SAP Upgrade - Features

Hi,
We are working in a sap upgrade project ECC 5.0 to ECC6.0. We have found a issue in the features ( PE03) after the upgrade of the dev system. The modifications done to the features has now been overwritten by sap.
eg: The dates maintained in the Feature GBCHG - decision tree nodes are not the same before and after upgrade.
1. Are changes to features captured in SPAU/SPDD or what is the way to find out which/what features need to be adjusted again ?
2. Are there any other sap hr objects configurations which needs to be taken care similar to features?
Thanks
Jagruthi

@ Jagruthi:
Hmmm, have you checked the overall structure of the Feature in QA using PE03.  A lot of implementations change the way a structure is used to assist their configuration.
When you are in PE03 click on Attributes to look at the author of the changes for the Feature.  This is seen on the Administrative Data box (bottom of the page).  Notice if Last Changed is a User Name of a company user instead of SAP.
Also when you're in this view, review the actual structure to determine if the same Structure and fields match what you have in DEV.
I really doubt SAP has changed the Feature from ECC 5 to ECC 6.  It is much more likely someone has reconfigured the Feautre a long time back.
Cheers, Al

Similar Messages

  • Need knowledge on sap upgrade 4.7 to ecc 6.0 in abap reports and sap query

    please give me some ideas and useful links on sap upgrade 4.7 to ecc 6.0 in abap reports and sap query

    Hi Jaya,
    Not very clear with your question.
    Are you looking for changes in areas od ABAP reports & SAP query when we upgrade SAP from 4.7 to ECC 6.0 ??
    If the response is YES, then please refer to SAP solution browser www.sapsolutionbrowser.com
    Define source release and target release .
    You will get module wise details on new features for target release.
    Hope this helps.
    Regards,
    Deepak Kori

  • SAP Upgrade documents

    Hi,
    Required SAP Upgrade documents for functinal upgrade
    Please me to kareemsap at Gml
    Thanks in advance
    kareem

    I believe you are on Functional side. If that is the case, you only need to know whats new in ECC 6.0 compared to ECC 5.0.
    A quick look at http://erp.fmpmedia.com/Default.aspx?alias=erp.fmpmedia.com/english will give you a fair idea. However, you need to read in SAP Help too before jumping on to upgrade.
    An upgrade means, you need to make sure old features remain and new are added.
    Regards
    Yash

  • SAP Upgrade  from SAP R/3 4.6 C to ECC6.0,  Delete DMC componenet

    Dear All,
    We are upgrading SAP from R/3 4.6C  to ECC6.0 . Our client has installed DMC in 4.6C as a "Main transport" request .   DMC becomes an Add-on tool in ECC6.0 . SAP pepare phase recognize DMC is already installed in 4.6C  and required  upgrade CD 51031689.  Upgrade CD 51031689 is not available in marketplace and required an restricted access . Actually  we are not using DMC component and would not  planning to upgrade to DMC 6.0 . SAP Upgrade Prepere phase has  facility to mark as "Delete" for unwanted add-on componenets. We are able to select "delete" radio button for other Add-on compoenents  but unfortunately "IS_SELECT" phase doesn't provide me an option to select "delete" radio button .Any  help/suggestions are highly appreciated.
    Thanks
    Mahendra

    Hi
    Try this link, which will give functionality enchancements between different versions of SAP.
    http://solutionbrowser.erp.sap.fmpmedia.com/
    Regards
    Ramakrishna

