SAP Workplace Systems Interface

We are intending to use XI to interface between ECC6 and Workplace Systems to capture time and attendance data.  Has anyone out there done this before, if so what are the pitfalls and can anyone tell me if there is a SAP certified standard interface?
Thanks & Regards
John

What do you mena with Workplace ?
Do you mean the SAP WP 2.11, the old-portal product of SAP ?
Sandro

Similar Messages

  • SAP Certification for  *ABAP  System Interfaces with SAP NetWeaver    7.0*

    Hi Experts,
      I am appearing for SAP Certification in the stream of  *ABAP 
      System Interfaces with SAP NetWeaver    7.0* 
      so as per the syllabus i required the following material,
      BC420,BC425, BC427,BC415,BC417,BIT300,BIT350
      BC401,BC402,BC400, BC430,BC490,ADM325,BC425,NET900,
      NW001,TESA20,TZCAFG,SM001
      so if any body is having the softcopy or any related links of the   
      above  mentioned material
      please send to my following mail ID's.
      <removed by moderator>
      Points Assured.
      Regards
      Praneeth
    Edited by: Jan Stallkamp on Oct 13, 2008 3:30 PM

    Don't ask for copyrighted material!
    Don't publish your e-mail address!
    Don't assure points!
    => this thread will be locked.
    Please read the rules of engagement otherwise you will set your account on risk of being deleted.
    Best regards,
    Jan Stallkamp

  • SAP Certification for   ABAP  System Interfaces with SAP NetWeaver

    Hi Experts,
      I am appearing for SAP Certification in the stream of  *ABAP 
      System Interfaces with SAP NetWeaver    7.0* 
      so as per the syllabus i required the following material,
      BC420,BC425, BC427,BC415,BC417,BIT300,BIT350
      BC401,BC402,BC400, BC430,BC490,ADM325,BC425,NET900,
      NW001,TESA20,TZCAFG,SM001
      so if any body is having the softcopy or any related links of the   
      above  mentioned material
      please send to my following mail ID's.
      <removed by moderator>  at  yahoo dot co in
      Points Assured.
      Regards
      Praneeth
    <THREAD LOCKED. Please read the [Rules of Engagement|https://wiki.sdn.sap.com/wiki/display/HOME/RulesofEngagement] to discover why>
    Edited by: Mike Pokraka on Oct 14, 2008 1:25 PM

    Don't ask for copyrighted material!
    Don't publish your e-mail address!
    Don't assure points!
    => this thread will be locked.
    Please read the rules of engagement otherwise you will set your account on risk of being deleted.
    Best regards,
    Jan Stallkamp

  • SAP Certfied Dev Professional - ABAP System Interfaces with SAP Netweaver 7

    Hi all,
    Has any one here done this certification ?
    SAP Certfied Development Professional - ABAP System Interfaces with SAP NetWeaver 7.0
    Code - P_ABAP_SI_70
    If yes, how has been the value add for you post this certification ?
    Regards,
    Nikhil.

    Hi Nikhil,
    I have not appeared for it but am sure that SAP's professional certification has very much value in the market. The professional level exam not only captures your knowledge but it shows the practical experience as well.
    Regards,
    Subhash

  • SAP certified professional - ABAP system interfaces with SAP netweaver 7.0

    Hi,
    I have one and half years experience in ABAP. I want to do "SAP CERTIFIED DEVELOPMENT PROFESSIONAL - ABAP SYSTEM INTERFACES WITH SAP NETWEAVER 7.0".
    I am currently in U.S and would like to do the certification here. Whom do I need to contact and what are the documents I need to furnish. Please throw some light on the process.
    Thanks,
    Poonam.

