SAP Upgrade 4.6C to ECC 6.0

Hi,
We are performing the SAP security upgrade from 4.6C to ECC 6.0 for our client.
In the 4.6C landscape the DEV, QAS & PRD systems are not in sync. To add, the upgraded DEV system has already been built in the ECC 6.0 landscape. This has resulted in the DEV ECC 6.0 system not containing all the roles which are present in the 4.6C production system.
My question is how do I bring all the roles & authorizations from the production environment in 4.6C into the DEV ECC 6.0 system so that I am assured I have the correct outputs when I run the SU25 step in the DEV ECC 6.0 system?

Hi,
You have not followed the upgrade cycle. You should have done onne test upgrade by copying the Production database.(system copy). Then you would have copied all the application data as well as roles. Then you should have done the upgrade.
Anyway now you have one option. You have the Quality server. Now move all the roles to quality server and then do the upgrade. Else copy the production data and then do the upgrade. This is will reduce your efforts while doing production upgrade. If helpful please do award points.

Similar Messages

  • Need knowledge on sap upgrade 4.7 to ecc 6.0 in abap reports and sap query

    please give me some ideas and useful links on sap upgrade 4.7 to ecc 6.0 in abap reports and sap query

    Hi Jaya,
    Not very clear with your question.
    Are you looking for changes in areas od ABAP reports & SAP query when we upgrade SAP from 4.7 to ECC 6.0 ??
    If the response is YES, then please refer to SAP solution browser www.sapsolutionbrowser.com
    Define source release and target release .
    You will get module wise details on new features for target release.
    Hope this helps.
    Regards,
    Deepak Kori

  • Error in SAP Upgrade 4.6C to ECC 6.0 in CONFLICT_CHECK Phase

    Hi All,
    I am doing an SAP Upgrade frm SAP 4.6C SR2 to ECC 6.0 SR2. When it enters the CONFLICT_CHECK we are facing the following error. i am performing this on Production system. Your immediate help is highly appreciated.
    #---- MASKING file CONFLCHK.LOG from E:\usr\sap\put\log
    #---- TIME: 20091212095249
    1 ETQ201XEntering upgrade-phase "CONFLICT_CHECK" ("20091212094722")
    2 ETQ367 Connect variables are set for standard instance access
    4 ETQ399 System-nr = '22', GwService = 'sapgw22'
    4 ETQ399 Environment variables:
    4 ETQ399   dbs_ora_schema=SAPR3
    4 ETQ399   auth_shadow_upgrade=0
    4 ETQ399 (trc) R3upExtendedInclusion: TRUE (default)
    4 ETQ399 (trc) R3upExtendedInclusion: TRUE (default)
    2 ETQ160 Starting conflict check
    4 ETQ010 Date & Time: 20091212094722 
    4 ETQ230 Starting RFC Login to: System = "CPA", GwHost = "DERSHASKFI140", GwService = "sapgw22"
    4 ETQ359 RFC Login to: System="CPA", Nr="22", GwHost="DERSHASKFI140", GwService="sapgw22"
    4 ETQ232 RFC Login succeeded
    4 ETQ233 Calling function module "SPDA_CONFLICT_CHECK" by RFC
    2EETQ360 RFC of "spda_conflict_check" failed:
    2EETQ361 code/exception  : SYSTEM_FAILURE
    2EETQ362 key             : RFC_ERROR_SYSTEM_FAILURE
    2EETQ364 message         :
    2EETQ399 SQL error 1654 occurred when accessing table OCSCMPLOBJ                    .
    4 ETQ359 RFC Login to: System="CPA", Nr="22", GwHost="DERSHASKFI140", GwService="sapgw22"
    4 ETQ232 RFC Login succeeded
    2EETQ235 Call of function module "SPDA_CONFLICT_CHECK" by RFC failed (error-status "-2")
    4 ETQ239 Logging off from SAP system
    4 ETQ010 Date & Time: 20091212094903 
    4 ETQ010 Date & Time: 20091212094903 
    Hemanth

    Hi,
    > 2EETQ399 SQL error 1654 occurred when accessing table OCSCMPLOBJ           
    Have you checked tablespace have sufficient space ?
    Thanks
    Sunny        .