  • Error in SAP Upgrade 4.6C to ECC 6.0 in CONFLICT_CHECK Phase

    Hi All,
    I am doing an SAP Upgrade frm SAP 4.6C SR2 to ECC 6.0 SR2. When it enters the CONFLICT_CHECK we are facing the following error. i am performing this on Production system. Your immediate help is highly appreciated.
    #---- MASKING file CONFLCHK.LOG from E:\usr\sap\put\log
    #---- TIME: 20091212095249
    1 ETQ201XEntering upgrade-phase "CONFLICT_CHECK" ("20091212094722")
    2 ETQ367 Connect variables are set for standard instance access
    4 ETQ399 System-nr = '22', GwService = 'sapgw22'
    4 ETQ399 Environment variables:
    4 ETQ399   dbs_ora_schema=SAPR3
    4 ETQ399   auth_shadow_upgrade=0
    4 ETQ399 (trc) R3upExtendedInclusion: TRUE (default)
    4 ETQ399 (trc) R3upExtendedInclusion: TRUE (default)
    2 ETQ160 Starting conflict check
    4 ETQ010 Date & Time: 20091212094722 
    4 ETQ230 Starting RFC Login to: System = "CPA", GwHost = "DERSHASKFI140", GwService = "sapgw22"
    4 ETQ359 RFC Login to: System="CPA", Nr="22", GwHost="DERSHASKFI140", GwService="sapgw22"
    4 ETQ232 RFC Login succeeded
    4 ETQ233 Calling function module "SPDA_CONFLICT_CHECK" by RFC
    2EETQ360 RFC of "spda_conflict_check" failed:
    2EETQ361 code/exception  : SYSTEM_FAILURE
    2EETQ362 key             : RFC_ERROR_SYSTEM_FAILURE
    2EETQ364 message         :
    2EETQ399 SQL error 1654 occurred when accessing table OCSCMPLOBJ                    .
    4 ETQ359 RFC Login to: System="CPA", Nr="22", GwHost="DERSHASKFI140", GwService="sapgw22"
    4 ETQ232 RFC Login succeeded
    2EETQ235 Call of function module "SPDA_CONFLICT_CHECK" by RFC failed (error-status "-2")
    4 ETQ239 Logging off from SAP system
    4 ETQ010 Date & Time: 20091212094903 
    4 ETQ010 Date & Time: 20091212094903 
    Hemanth

    Hi,
    > 2EETQ399 SQL error 1654 occurred when accessing table OCSCMPLOBJ           
    Have you checked tablespace have sufficient space ?
    Thanks
    Sunny        .

  • SCC4 - Protection against SAP upgrade

    Hello guys,
    i have a question regarding to the "Protection against SAP upgrade" flag in SCC4 for the client settings.
    I know that this flag will make a client unusable in case of an upgrade (for example from ERP2004 to ERP2005), but what is about applying support packages?
    Is this flag also valid for support packages?
    The documentation about this parameter does not make a statement to this point:
    > If this flag is set, the client is no longer supplied with data during SAP upgrades. After an SAP upgrade, it is not possible to work actively in the client. The flag can only be set for a test client or an SAP reference client (Early Watch).
    Does SAP understand "applying support packages" as an upgrade?
    Answers will be rewarded.
    Regards
    Stefan

    No.
    Applying SP is not SAP upgrade.
    -Pinkle

  • Can we do oracle 11g software installation in parallel to SAP upgrade

    Hi Basis Expert,
    I need your inputs for one of this query
    The query is. Can we do oracle 11g software installation in parallel to SAP upgrade when the system is in Downtime phase.
    The idea is running SAP upgrade and in parallel running oracle 11g software installation. So that we can reduced the time.
    Please share your valuable inputs.
    Regards,
    Anil Shenoy.

    yes, of course.
    using different environment during the installation of the new engine, you could install the new oracle home 11 also tomorrow (including the SBP).
    infact, before the ./RUNINSTALLER you have to set the environment
    setenv ORACLE_HOME /oracle/SID/112_64
    setenv ORACLE_HOME_SRC /oracle/SID/102_64
    setenv ORACLE_HOME_TGT /oracle/SID/11202
    setenv  LIBPATH $ORACLE_HOME/lib:$LIBPATH
    setenv PATH /oracle/SID/112_64/bin: $PATH

  • What are the roles & responsibilites of consultant in SAP upgradation or mi

    Hello ,
    Would you please any dody help me to provide the role & responsibilities of consultant in SAP upgradation or migration project.Thanks.
    Regards,
    Sampally

    Hello,
    If the project is of technical up gradation then with no functionality changed, Then the job of abap consultant is critical, right from creating spdd and spau, interfaces, debug the new programs and fix the bugs if exists in the new programs. The functional consultant has to test the new system from functions point of view; functional consultant is responsible for taking user acceptance test before going on live to the new system.
    Regards,
    Vivek

  • SAP upgrade - questions for report painter and query

    Hi Experts,
    I have two quwstions of SAP upgrade.
    My requirement is: SAP upgrade from 4.6B to ECC 6.0 with non-unicode.
    1.Does SAP upgrade influence the report painter? If influence, could you tell me what should I do for this case.
    2. We have so many queries (SQ01) in our system and many of them haven't been run for a long time. we need a tool to get the runtimes of queries in a certain durition.
    For example: From 2008/01/01 to 2008/03/31,I want to know how many queries had been run/ query name/ runtimes of each query.
    Best regards,

