SAP XI 2 BI Integration with ECC 6.0

Dear all,
we are planning to do XI integration between ECC 6.0 to BI
1) How to Get the BI Standard data from ECC 6.0?
2)We are planning to integrate Standard BI reports with ECC 6 0 through XI.
Please sugget the scenario for integration between ECC 6.0 to BI through SAP XI.
Thanks In Advance.
Mahesh

Hi Mahesh,
Please go thru these links
To push data from BW to XI, please check
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/biw/g-i/how%20to%20push%20data%20into%20bw%20from%20xi.pdf
To send data from XI to BW please check
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/biw/g-i/integrate%20bw%20via%20xi.pdf
https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/40574601-ec97-2910-3cba-a0fdc10f4dce
XI-BI Integration unsing RFC
Pushing data from BI to XI using RFC Adapter
https://forums.sdn.sap.com/click.jspa?searchID=17734474&messageID=5878682
Thanks,
Shweta

Similar Messages

  • How is the integration with ECC in SRM 7.0??

    Hi,
    Working with SRM 5.0 or 5.5  the use of XI for integration with ECC is not mandatory because when we send any document from ECC to SRM like requisitions (to convert them in shopping cards) or when we send any document from SRM to ECC like shopping cards, PO´s, contracts,  we only use the RFC´s and the abap programs.
    Is the same behavior with SRM 7.0?????
    Could the integration from SRM 7 with ECC 6 work with RFC´S without XI or for this vertions is XI mandatory?????
    Thanks

    SRM70 is closely integrated with XI for transferring docs between ECC and SRM.  SAP introduces eSOA tech nology with SRM70 and hence all documents like PR from ECC to SRM, Central Contract from SRM to ECC, PO creation (Classic), etc uses this techn ology.
    Thanks,
    Jagadish

  • CRM 3.0 integration with ECC 6.0

    Hi all, I wanted to confirm if CRM 3.0 can be integrated with ECC 6.0
    If yes, then which support pack,etc. will be applicable and what all issues could be encountered in integration?
    Thanks in advance.

    Hi Animesh,
    just to be clear.
    the CRM and the backend ECC60 are communicating via  Plug -ins
    you can read more information here
    http://service.sap.com/r3-plug-in
    http://service.sap.com/~form/sapnet?_SHORTKEY=01100035870000601131&
    The other  SP level of the systems (BASIS etc.) are independent.
    Once you could conect the systems at basis level. You can begin your work at
    Application level.
    Whether you can have problems here please ask the CRM Gurus in a separate therad in other forum.
    I Hope I have answered all of your questions.
    Kind regards
    Imre Takácsi-Nagy
    Senior Support Consultant II.
    SAP Global Support Center Austria
    Netweaver WEB Application Server ABAP / JAVA

  • Brief discussion on SAP XI and its' Integration with SAP MDM.

    Hi,
    I have never worked on SAP XI.
    I am discussing it on brief, please give your valuable replies.
    SAP XI consists of System Landascape Directory(SLD).
    SLD Consists of Business System and Techinical System.
    Technical System contains all information about the software
    component. The Business System consists of Inbound and Outbound Business
    System which are used as logical names for data transfer.
    There is communication Channel for Receiver and Sender Business System and n agreement
    is signed between Sender and Receiver.
    Outbound Interface defined for Business System Outbound and Techical System associated
    with the Business System,
    Inbound Interface defined for Business System Inbound and Techical System associated
    with the Business System.
    In SAP NetWeaver XI Integration Directory, we have defined the Integration Scenarios,
    Actions, Interface Objects, Mapping Objects, Adapters Objects.
    Mapping Object defines the Structure and Value Mapping.
    Adapter Objects defines the Adapter program which implements RFC Adapter, FTP Adapter logic.
    FTP Adapter is used for XI-MDM Communication.
    RFC Adapter is used for XI-ECC Communication.
    Integration Repository: Both Outbound and Inbound Interfaces are Mapped with Value mapping and
    Structure Mapping inside Integration Repository.
    The File Adapter takes the File from the Outbound port of MDM System
    and sends it as IDOC to Receiver Business System.
    Value Mapping must be done between Sender and Receiver interfaces.
    Value Mapping is done by XSLT or Java based program.
    SAP NetWeaver XI Integration Server at runtime:
    Message Split, Interface Determination, Receiver Identifaction, Mapping, Techincal Routing
    and Call Adapter Proccess are done.
    In SAP XI 3.0 and MDM 5.5:
    Step 1: Create busines system as service.
    Step 2: Create communication channel for each business service. If the system can communicate
    through different channels, then create all possible channel types if necessary.
    Step 3: Create receiver agreement between the systems.
    Step 4: Interface determination:
    - Here you see for the first time the software component mentioned;
    there are some special requirements regarding this software component in relation to the customizing ID mapping.
    - To modify this software component, the customer needs to copy the SAP standard delivered software component
    into its own namespace. The customer is able to modify to create archives
    for the customized ID mapping.
    Receiver determination.
    Configure an FTP Server on the MDS.
    Create a send folder for outbound messages using outbound port(s) for
    remote systems(s).
    Create receive folder inbound messages using inbound port(s) for remote systems.
    This ia all about concept of SAP XI Infractsture and its' Integration with SAP MDM 5.5.
    Regards
    Kaushik Banerjee

