Hi All,
I'm new in this forum ...
My problem is the following: Im working in an Upgrade Project and we have to make some test with CREMAS IDOCS. The basic type CREMAS03 has an extension with some Z segments.
When we change the field "Alternat.payee" by XK02, an idoc must be created. Then by BD14, this idoc have to be sent to another system.
My problem is when I run the BD14, the idoc created hasn't have the Z segments filled.
I was looking for the exit where has the code that fill those Z segments.
And the components:
EXIT_SAPLKD01_001
EXIT_SAPLKD02_001
Are not included in the Enhancement SAPMF02K in ECC 6.0 but they appears in 4.6c ...
Anybody knows if this could be the problem or there are something else ...?
Thanks!!!!
Leandro

Hi,
Try this it worked for me though,
1. Goto SPRO_ADMIN
2. Select the Project
3. Choose Change
4. Go To Transport Requests TAB
5. Activate CTS Functionality
6. Save it after the Pop Up
7. Go to Se10 and check if the Project Field is getting Populated with the Desired Project or not.
Regards,
Nitin

Similar Messages

  • Logical Components and Solution Landscapes - 2 PRD ECC Servers

    When I assign my PRD ECC5 server to Logical Components > SAP ECC > SAP ECC Server > SAP ECC, I select the Product Version as SAP ECC5.
    From the drop down list on Production System, I can see both my ECC 5 PRD's clients listed. I select one client, all OK. Problem is I have 2 Production ECC5's, both to be used in seperate solutions. So I can only select ONE of these,
    How can I use 2 ECC5 Production systems in Logical Components, or does it need to be configured differently?
    Thanks,
    Derek

    hi Derek,
    you can create more than one logical component under ECC. Just name it something like ZECC2 and the define the systems for this logical component. You can then use the logical component in your project system landscapes.
    To add a new one just right click on the text SAP ECC Server and select Create Logical Component.
    regards,
    Jason

  • How define ECC 6.0 system in smsy? Solution Manager 7.0 SP15

    Hi Colleagues,
    I have to define ECC 6.0 in my Solution Manager 7.0 SP15.
    At smsy transaction -> Landscape Components -> Systems I don't find name SAP ECC to create new system. So I created it on SAP ERP.
    My problem is when I go to create a logical component to assign my ECC system. So I go to transaction smst-> System Groups and Logical Components -> Logical components -> SAP ECC -> SAP ECC Server, I've created a Z New logical componets and at the right frame I am not able to assign my define system under SAP ERP. I get a pop-up "No system found for this product/main instance".
    Please could you help me?
    Thanks and Regards
    Raul

    Hi,
    The problem is solved.
    When I defined the system in smsy transaction, I made a mistake because I define it like a ERP 2005 and not a ECC 6.0, so in the next step when I want include this new system in a ECC 6.0 logical group, it wasn't able to find any ECC 6.0 system defined.
    Thanks, René for your reply.
    Regards

  • Migration to ECC and BW in one instance

    Hello,
    a customer has the ERP part on 4.6c and a BW on 3.1.
    Is there a standard migration path to ECC 5.0 with an internal BW on netweaver 04?
    Is it possible to first upgrade the BW system on a separate instance and later migrate it into the upgraded ERP ECC 5.0 system, so that there is only one instance at the end?
    Thanks for help!
    Matthias

    Hi Magesh,
    mySAP ERP 2004 is a new ERP solution from SAP.
    It divided into variuos software components. Basically you can divide mySAP ERP 2004 into 3 types of components
    1) ABAP Components
    2) JAVA Components
    3) Additional Components
    SAP ECC 5.0 is one of the ABAP Components. The ECC consists of the ECC application and the ABAP SAP Web Application Server 640. The plug-ins are an integral part, which are used to connect for example to SAP BW. It consists of the following S/W Components
    EA-IPPE 300PI
    EA-RETAIL 500
    EA-PS 500
    EA-HR 500
    EA-GLTRADE 500
    EA-FINSERV 500
    EA-DFPS 500
    EA-APPL 500
    SAP_APPL 500
    SAP_HR 500
    Hope this helps.
    Regards,
    Shubham

