SAP Upgradev from 4.7E to ECC 6.0
Hi,
We are doing SAP ecc 6. 0 upgradation from SAP 4.7EE.( database is 10.2.0.2 & WIN 2003 server)
After ran prepare we are getting the error message as mentioned below:
INFO> The following values may be preliminary because of
free space consumption during productive operation and
additional free space requests derived in a later stage.
Conversions of modified tables can require additional space.
Please use the largest free space request printed,
which are the values at the very end of this file.
ERROR> Insufficient free space in the database as follows:
Create TABLESPACE PSAPDIMD with 127 MB
Create TABLESPACE PSAPDIMI with 127 MB
Create TABLESPACE PSAPODSD with 139 MB
Create TABLESPACE PSAPODSI with 139 MB
Create TABLESPACE PSAPFACTD with 127 MB
Create TABLESPACE PSAPFACTI with 127 MB
Create TABLESPACE PSAPPTU700 with 33772 MB
INFO> To adjust the size of your tablespaces, you may use the commands
in file 'D:\usr\sap\put\log\ORATBSXT.LST' using the 'brspace' utility.
Please copy the file before making changes, as it may be
overwritten in subsequent upgrade phases.
INFO> During the upgrade, the new SAP kernel
will be installed. All files and subdirectories
in directory D:\usr\sap\PTU\SYS\exe\run which are not used
in Release 700 will be removed.
The files from "dbclient.lst" in the kernel directory are kept.
Files and subdirectories can be protected from deletion
if they appear in a file "protect.lst" in the same directory
(each protected name in a separate line).
For security reasons, directory D:\usr\sap\PTU\SYS\exe\run
should be saved in a backup.
INFO> It is possible to upgrade the frontend software before
you start SAPup!
#===========================================================#
PREPARE module General checks finished with status failed #
#===========================================================#
#=======================================================#
Requests and information for module Activation checks #
#=======================================================#
#=================================================================#
PREPARE module Activation checks finished with status succeeded #
#=================================================================#
#======================================================================#
Requests and information for module Necessary checks for conversions #
#======================================================================#
#================================================================================#
PREPARE module Necessary checks for conversions finished with status succeeded #
#================================================================================#
#=====================================================================#
Requests and information for module Optional checks for conversions #
#=====================================================================#
Information:
In file D:\usr\sap\put\log\TABCONV.LST you can see a list of tables
which will be converted in your SAP System during the upgrade.
The list of tables was determined at SAP and is not complete for
your system. Other tables might have to be converted due to your
modifications. The final list of tables can only be determined immediately
before the conversion during downtime. The list contains the names and
the size of the tables.
INFO> The following values may be preliminary because of
free space consumption during productive operation and
additional free space requests derived in a later stage.
Conversions of modified tables can require additional space.
Please use the largest free space request printed,
which are the values at the very end of this file.
ERROR> Insufficient free space in the database as follows:
Create TABLESPACE PSAPDIMD with 127 MB
Create TABLESPACE PSAPDIMI with 127 MB
Create TABLESPACE PSAPODSD with 139 MB
Create TABLESPACE PSAPODSI with 139 MB
Create TABLESPACE PSAPFACTD with 127 MB
Create TABLESPACE PSAPFACTI with 127 MB
Create TABLESPACE PSAPPTU700 with 33772 MB
INFO> To adjust the size of your tablespaces, you may use the commands
in file 'D:\usr\sap\put\log\ORATBSXT.LST' using the 'brspace' utility.
Please copy the file before making changes, as it may be
overwritten in subsequent upgrade phases.
#============================================================================#
PREPARE module Optional checks for conversions finished with status failed #
#============================================================================#
#==========================================================#
Requests and information for module Modification support #
#==========================================================#
PLEASE SUGGEST HOW CAN WE REMOVE THIS ERROR.