    > 1.Does SAP upgrade influence the report painter? If influence, could you tell me what should I do for this case.
    You can check
    Note 1155524 - ReportWriter: Upgrade Issues ECC6.0 -Common Customer Issues
    > 2. We have so many queries (SQ01) in our system and many of them haven't been run for a long time. we need a tool to get the runtimes of queries in a certain durition.
    Such a tool was RBE (Reverse Business Engineer) - which is out of support.
    You can try to get that information from ST03. If that is not enough there's no other way than booking an SLO service to find out the queries that have not been used (http://service.sap.com/slo).
    Markus

  • PDF in Japanese language not appearing after SAP upgrade

    Hi,
    When a P.O. is generated and when user clicks on Print Preview a PDF file will be generated and sent to the Vendor in Japanese Language, It was working fine now some SAP upgrades has  been done last week, Now nothing appears in the PDF P.O. generated, So please let me know what went wrong and is there a seperate package for Japanese language or how to go about this.
    Points assured.
    Regards,
    Prabhu

    Please help me.....
    Points assured
    regards,
    Prabhu

  • Put Together A Data Archiving Strategy And Execute It Before Embarking On Sap Upgrade

    A significant amount is invested by organizations in a SAP upgrade project. However few really know that data archiving before embarking on SAP upgrade yields significant benefits not only from a cost standpoint but also due to reduction in complexity during an upgrade. This article not only describes why this is a best practice  but also details what benefits accrue to organizations as a result of data archiving before SAP upgrade. Avaali is a specialist in the area of Enterprise Information Management.  Our consultants come with significant global experience implementing projects for the worlds largest corporations.
    Archiving before Upgrade
    It is recommended to undertake archiving before upgrading your SAP system in order to reduce the volume of transaction data that is migrated to the new system. This results in shorter upgrade projects and therefore less upgrade effort and costs. More importantly production downtime and the risks associated with the upgrade will be significantly reduced. Storage cost is another important consideration: database size typically increases by 5% to 10% with each new SAP software release – and by as much as 30% if a Unicode conversion is required. Archiving reduces the overall database size, so typically no additional storage costs are incurred when upgrading.
    It is also important to ensure that data in the SAP system is cleaned before your embark on an upgrade. Most organizations tend to accumulate messy and unwanted data such as old material codes, technical data and subsequent posting data. Cleaning your data beforehand smoothens the upgrade process, ensure you only have what you need in the new version and helps reduce project duration. Consider archiving or even purging if needed to achieve this. Make full use of the upgrade and enjoy a new, more powerful and leaner system with enhanced functionality that can take your business to the next level.
    Archiving also yields Long-term Cost Savings
    By implementing SAP Data Archiving before your upgrade project you will also put in place a long term Archiving Strategy and Policy that will help you generate on-going cost savings for your organization. In addition to moving data from the production SAP database to less costly storage devices, archived data is also compressed by a factor of five relative to the space it would take up in the production database. Compression dramatically reduces space consumption on the archive storage media and based on average customer experience, can reduce hardware requirements by as much as 80% or 90%. In addition, backup time, administration time and associated costs are cut in half. Storing data on less costly long-term storage media reduces total cost of ownership while providing users with full, transparent access to archived information.

    Maybe this article can help; it uses XML for structural change flexiblity: http://www.oracle.com/technetwork/oramag/2006/06-jul/o46xml-097640.html

  • Role of Time Mgmt functional consultant during SAP Upgrade from 4.7 to ECC6

    Hi,
    Could anyone explain the role of a time management functional consultant during SAP upgrade from R/3 4.7 to ECC6.0. Please provide me if you got any documentation.
    Thanks,
    Sunny

    "After you upgrade to SAP ERP 6.0, you can enhance the functionality of your application without performing a further
    upgrade thanks to a new deployment technology u2013 the SAP enhancement package for SAP ERP. The enhancement
    packages simplify the way you manage and deploy new software functions for SAP ERP." - that is the real benefit of ECC 6.0
    There aren't any major changes to PTM functionalities from 4.7 to 6.0. I hope your system is already using IT 2006 instead of IT 0005. Under functional role, you are required to configure/test any functional upgrade and manage data.
    Regards
    Yash