    Dear Poonam,
    the "Professional"-Certification is very very hard - during my last Certifcation Exam, all candidates with the Pro-Exam failed (I was so glad I chose the normal certification...)
    Here's how to book your exam:
    Go to [http://www.sap.com/services/education/certification/index.epx|http://www.sap.com/services/education/certification/index.epx] and follow the instructions ("visit the local SAP Education Web site for the country").
    Figure out the exam code for your certification. Example: For the US, there is a downloadable list (PDF) of exams available, called "list of the available certification exams".
    Schedule the exam according to the rules of your region - here is the link for the US:
    [http://www.sap.com/usa/services/education/certification/exam.epx|http://www.sap.com/usa/services/education/certification/exam.epx]
    Regards,
    Klaus

  • SAP CERTIFIED DEVELOPMENT PROFESSIONAL - ABAP SYSTEM INTERFACES WITH SAP

    Hello Experts
    I am Atush Rohan, I have done my "SAP Certified Development Associate - ABAP with SAP NetWeaver 7.0" on 3rd April 2009.
    I want to appear for "SAP Certified Development Professional - ABAP System Interfaces with SAP NetWeaver 7.0". I have about 3 and half years or experience in SAP ABAP. And I plan to give this certificate exam in the coming 6 months.
    Could you please tell me how i apply for this exam, and whether SAP provides the certificate material for the exam "P_ABAP_SI_70". Waiting for a positive reply.
    Regards
    Atush Rohan
    Edited by: Atush Rohan on Jul 30, 2009 1:21 PM

    hi,
    actually you can find your sid on your certificate itself ... your sid will start with SXX .. ok now along with this you will receive an envelope in which there would be an letter where detalis regarding your sid and password for login access in sap market place will be stated... so you can login with that in server market place.... usually you get this along with the certificate and is being provided by the centres authority...   now if you have not received it so you need to contact your centre and tell them to give it to you... if they dont barged then you can ask them for the concern guy's email .... this guy is the one who receives all the documents relating with your certificate .. now this guy is someone from sap labs banglore ...  also if you have not received your id card so you can mail him or tell your centre authority in that case now usually the centre guys take the matters lightly ...
    ok and as far as your certification exams goes i did search the pearson website they really dont have that professional certification for the abap guys but they do have one for functionals and some other....
    ok now you need to approach yout nearest certification centre in that case and simply ask them that you need to appear for level 2 certification also you can contact the sap labs banglore in that case but i know that they are not responding .....
    so in that matter you tell your centre that you need to schedule the certification they will charge you the certification amount and then will  schedule the date..... yes they can do that.
    hope this will surely help you!!!
    thanks & regards,
    Punit Raval.

  • Synchronize / interface 2 SAP HRM systems.

    Dear community, here at a customer in NL we would like to keep 2 seperate SAP HRM systems in sync. One of these HR systems is the source system and is called the parent. But there are a few infotypes where the child system is the source, this is related to Time infotypes. Both systems are equal in terms of release and patch level.
    My questions are:
    -Does anyone of you have experience with interfacing in a simular setup? If yes please let me know what your experiences were.
    -What type of interface would you suggest, if FTP is the method to send data across.
    (and what would you recommend, e.g. if FTP was not the mandatory method)
    -How to keep control ? How can we make sure all new and changed data is send and received correct in the child system?
    Much apprieciated if you can provide some input for this case!
    Many thanks,

    Hi,
    This kind integration is done using native SAP integration mechanism ALE "Application Link Enabling".
    It allows seamlessly integrate SAP systems.
    Please check SDN page about it: http://www.sdn.sap.com/irj/sdn/ale
    For your case there is a special scenario for integration of 2 SAP HR systems: HR Master data distribution.
    This document shed more light on it: http://help.sap.com/printdocu/core/Print46c/en/data/pdf/CABFAALEHR/CABFAALEHR_ALE_VERT.pdf
    Regarding your questions:
    -Does anyone of you have experience with interfacing in a simular setup? If yes please let me know what your experiences were.
    Yes, this is well known master data distribution scenario managed with ALE.
    -What type of interface would you suggest, if FTP is the method to send data across.
    (and what would you recommend, e.g. if FTP was not the mandatory method)
    This is standard SAP interface, no addition development is need if you use only standard infotypes and fields.
    -How to keep control ? How can we make sure all new and changed data is send and received correct in the child system?
    During interface set up you define what system is master for what infotypes, then these settings are used during data exchange. All changes are registered with change pointers what makes sure that all necessary changes are interfaced.
    Cheers