  • SAP Upgrade 4.6C to ECC 6.0 EHP5 system customer is using Data Archiving

    Dear All,
    I am planning to do SAP Upgrade from 4.6C to ECC 6.0 EHP5, in the source system customer is using SAP DATA ARCHIVING. As per some of the SAP Notes before downtime phase we need to disable all the dataarchiving jobs .
    1) My question is do we need to do any presteps before starting the upgrade related to SAP DATA ARCHIVING ?
    2) After the upgrade if customer wants to use the old archiving objects etc... whether they will able to do it. For this do we need to raise any message with SAP regrading the dataarchiving before the upgrade
    Please let me know if you have any ideas on the above questions.
    Thanks & Regards
    Ravikiran

    Hi,
    I would suggest you to do the data archiving after upgrade project or finish data archiving before upgrade project. As lots of new archiving objects has been delivered in ECC.
    Also, its true that before starting downtime project you need to stop all your jobs. Also, SAP has recently introduced new retention management technique for data archiving starting from EHP4 onwards to manage data archiving more efficiently. If you are interested, you can explore this further on http://sdn.sap.com/irj/sdn/ilm or http://service.sap.com/ilm.
    Thanks
    Sunny

  • SAP Upgrade 4.7ee to ECC 6.0

    Dear experts
    we are planing SAP Upgrade 4.6 C to ECC 6.0 on windows 2003 Server with Oracle Database please anybody explain prerequests and post upgrade activities and upgrade phase's.
    what are the phase's are inportant...to monitor
    Regards
    Bandla

    Hi Bandla,
       Please check this beautiful [WiKi|https://www.sdn.sap.com/irj/scn/wiki?path=/display/erp6/learning+map].
    Regards,
    S.Manu.

  • Pipeline withdrawal fails after SAP upgrade 4.6B to ECC 6.0

    Hi experts,
    our customer has been using Water as a pipeline material for years now, but after upgrade to ECC 6.0, we receive error message M7009 (Special Stock P not defined) when trying to perform a goods issue to process order for this (same) article.
    Strangely, the error message only comes up when we use COR6 or MIGO's 'Goods issue to order' or 'to reservation', and not when we do 'goods issue other', manually take movement type 261 P, and check.
    Now since the only difference I can see at this point is the absence of the Reservation tab in MIGO, I assume the reservation has something to do with this error.
    Any ideas?

    Hi,
    before confirming production order via Co15, in goods movements, there is storage location populated for this material. If I delete SL for it, then goods movement is succesfully done.
    In ecc 5.0, SL is also populated but it is working fine.
    Any idea?
    Edited by: Alberto Emilio Gallardo Doñate on Apr 22, 2010 12:21 PM

  • SAP upgradation ?

    hii
    What will be the major work for MM consultant in SAP upgradation (4.5 to ECC 6.0).
    What is the latest version of SAP??
    Explain in more detail about MM consultant roles and responsibilities n SAP upgradation (4.5 to ECC 6.0).
    Thanks

    Normally upgradation project is basis driven project. Basis guys will prepare the system taking into consideration of all the aspects of the system. This itself is project called upgrade. Upgrading project mostly involves testing with the existing system with the new system. SAP already released the release notes for this Upgrading ECC 6.0{example 4.6C to ECC 6.0}. (1).Functional consultant have to do unit test/Integration test/Regression test in new system based on the business process documents prepared for your present system. (2).Functional consultant mostly encounter Interface issues (If exist)/Authorization issues/Enhanced naming issues/Usage issues. (3).Example:In older version you have to do external configuration for CIN. However .In ERP 2005, It is already in built. Hence Knowledge of CIN will be more than sufficient to manage the CIN issues. (4). More over Functional consultant must be very confident in the business process. Unless you will receive many UAT issues. (5). Whenever Functional consultant do unit test and Integration test, use user id to.When you do regression testing, get the user id from user copy all the roles from the user id and create new id. Using this new id you do the Regression testing. This will avoid many problems. (6). Another Important, big issue is patch work information. For example After release of 46C, SAP released many patches for 46C.However these patches are all not updated in to your present 46C system. These patches are already in built in ECC 6.0, hence you will get diff.result when you do testing. If such a case, advices the user about the patch work, and proceed. In most of my cases, SAP enjoyed with 46C without patch scenario, but in ECC6.0 they started to complain, b'cas the new patches.
    Check this link for further details:
    Re: upgrade from 4.7 to 6.0
    Edited by: Afshad Irani on Aug 9, 2010 11:35 AM