    Hi Kaushik,
    You must be aware of File types that MDM Import Manager can Import i.e. we have XML, Excel etc. Now there are two transactions to extract data from R3
    1. MDMGX -
             - For lookup table extraction
             - Output in XML format which MDM can import without using XI.
              - FTP can be configured to put the file in the desired folder which will be then picked by Import Server.
    2. MDM_CLNT_EXTR -
              - For Main table records.
              - Output is in Idoc format which MDM doesn't understand hence we need XI in between which converts Idoc file received from R3 into XML which can then be imported using Import Manager or Import Server. For this we need to implement XI Scenario that consists of Source System, Receiver System, Type of Data etc.
    Just a basic understanding...
    Regards,
    Jitesh Talreja

  • Steps: SNC (Supplier Network Collaboration) Integration with ECC through XI

    Hi,
    Has anyone worked on the SNC(Supplier Network Collaboration) integration with SAP ECC via SAP XI.
    Could you pls share any documentation related to this. And also could anybody tell me the setup required to go ahead with the integration.
    Thanks,
    S

    Hi Xavier,
    SNC integration with XI has predefined mappings. So ask your basis guys to download the XI content for SNC using with PI. Once they deployed you will have a builtin predefined content in XI. Within the predefined content mostly they all are xsl mappings.
    If your requirement is with the standard idocs then you can use them directly. Else if their is customization they you may need to change the mappings according to your requirements.
    Also check this help:
    http://help.sap.com/esoa_scm_snc2007/helpdata/en/index.htm
    Regards,
    ---Satish

  • Sourcing integration with ECC using PI (percentage rebate scenario)

    Hi Experts,
    Sourcing - OP 7
    ECC - configurations done for rebate conditions as mentioned in standard configuratin guide
    PI - SP02 patch 0
    We are publishing percentage rebates in Master agreement from sourcing to ECC to create Online Agreement using standard predelivered content for PI from SAP, however ECC returns error in RFC response mentioning
    No currency code found for ISO code P1 in field HEADER_CONDITION/CURRENCY_ISO
    I checked PI content & I see for % rebates, field HEADER_CONDITION/CURRENCY_ISO is always populated in PI with P1.
    What are the next steps to be done in ECC or in PI to overcome the mentioned error.
    Any pointers will be appreciated, Thanks.

    Hello Jeet,
    I would suggest to check first that in both your SAP ERP and SAP Sourcing an ISO Code P1 for percentage exists. Further I would check if a rebate with an absolute amount works fine (also create multiple amounts and check if a scale is created in ERP, just to ensure that it works in general). E.g. check if the price condition/condition type exists and is configured correctly in ERP.
    If that all looks good you might want to check the ERP transaction BBP_ES_ANALYZE. I recently created a SDN blog about some tips and tricks, it also explains this transaction, please see ERP integration with SAP Sourcing – tips and tricks Maybe the error message(s) in this transaction will help you to better understand what is going on.
    Hopes that will help you
    Markus

  • Pro/E integration with ECC 6.0

    I want to integrate Pro/E with ECC 6.0 in order to transfer/exchange engineering data such as materials, BOMs, engineering changes, documents, etc.
    Does anyone know of Pro/E functionality or a 3rd party product that does this sort of thing?
    Kind regards,
    Rex L. Farris

    A direct interface is developed by .riess GmbH and SAP.  It is SAP certified and supported by SAP.
    For more information,
    Go to <a href="http://service.sap.com/plm">http://service.sap.com/plm</a>
    Life-Cycle Process Support -> Product Development -> Integration -> MCAD Integration -> Pro/ENGINEER

  • C4C integration with ECC 5.0

    Guru,
    My company is looking for implementing cloud for customer, but our backend system is running on ECC 5.0.
    SAP had strongly recommended us to upgrade our ECC before implementing C4C project.
    Through some reading, it seems that integration prerequisite is ECC has to be version 5.0
    Or there is any workaround to integrate (standard integration) C4C to ECC 5.0 through HCI? Like by applying or enhancing standard iflow that released for ECC 6.0?
    Thanks.
    Cheers,
    Jim

    Not sure where you have read that ECC 5.0 would be supported. The official SAP position is summarised in the table below. You can clearly see that some functionalities even depends on what EHP level you are at with ECC 6.0.
    SAP PI and HCI leverage the same iFlow content.