  • Interface between Microsoft Project and SAP Project Systems

    Hi,
    When we update SAP Project systems from Microsoft Project, our users want to swap values between project nodes id and description. Is this possible? Which BAPIs are used by OpenPs? I am trying to find a user-exit where I can swap these values.
    Thanks in advance.
    Regards
    Jitendra Pongurlekar

    Refer Note 579761. This can provide you some hint.
    Regards
    Sreenivas

  • Proxy Activation - ECC 6.0 to SAP PI system

    Hi All,
    Our envirnonment -
    1) SAP ECC 6.0 ( R/3 system)
    2) SAP PI ( R/3 system)
    To  establish communicate between SAP ECC 6.0 to SAP PI ( R/3 system using proxies )-
    we have setup following steps on ECC 6.0 system-
    1) Created a HTTP connection in the business system of type H.
        Please let me know what is the path prefix we need to set.
    2) Configuration Business system as local Integration Engine.
    3) Connection between Business System and System Landscape Directory
       Create RFC destination (TCP/IP) LCRSAPRFC and SAPSLDAPI for the SLD connection.
    I have developed a sample interface to send data from SAP ECC --->PI --> File system ( Proxy to file interface)
    When i run the report to call the proxy it is pushing the data on the integration engine of the ECC system.
    How can i debug what is the problem is ? why the data is not getting pushed on PI system using proxy ?
    How can i debug this ? Please let me know if i am missing any thing in proxy activation between ECC to PI system.
    Regards,
    Kishore

    Hi ,
    I have cross checked the activation steps.
    I am able to create a interface proxy to File
    SAP ECC R/3 system --- > SAP PI ---> File system
    I have created a proxy on ECC R/3 system using SPROXY. when i trigger the proxy using a abap report the data is not getting pushed on to SAP PI system .
    When i do a SXMB_MONI on ECC system it should call the integration server as out bound ... It is throwing a error message as mentioned below.
    <?xml version="1.0" encoding="UTF-8" standalone="yes" ?>
    - <!--  Call Integration Server
      -->
    - <SAP:Error xmlns:SAP="http://sap.com/xi/XI/Message/30" xmlns:SOAP="http://schemas.xmlsoap.org/soap/envelope/" SOAP:mustUnderstand="">
      <SAP:Category>XIProtocol</SAP:Category>
      <SAP:Code area="PARSER">ITEM_MISSING</SAP:Code>
      <SAP:P1>Envelope</SAP:P1>
      <SAP:P2 />
      <SAP:P3 />
      <SAP:P4 />
      <SAP:AdditionalText />
      <SAP:ApplicationFaultMessage namespace="" />
      <SAP:Stack>XML element Envelope missing in SOAP message header (SAP XI Extension)</SAP:Stack>
      <SAP:Retry>M</SAP:Retry>
      </SAP:Error>
    Please let me know how to proceed .
    Cheers,
    Nanda

  • Switch over between two SAP PI systems for downtime minimization

    Hello Colleagues,
    with our interfaces over our SAP PI 7.31 (ABAP/Java) system we assume we will run in a 7x24 h runtime scenario in the future.
    Regarding Business Continuity we have to think about solutions which help us to handle downtimes greater than 15 min. regarding Support Package upgrade, Kernel update, EHP, etc.
    The first idea is to implement a second equal SAP PI productive system in parallel to the existing one.
    On the sender side a switch over implementation like WebDispatcher, Load Balancer, etc.
    For maintenance all Interface traffic can run over PI Nr. 1 and PI Nr. 2 can be updated.
    Afterward all interfaces will switched to PI Nr. 2 and PI Nr. 1 can go in maintenance.
    Could be this as suitable solution for SAP PI Business Continuity or do you know better solutions?
    Many thanks in advance!
    Regards,
    Jochen

