/SAPAPO/RRP4 - SNP Orders

Hi,
I have some problems with APO SNP orders.
If I execute /SAPAPO/RRP4 t-code, for a month, I obtain 9 orders (1 SNP), but when I test extraction for BW in RSA3 with extractor 0APO_PPDS_ORDER_01, I obtain only 8 orders and the SNP one is missing.
There is an other standard extractor able to extract these information?
If I want to create a standard datasource, in wich table can I find these details (for example MENGE field)?
Regards.

Hi,
The data source 0APO_PPDS_ORDER_01 is not designed to extract SNP orders. It is designed for PPDS orders. But you can create a data source to extract SNP orders. For further informations check the online documentation at:
   http://help.sap.com/saphelp_scm50/helpdata/en/8f/ca630f116211d5b3170050da385632/frameset.htm
you should create you own datasource for extracting SNP orders. Note all orders in APO stores in livecahe,not in database tables.
Regards,
Sunitha

Similar Messages

  • Creation of Manual Orders in PPDS in /sapapo/rrp4

    Hi All,
    We are using PPDS for production planning. In the process of generating a plan in short term horizon, after executing the scheduling heuristic, user wants flexibility of manually creating some orders.
    We are using /sapapo/rrp4, where user can create manually orders in PPDS.
    Last week, during some reading , came to know that , manual order creation in /sapapo/rrp4, only creates orders in Live Cache, it does not save orders in APO data base.
    So, if i understand , live cache goes down, then all my order information will be lost. I long run , is it going to create a problem.
    Has anyone worked in same kind of requirement.
    thanks,
    Rao

    Hi
    Most of transaction data in APO is stored in live cache whether created by heuristic or manually.
    Of course if live cache goes down there will be problems but it will be no better if orders are created by heuristic..
    Regards,
    Nitin

  • Error:conversion of PPDS order from SNP order-error /sapapo/rrp_heur45

    Hi,
    I am converting a snp planned order from ppds order in transaction /sapapo/rrp_sap2ppds and using heuristic sap_pp_002.But it is canceling the heuristic and giving above error message.I have given 60days ppds horizon and 61days snp horizon.lot size:lot-for-lot.Please suggest what to do?
    Thanks&regards
    venkadesh

    Hello ,
    The hueristics sap_pp_002 you are using is based on algorithm "planning of std. lots".
    For converting Supply Network Planning (SNP) orders or Capable-to-Match(CTM) orders into Production Planning and Detailed Scheduling (PP/DS) orders, try to  use a heuristic based on the algorithm /SAPAPO/HEU_SNP_CONVERT, such as the standard heuristic SAP_SNP_SNGL..
    I think the above mentioned hueristics should be able to solve the problem .
    Also for more information refer to below link.
    http://help.sap.com/saphelp_scm2007/helpdata/en/8a/475c3c3906b106e10000000a11402f/frameset.htm
    Thanks & Regards
    Abhijit S Nakhwa

  • How to conversion of SNP orders into PP/DS orders

    Hi gurus,
    How to conversion of SNP orders into PP/DS orders, Can u explain me, what is the process.
    PRASAD

    Hi,
    You have to convert SNP Planned Orders to PPDS Planned Orders thru /SAPAPO/RRP_SNP2PPDS by specifying
    Planning version,product and location and the standard heuristic SAP_SNP_SNGL and propagation range.
    or in /SAPAPO/RRP3 and /SAPAPO/RRP4 directly.
    Thanks,
    nandha

  • There are no scheduled and delivery dates in /sapapo/rrp4

    Hi Gurus,
    When executing the transaction /sapapo/rrp4, category PO memo are being displayed. But I noticed that there are PO memos that dont have scheduled and delivery dates while the others have. Is this behavior normal? But when compared to transaction /SAPAPO/RRP3, the PO memos that dont have dates in /SAPAPO/RRP4 have dates in transaction /SAPAPO/RRP3. Could you please help me understand why there are PO memos that dont have sheduled and delivery dates when using /SAPAPO/RRP4?
    Thanks,
    Ann

    The rrp4 view shows only receipt elements, such as Planned orders, WIPs etc.In rrp3 view (Product view), we can see both requirement and receipt elements an pegging structure.