  • Integration with ECC 6 and Xcelsius

    Hi,
    I would like to know if its possible to integrate Xcelsius directly with an ECC report.
    For example, take the ALV data and 'send' it to Xcelsius in order to have an Xcelsius report.
    I know that Xcelsius has (now), built in integration with BW queries, but wonder if that is proprietary with BW, or can the concept of integrating a report from BW work in ECC?
    Please advise.
    Thanks.
    JP

    Hi,
    in case you would like to build an Xcelsius dashboard on top of ERP data you can use Crystal REports to connect to the ERP system  (see here: /people/ingo.hilgefort/blog/2008/03/23/businessobjects-and-sap-part-4) and then you can use Live Office to connect Xcelsius to a Crystal REports objects. see here:
    XC, CR and LO Part 1 of 4
    /people/ingo.hilgefort/blog/2008/10/03/businessobjects-and-sap-part-1-of-4--creating-a-xcelsius-dashboard-on-top-of-sap-bi
    XC, CR and LO Part 2 of 4
    /people/ingo.hilgefort/blog/2008/10/07/businessobjects-and-sap-part-2-of-4--creating-a-xcelsius-dashboard-on-top-of-sap-bi
    XC, CR and LO Part 3 of 4
    /people/ingo.hilgefort/blog/2008/10/07/businessobjects-and-sap-part-3-of-4--creating-a-xcelsius-dashboard-on-top-of-sap-bi
    XC, CR and LO Part 4 of 4
    /people/ingo.hilgefort/blog/2008/10/10/businessobjects-and-sap-part-4-of-4--creating-a-xcelsius-dashboard-on-top-of-sap-bi
    In regards to an ALV - there will be an integration with Crystal Reports but not for Xcelsius and keep in mind that an ALV is a push model and is only available when the transaction is been executed.
    Ingo

  • Supplier Registration in ESourcing  ( Vendor integration with ECC or MDM )

    Hi All,
      SAP ESourcing has the functionality of Supplier Registration.  As per the functionality, Supplier will provide all the required information in the registration form. The Supplier form will go for approval to the Buyer / Purchaser. Once approved, the supplier will considered for RFx event. My questions are :
    1 :Is there OUT OF BOX standard solution provided by SAP for integration of newly Approved supplier / vendor of ESourcing system  with ECC so that system will automatically create new vendor in ECC.
    2 : Is there OUT OF BOX standard solution provided by SAP for integration of newly Approved supplier / vendor of ESourcing system with MDM (Master Data Management system ) .
    Please through some pointer on this ?
    Regards,
    Kalandi

    Hi Kalandi
    For your first question, if you deploy standard integration package provided by SAP  for e sourcing-ECC integration, you can replicate approved e sourcing vendor to ECC using  standard script (I think script name is  "Publish to ECC" ).
    In case you prefer a custom option,you can write a customized script to get a flat file (.CSV) download of  e sourcing vendor whcih can be used to update ECC
    As far as OUT OF BOX standard solution provided by SAP for integration of newly Approved supplier / vendor of ESourcing system with MDM (Master Data Management system ) is concerned, there is no standard solution provided by SAP but again since it is possible to get a CSV export of vendor field, it can be used to update MDM as well
    Hope this helps!
    Regards
    Mudit Saini
    Edited by: Mudit_UCB on Jun 28, 2011 1:20 PM

  • SAP B1 8.8 integration with Crystal report

    Hi Experts,
    Is there different Installer for SAP B1 8.8 version.
    I installed crystal report for SAP B1, but I am getting following error
    " External connection to database failed. SAP Crystal add on may not function properly. Please rerun the Account setup with Superuser login"
    I am login as Super User & When i am trying to open Account Setup , i am getting following error -
    " Item - Could not commit action because the item is currently in focus. [ 66000-23]
    could you please suggest, possible solution
    tks,
    Sb1

    Hi Sb1,
    There is no external addon and installer for Crystal report integration with SBO 8.8. Just install SBO8.8 and CR2008 is using for only designing the reports. SAP already incorporated all the related integration in SBO 8.8 version.
    Thanks
    Sachin

  • SAP MM- SRV Mgmt integration with Fleet management-Config Required

    Hi friends,
    My client is asking us to implement SAP fleet managent integration with SAP MM service management.kindly help me by providing config details also.
    Regards,
    William