    Hello Bernhard, Hello Holger,
    many thanks for reply and providing these valuable information's.
    The nZDM Concept is already known to me but it doesn’t answer all our questions.
    Please let me explain a little more in detail.
    Not currently but in the near future we assume some new interface over our SAP PI System will come with the requirement max. downtime lower thank 10 to 15 min. only allowed.
    To be prepared regarding this possible scenario, we start thinking about possible different solutions.
    First step was the nZDM Concept, of course. But it didn’t meet all our requirements regarding interface downtime.
    Some points are:
    possible min. downtime is 30 min. and thus is over our requirements for interfaces
    only for Update (and planed for Upgrade) the SAP PI application
    all operating system and database related maintenance tasks are not covered by nZDM
    all Hardware (Server, Storage, etc.) as well not covered by nZDM
    Among others, because of these facts we start thinking about a second equal SAP PI system beside to existing productive one.
    Than line 1 will take over the whole interface traffic and in the meantime the line 2 can go in maintenance. After finalizing the maintenance for SAP PI Nr. 2 we can switch the interface traffic to SAP PI Nr. 2 to get SAP PI Nr. 1 free for maintenance.
    Regarding the topic “PI Federation” I found here in these documentation's several hints regarding this scenario (two SAP PI systems in an switch over scenario).
    PI Federation – An Overview
    among others  Page: 27
    Business Continuity: Central PI integration Server with redundant Integration Server to be used in controlled switch over scenarios when upgrading or patching.
    or
    How to Fast-Switch Integration Scenarios between SAP PI Runtimes Part II: Web Dispatcher
    But I didn’t found any further detail documentation's regarding this approach.
    The solution should fit as well to our existing hardware infrastructure.
    For production we use an IBM (AIX) failover-cluster switch between our both data center.
    Regarding our hardware infrastructure prerequisites and downtime requirements, which solution(s) do you recommend? Is PI Federation still an option?
    Many thanks in advance!
    Regards,
    Jochen

  • Error while registering SAP ECC system in UWL systems

    hi,
    Error while registering SAP ECC system in UWL systems.
    Errors:
    System R3Production: Thu Nov 27 16:12:05 GMT+05:30 2008
    (Connector) :com.sap.netweaver.bc.uwl.connect.ConnectorException:Thu Nov 27 16:12:05 GMT+05:30 2008
    (Connector) :com.sap.mw.jco.JCO$Exception:Connect to SAP gateway failed
    Connect_PM  TYPE=A ASHOST=132.147.0.112 SYSNR=00 GWHOST=132.147.0.112 GWSERV=sapgw00 PCS=1
    LOCATION    CPIC (TCP/IP) on local host with Unicode
    ERROR       partner '132.147.0.112:sapgw00' not reached
    TIME        Thu Nov 27 16:12:05 2008
    RELEASE     700
    COMPONENT   NI (network interface)
    VERSION     38
    RC          -10
    MODULE      nixxi.cpp
    LINE        2823
    DETAIL      NiPConnect2
    SYSTEM CALL connect
    ERRNO       79
    ERRNO TEXT  A remote host refused an attempted connect operation.
    COUNTER     2
    Item type retrieval and registration requires a connection to the systems and may take a couple of minutes
    For each system, they are generated as the configuration named 'uwl.webflow.<system_alias>' or 'uwl.alert.<system_alias>'.
    After configuration changes in the backend system, you must re-register the system.
    regards.
    Srinivas.

    Hi,
    you can check few things prior proceeding:
    Does your connector test after adding your backend system in portal works fine?
    Did you define a system alias?
    Make sure your SSO is working,
    Also check your Jco detination webdynpro tab.
    Regards,
    Vamshi.

  • Extracting Values of a Field from a Database Table in SAP ECC System

    Hi,
    I downloaded Extracting Values of a Field from a Database Table in SAP ECC System Using MII 12.0
    senario from sdn. I'm trying to do that senario in MII 12.05. But I have problem with section 6 in page 7 (you can supply senario from sdn)
    "6- Under the loop of Repeater, use action u2018Rowu2019 to append just the string part of the WA which will display only values for field u2018Batchu2019"
    I did not find WA elemen in Output element of Repeater_0
    How can I create WA element?
    Thanks.