  • UPGRADE ECC 6.0 with AFS 6.3 from R/3 4.7

    We are now preparing the upgrade of our R/3 server to ECC 6.0 with
    AFS . As per the plan and SAP guide for upgrade we started the prepare
    phase with upgrade master for ERP 6.0 . But in the initial stage i saw
    the page of prepare it showing all the induatry specific components
    like ECC DIMP ,IS_OIL etc . But we want to use AFS 6.3 . So if i
    continue the installation all the industry specific addon installed .
    So why because of the conflict iam should not apply AFS into our
    server .
    So kindly tell me how can i remove ECC DIMP like industry components
    from the prepare phase .

    good

  • Installing FIORI TIMESHEET Recording & Approve COMPONENTS

    Hi Guys,
    While i'm trying to install FIORI TIMESHEET Recording & Approve components related to UISRA*  on 7.4 gateway server and SRA* components in ECC ehp7 server as mentioned in the installation guide .
    I have installed UISRA002 on GW server but when i try to install UISRA010 prerequisites are UI_INFRA & UI_INFRA add-on's  it asks for the stack xml file as shown below do we need to use solution manager ?
    if the components were updated kindly let us know the new components or advice how to fix this issue .
    Tags edited by: Michael Appleby

    Hi Krishna,
    Do not install UISRA*. Those are old UI.
    Important Note: Please use new UI with new SAP Fiori Launchpad
    New UI components have UI extension points and work with new SAP Fiori Launchpad.
    Please find correct components based on your Backend version.
    SAP Fiori - Add-on quick reference for transactional apps
    Regards, Masa
    SAP Customer Experience Group - CEG

  • Components Software working with

    Hi! experts
    Can any one tell me how can I see the number of Software Components on ECC 5.0, BW and Portal ??
    I need to know both First and Second tier component. (Ej: AC-COB, AC-INT, ALL-AC, etc)
    We need to know for example: componente of R3 Modules that working with, Portal componentes, BW components, and so on.
    Thank you very much
    Xiomara

    No cross posting
    Read the "Rules of Engagement"
    regards
    Juan

  • Number of software components

    Hi! experts
    Can any one tell me how can I see the number of  Software Components on ECC 5.0, BW and Portal ??
    I need to know both First and Second tier component. (Ej: AC-COB, AC-INT, ALL-AC, etc)
    Thank you very much
    Xiomara

    hI! Juan
    Thanks.
    We are interested in knowing not only the Symten component Software also we need to know about the ERP, BW, Portal, and soon. In other words need to know the total compnonent software installed on the systems.
    With the SPAM and http:/hotname:50000/index.html we can get just a few of them.
    If you have any other idea please let us know
    Thank you

  • Solution Manager Landscape Components

    Hi,
       I am in the process of configuring Maintenance Optimizer.
       I have SolutIon Manager Development(SMD) and Solution Manager Production(SMP).
       I have some confusion
       When I go to TC SYSY in SMD the Landscape Components are ECC DEV,SM4 DEV and Sand Box.
       The same when I see in Production I can see only EPORTAL7.
        Also in SMD I have the option of adding ECC QAS and ECC PROD which I do not get in SMP.
        I just want to know where do I configure Maintenance Optimizer in SMD or SMP.
    Also do I need to add ECC QAS and ECC PROD in SMD.
    And do I need to check any connectivity between ECC and Solution Manager.
    Or at last is there any configuration issue if you feel.
    Thanks
    Parvez Khan.

    Hi Parvez,
    You get the latest version of Solution Manger Config guide and start checking your config step by step. I feel Landscape components are not added properly in SMD also check the respective RFCs ( Which is mentioned in Config Guide)
    Hope this is useful
    Regards
    Umesh

  • SAP R/3 application component issue

    Hi all,
    My issue: SAP R/3 application component hierarchy node in RSA6 got saved in $TMP package as local object. When iam transporting the request from Dev to QA this hierarchy is not getting transported and all the application components in ECC QA are assigned under not defined node as individual node.
    Not only this when i replicate the data sources in BI side in QA these data sources are replicated but come under unassigned nodes because of the missing main node.
    So can any body help me in removing this main node from the $TMP folder and save this in a transpotable package to transport that to QA ECC and the same to replicate in BI.
    Regards,
    Prabhakar.