  • SAP Security Upgrade 4.6C to ECC 6.0

    Hello Gurus,
    we are upgrading our systems to ECC 6.0 from 4.6C.
    in SU25 step, do i need to manually go into every role and find the differences in Field values ?
    there are more than 2500 roles and its becoming tedious task.
    Is there any easy or other procedure available for the same ?
    Regards,
    Chaitanya

    There are many tricks you can use to shave a role upgrade down to about 2 day's work, but day 1 is during the implementation design way back when to consider upgrades much later on...
    Just knowing that you have 18k roles and 2500 turned red in step 2a is not enough infos to give you any efficient advice (I am not talking about your time... ;-).
    What is however obvious is that between 2a and 2c there is 2... ah...?!?! That is your next closest catalyst, but dont hit the "accept SAP data" button unless you have not done any changes in SU24!
    Some other key figures for upgrades are:
    - Number of roles with distinctly different menus.
    - Number of changed auths which are not copies.
    - Number of manual auths needing manual adjustments.
    - Obsolete and disabled objects.
    - Security patches for unnoticed missing auth-checks.
    - Cut-over, development freeze and parallel maintenance time period.
    Cheers,
    Julius

  • WCF-SAP Adapter throwing errors after SAP Upgrade from ECC 5 to ECC6 Release 640 to 700

    Hello Everyone,
    We were able to communicate(Send and Receive Idoc's) to SAP via WCF-SAP Adapter in BizTalk 2010.
    SAP Servers were upgraded to ECC5 to ECC 6 and we started facing below issue communicating on send and receive both.
    I am aware that there is a hotfix available but that is more on the Receive Side from SAP. Nevertheless I installed the hotfix but issue still persists. Any suggestions will be highly appreciated.
    Microsoft.ServiceModel.Channels.Common.XmlReaderParsingException: The segment name is not valid for the IDOCTYP, Release, or CIMTYP. Segment name: E2EDP01006GRP   IDOCTYP: ORDERS05   
    Release: 700    CIMTYP: . Ensure that your message xml validates against the operation schema.
    Server stack trace:
       at System.Runtime.AsyncResult.End[TAsyncResult](IAsyncResult result)
       at System.ServiceModel.Channels.ServiceChannel.SendAsyncResult.End(SendAsyncResult result)
       at System.ServiceModel.Channels.ServiceChannel.EndCall(String action, Object[] outs, IAsyncResult result)
       at System.ServiceModel.Channels.ServiceChannel.EndRequest(IAsyncResult result)
    Exception rethrown at [0]:
       at System.Runtime.Remoting.Proxies.RealProxy.HandleReturnMessage(IMessage reqMsg, IMessage retMsg)
       at System.Runtime.Remoting.Proxies.RealProxy.PrivateInvoke(MessageData& msgData, Int32 type)
       at System.ServiceModel.Channels.IRequestChannel.EndRequest(IAsyncResult result)
       at Microsoft.BizTalk.Adapter.Wcf.Runtime.
    Thanks,
    Vikingss

    I am aware that there is a hotfix available but that is more on the Receive Side from SAP. Nevertheless I installed the hotfix but issue still persists. Any suggestions will be highly appreciated.
    For this issue, you can contact Microsoft support directly(http://support.microsoft.com).