    Cemil,
    Set up a SAP JCo Interface action block.  Use the RFC name RFC_READ_TABLE.
    In the link editor map the table to "MARA", set RowCount to something small (20 is good sample size) and create an xml transaction property named FIELDS and copy the following into it:
    <?xml version="1.0" encoding="UTF-8"?><FIELDS>
          <item>
            <FIELDNAME>MATNR</FIELDNAME>
            <OFFSET/>
            <LENGTH/>
            <TYPE/>
            <FIELDTEXT/>
          </item>
          <item>
            <FIELDNAME>MTART</FIELDNAME>
            <OFFSET/>
            <LENGTH/>
            <TYPE/>
            <FIELDTEXT/>
          </item>
          <item>
            <FIELDNAME>BSTME</FIELDNAME>
            <OFFSET/>
            <LENGTH/>
            <TYPE/>
            <FIELDTEXT/>
          </item>
          <item>
            <FIELDNAME>XCHPF</FIELDNAME>
            <OFFSET/>
            <LENGTH/>
            <TYPE/>
            <FIELDTEXT/>
          </item>
          <item>
            <FIELDNAME>DATAB</FIELDNAME>
            <OFFSET/>
            <LENGTH/>
            <TYPE/>
            <FIELDTEXT/>
          </item>
        </FIELDS>
    Then link the Transaction.FIELDS to SAP_JCo_Interface_0.Request{/RFC_READ_TABLE/TABLES/FIELDS}.  You may run into problems with two other fields and optionally they can be removed (set link type to remove xml).  I usually remove them initially for testing.  The two fields are:
    SAP_JCo_Interface_0.Request{/RFC_READ_TABLE/INPUT/NO_DATA}
    SAP_JCo_Interface_0.Request{/RFC_READ_TABLE/INPUT/DELIMITER} (or you can set this to something like a semicolon,";" or tilda,"~".  I find it easier to caclulate position by length, but that is my own idiosyncrasy.)
    Once you get this one working, we can explore how to do filtering on the dataset.  Your output should be something like this:
    <?xml version="1.0" encoding="utf-8"?>
    <RFC_READ_TABLE>
      <INPUT>
        <DELIMITER />
        <NO_DATA />
        <QUERY_TABLE>MARA</QUERY_TABLE>
        <ROWCOUNT>20</ROWCOUNT>
        <ROWSKIPS>0</ROWSKIPS>
      </INPUT>
      <TABLES>
        <DATA>
          <item>
            <WA>000000000000000023ROH 00000000</WA>
          </item>
          <item>
            <WA>000000000000000038HALB 00000000</WA>
          </item>
          <item>
            <WA>000000000000000043HAWA 00000000</WA>
          </item>
          <item>
            <WA>000000000000000058HIBE 00000000</WA>
          </item>
          <item>
            <WA>000000000000000059HIBE 00000000</WA>
          </item>
          <item>
            <WA>000000000000000068FHMI 00000000</WA>
          </item>
          <item>
            <WA>000000000000000078DIEN 00000000</WA>
          </item>
          <item>
            <WA>000000000000000088FERT 00000000</WA>
          </item>
          <item>
            <WA>000000000000000089FERT 00000000</WA>
          </item>
          <item>
            <WA>000000000000000098HALB 00000000</WA>
          </item>
          <item>
            <WA>000000000000000170NLAG 00000000</WA>
          </item>
          <item>
            <WA>000000000000000178NLAG 00000000</WA>
          </item>
          <item>
            <WA>000000000000000188NLAG 00000000</WA>
          </item>
          <item>
            <WA>000000000000000288HALB 00000000</WA>
          </item>
          <item>
            <WA>000000000000000358HAWA 00000000</WA>
          </item>
          <item>
            <WA>000000000000000359HAWA 00000000</WA>
          </item>
          <item>
            <WA>000000000000000521HAWA 00000000</WA>
          </item>
          <item>
            <WA>000000000000000578FERT 00000000</WA>
          </item>
          <item>
            <WA>000000000000000597HAWA 00000000</WA>
          </item>
          <item>
            <WA>000000000000000598VERP 00000000</WA>
          </item>
        </DATA>
        <FIELDS>
          <item>
            <FIELDNAME>MATNR</FIELDNAME>
            <OFFSET>000000</OFFSET>
            <LENGTH>000018</LENGTH>
            <TYPE>C</TYPE>
            <FIELDTEXT>Material Number</FIELDTEXT>
          </item>
          <item>
            <FIELDNAME>MTART</FIELDNAME>
            <OFFSET>000018</OFFSET>
            <LENGTH>000004</LENGTH>
            <TYPE>C</TYPE>
            <FIELDTEXT>Material Type</FIELDTEXT>
          </item>
          <item>
            <FIELDNAME>BSTME</FIELDNAME>
            <OFFSET>000022</OFFSET>
            <LENGTH>000003</LENGTH>
            <TYPE>C</TYPE>
            <FIELDTEXT>Purchase Order Unit of Measure</FIELDTEXT>
          </item>
          <item>
            <FIELDNAME>XCHPF</FIELDNAME>
            <OFFSET>000025</OFFSET>
            <LENGTH>000001</LENGTH>
            <TYPE>C</TYPE>
            <FIELDTEXT>Batch management requirement indicator</FIELDTEXT>
          </item>
          <item>
            <FIELDNAME>DATAB</FIELDNAME>
            <OFFSET>000026</OFFSET>
            <LENGTH>000008</LENGTH>
            <TYPE>D</TYPE>
            <FIELDTEXT>Valid-From Date</FIELDTEXT>
          </item>
        </FIELDS>
        <OPTIONS />
      </TABLES>
    </RFC_READ_TABLE>
    Add a repeater sourced on:
    SAP_JCo_Interface_0.Response{/RFC_READ_TABLE/TABLES/DATA/item}
    Link your repeater output to a tracer with this:
    Repeater_0.Output{/item/WA}
    What you will see in each tracer message is a single line of data with all the fields contents concatenated together.  You can look up what each field in the string represents by the length of the field as returned in the Response segment of the RFC_READ_TABLE rfc.  Then you can parse out the data you are interested in.
    Give this a try and let me know how you succeeded.
    By the way, I could not find the scenario you referred to.  Can you post a link?
    Regards,
    Mike
    Edited by: Michael Appleby on Jan 12, 2009 5:16 PM