Thanks & Regards,
Madhu
Hi,
>
> ERROR> Insufficient free space in the database as follows:
>
> Create TABLESPACE PSAPDIMD with 127 MB
>
> Create TABLESPACE PSAPDIMI with 127 MB
>
> Create TABLESPACE PSAPODSD with 139 MB
>
> Create TABLESPACE PSAPODSI with 139 MB
>
> Create TABLESPACE PSAPFACTD with 127 MB
>
> Create TABLESPACE PSAPFACTI with 127 MB
>
> Create TABLESPACE PSAPPTU700 with 33772 MB
>
>
> Create TABLESPACE PSAPDIMD with 127 MB
>
> Create TABLESPACE PSAPDIMI with 127 MB
>
> Create TABLESPACE PSAPODSD with 139 MB
>
> Create TABLESPACE PSAPODSI with 139 MB
>
> Create TABLESPACE PSAPFACTD with 127 MB
>
> Create TABLESPACE PSAPFACTI with 127 MB
>
> Create TABLESPACE PSAPPTU700 with 33772 MB
>
As you can see prepare is saying to create the tablespace. Please create above tablespace then prepare check will be successful.
Thanks
Sunny
Similar Messages
-
SAP Upgrade from 4.7 to ECC 6.0 connected to BW 7.0 Best Practices
We are upgrading SAP R/3 4.7 to ECC 6.0. We have been running live in a BW 7.0 environment. We have done some enhancements for 2LIS_11_VAITM - Sales Document Item Data and 2LIS_13_VDITM - Billing Document Item Data datasources. We currently have a test instance that has been upgraded to ECC6.0.
What are the best business practices for testing BW to insure data transfer and enhancements are working correctly?
Eg. Should we connect the ECC6 instance to BWD and test there OR upgrade R/3 TST that is connected BWD and test there OR Upgrade QAS and test in BWQ.
Thanks in advance . . .
Edited by: RWC on May 4, 2011 6:26 PMHi RWC,
the plug-in will change slightly, you may notice differences in the screens of RSA2 and others after the upgrade.
Regarding best practices: In a recent upgrade our project team decided to create a parallel landscape with a new, additional Dev and QA on the R/3 side.
We connected these new systems to a BW Sandbox and the BW QA.
We identified all datasources, transfer rules and infopackages in use in production and recorded them with related objects onto transports in BW Dev. Before the import into BW Sandbox and BW QA we adjusted the system name conversion table to convert from old R/3 Dev to new R/3 Dev in order set up all the required connections for testing with the upgraded R/3 systems.
After the go LIVE of the upgrade we renamed the old R/3 Dev system in BW Dev and ran BDLS to convert everything (speak to your Basis team). That way we made sure not to lose any Development and we got rid of the old R/3 Dev system.
Take a look at this post for issues we encountered during this project and test everything you load in production.
Re: Impact on BI 7.0 due to ECC 5.0 to ECC 6.0 Upgrade
Best,
Ralf -
SAP Upgradation from 4.5B to ECC 6.0
Hi all,
We need to upgrade from 4.5B to ECC 6.0. Gathered all the information abt. the 4.5 B system...Its on AIX using ORACLE.
I want to know few more info. with your help. i have access to the system through GUI, but didnt have OS level access..
1.) How to know whether the system is CLUSTER configured, any transaction?
2.) I didnt find any Upgradation Guide particular to AIX, can u pls. guide me the path for that in SMP?
3.) How to check whether its using any third party tools(Like Fire Fighter...etc) and any usage types configured(Like PI, BI...)
please guide me in knowing the above through GUI?
Thanks,
SubbuHi,
Roadmap is the recomended way to manage the Upgrade project, but this will not make anything automatic. If you don´t have the knowledge and time to configure the project in Solman then just follow the Upgrade Guide. In this Roadmap is included Technical and Funtional processes and it is an excellent starting point for the project but as already said, if don´t have the knowledge or any other person from the team either, then don´t worry much about it althoug it is imperative that a good Project is designed before starting the process either using MS Project or any other software, after the first tests you will have to adjust times for next upgrades.
