Scenario Problem: Equipment in one plant and diesel issue from other plant
Dear all,
I have an issue in my organization.I have an equipment in maintenance plant 1000;but for 2-3 days the equipment goes to work in other project with different maintenance plant 2000 ; and it is very dynamic.
Now i am not able to book the costs of fuel on a different cost center without changing the maintenance plant; as the equipment movement is day wise and hour wise.Equipment has to stay with the original plant but the costs have to be booked in the current plants of fuel and spare consumption.
Regards
Praveen Dhankar
Dear Seran
Thank you for the scenario clarity through fleet management.
Regards
Praveen Dhankar
Similar Messages
-
Sales order comes in 1 plant and get dispatch in other plant
Hi Guru's
we've a scenario where we've one company and 2 plants located in 2 diffrnt states, here we r working on MTO scenario, where lets say we hv 2 plants name 101 n 102.
sales order comes for FG in 101 plant it triggers the initial production n remaining production takes place in 102 and final FG get dispatch from 102 plant.
how to map this sales order whose receiving plant is 101 and delivering plant is 102 in SAP so i cud run MRP on this sales order in 102 plant so as to get dep req in 101 plant?
Kindly assist
AmanHello
You can refer following links for your reference:
- Make to Order for STO
- STO Link in MTO
- MTO and STO
Regards
JP -
Count moving object (Inter the ROI from one side and leave ROI from other side)
Hello All
I want to design program that can counting moving object that inter ROI from one side and come out from the other side, I want to give each object ID number
I have design a program that compare between object distances from one frame to the next frame, but the program efficiency is very low
If any one can give me a sample code that I can use or modify it to suite my applicationHello,
you will find the code in the attachment (saved for LV2013). There is a longer delay inside the loop, remove it for efficiency.
Roughly measuring the time to read an image, the processing takes ~8 ms on my computer (~500x200 image resolution). That is ~125 samples/images per second. Is this not fast enough for you? Considering better image resolution, the time is of course increased.
My specifications:
Core i7 3632QM
6 Gb RAM
Win 7 x64 (Labview x86 though).
Best regards,
K
https://decibel.ni.com/content/blogs/kl3m3n
"Kudos: Users may give one another Kudos on the forums for posts that they found particularly helpful or insightful."
Attachments:
IDMovingObjects.zip 64 KB -
Material Issued from other Plants
Hi All,
I have 2 question here.
I have created a STPO with delivery date say 12.09.2009 from my plant ABC to the Plant XYZ and 140 qty, For this XYZ plant has issued material on 15.09.2009 around 100 qty.,
Now I am looking for the report ME2W to find out what are all the materials has supplied by other plant till 14.09.2009.
but as per the report ME2W it is having I/P option as delivery date, so if i put delivery date between 01.09.2009 to 14.09.2009, it is showing all the material which is issued on after 14.09.2009 also as i have put the delivery date and also it is checking as per delivery date.
Question:
1. How to get these reports ie., materials issued as per issued date or posting date not as per delivery date or not as per material code---- any transaction available for this.
2. one more i come across here in STPO is that, if i create 100 qty of PO but it is allowing to issue more than the PO qty, say if i create Po with 100 Qty but other plant can issue more than 100 ie.,>100.
Is thr any settings available to make such the system should not allow to issue more than the PO qty.
Please help me out on this.
Regards,
Nagaraj S
Edited by: Nagaraj S on Oct 1, 2009 2:52 PMDear Vidya Dewangan ,
I have checked MB5B, it is not for the requirment what i want.
See this report or MB51 would works with only 2 plants where within which these ST can occur.What in my scenario we have more than 2 plants, See i will clearly expalin the situatin -
Thr are 3 plants- Plant A,Plant B, Plant C.
ST happens b/w A and B, A & C, B& C and Visa versa.
Now I want to know what are all the ST happens between Plant A and Plant B, where Plant A has supplied some material to plant B on some day(ie., 351 on posting day),say i dont know material i know only the dates.I cant use MB51, is thr any other report i can get.
Pls help me out.
Regards,
Nagaraj S -
Finished product in one plant and finished product in another plant
Hi ,
In one plant client is manufacturing a finished and he is selling from the same plant and this product he is doing stock transport (sto) to another plant where he is using it as semifinished in the assembly.