  • Loading transaction data from flat file to SNP order series objects

    Hi,
    I am an BW developer and i need to provide data to my SNP team.
    Can you please let me know more about <b>loading transaction data (sales order, purchase order, etc.,) from external systems into order based SNP objects/structure</b>. there is a 3rd party tool called webconnect that gets data from external systems and can give data in flat file or in database tables what ever required format we want.
    I know we can use BAPI's, but dont know how. can you please send any <b>sample ABAP program code that calls BAPI to read flat file and write to SNP order series objects</b>.
    Please let me know ASAP, how to get data from flat file into SNP order based objects, with options and I will be very grateful.
    thanks in advance
    Rahul

    Hi,
    Please go through the following links:
    https://forums.sdn.sap.com/click.jspa?searchID=6094493&messageID=4180456
    https://forums.sdn.sap.com/click.jspa?searchID=6094493&messageID=4040057
    https://forums.sdn.sap.com/click.jspa?searchID=6094493&messageID=3832922
    https://forums.sdn.sap.com/click.jspa?searchID=6094493&messageID=4067999
    Hope this helps...
    Regards,
    Habeeb
    Assign points if helpful..:)

  • Convert SNP Orders to PPDS Orders in CIF

    We have a requirement to segregate the orders created in SNP and scheduled in ECC.  I know this can be done with the Production Planned and Production Confirmed key figures based on ATP Category as EE is for SNP and AJ, AK, AL, AI are PPDS.  The complication is we are not using PPDS for short term scheduling; therefore ECC will control the short term scheduling.  We are currently removing the Firm indicator on ECC for any SNP (EE) order using a user exit.  This allows for seeing the SNP orders as not scheduled (not firmed) in ECC.  When the scheduler firms the planned order in ECC we want the order to show in the production confirmed key figure in SNP.  This can be done by setting the EE Firmed to the Production Confirmed key figure, but now the SNP Planner has SNP Orders on two different key figures.  Therefore, our requirement is to change any SNP order (EE Category) to a PPDS order if it is firmed.   This way Production Planned are SNP orders only and Production Confirmed are scheduled or created ECC orders.
    We have tried using APOCF004 to change the APOAPPL from a 3 to a 1 and BADI ORDER_INB_MODIFY_AFTER_MERGE changing cs_ordkey-appli from 4 to 2.  Neither of these options worked.  Possibly because of the difference in structures and number range, the system is not doing the convert.
    Thank you in advance for any suggestions.

    Hi,
    Please check the settings in the heuristics  SAP_SNP_SNGL(Individual Conversion SNP --> PP/DS) or SAP_SNP_MULT, whatever you are using.
    PPDS horizon is relevent for the conversion and SNP horizon may not be relevant.
    The details are as below:
    The conversion horizon for SNP to PPDS is decided as below.
    Conversion Hprizon
    The offset and the PP/DS horizon together define the conversion horizon, that is, the period in which you want to convert Supply Network Planning (SNP) orders and Capable-To-Match Planning (CTM) orders into Production Planning and Detailed Scheduling (PP/DS) orders:
    Conversion horizon = PP/DS horizon + offset
    You must specify a positive value for the offset. The conversion horizon begins on today's date and continues for the relevant number of calendar days into the future. So that the system converts an SNP or CTM order into a PP/DS order, the start date/time of the order must be within the conversion horizon. If you want to extend the conversion horizon to the end of the SNP or CTM planning period in which the end of the conversion horizon lies, you enter a daily buckets profile.
    Hope this helps.
    Regards
    Datta

  • Restrict SNP orders on PPDS board

    Hi Gurus,
    When ever I am accessing the Detailed Scheduling board I am able to see both SNP and PPDS planned orders.
    I want to see only PPDS orders and not SNP orders.
    What settings I have to do to achieve my requirement.
    Regards
    Sravan Maturu

    You need to configure 'Decision tables for graphical objects' for the planning board profile you are using in the planning board .
    Here, you need to enter a condition for SAP APO Application eg.
    IF 
    Table Name      3    Order
    Field Name      SAP APO Application
    Relat. Operator NE
    Compar. Value  4  << SNP
    then process to next Decision group.
    I hope this would help.
    Rgs - Vikas