Buy the way in the upgrade guide there are some sections specially dedicated to AIX but most parts of the process are the same for any OS/DB combo. Basically check prerequisites, do prepare, fix what ever is necesary and then run upgrade process.
Read the Upgrade Guide 2 or 3 times to get a clear Idea on what should be done before, during and after the upgrade process, read all related notes and have them printed in case of any problem.
AND you should have access to OS level, if you don´t then when doing Prepare or Upgrade then you won´t be able to look at the logs and that is Vital during the process. Also need to have access to SAP directories to check and change files like copying upgrade DVD's, upgrading R3trans, TP, etc so explain that to them or make one of them to be next to you.
Good Luck -
Delta data migration on SAP upgread from 4.6C to ECC 6.0
Hi,
We are planning for SAP upgrade in our Production environment and we are facing the below listed constraints and need your advice on the options to peform ECC Upgrade.
1) Present HW resource is already facing bottleneck and so no additional load can be added.
2) We have a completely new HW environment due to which we are unable to perform the test upgrade.
Also, is there anyway to perform the Prepare Activities on new hardware (copy of Production system) first and then do the delta data migration for update of transactional data from present production system to new system (Prepare Activities done on this system) without affecting the Prepare Activities data.
Thanks & Regards,
PratapHi Pratap,
You can first make a copy of you production system on new hardware by homogeneous system copy. Then do the test upgrade if everything will be fine. Then as suggested earlier migrate your production to new hardware and then do the upgrade.
Thanks
Sunny -
HTML Page not appearing after SAP Upgrade from 4.6c to ECC 6.0
Dear All,
I am novice in ITS and IAC configuration stuff....
Issue: We have a HTML page which shows a tree structure of Functional location and Equipments. A Z transaction is built to cater the requirement. User logs on to the HTML page navigates thru the Tree structure of Functional locations and equipments and the logs the workrequest or Break down details. In 4.6C every thing is working fine. But after Upgrade in Testing Server (We are not go live yet) we are facing a problem where the HTML page with tree structure is skipped off and directly the Z transaction is appearing on the web page.
Did any one faced such issue? Any thoughts is highly appreciable?
Thanks,
Sanjay.Thanks Frank and Dhurairaj....and sorry for the delay in responding..
I have checked my service in SICF and it is active. I also tried to create a new Service and now I am now getting "500 Connection timed out" error.
Our Z transaction is ZW03 and Service name is ZW03_2.
We are on Netweaver 7 (2004s)
Steps I followed:
1. Created a Service ZW03_2 in SICF (New Sub element) and then Activated.
default host -> SAP -> bc -> gui -> sap -> its
2. Created a folder ZW03_2 under SAP->Public->ITS (Transaction SE80, MIME Repository) and imported all MIME objects into that folder.
3. Created a Internet Service ZW03_2 in SE80. Once I created a Service already there is blank folder Topic 99. Then I created two folders Mime Objects and HTML Templates. Imported all Mime objects into folder "Mime Objects" and Created templates in "HTML Templates" folder. Then I published ..
After doing all the above setting then I tried to test the service and I am getting 500 Connection time out.
Please let me know if I missed any step or if I have done any setting incorrectly.
Thanks,
Sanjay. -
Interview questions on upgrades from 4.7 to ECC
Hi,
Can any one please post some potential areas/questions that will be asked for upgrade projects from 4.7 to ECC6.0
Points will be awarded.
ThanksHi Frank,
this is good question, why because sap upgrades from 4.6b to ecc 6.0 is very risky.
take one example , in 4.5b , me21n application having 620 screen where as in ecc 6.0 having 9000 screen . that time we will take care of it.
check the obsolete function modules , 4.5b , having ws_upload, ws_download.... use cl_gui_frontend_services , under these having differnt type of methods.
once you change the code in ecc , go to tranx : SLIN check the error where it is exact. -
Asset query execution performance after upgrade from 4.6C to ECC 6.0+EHP4
Hi,guys
I am encounted a weird problems about asset query execution performance after upgrade to ECC 6.0.