  • SAP LSO system to XI Integration

    Hi Experts,
    Currently i am working on SAP LSO system integration with External system(Skill soft) using PI.
    Has anyone successfully used standard LSO XI services to integrate with external Learning vendors?Could you please give me the steps or let me know  how you implemented the scenario( SAP LSO system--> XI -- > Web service).
    Thanks in advance
    Ankur

    Hello All,
    I am working on a  similar scenario of LSO integration with Skillsoft via PI. I have already referred the PDF XI Configuration for SkillSoft Integration.
    The flow of interface in my scenario is
    Portal(FrontEnd) <-> ECC(BSP Application at Backend) <-> PI <---> External Learning Vendor(SkillSoft).
    1) Commnication is from SAP LSO System to Third Party(Skill Soft) through PI(XI).
    2) It will be synchronous call.
    3 ) From portal user should be able to register, book,Lauch, or Track the course and will get response back to SAP LSO system/portal from Skill Soft.
    4) Portal is the frontend and backend is the BSP application(HCM_Learning).
    Can you please let me know the details how to handle this scenario and pass the parameters like customerid, assetid,courseid etc to PI(XI). Also let me know what would be the best approach to follow in this scenario..Is there any BAPI / RFC available for this scenario.
    Please guide me how to pass data(like customerid, learnerid...etc) to PI  from Once the user clicks to register/book/launch the course
    Thanks
    Shikha Jain

  • How can generated EWA for SAP Portal system

    Hi Guru there,
    Usually generate EWA should maintenan RFC, We have SAP Portal systems ( prod PP1 and test PT1 and dev PD1), but they are not appeared at saplogon and no general SAP interface, only operationing system level we can start/stop SAP system and database and from the operating system browser can see the portal work normal ( 50000 port) or not.
    How can I generate EWA from solman?
    waiting for your kind reply!
    best regards,
    WEI

    Hi Wei,
    Do you already know SAP Note <a href="http://www.service.sap.com/sap/support/notes/976054">976054</a>?
    This SAP Note describes the setup of EWA for NON-ABAP Components.
    Please see the description and the attachments.
    Best regards,
    Ruediger

  • SAP Business Systems Analyst w/L&D business function experience $90-120/hr!

