same time for at least ten seconds, until the Apple logo appears.
    - If that does work, contact iTunes and request a redownload.  You can ask for a refund though.

  • Sorry I'm new to Final Cut Express. How do you make an image (jpeg file for example) move across the screen slowly as I've seen in many films.

    Sorry I'm new to Final Cut Express. How do you make an image (jpeg file for example) move across the screen slowly as I've seen in many films.

    Neil from bristol wrote:
    … How do you make an image … move across the screen …
    by setting KEYFRAMES
    (read, what FC/e's built-in Help-feature tells about it)
    resize and set pic to start position
    set keyframe
    move playhead in timeline to desired length
    set pic to end position
    set keyframe …

  • TS2634 Why won't my screen orient for a movie on the dock?

    Why won't my screen orient for a movie on the dock?  It used to.

    Are you by any chance using Netfix when this happens. If you are, I believe that this changed in their last app update. The movies will only work in landscape mode.
    If you are not using Netfix and you are using the videos app, close the app and reboot the iPad.
    Tap the home button once. Then tap the home button twice and the recents tray will appear at the bottom of the screen. Tap and hold down on any app icon until it begins to wiggle. Tap the minus sign in the upper left corner of the app that you want to close. Tap the home button twice.
    Reboot the iPad by holding down on the sleep and home buttons at the same time for about 10-15 seconds until the Apple Logo appears - ignore the red slider if it appears on the screen - let go of the buttons. Let the iPad start up.

  • Which is the better for watching movies in the pho...

    Hey. Im getting a new phone and I'm wondering which one of
    the Nokia 6120 Classic and the Nokia 5310 XpressMusic is best for watching movies in the phone?

    The N95 may have a bigger screen than the 6120c, but they both have a pixel count of 240x320. On the N95 the picture is bigger but at lower resolution: 142 dpi on the N95-8 vs 200 dpi on the 6120i.
    They're both not suitable for watching movies.
    symbian programs & themes, nokia maps for any browser on any operating system of your choice, and other tricks to tame symbian: http://symbian.site666.info

  • How can I add a new Template to My Templates in Pages? I've read most of the discussions on the subject but it doesn't work for me. By the time I reach the Templates folder, I only see templates for Numbers and not for Pages. Need help, please.  Thanks

    How can I add a new Template to My Templates in Pages? I've read most of the discussions on the subject but it doesn't work for me. By the time I reach the Templates folder, I only see templates for Numbers and not for Pages. Need help, please.  Thanks

    Si vous avez utilisé la commande Save As Template depuis Pages, il y a forcément un dossier
    iWork > Pages
    contenant Templates > My Templates
    comme il y a un dossier
    iWork > Numbers
    contenant Templates > My Templates
    Depuis le Finder, tapez cmd + f
    puis configurez la recherche comme sur cette recopie d'écran.
    puis lancez la recherche.
    Ainsi, vous allez trouver vos modèles personnalisés dans leur dossier.
    Chez moi, il y en a une kyrielle en dehors des dossiers standards parce que je renomme wxcvb.template quasiment tous mes documents Pages et wxcvb.nmbtemplate à peu près tous mes documents Numbers.
    Ainsi, quand je travaille sur un document, je ne suis pas ralenti par Autosave.
    Désolé mais je ne répondrai plus avant demain.
    Pour moi il est temps de dormir.
    Yvan KOENIG (VALLAURIS, France)  mercredi 23 janvier 2011 22:39:28
    iMac 21”5, i7, 2.8 GHz, 4 Gbytes, 1 Tbytes, mac OS X 10.6.8 and 10.7.2
    My iDisk is : <http://public.me.com/koenigyvan>
    Please : Search for questions similar to your own before submitting them to the community

  • How to make repricing for specific conditions at the time of billing?

    Hello
    I'm SD Pricing person. Let me ask here experts below my concern.
    In EU countries, there is recycling fee in sales of electronics or Note PC with batteries....to keep our earth clean.
    So when customers buy such products, they have to pay more as recycling fee including invoice amount.
    My question is... we want to make repricing for recycling conditions when the billing is created.
    Based on our configuration, recycling condition is not defined as a kind of tax condition.
    So this value is just copied from sales order.
    (pricing type in copy control is 'G' which means repricing for tax condition.)
    In this situation, we want to make repricing for those conditions during operating system.
    Is there any easy way to cover this?
    As I think, this is not easy because the system is already operated.
    To change condition attribution is really risky. If we dare do, we have to migrate all open orders.
    So I want to put this way to the end of my choice.
    For this requirement,
    1. We have to change condition class or category or calculation type in order to be repriced based on pricing type 'G'.
        (ex. Set the condition category as 'I' inter-billing or 'L' always repricing.)
        But transaction data are created now and all open orders will be affected.
    2. To create new conditions are not easy because these conditions are mapped to the CO-PA value field and the values are posted in FI doc.
    3. To change pricing type in copy control is almost impossible because of the impact.
    What can I do this in this situation?
    What I want to do is just to make repricing for specific conditions at the time of billing in case that pricing type of copy control is 'G'.
    Thank you in advance.

    Let me ask agagin to all experts.
    I want to make A condition to be repriced at the time of billing.
    For this, I have to set condition category as 'L' (Generally new when copying).
    But I do not want to do in that way becauuse I am maintaining big operated system now.
    In addition, though I migrate open orders after changing config. as 'L', it is almost impossible for use to migrate because we have more than a thound open orders per a DAY as Globalized system.
    That is why I am asking.
    Simply I can create new condition but as I mentioned, there are various recycling fee so we already created about 10 conditions. And this recycling conditions are linked to REA package of SAP. So creating another 10 more conditions can not be a way for us.
    At last, what I want is not to be shown this condition only in billing doc.
    'A' condition should be displayed in both Sales order and Billing doc.
    And simultaneously, when the billing is created and if user changed 'A' condition master, then new value which is different from sales order have to be reflected in billing doc.
    Thank you in advance.

Maybe you are looking for