Our client had migrated sap system from 4.6c to ECC 6.0. We test all transaction code and related stand report and query.
Everything is working normally except this asset depreciation query report. It is created based on ANLP, ANLZ, ANLA, ANLB, ANLC table; there is also some ABAP code for additional field.
This report execution costed about 6 minutes in 4.6C system; however it will take 25 minutes in ECC 6.0 with same selection parameter.
At first, I am trying to find some difference in table index ,structure between 4.6c and ECC 6.0,but there is no difference about it.
i am wondering why the other query reports is running normally but only this report running with too long time execution dump messages even though we do not make any changes for it.
your reply is very appreciated
Regards
BrianThanks for your replies.
I check these notes, unfortunately it is different our situation.
Our situation is all standard asset report and query (sq01) is running normally except this query report.
I executed se30 for this query (SQ01) at both 4.6C and ECC 6.0.
I find there is some difference in select sequence logic even though same query without any changes.
I list there for your reference.
4.6C
AQA0FI==========S2============
Open Cursor ANLP 38,702 39,329,356 = 39,329,356 34.6 AQA0FI==========S2============ DB Opens
Fetch ANLP 292,177 30,378,351 = 30,378,351 26.7 26.7 AQA0FI==========S2============ DB OpenS
Select Single ANLC 15,012 19,965,172 = 19,965,172 17.5 17.5 AQA0FI==========S2============ DB OpenS
Select Single ANLA 13,721 11,754,305 = 11,754,305 10.3 10.3 AQA0FI==========S2============ DB OpenS
Select Single ANLZ 3,753 3,259,308 = 3,259,308 2.9 2.9 AQA0FI==========S2============ DB OpenS
Select Single ANLB 3,753 3,069,119 = 3,069,119 2.7 2.7 AQA0FI==========S2============ DB OpenS
ECC 6.0
Perform FUNKTION_AUSFUEHREN 2 358,620,931 355
Perform COMMAND_QSUB 1 358,620,062 68
Call Func. RSAQ_SUBMIT_QUERY_REPORT 1 358,569,656 88
Program AQIWFI==========S2============ 2 358,558,488 1,350
Select Single ANLA 160,306 75,576,052 = 75,576,052
Open Cursor ANLP 71,136 42,096,314 = 42,096,314
Select Single ANLC 71,134 38,799,393 = 38,799,393
Select Single ANLB 61,888 26,007,721 = 26,007,721
Select Single ANLZ 61,888 24,072,111 = 24,072,111
Fetch ANLP 234,524 13,510,646 = 13,510,646
Close Cursor ANLP 71,136 2,017,654 = 2,017,654
We can see first open cursor ANLP ,fetch ANLP then select ANLC,ANLA,ANLZ,ANLB at 4.C.
But it changed to first select ANLA,and open cursor ANLP,then select ANLC,ANLB,ANLZ,at last fetch ANLP.
Probably,it is the real reason why it is running long time in ECC 6.0.
Is there any changes for query selcection logic(table join function) in ECC 6.0. -
Open item ( balance) can be find in upgrade from 4.7 to ECC 6
Dear experts
We are planning to upgrade our SAP system from 4.7 to ECC 6
One of my consultant told me that only open balance willbe moved ( customer /vendor open items)
How can it be done for the user if he want to see the details of cleared invoices/payment for the vendor/customer ????
Is this the drawback in SAP system
Rregars
Shamul heqI think the consultant is confused with Archiving, this is an upgrade and nothing will be lost!! all info for vendors, customers, old invoices, cleared invoices, etc will be there once the system is upgraded.