    Hi Markus,
    This issue iam facing in ECC side. Unless untill i transport this application component hierarchy all my application components in ECC QA will be under a not defined nodes.
    So please suggest me the approach to resolve this issue.
    Regards,
    Prabhakar.

  • Problem while creating WebAS ABAP Technical System in WAS 7

    Hi All,
    I have installed WAS 7 and EP 7 SP9 as part of SR2 Installation. I had checked the option configure local SLD. I have to create and SLD to conenct EP to ECC 6.
    When I was creating the Technical System, at the last step i found out that ECC 6 was not available in the installed products(only ECC 5 was available). So i Upgraded CR Content to SAP_CR 3.2 and CIM to 1.5.20. When I am trying to create the Technical System again I do find ECC 6.0 in the Installed Products but there are no corresponding Installed Components for ECC 6.(The same exists for ECC 5). as a result I am not able to create the Technical System as atleast one component has to be selected. I have tried re importing the CIM Model and cr content again but its not working.
    When I select SLD Data Supplier in Visual Admin I get the following error message.
    Error While loading service SLD Data Supplier
    java.lang.ClassNotFoundException: com.sap.sldserv.vaclient.ClientManagement
    Is there any solution to this. Points will be given.
    Regards,
    Shyam.
    Message was edited by:
            Shyam R Nair

    hi,
    use th following thread,
    No products installed while adding a Technical ABAP System in the SLD.
    Regards
    Jayapriya

  • Problem during installation of EHP4 on IDES with preinstalled EHP3

    I have a problem during installation of EHP4 on IDES with preinstalled EHP3(I got it with media sent last year in april).
    Namely during PREP_EXTENSION/EHP_INCLUSION! phase i got error:
    Severe error(s) occured in phase PREP_EXTENSION/EHP_INCLUSION!
    Last error code set: Component 'WEBCUIF' not found
    When checking components of ECC system I did not found 'WEBCUIF' component whereas in xml file (generated by SOLMAN) it exists. Which direction I should take. I am afraid to delete entries in xml file.
    I need help

    When checking components of ECC system I did not found 'WEBCUIF' component whereas in xml file (generated by SOLMAN) it exists. Which direction I should take. I am afraid to delete entries in xml file.
    You need to download and install all requirements as selected by Solution Manager for EHP4, WEBCUIF is a required component. Do not delete any entries in the xml file.
    Nelis

  • EHP4 Upgrade pahse REPACHK2

    Hi Gurus,
    I have recently installed ECC6 EHP4 ready on AIX environment. We decided to upgrade its ECC 6 components to ECC 6.04/EHP4. I am now in the phase REPACHK2. It show the message
    PREPROCESSING - Shadow System Installation
    Lock Development
    The development has to be locked now!
    After locking the development, no one can change any development object until the end of the process.
    The problem is the GUI seems freezed/Hang, I could not press back or next. On my research the next phase is LOCKEU_PRE to lock the system.
    Other details:
    1. I executed topas from the command line and it shows the running application JAVA CPU 90% usage Disk 80% usage. Now I could not tell whether the system is running the phase REPACHK2 or does it still wait for my input.
    2. I select high resource during the phase.
    3. SAPehpi LOG shows that im currently in REPACHK2 phase.
    Please advise what to do?
    Thanks in advance,
    Newbie

    Hi,
    Let me know yr hardward configurations.....!!
    Restart the EHPI process again. Again it stops, stop the installtion, restart the entire server again, and restart the installation.
    Regards,
    Rao.