  • SNP orders to PPDS orders

    Dear Experts,
    The system appears to have converted a number of SNP orders to PPDS while retaining the SNP orders too.but the orders should not have been converted to PPDS although they are outside the SNP horizon.
    What could be the reason?
    Kindly suggest the way out.
    Regards,
    Srinivas.S

    Hi,
    Please check the settings in the heuristics  SAP_SNP_SNGL(Individual Conversion SNP --> PP/DS) or SAP_SNP_MULT, whatever you are using.
    PPDS horizon is relevent for the conversion and SNP horizon may not be relevant.
    The details are as below:
    The conversion horizon for SNP to PPDS is decided as below.
    Conversion Hprizon
    The offset and the PP/DS horizon together define the conversion horizon, that is, the period in which you want to convert Supply Network Planning (SNP) orders and Capable-To-Match Planning (CTM) orders into Production Planning and Detailed Scheduling (PP/DS) orders:
    Conversion horizon = PP/DS horizon + offset
    You must specify a positive value for the offset. The conversion horizon begins on today's date and continues for the relevant number of calendar days into the future. So that the system converts an SNP or CTM order into a PP/DS order, the start date/time of the order must be within the conversion horizon. If you want to extend the conversion horizon to the end of the SNP or CTM planning period in which the end of the conversion horizon lies, you enter a daily buckets profile.
    Hope this helps.
    Regards
    Datta

  • How to download output process receipt /SAPAPO/RRP4 using a background job.

    Hello,
    I am taking download for various location and product in the /SAPAPO/RRP4 , /SAPAPO/RRP1 or /SAPAPO/POV1.
    But as the size of the output data is very high, many times it loggs out.
    Can anybody suggest how to run this report in background ad take download.
    Regards

    Hi,
    We also had similar requirement and we have tried in many ways to set the job to run in background and to download the output but we failed. Then we developed the Z program using BAPIs with excel interface. You can use BAPI - BAPI_POSRVAPS_GETLIST3 to get the list and then filter as you require and download the put put using excel interface.
    It works.
    Regards
    Venkat

  • Pegging between SNP orders?

    Is there pegging relationships between SNP orders? If it's so, what are the differences between pegging of SNP and PP/DS orders.
    Thanks

    Hi Mikalai,
    SNP has 3 solvers for rough-cut capacity planning i.e. Heuristics, Capability-To-Match and Optimizer. Heuristics and Optimizer are time-series based solvers and pegging is not supported using these solvers. The only solver that is order-based is CTM and with CTM pegging is possible. Even though CTM is different from rest of the SNP, it is often gets clubbed with SNP functionality.
    SNP can only schedule to a minimum of one day granularity and where as PP/DS can schedule to second. As far as pegging methods are concerned, fixed & dynamic pegging are available for both CTM & PP/DS.
    Hope this helps.

  • How are SNP order dates decided?

    Hi All,
    Where do we maintain the settings to tell SNP to generate orders(PRs/STRs/Planned orders) at the begining of the period OR at the end of the period OR in the mid of the period?
    Regards
    Manotosh

    Hi,
    While maintaining  Transaportation Lanes  (Transaction: /SAPAPO/SCC_TL1   ), in the u201CMeans of Transportu201D detail screen, you have u201CPeriod  Factoru201D field .  This Period Factor field is used  for Calculating the Availability Date/Time (Factor used by the system to calculate the availability date/time of a receipt element within a time period (bucket) ).
    Its use is as below:
    The system determines the exact availability date/time of the receipt elements within a period, by adding a time interval (that it gets by multiplying the period factor with the period length) to the start time of the period. You can enter a factor between 0 and 1, where 0 is the start of the period, 0.5 the middle, and 1 the end of t
    he period. When calculating the availability date/time, the system takes into consideration all weekdays, meaning that it does not take into consideration any days that have been defined as non-workdays in the calendars.
    The following applications can take the period factor into account:
    u2022 Heuristic in Supply Network Planning (SNP)
    The SNP optimizer does not consider any period factor.
    u2022 Period lot-sizing procedure in Production Planning and Detailed Scheduling (PP/DS)
    There is one more field u201CBucket Offsetu201D and this is also used  alon with the above field value, if required.
    I hope this gives you insight.
    Regards
    Datta

  • Creating non pegging relevant snp orders by using snp optimizer

    Hi all,
    We want to create snp planned orders with non pegging relevant by using snp optimizer, how can we do this?
    Regards,
    Burak

    Hi Burak,
    In IMG, use the following menu path
    SAP SCM Impl Guide --- APO --- Supply Chain planning --- PPDS --- Global settings --- Maintain Global parameters and values --- Under Planning Tab --- Activate fixed pegging.
    This is universal setting for the entire client.
    Hope this helps.
    Please confirm
    Regards
    R. Senthil Mareeswaran.