  • SAP Upgrade issue  ABAP-PI Proxy error

    Hi Guys,
    We have an issue in SAP R3 system after the recent SAP upgrade.
    The proxy programs in R3 were using SAP Standard structure in their development.
    Standard structure : SAPPLCO_LOG_ITEM_CODE (TYPE SAPPLCO_LOG)
    And so after the upgrade, There seems to be a new field added in the above standard structure and hence causing mismatch between the proxy program developed internal structure to the SAP standard structure.
    We come to understand that this Standard structure is being used from SAP PI, Software component SAP APPL.
    So SAP PI has old SAP standard structure and SAP R3 has new standard structure with additional field.
    Can you please suggest how to overcome this issue. We have also raised an OSS ticket to SAP.
    Kind Regards
    Rajesh.S

    Hi Harald,
    Thank You for the information. I was able to download SAP_APPL 6.06 content from SAP service market place. Here We have a doubt before importing the new SAP APPL content. In market place downloads under SAP_APPL 6.06 we were able to see few many database downloads with last changed at 3.04.2014.
    Our EHP upgrade for SAP_APPL is 6.06 , SP level 0007. So we should download / import  the highlighted content version (SAPAPPL60607) in the screenshot from market place or download / import the latest change under SAP_APPL 6.06 download patch ? Kindly let us know.
    Best Regards,
    Rajesh.S

  • SAP Upgrade 4.6C to ECC 6.0 EHP5 system customer is using Data Archiving

    Dear All,
    I am planning to do SAP Upgrade from 4.6C to ECC 6.0 EHP5, in the source system customer is using SAP DATA ARCHIVING. As per some of the SAP Notes before downtime phase we need to disable all the dataarchiving jobs .
    1) My question is do we need to do any presteps before starting the upgrade related to SAP DATA ARCHIVING ?
    2) After the upgrade if customer wants to use the old archiving objects etc... whether they will able to do it. For this do we need to raise any message with SAP regrading the dataarchiving before the upgrade
    Please let me know if you have any ideas on the above questions.
    Thanks & Regards
    Ravikiran

    Hi,
    I would suggest you to do the data archiving after upgrade project or finish data archiving before upgrade project. As lots of new archiving objects has been delivered in ECC.
    Also, its true that before starting downtime project you need to stop all your jobs. Also, SAP has recently introduced new retention management technique for data archiving starting from EHP4 onwards to manage data archiving more efficiently. If you are interested, you can explore this further on http://sdn.sap.com/irj/sdn/ilm or http://service.sap.com/ilm.
    Thanks
    Sunny

  • SAP Upgrade 4.7ee to ECC 6.0

    Dear experts
    we are planing SAP Upgrade 4.6 C to ECC 6.0 on windows 2003 Server with Oracle Database please anybody explain prerequests and post upgrade activities and upgrade phase's.
    what are the phase's are inportant...to monitor
    Regards
    Bandla

    Hi Bandla,
       Please check this beautiful [WiKi|https://www.sdn.sap.com/irj/scn/wiki?path=/display/erp6/learning+map].
    Regards,
    S.Manu.

Maybe you are looking for

  • 1st Generation iPod problem - folder icon/exclamation!

    Any help would be appreciated. I have a 1st generation iPod and it has worked fine since 2002. The battery seems fine and have had no problems with it until yesterday. When I connected my iPod via firewire to my Mac, iTunes wouldn't recognize it. The

  • Upgrade WLC 5508 Ver. 7.0.98.0 to Ver 7.6.110.0

    i will upgrade WLC 5508 Ver 7.0.98.0 with License 50 AP. to Ver 7.6.110.0 will it ask to install license ?

  • Why is my text jumping?!??!

    Hi there, I often get this problem. I'm working on a DV NTSC project and often when I have moving text I get this bouncing letter problem. You can download here [3.5MB] http://www.box.net/shared/static/o1ccf7xafa.mov and see what happens with the let

  • Finder is really slow ( 15 sec.) after mavericks update on brand new iMac 27" WITH fusion drive...

    When looking up files it's fine, but when trying to save or open anything through ANY program, i.e. Adobe CS6 programs, Microsoft Word, but also Apple software, finder is really slow (15 sec. or more of the same spinning beach ball) after the OSX Mav

  • Problem with BTNetProtect Plus

    Hi, About two weeks ago there was a major update from McAfee .. the next day my pc kept locking up, I couldn't do anything with it.  So I had to open in Safe Mode and restore registry to a previous date before the McAfee update. That got my pc workin