  • Replace logical component in solar01

    Hi,
    We have an issue with Logical component maintained in "transaction"  tab for business process under Project in solar01.
    Logical components for ERP systems have been changed from SAP ECC to SAP ERP. All ERP systems are now maintained in SAP ERP and corresponding Logical component. But the business processes mainatained refer logical component SAP ECC.
    We tried to replace and delete the logical components in solar_project_admin -> System Landscape but it does not allow to delete neither replace with new SAP ERP logical components.
    Get message "Logical component SAP ECC is still being used"
    Please help on solution.
    Thanks & Regards,
    Anthony.

    Thanks for reply.
    actually we tried to add new SAP ERP logical component and updated in the project.
    When we try to use Logical Component replace function we get below message :
    "The logical components SAP ECC and Z_ERP have different products"
    So the logical component in "transaction" tab still cannot be replaced.
    Moreover in few business process it does not list Z_ERP logical component to manually replace same in Logical component dropdown.
    we found one SAP note :
    SAP Note 1429697 - SMSY: Converting product versions
    this SAP note refers to a report SMSY_SWITCH_PRODUCT which can be used to switch logical componment SAP ECC to SAP ERP.
    But SAP ECC is used in atleast 15 more projects so need to know impact of running this report.,
    Thanks & Regards,
    Anthony

  • High Availability Test Cases for ECC6.0, PI 7.0, BI 7.0???

    Dear All
    I am in a pretty difficult situation here. I have to write test cases for the components in the High Availability environment. We are running AIX 5L with HACMP/XD clusters ACTIVE/PASSIVE setting. The following components are in the landscape, ECC6.0, PI 7.0 BI 7.0 cFolders 4.0 Portal 7.0 SLD 2004s and Solman 4.0. I have to write test cases for the above components especially ECC, PI BI and cFolders in the HA environment as to
       1.<b>WHAT WILL BE THE EFFECT ON OTHER COMPONENTS IF ECC</b> <b>FAILOVER  and so on for PI and BI</b>,
       2. How do I check the consistency of the system after a failover, since the time for a failover will be anywhere between 3 - 4 mins.
    Can anyone pls give me a 5 or 6  checks like
    Checking RFC connections
    ABAP dumps
    Consistency check (txn: SICK)   and so on
    In the test cases I have to make sure that after a failover the system is up and ready to perform the activities that it was able to before the Failover......
    Will appreciate any suggestions and will definitely reward points for any helpful answers....Thanks in advance.

    Hi Shailesh,
    If you want you can activate SCM_SNC_GEN_1 depending upon business needs or configuration.
    As per my understanding there is no need to activate any business function but if you need additional feature of SNC to be used then refer below help link for more details:
    http://help.sap.com/saphelp_SNC700_ehp01/helpdata/en/a2/6d67d9b60149cb887acf72ae0b90ac/frameset.htm
    In ECC you are going for EPh5 which means no need to activate any additional business function(Normally SNC needs EPh4 only for some the latest feature to be use like in workorder collaboration ManufacturingWorkOrderInformation and ManufacturingWorkOrderProductionProgressNotification XML are used if ECC is with EPh4)
    Regards,
    Nikhil

Maybe you are looking for

  • DELETE when using a JOIN - How does this work?

    I need to perform a DELETE but must join 2 tables to get the correct rows. I only want to delete data from one table. Unfortunately, neither table has a primary key. Is there an easy way to do this and be certain of the results? (I've inherited this

  • How Do You Change the Icons / Change Multiple Icons?

    I've learned that to change most icons on the Mac is Getting the icon you want to change, and the icon you are changing it with. You select "Get Info" by holding "ctrl" and clicking on each icon. Then You click on the icon on the top left of the "Get

  • I cant find my iphoto.

    My hard drive was replaced earlier this year, is it possible that they didnt include it in the replacement?

  • IPhoto file Corruption from HP Digi. Cam

    Long story short, I finally convinced my parents to get a Mac. So i picked up a Mac Mini for them today, and when we got it set up i hooked up my mom's digital camera to it. It's a HP Photosmart M415. The pictures are in jpg format. So here's the iss

  • Has anyone used "Final Cut Library Manager" with FCP X 10.1?

    I've just noticed this inexpensive app which looks interesting. http://www.arcticwhiteness.com/finalcutlibrarymanager/ Has anyone used it? Comments?