    Hi,
    Read the below sap help
    http://help.sap.com/saphelp_470/helpdata/en/e3/0aeb1802e211d39eeb0000e8323350/frameset.htm
    Kapil

  • SAP connector for CAD Integration with Unigraphics (NX)

    Hi Experts,
    Could you please guide me on where can I download CAD Integration connector for Unigraphics (NX).
    Thanks in advance.
    Kind regards,
    Neil

    Thank you very much for the useful link Martin. Anyway, there are some things that I cannot find for NX Unigraphics integration:
    In the wiki you can find
    You can download the CAD-Integration-Software from http://service.sap.com/swdc and then goto
    Installations and Upgrades > Supplementary Components for Cross Industry Solutions > Life-Cycle Data Management > SAP PLM Integrations > select the desired integration
    But that path does not exist in SAP download software page.
    Also, in the availability matrix I can find integration with several systems (catia, solid edge, autocad...) but not unigraphics.
    Could you please provide some more information on the topic?
    Thanks a lot.
    Neil

  • SAP Lumira 1.17 Connectivity with ECC 6 giving error

    Hi Expert,
    We're on SAP Lumira 1.17 and I'm getting attached error when I'm connecting with EC 6 via Query with SQL. I've attached the error log. Can you someone please look into this , how can I resolve this error to connect with ECC.
    I'm trying

    Hi Antoine,
    Thanks for response.
    Are you able to connect to this ECC system using either:
    - a SAP tool like SAP logon
    Yes, I can.
    - a BI tool like information design tool (if you have access to it)
    Yes, I can access. I can also connect UNX universe which is built on ECC with Webi as well. It's only in Lumira which is not working.
    -Can you try from SAP Lumira changing the language used?
    Yes, I tried to change different language (US and UK both) but not working.
    -As the base error from your log file raised from ECC is
    This error log is generated from Lumira only.
    Thanks,
    Pawan

  • SAP ISU(EpH 4) integration with MDUS using SAP PI 7.0

    Hello Everyone,
    As I am newbie to all this, I have been doing R&D to achieve the Integration between our SAP ISU and MDUS. Here is what I have already done.
    Establish the link between SAP ECC and SAP PI Server (Ports, RFCs, etc.)URL: Connection Settings between ECC and PI system - Process Integration - SCN Wiki
    SFW5: Switched the Utilities Component On
    SPRO: Define Advance meter capabilities and Activation Groups
    Imported the AMI related components IS-UT 604 to the IR
    Defined Landscape, Technical and Business Systems
    Here are the challenges I am facing and where I need your help.
    How do I configure a scenario (e.g. Remote Disconnect) in PI, I will be very happy for step by step instructions
    How do I configure that If I Disconnect the Device in ISU, a service call is generated in ISU which will flow from ECC -> PI Server -> MDUS and how do we test it?
    How do I check if the call has reached PI Server? I mean there must be some logging like ABC Application requested for XYZ Service.
    Your help is much appreciated. It is much like connecting the pieces yet unknown to me. Feel free to share if there is any guide or handbook available for a sample AMI Integration Scenario.
    Regards,
    Adil Khalil

    Hi Adil,
    Firstly download the Enterprise Services for SAP PI  from the service market place, released for the Ehp eg Ehp6 of your back end  ISU system.
    go to the below link
    https://websmp205.sap-ag.de/swdc
    Download all the (ES)content related to utilities  XI CONTENT-IS-UT  and load this in your PI system. Once you have these ESR in PI, you will be able to connect your SAP ISU system with the help of a proxy.
    Regards,
    Iqbal

Maybe you are looking for

  • CURSOR_SHARING fixed in Release 2?

    The IT team, here, had initially set CURSOR_SHARING to SIMILAR in 10g R1. They noticed that we were getting incorrect Data Dictionary values. So CURSOR_SHARING had to be set back to EXACT. It was a bug in 10g R1. Does anybody know if this issue was f

  • ITS Instances

    How can I install 3 ITS instances on my machine (2 connection instance tomy SAP systems and 1 admin instance). Cuureently I am installing a connection instance and it works. When I try another instance it does not work. I am installing the second by

  • Unable to connect to SAP WEB AS

    Hi all, Even though I specified correct J2EE Engine settings in the windows>Preferences>SAP J2EE Engine settings. The remote sever is not connecting.. Regards , PRADEEP

  • Calendar by date selection

    Hi, I have a question, if I want to constrain some date characteristic in a report in query designer, then calendar displays. But I need  that only relevant dates are displyed, do you know, what to do? Thanks    RH

  • I am trying to get my i cloud verified they say email has been sent but I'm not getting it I check all folders

    i am ttying to get my iCloud verified Apple said they sent email I am not getting the email I checked all folders