  • Step by Step procedure of SAP upgrade + Oracle upgrade from 4.6C to ECC 6.0

    Hi Chaps,
    Could you please provide the step by step procedure of end to end SAP Upgrade which includes oracle database upgrade as well..and post upgrade process tooo....
    Thanks
    Keshav

    There is nothing like that.
    Each system is different, each application is different; on top of that it would be WAY too much to post here.
    Get your upgrade guides:
    http://service.sap.com/instguides
    --> SAP Business Suite Applications
    --> SAP ERP
    -> SAP ERP 6.0
    --> Upgrade
    --> Upgrade Documentation - SAP ERP 6.0 SR3
    Here choose your OS and platform and read all the notes. Be prepared to use a week just for technical preparation and documentation/notes checking before you even doubleclick on something.
    For the Oracle Upgrade use
    http://service.sap.com/instguides
    --> Other Documentation
    --> Database Upgrades
    --> Oracle
    Markus

  • SAP SRM 7.0 with ECC EHP 4 components to execute scenario

    Hi All,
    I am new to SAP SRM 7.0.Could you please let me know that what are all the components needs to be in place to execute the technical scenarios and business scenarios.I had an hands on experience on SAP SRM 5.0 with ECC 6.0 backend.
    Some where i read that there are lot of configuration  changes when we integrate SRM 7 with ECC EHP 4.Do we need to have PI 7  for executing Centralized contract and plan driven procurement scenario?Please guide me to have some exposure towards higher version.Thank you in advance.
    Best Regards,
    praveen

    Hello,
    You can refer the INSTALLATION AND UPGRADE INFORMATION , Master guides etc maintained at the below mentioned location which will answer all your query's here.
    Goto URL http://service.sap.com/srm-inst and then navigate to SAP SRM --> SAP SRM Server 7.0 .
    Best Regards,
    Rahul

  • Upgrade from 46C to ECC 6

    Hello:
    We are planning to begin technical upgrade in SAP, from 46C to ECC 6.0.
    I have the next landscape:
    -Current SAP (CS): SAP 46C with Oracle 8.1.7 and Solaris 8
    -New Server (NS): Without SAP, 40% more of capacity, with Oracle 10.2 and Solaris 10 already installed.
    We want to install SAP ECC 6.0 in NS and get the data from CS.
    Which is the best and easy way to do this? SAP manuals are quite generic. I have two ideas but I would like your comments:
    1st way
    1. Homogeneous copy of CS
    2. I install ECC 6.0 in NS with the option to import data generated in 1. (is this possible??)
    3. Finish installation and aditional configurations. I begin to test.
    2nd way
    1. Homogeneous copy of CS
    2. I install 4.6C in NS with the option to import data generated in step 1. (Not sure if 4.6C will accept Solaris 10 and Oracle 10.2).
    3. I suppose I don't need to reconfigure after installation and import.
    4. I do necessary tests. At this point I would have 46C on the new versions of Solaris and Oracle.
    5. I begin the SAP upgrade to ECC 6.0 in NS
    6. .... The remaining processes indicated by SAP
    Thanks for your attention.

    > -Current SAP (CS): SAP 46C with Oracle 8.1.7 and Solaris 8
    > -New Server (NS): Without SAP, 40% more of capacity, with Oracle 10.2 and Solaris 10 already installed.
    The database software is usually installed during the run of sapinst/R3setup, not before. You may run into problems if you pre-install Oracle (environment, necessary database options not set etc.)
    The easiest way would be do to a system copy.
    I would then
    - install the latest Oracle instantclient
    - install the latest kernel 46D_EX2 kernel
    Markus

  • SAP upgrade - questions for report painter and query

    Hi Experts,
    I have two quwstions of SAP upgrade.
    My requirement is: SAP upgrade from 4.6B to ECC 6.0 with non-unicode.
    1.Does SAP upgrade influence the report painter? If influence, could you tell me what should I do for this case.
    2. We have so many queries (SQ01) in our system and many of them haven't been run for a long time. we need a tool to get the runtimes of queries in a certain durition.
    For example: From 2008/01/01 to 2008/03/31,I want to know how many queries had been run/ query name/ runtimes of each query.
    Best regards,