Regards, -
Structure SI_BBSEG not found during upgrade from 4.6C to ECC 6.0
Hi
We are upgradingour SAP system from 4.6c to ECC 6.0 and we are having an issue while generating the programs, error says '.INCLUDE SI_BBSEG ' not found. It seems like structure SI_BBSEG was not created by SAP'. How would i resolve this issue? i couldnt find any OSS note on this. Please advice.
thank you,
- AAnil
SI_BBSEG is Include structure of BBSEG & comes already included in it as std SAP. (u can see it in SE11 >> BBSEG)
It does not exist till you want to enhance BBSEG & add your custom fields. Normally those fields will be added to Std SAP screens as custom enhancements . You can go to SE11 & double click; it will ask Do you want to create ?
What is the process you are following for moving Enhancements from 4.6 to ECC6 (user Exits, screen exits) ? If this SI_BBSEG exists in old system, then there must be std screen enhanced which uses the fields of this structure. There could be some programs too which are using this structure while creating FI Documents using std BAPI. recomended that these should move to ECC6 together.
If you have not enhanced BBSEG in 4.6 then refer note : 590977 -
Data Migration from Legacy system to ECC systems via ETL through SAP PI
Hi All,
I wanted to know if we can migrate the data from Legacy systems to ECC systems via PI.
What I understand is there is ETL tool is used to extract the data from legacy system, and what client is looking to load that data via PI?
Can we do that ? I am concerned because this will involve mass data?
If I have to use PI , I see option of PROXY / IDOC /FILE as receiver in ECC system (take the data from ETL)?
Can somebody has done this earlier , please share the approach.
Thanks,
Pushkar PatelHi ,
I require few details from you.
1. What ETL tool you are using, If Informatica, it already have PowerConnect to connect to SAP. So you can create source and Target Structure and also you can use RFC's to send data to R/3. Else, for other ETL tools, can you prepare RFC's or any other way to send data to R/3. let me know the tool.
2. Does R/3 contains the master data tables? If yes, then try to use LSMW for Mass upload of data to tables.
If your client don't want to use either of these options please elaborate, what is the case.
Regards
Aashish Sinha -
Upgrade project : from SAP R/3 4.6C to ECC 6.0 by using SAP Data Services
Hi All,
My client is upgrading from SAP R/3 4.6C to ECC 6.0
We are planning to use SAP Data Services(Data Integrator) in the upgrade plan from SAP R/3 4.6C to ECC 6.0 for Data Migration.
we have no idea whether we can use this SAP Data Services(Data Integrator) in SAP upgrade data migration.
The bottom line is we have to make use this Data Services (Data Integrator) product in our upgrade plan for Data Migration.
Please tell us if anybody already used it such kind of scenario in a data migration project with Data Services(Data Integrator).
If we can use Data Service(Data Integrator) what are the pros and cons in using this Data Services(Data Integrator).
Thank You,
AshokMy opinion is you would want to utilize SAP tools to port the data - our SAP BASIS administrator is out this week but we can provide exact tool names when he returns. ELM (External List Management), IDOC are some of the tools.
You could use DS/DI to export, cleanse, deduplicate the records prior to importing with SAP tools if that is your end goal.
We also offer a data quality tool that extends DS/DI to cleanse/deduplicate name/address records as they are entered into the system. It also comes with batch tools to cleanse/dedup the entire systems name/address information. See Data Quality Management for SAP for further details. -
Source System changes from SAP System to BI Warehouse on ECC activation
We are in the process of building a new development environment from an existing development environment.
After copying from system backup in the new development environment we performed BDLS to map to new source systems. At this point of time the source system for ECC ("SAP System from Release 3.0E" was changed to type "SAP Business Information Warehouse".
Why does this happen?
How can we prevent this?
Thanks for your help.Hello.
Please check the following note if ti can be helpful to fix this issue.
1087980-ECC Source systems appearing in BI folder
Thanks,
Walter Oliveira, -
An upgrade of ERP SAP from version ECC 6.0 EHP 7 to ECC 6.06 EHP 10 is being planned in the company I work for. However, I don´t know what the benefices are to implement this upgrade so I wonder if someone knows benefices of upgrading SAP ERP from version ECC 6.0 EHP 7 to ECC 6.06 EHP 10?