  • NO fixing SNP Orders

    HI SNP Gurus!!
    I would like not ot getting SNP fixed orders after heuristic execution, I mean, I need unfixed orders?
    Does anybody know how can I do that?
    Thanks in advance to everyone

    Hi ,
    Set SNP procuduction Horizon within this horizon SNP Heuristics plan Unfixed  orders after that it will plan fixed order.
    Mj

  • To build query related to SNP: Planned Order

    Hi,
    System: SCM 5.0
    Scenario: SO received at plant and planning creates PR against SO at plant and accordingly SNP:Planned Order at Vendor location. If SO is cancelled/deleted (manually), sometime only the PR gets cancelled/deleted (automatically during planning run) but corresponding SNP:Planned Orders still remains at vendor location and so the dependent requirements. PR and Planned Orders are pegged to SO so one-to-one relation is maintained.
    I could not find any reason why system is not deleting Planned Order at vendor location despite SO and PR is deleted at plant location. So I am planning to build query where SNP:Planned Orders are not pegged to any PR or SO.
    Can anyone help with list of SNP:Planned Order tables so that I can build query around it to identify ghost Planned Orders.
    Hope I was clear with my query but let me know if any further information is require.
    Thanks and regards,
    Devang

    HI Marius,
    Sorry for delay reply.
    I was working on on some other more critical issues to business.
    Finally we decided to built report to identify obsolete Planned Orders for which PR is not available in ordering plant. I have listed below logic for that report:
    Get Location ID from table /SAPAPO/LOC based on Location entered in selection screen
    Get PEGIDs from FM /SAPAPO/DM_MATLOC_GET_PEGIDS based on IV_SIMID as 000 and location id from step 1
    In FM /SAPAPO/OM_PEG_CAT_GET_ORDERS, use SIMVERSION as 000 and in Import Para IS_GEN_PARAMS insert all PEGIDs from step 2.
    From Export Para ET_PEG_INPNODE take From_OrderID and store in internal table.
    Execute T.Code /SAPAPO/RRP4 with following selection (Use Selection Variant: OBSOLETE PR and add Location as entered in Selection Screen)
    Planning Version: 000
    From: Current date – 60 days
    To: Current date +180 days
    Location: 0000201328
    Product: *
    Order Type: 1F
        6. Compare output of step 4 and step 5 and display result.
    From FM /SAPAPO/DM_MATLOC_GET_PEGIDS the output (step 4) will be Order ID (22 characters) while step 5 (T.Code /SAPAPO/RRP4) will give Planned Order number (8 character). I am not sure how to compare Internal Order ID (22 characters) for corresponding Planned Order Nos. (8 characters).
    I have not marked your post as correct answer as still need to find answer of above query.
    Thank you in advance for your guidance.
    Regards,
    Devang Shah

Maybe you are looking for

  • Entrada de Mercadoria - Processo Triangular

    Foram entradas MIGOs que eram onde um material se trata de um processo de transformação de material (processo triangular) no caso o usuário não fez a entrada de mercadoria com o outro material que seria com o tipo de movimento 543 , com isso resta um

  • It's been almost 2 weeks and I still didn't receive my package

    Hi guys, I don't know how to ask for help because I have already sent an email to Best Buy and anyone aswered me. I made an order on December 15th for my xbox one and some games. Most of them arrived between 19th and 22th, however one game, Far cry 4

  • How to Get the Parent Community of a Community Using PRC

    Greetings, Using the PRC, I am trying to build a heirarchy table of all of the Communities a particular user has access to. Stated another way, I want to be able to build a tree of all of the communities a user can access, and display them in an expl

  • How to call tuxedo in Visial basic?

    The version we are using is Tuxedo 6.5. Now we want to call tuxedo in our VB application. but tuxedo is a field we have little touch with. So i have no idea how to bind these two together. Hope you kindly give a hand (maybe some documents on this) th