SAP Upgrade  from SAP R/3 4.6 C to ECC6.0,  Delete DMC componenet

Dear All,
We are upgrading SAP from R/3 4.6C  to ECC6.0 . Our client has installed DMC in 4.6C as a "Main transport" request .   DMC becomes an Add-on tool in ECC6.0 . SAP pepare phase recognize DMC is already installed in 4.6C  and required  upgrade CD 51031689.  Upgrade CD 51031689 is not available in marketplace and required an restricted access . Actually  we are not using DMC component and would not  planning to upgrade to DMC 6.0 . SAP Upgrade Prepere phase has  facility to mark as "Delete" for unwanted add-on componenets. We are able to select "delete" radio button for other Add-on compoenents  but unfortunately "IS_SELECT" phase doesn't provide me an option to select "delete" radio button .Any  help/suggestions are highly appreciated.
Thanks
Mahendra

Hi
Try this link, which will give functionality enchancements between different versions of SAP.
http://solutionbrowser.erp.sap.fmpmedia.com/
Regards
Ramakrishna

Similar Messages

  • Upgrade from SAP Webas 6.40 to SAP Netweaver 2004s

    Do we have to change the virtual host name used for high availability clustering environment to local host name before we conduct the upgrade from SAP WebAS 6.40 to SAP NetWeaver 2004's ?

    Do we have to change the virtual host name used for high availability clustering environment to local host name before we conduct the upgrade from SAP WebAS 6.40 to SAP NetWeaver 2004's ?

  • Follow up activities after SAP (CU&UC) upgrade from SAP 4.6c to ECC6 EHP4

    Dear Friends
    We have completed SAP (CU&UC) upgrade from SAP 4.6c to ECC6 EHP4.
    We refereed the upgrade guide for follow activities and we required confirmation before performing the activities.
    Could you please help us what needs to be done immediately after upgrade.
    Regards,
    Bharathi

    Dear Nils,
    Thanks for the support.
    Yes, we are following the same document 'CUUC46C_to_NW701SP07' for unicode conversion after the upgrade from the note 928729.
    Please suggest us in that document which are the steps should be carried out after ECC6.0 EHP4 upgrade,
    1. Preparation
    2. Unicode Preconversion Phase in SAP Basis 4.6C
    3. Upgrade Process
    4. Unicode Conversion Phase
    5.  Unicode Conversion Completion Phase
    6. SAP Notes
    Regards,
    Bharathi

  • Is it possible for XI 2.0 to connect to ECC 6.0 upgraded from SAP R/3 4.6?

    Hi,
    I just wanted to know whether it is possible for XI 2.0 to be used with ECC 6.0 which is upgraded from SAP R/3 4.6.
    If yes, could you forward some links so as to know how.
    Thanks,
    Fariha

    hi,
    >>>>Is that Possible..?
    yes
    >>>Wont there be any additional configuration needed ?
    if you use IDOCs then you don't need anything special
    Regards,
    michal

  • How  to Upgrade from SAP NetWeaver 7.01 to NW 7.02?

    Hi Experts,
      I am working on GRC upgrade project,we need upgrade to GRC10.0 from GRC3.0.
    GRC 10.0 only work on NW7.02,we now have NW7.01. 
      How  to Upgrade from SAP NetWeaver 7.01 to NW 7.02?
    Use EHPI tools or just spam/saint  or any other way ?
    current version:
    SAP_ABA 701 0006 SAPKA70106
    SAP_BASIS  701 0006 SAPKB70106
    PI_BASIS 701 0006 SAPK-70106INPIBASIS
    SAP_01 0006 BW SAPKW70106
    Thanks!

    HI,
    Net wevaer 7.2 CE is totally different from Net weaver 7.01.
    No relation i feel.kindly check the links.
    http://help.sap.com/saphelp_nwce72/helpdata/en/44/d958673ef05f4de10000000a11466f/frameset.htm
    http://help.sap.com/content/documentation/netweaver/index.htm
                      OR
    You do not need Netweaver 7.2 CE for using NWBC 3.0. You just need netweaver 7.02.
    You simply need to apply enhancement package 2 on your existing 7.01 system to make it 7.02.
    Please refer to installation guides on service marketplace, there you can see the EHP2 installation guides.
    Also, see SAP Note 900000 - Netweaver Business Client - FAQ. This will give you all the details required.
    *Regards,
    Ajitabh