Regards, AlejandroHi _Miguel
I am going from ECC 6.0 to ECC 6.06. However, I don´t know what the benefices are to implement this upgrade so I wonder if someone knows benefices of upgrading SAP ERP from version 6.0 to 6.06
regards, Alejandro -
Error while deploying a PAR file from NWDS into an ECC.
Hi all,
I am getting this error while deploying a PAR file from NWDS into an ECC.
Operation Failed: Please make sure the server is running or check the log (sap-plugin.log) for
more detail.
My server is running properly
1 - Where is sap-plugin.log file? I don´t find it.
2 - Could there be another file with another name with information about the error?
3 - Is there another way to deploy the file directly from the ECC?
Regards,Hi,
Just make sure you have maintained correct server setting to check the same open the NWDS and follow this path
Windows/ Prefereces / SAP Enterprise Portal
Check the following enteries
Alias
Host
Port
Login etc.
Regards, -
Unicode error while upgrading from 4.7 to ECC 6.0
Hello all,
I am upgrading our SAP from 4.7 to ECC 6.0. while doing so we had folllowing error in the adjoinig statement of Search.
Error : Table I_VBLS must have a character line type (data type C,N,D,T or string)
Statement :
W_TMP10 = I_VBLS-VBELN.
SEARCH I_VBLS[] FOR W_TMP10 STARTING AT 1
IF SY-SUBRC NE 0.
EXIT.
ENDIF.
Now I tried to remove this error by putting a loop on internal table I_VBLS and inside it concatenating the header line with a Field symbol and after that to a string variable. Then I used SEARCH statement for the same string. but unfortunately this is changing the functionality of the program by large extent. Does anybody know the exact code snippet to replace search Internal Table
Edited by: Aalhad Deshpande on Feb 23, 2009 3:18 PM
Edited by: Aalhad Deshpande on Feb 23, 2009 3:19 PMHi,
Try to use this method.
CALL METHOD CL_ABAP_CONTAINER_UTILITIES=>FILL_CONTAINER_C
E:G :-
WRITE crlf TO i_linea-linea2.
In this case also their are not mutually convertable. try to use this method and let me know
CALL METHOD CL_ABAP_CONTAINER_UTILITIES=>FILL_CONTAINER_C
EXPORTING
IM_VALUE = crlf
IMPORTING
EX_CONTAINER = i_linea-linea2
EXCEPTIONS
ILLEGAL_PARAMETER_TYPE = 1
others = 2.
Regards,
Sathish
Maybe you are looking for
-
SAPSQL_ARRAY_INSERT_DUPREC during saving of Process Chain
Dear all, On saving, when adding a process to an existing Process Chain - like Rollup or Change Run - in our SCM 5.0 system, we receive a short dump 'SAPSQL_ARRAY_INSERT_DUPREC' (complete short dump at the end of the msg). A problem arose on the line
-
Not right data when row_number used in inner-view sql query...
Hi , I use the below sql statement which displays the right data select CODE_FARMAKOU,EMP_NAME,PACKTYPE,PACKSIZE , SUM_POSOTITA , row_number() over(partition by code_farmakou order by sum_posotita desc) from (SELECT CODE_FARMAKOU,EMP_NAME,PACKTYPE,
-
Display results of MySQL query from AMFPHP by ArrayCollection in AS3 (Flash CS4)
Hi, i am using Flash CS4 (AS3) + AMFPHP + MySQL to do own flash frontend for Wordpress CMS. Everything is going fine but i`ve got one problem. Problem with properly display of result of query in AS3 by using ArrayCollection. When i check my service
-
Trouble connecting to home wireless router
I'm using a Belkin wireless router with security mode of WPA/WPA2-Personal (PSK). My iPod touch 2G used to be able to connect to the wireless network, but it can't now. It gives me incorrect password message. Only thing I've done is update the softwa
-
Hello everyone- Would anyone know how to create error bars in charts in Keynote 3? I can't seem to find an answer anywhere to this question. Many thanks to future replies... Powerbook G4 Mac OS X (10.4.6)