    > 1.Does SAP upgrade influence the report painter? If influence, could you tell me what should I do for this case.
    You can check
    Note 1155524 - ReportWriter: Upgrade Issues ECC6.0 -Common Customer Issues
    > 2. We have so many queries (SQ01) in our system and many of them haven't been run for a long time. we need a tool to get the runtimes of queries in a certain durition.
    Such a tool was RBE (Reverse Business Engineer) - which is out of support.
    You can try to get that information from ST03. If that is not enough there's no other way than booking an SLO service to find out the queries that have not been used (http://service.sap.com/slo).
    Markus

  • Role of Time Mgmt functional consultant during SAP Upgrade from 4.7 to ECC6

    Hi,
    Could anyone explain the role of a time management functional consultant during SAP upgrade from R/3 4.7 to ECC6.0. Please provide me if you got any documentation.
    Thanks,
    Sunny

    "After you upgrade to SAP ERP 6.0, you can enhance the functionality of your application without performing a further
    upgrade thanks to a new deployment technology u2013 the SAP enhancement package for SAP ERP. The enhancement
    packages simplify the way you manage and deploy new software functions for SAP ERP." - that is the real benefit of ECC 6.0
    There aren't any major changes to PTM functionalities from 4.7 to 6.0. I hope your system is already using IT 2006 instead of IT 0005. Under functional role, you are required to configure/test any functional upgrade and manage data.
    Regards
    Yash

  • Recommandations for upgrading from 46C to ECC 6.0

    Hello
    Our SAP system landscape is actually in 46c and is only composed of 3 servers with almost 40 users declared (25 actives) on production system. Modules FI/CO HR MM are actually implemented.
    We plan to upgrade the system to ECC 6.0 between March and August of 2009. The evaluation of the upgrade should begin as soon as possible. Do you think it can be possible to realise the upgrade alone, without the help and expertise of a SAP consultant? Do you think the delay for preparing the upgrade is suffisant?
    Thank you.

    As suggested earlier, refer to Master and technological guides for reference.
    also for information, the upgrade can fall under any below scenarios.
    1. Strategic Business Improvement
    Focus on functionality extension and improvement
    Enablement of new and optimized business processes and scenarios based on new ERP core functionality
    2. Functional/Retrofit Upgrade
    New functionality to be implemented as part of the upgrade, modification clearing
    Focus on reduction of system complexity
    3. Technical Upgrade
    Focus on pure technology upgrade
    Retain functionality used
    Review Usage of custom developments
    As per the requirement.  knowledge and experience the decision can be made.

Maybe you are looking for

  • Error while opening Non-Catlog request in iprocurement

    Hi All, When i am opening the page it is giving error msg as follows. oracle.apps.fnd.framework.OAException: java.lang.NullPointerException      at oracle.apps.fnd.framework.OAException.wrapperInvocationTargetException(OAException.java:975)      at o

  • Can`t post replies in photoshop feature requests section

    the reason is probably obvious but not to me, I cannot post a reply to anyones comments or thread in the photoshop feature requests, it usually reads "reply" to be able to comment on anothers comment, but only reads "report abuse" in the photoshop fe

  • System center sql 2012 remote or local install

    Guys I'm testing System Center 2012 R2 right now I plan on installing configuration manager for starters. I would like to ask you guys did you install your sql server instance locally for System Center or do you have a remote SQL server installation

  • Photos icon does not appear

    I am currently logged on to Icloud.com and can see all icons expect Photos, how can I retreive my photos thru Icloud in my PC. I know I backed them up.

  • Reinstalling Safari on OS 10.5.8

    Hi Everyone, A while back I deleted my Safari program as I opted to use Firefox instead.  Now I have discovered that it may be a better browser to access certain webinars I need to participate in.  I have tried to download a version appropriate for m