  • Upgrade from SAP BO 3.1 SP3 to SAP BO 3.1 SP5

    Hi
    We are doing upgrade from SAP BO 3.1 SP3 to SAP BO 3.1 SP5, can you please help in below points
    1. How much time does it take to run SP5 upgrade service pack for servers and client tools. The server need to be upgraded only on weekend, is it possible to upgrade in 1.5 days?
    2. The OS is Windows 2008 server. what should be the rollback plan in case of upgrade failure ? One of server uses VM image while Production server doesnt have any VM image.
    3. If BO client tools are on SP3, can they still connect to BO server components on SP5 - (for interim period when servers are upgraded first)
    Thanks
    anu

    Hi Anu,
    1. The upgarde should be completed in 1.5 days for the server and client componenets depending upon the number of servers you have in the cluster . If you are planning for upgarde do it successfully first on TEST , DEV and then proceed with PROD servers
    2. The roll back plan includes thebackup of the CMS database , the filestore directory and the complete installation folder . In case of any issue , you can the place the backup . If the servers are on the VM , it is always recommeded to have the snapshot of the images before the upgrade
    3. Yes, they can connect to the SP3 servers , but always recommeded to upgarde and have servers and client tools on same patch .
    Thanks,
    Sneha

  • Role of Time Mgmt functional consultant during SAP Upgrade from 4.7 to ECC6

    Hi,
    Could anyone explain the role of a time management functional consultant during SAP upgrade from R/3 4.7 to ECC6.0. Please provide me if you got any documentation.
    Thanks,
    Sunny

    "After you upgrade to SAP ERP 6.0, you can enhance the functionality of your application without performing a further
    upgrade thanks to a new deployment technology u2013 the SAP enhancement package for SAP ERP. The enhancement
    packages simplify the way you manage and deploy new software functions for SAP ERP." - that is the real benefit of ECC 6.0
    There aren't any major changes to PTM functionalities from 4.7 to 6.0. I hope your system is already using IT 2006 instead of IT 0005. Under functional role, you are required to configure/test any functional upgrade and manage data.
    Regards
    Yash

  • Depreciation Run Error while Upgrading from SAP 4.6C TO ECC6.0

    Hi
    We are upgrading from 4.6c to ECC 6.0.  In ECC 6.0 we need to make the Number Range Interval as "Internal" and Batch Session tick to be removed from the Depreciation Document Type. 
    While executing depreciation run, it got terminated and I have done the above changes.  After that I have restarted the Depreciation.  I have got the following error Message.
    Message(s) during check of document ERROR00001
    Message no. AAPO511
    S:/SAPDMC/LSMW_AUX_020:006 20
    Message no. /SAPDMC/LSMW_AUX_020006
    If any body aware solution, kindly reply to this message
    Thanks
    siva

    Check this useful links
    Key differences between SAP 4.6 - ECC 6.0
    http://sap.ittoolbox.com/groups/technical-functional/sap-hr/difference-sap-ecc60-with-sap-r3-3161113
    LE/WM functionality difference between 4.6c and ECC 6.0
    differences between SAP R/3 ECC 6 & SAP R/3 4.6C in Material management mod
    Upgrade from SAP R/3 4.6 C to ECC6.0 - To find obselete and new tcodes
    Upgrade from SAP R/3 4.6 C to ECC6.0 - To find obselete and new tcodes

  • Error after upgrading from  sap b1 pl 35 to pl 49

    hello sap experts 
    iam getting the following error after upgrading from  sap b1 pl 35 to pl 49 this error is coming if we have given round off or discount in the below cell
    "Discount deviates from authorised ranges (sales oreder-discount%for document) [message 439-15] pls make it as soon as possible an i will be thankful to those guys .
    regards
    Jenny

    Hello Jenny,
    You may check by supreuser account first to see if you got the same error.  If not, it probably just related to user authorization.  If yes, it must be a bug.
    Thanks,
    Gordon

  • Impact of upgrade from SAP CRM Interaction Center 4.0 to 5.0 on Genesys CTI

    Hi Friends,
    I would like to know that what is the impact of upgrade from SAP CRM Interaction Center 4.0 to 5.0 on Genesys CTI software.
    1) Will there be anything we need to change?
                for e.g.
                     a) Settings
                     b) Software
                     c) Hardware
    2) What do we need to keep in mind when upgrading from SAP CRM Interaction Center 4.0 to 5.0?

