Scehuling

Hi,
1.Q
After first time schedule, some activities are confirmed and some are partially confirmed. Now When i run schedule again, does dates of subsequent activity are changesd? If yes, then does system stores the first time schedule dates any where.
2.Q After first time schedule, some activities are confirmed and some are partially confirmed. Some activities are compled before earliest schedule dates. Now where can see projected dates for next activity, which gives me idea how early i can complete as pervious activites completed before expected.
Regards,
Sachin

Hello Sachin,
please verify following
For Q 1 :
If you confirm few activities, in the next schedule run system will consider the actual dates and schedule remaining acitivities. Earliest and latest dates of confirmed activity loose significance. Next activity earliest date is considered after the actual finish of confirmed activity and accordingly other activities in network are scheduled as per the releations maintained.
For Q 2 :
Incase of partial confirmed activities, the consideration is dependent of shift order indicator setting. If you tick shift order indicator in scheduling parameters, parital confirmed activity earliest start date is shifted to actual start and finish date will be calulated based on frcst duration for completion of remaining work.  If you donn tick this indicator, partial confirm activities are treated as normal activities i.e. their earliest and latest dates are consdiered.
If you want have track of previous dates, Assuming Network determines dates and Bottom-up scenario.
transfer basic dates to frcst dates first for network. in T-code CJ20N. Edit--- Dates -- Trnsfr basic to frcst.
1) Then schedule Frcst dates for WBS elements. T-code CJ20N. Seetings --- set of dates -- forecast dates.
2) Then WBS level frcst dates are determined by scheduling.
Than again repeat step 2 . ( Back to basic dates).
As project progress, some changes happen.....you do scheduling. Each schedule run will update basic dates at WBS level.
Frcst dates in WBS level always refer to orginal basic dates.
Thanks
Saikishore Ganga
Edited by: Saikishore Ganga on Apr 19, 2008 10:54 AM

Similar Messages

  • Alert Message for Scehuled messages

    Hello,
    Can we get alert email for scheduled messages in Integration Engine? If yes how to get that?
    Regards,
    Ansar.

    HIIII
    Go through these blog ..
    Configuring scenario specific E-mail alerts in XI-CCMS: Part  - 1
    The specified item was not found.
    CCMS ALERTS
    XI : Configuring CCMS Monitoring for XI- Part I
    XI :  GRMG Customizing for XI CCMS Heartbeat Monitoring Part II
    Configuring scenario specific E-mail alerts in XI-CCMS: Part 3
    Alerts
    • My blog
    transaction handling in XI
    The specified item was not found.
    • Auto triggering of alerts
    transaction handling in XI
    • SCOT
    not sending email from alert inbox

  • Schedule line Release with help of release creation profile.

    Hello,
    Is it possible to create the schedule line release for scehule line automaticaly by heuristcs run with the help of release creation profile of external procurement relationship ?
    We can release the schedule line in product view.
    What is other way release the schedule line?

    Hi,
    Credit check is done to see if the customer has crossed his credit limit or not. Incase you want to forcefully release order we use [VKM1]. What is this got to do with the schedule lines??? Irrespective of whether the order is under credit hold or no the schedule line are determined the same way. Didnt understand the connection.
    Regards
    Nadarajah Pratheb

Maybe you are looking for

  • Replacement iPad limited to IOS 5.1.1?

    Battery failed in iPad (original) S/N V5******Z39, sent it in and received replacement S/N CQ****9UZ... The original had 6.0.? as OS, This one advises that IOS 5.1.1 A large number of my 'old' apps won't work on the replacement unit. H E L P <Persona

  • Fault message in BPM process

    I have a bpm process with a sync send step. i have a default fault message strcuture and my sync interface ( a proxy) is using this as fault message format. In case of an fault in the proxy i get the fault message returned. In my bpm i have an except

  • Import net.rim.blackberry.api.phone.phonelogs.*;

    I have developed a midlet with WTK22 and I have successfully used the Blackberry rapc tool to compile it for the Blackberry where it runs very well. I would now like to import the Blackberry RIM classes in net.rim.blackberry.api.phone.phonelogs.*; to

  • QA32 UD - Disable screen fields UD code and Quality score in QA12 screen

    Hi, This is regarding the QM module , QA32 transaction , UD subscreen under Characteristics tab. I need to disable the UD Code and Quality score  screen field in QA12  in cases where the inspection lot  stocks are completly posted. How can I achieve

  • Basic Setup Web Page Error

    When I type in the IP address of the router in the address bar, the page comes up with errors and none of the tabs at the top of the page are showing, meaning I can't click on "Wireless". My router and adapter are showing a connection, but it tells m