    Our prominent Orange County client is aggressively seeking a SAP Business Systems Analyst! This is a contract position and is located at their Irvine office. This company is privately held and extremely stable. They have built upon a solid foundation of values, including a focus on the long term and emphasis on quality. They are growing rapidly with a very advanced IT shop. They have many popular bleeding edge technologies and methods, and are looking for individuals with deep knowledge and experience in leadership and management that can help them lead effective IT project teams. Our client's IT Department has over 1000 employees and is growing. They widely use RUP, UML, ITIL and Waterfall methodologies so it is a plus if you are familiar with them.
    Below is the job description for the position. Please review and if you are interested, please contact Susan Ashman (susan.ashman @ zebra-net.com) at 949-910-9800 or 949/900-6110 we will be happy to tell you who our client is and begin the interview process for you.
    Required skills:
    Thorough knowledge of System analysis and functional design
    General knowledge of:
    u2022 The securities/mutual fund industry (terminology, procedures and regulations) with thorough knowledge in some specific areas
    u2022 Software development and implementation
    u2022 Structured programming techniques
    u2022 Data modeling and database design
    u2022 User interface principles and windows design standards
    u2022 System design documentation
    u2022 Documentation and training
    u2022 Project planning and estimation
    u2022 Application Architectures
    Basic knowledge of:
    u2022 Project Management
    Must have Technical Skills:
     Three (3) yearsu2019 experience as a SAP BSA with focus on L&D business function
     SAP ECC 6.0 LSO602 working module experience
     Experience supporting SAP LSO in a functional capacity
     Implementation/project experience would be a plus
     Working knowledge of waterfall SDLC practices
     Ability to follow step by step instructions independently and assist business user in troubleshooting production issues
     Ability to analyze business issue/defect, document findings and resolution with an ability to estimate effort to correct
     Understanding of SAP LSO practices and procedures, with an ability to understand the need to escalate to SAP when necessary
    Must have general skills:
     Need business systems support for a daily activities relating to support of SAP LSO ECC 6.0. This includes different delivery methods especially eLearning and Virtual classroom which are currently the most heavily used
     Serve as the primary liaison between the business requirement and the technical teams
     Provide daily production support to training organizations
     Perform SAP confirmation as it related to enhancements to existing SAP LSP operation
     Ability to manage enhancement, defect or data maintenance requests through implementation lifecycle
     Documentation related to enhancement, defect or data maintenance implementations
     SAP resource has end-to-end practical not conceptual experience in the use of SAP LSO and SAP portal and SAP Authoring Environment

    maybe OP want to extract all numbers from his inbox using regular expressions?

Maybe you are looking for

  • Cost of goods sold report

    Hi all, Is there any standard report for Cost of goods sold by production order?Please let me know how to see cogs report by production order. Let me know how to calculate this cogs . Thanks, Sai. Edited by: fico sap on Jul 11, 2008 1:42 PM

  • Where to find netscape.javascript package

    Now, im making a programm in which a applet needs to access the form filed. thanks in advance

  • OBIEE 11.1.1.6 installation hangs without any error or warning

    Hi all, I'm trying to install OBIEE 11.1.1.6 on a previous 11.1.1.5 installation, on Windows Server 2003 Enterprise Edition. I followed the instructions on the "Oracle® Fusion Middleware Upgrade Guide for Oracle Business Intelligence 11g Release 1 (1

  • Posibilities of user and system status?

    Hi CRM experts, I've some doubts respect the user and system status configuration. My client wants to stop the upload process (to R3 site) of a Sales Order document, regarding a specific user status. Then, they want to restore the uploading process r

  • Firefox crashes on some web sites because of Shockwave Flash plug-in

    I have the latest Firefox running on updated Windows Vista SP2. Each time I go to my Google+ site, FF opens it and then crashes. I have located the problem for this crash to the Adobe Flash plug-in. When I disable the Shockwave Flash plug-in, crashes