    Hello!
    The biggest change you must face is related to Java. If you had CRM4.0 Java configuration, you must change your settings to the non-java configuration CRM5.0 has. Most of those changes are performed by the upgrade program, but you must activate services in transaction SCIF.
    Your other concerns:
    - Software: Most of the Genesys releases are compatible with both java and non java configurations. Anyway, I am sure Genesys has compatibility instructions.
    - Hardware: No changes to my knowledge
    <b>Hope it helps. Please, reward points if so</b>
    Regards
    Joaquin

  • Calling Non SAP programe from SAP program

    Hi Experts...
    Can we cal Non SAP programs Like Windows EXE programs from ABAP programs ?
    If yes Then How .....
    Regards ...
    ..Ashish

    Hi Ashish ,
    Ya we can call a non SAP program from SAP program.
    For example we can call a EXE program from the SAP program using the RFC connection created in SM59.
    In Sm 59 you can create a TCP/IP connection and give the path of the executable there.

  • How to make data available in SAP PI from SAP BI

    Hello All,
    I have certain data in a INFOCUBE ie in SAP BI and as per my requirement i want to push that data to SAP PI
    Can I get to know the process to make data available to SAP PI from SAP BI..?.
    It would really helpful if i get the step by step procedure for the same.
    Thanks in Advance.
    Regards,
    Foram

    Hi,
    SAP PI is the interface to move file from one system to other system like BI, R/3 etc.,
    Create open hub on top of Info cube based on your requirement. Create logical path and assign physical path to logical path using T-code FILE. Provide that logical path in Open hub destination where the file will be placed. Then SAP PI team will pick that file and process that file as per requirement.
    Thanks & Regards,
    Chandra Sekhar.

  • Books for SAP Script from SAP Press

    Do we have any books published for SAP Scripts from SAP Press ?

    Hi,
    Yes-> http://www.sap-press.de/katalog/buecher/titel/gp/titelID-667?GalileoSession=74564414A2Qf67.aL0Q
    Have also a look at
    http://www.amazon.com/gp/product/1893570142/102-2992344-7930525?v=glance&n=283155&n=507846&s=books&v=glance
    Eddy

  • How to stop start SAP system from SAP transactions?

    Hi Experts,
    How can i stop start the SAP system from SAP screens? Are there any transaction for this  need?
    thanks,
    philaphi

    Hi,
    Use Tcode RZ03 -->  Control --> Stop SAP Instance.
    Best Regards,
    Sachin.

  • Error during upgrade from sap R3 4.7 ext 110 to ERP6 EHP4

    Dear all
    we doing an upgrade in test server to ERP6 with EHP4,source release is sap Entreprise 4.7 110.We have copied all the required DVDs to the server .During the configuration phase while giving the EHP package we got the error.
    EHP_INCLUSION.log details
    4 ETQ233 Calling function module "SPDA_PREPARE_PATCH" by RFC
    4 ETQ234 Call of function module "SPDA_PREPARE_PATCH" by RFC succeeded
    4 ETQ239 Logging off from SAP system
    4 ETQ010 Date & Time: 20100915210509
    2 ETQ732 Package descriptions uploaded successfully
    4 ETQ399 Looking for SAINT package for 'SAP_APPL' ...
    4 ETQ399 R3upReadNewPackages:
    4 ETQ399   patchType='U', langVect='DE'
    4 ETQ359 RFC Login to: System="MBD", Nr="00", GwHost="saptest", GwService="sapgw00"
    4 ETQ232 RFC Login succeeded
    4 ETQ233 Calling function module "spda_read_new_packages" by RFC
    4 ETQ399   ismovesVersion='0'
    4 ETQ399 R3upReadNewPackages: exit: rc=0
    4 ETQ399      Found: name = 'SAP_BS_FND', release = '701', package = 'SAPK-701GGINSAPBSFND', type = 'AOX'
    4 ETQ399             (not usable, different component
    4 ETQ399 ... No matching package found.
    Is this related to the current SAP_APPL support pack version ?.currently we have
    SAPKH47031 SP 31 for SAP_APPL 4.70
    Regards
    Shahnas.S

    > i have few questions regarding above
    (Almost) all of your questions are answered in the note:
    > 2.Do wee need to apply the above note for non-unicode upgrade
    <...>
    Even on non-Unicode system you should replace all matchcodes that are still required by search helps.
    <...>
    > 3.Note 1330256  recomends to apply support pack or to apply the Note 1330256  ,but we can do it only at upgraded version.
    Yes - it avoids dumping with the dump mentioned in the note
    > 4.How to identify the matchcodes 
    <...>
    You can use the program TWTOOL01 to determine the existence of matchcodes.
    <...>
    > 5.How to delete them
    <...>
    You can then use the function module DD_MCOB_DEL to delete matchcode objects, and the function module DD_OBJ_DEL to delete matchcode IDs.
    <...>
    > 6.Impact of deleteing matchcodes
    None since they were replaces by search helps.
    Markus

Maybe you are looking for