Ex.Bike handle is manufacturing in one plant and selling it from the same plant to the customer.Here this product is a finished good.Where as same material is used as during the assembly of Bike in other plant where this product is used as semifinished.
Please guide how to make the same material code as finished in one plant and as semifinished in other plant.
Regards,
vrHello
As per my knowldge, it is not possible to maintain same material code in this scenario.
All you can do is to make 2 matrial codes for finished and semifinshed material and at the time of STO betweem the plants, Do material to material transfer (movement type 309) either before issuing for STO from plant 1 or after receiving in plant 2.
Will explain the steps:
Material code M0001- finished good (handle) in plant A.
Material code M0002- Semifinished goods (handle) to be maintained in plant A and plant B.
STO (material code M0002) for stock to be transferred from Pant A to Plant B.
Material to material transfer (M0001 to M0002)in plant A using movement type 309.
GI (Material M0002) from Plant A against STO.
GR (Material M0002) at Plant B.
Hope it is clear.
Regards -
In private browsing not working in Firefox 3.6.12 If I open yahoomail one session for one account and if I open other session for yahoomail, it automatically opens the earlier mail account. But if I want to use more than one yahoomail accounts, in private browsing is not working. Please suggest.
That problem isn't related to Private Browsing specifically, that's how Firefox works with regards to multiple "sessions" with the same server - only one logon is allowed at any time. Try using one of these extensions to be able to run multiple session cookies.
Multifox: <br />
http://br.mozdev.org/multifox/ <br />
Cookie Swap extension: <br />
https://addons.mozilla.org/firefox/3255/ <br />
Cookie Pie extension: <br />
http://www.nektra.com/oss/firefox/extensions/cookiepie/ -
Repeating problems (1) Many Missing Files; and (2) Downloading From iTunes
I am having multiple issues with the iTunes store currently. I have spoken with an Apple Expert on August 14, 2010 (case number available if needed). Although he was very good at helping me to the best of his ability, he referred me to iTunes Store Customer Service, which I previously was in contact with.
I have 2 types of repeating problems (1) Many Missing Files; and (2) Downloading From iTunes Store.
_Problem One - (1) Downloading From iTunes Store_
I have 1610 missing files from my iTunes folders. I created a list of missing items by following these steps:
+If for any reason you find yourself with random missing tracks, (or are trying to recover from a dying hard drive like me), there is an easy way to isolate those missing tracks.+
+1. Create a standard playlist called "Not Missing".+
+2. Drag your entire library into that playlist. Missing tracks cannot+
+be copied to a playlist.+
+3. Create a smart playlist called where you select the following conditions in the options window for the new smart playlist:+
+*dropdown menu* PLAYLIST+
+*dropdown menu* IS NOT+
+*dropdown menu* NOT MISSING.+
+4. Rename the smart playlist "Missing"+
+5. Right Click the "Missing" playlist+
+6. Click the "Export..." option+
+7. Select the Plain Text option and Desktop location+
My missing playlistable items represent a better part of a decades worth of audiobook files, transfered files from my PC days, etc... i loved my - now missing - Doctor Who and Torchwood purchases from iTunes.
I have already read the Trouble Shooting, checked Time Machine Backup, and been walked through replacing the preferences list. The missing file path from the "get info" options in iTunes points towards a non-existant file.
_Problem Two (2) Downloading From iTunes Store_
I have had problems downloading files from iTunes for months. I first noticed it with the TV Show "Avatar: The Last Airbender". Lately, when I download from the (non-music) part of the store, the majority of files are downloaded and then immediately not found. This has been prompting iTunes to repeat the download. Until I force quit itunes and *potentially cry*.
There have been multiple iTunes store purchases of audio books recently. If I reported the missing file immediately, I can contact iTunes support to repost the file and that usually fixes the issue. But today, I went to go rewatch "Torchwood: Children of Earth" and noticed Problem One.
_Hind Sight_
If provided with a spreadsheet of my iTunes Store purchase history, I can write a vlookup( formula in excel to compare the list against my exported missing list so a shortlist of what is missing from just my iTunes Store purchase history can be created (hint: it's the majority of items from the list, others are years worth of files from my PC days). If we could do that, could iTunes make my missing purchases available?
Then we can focus on purely, trying to figure out why they went missing in the first place - so we can prevent it again & possibly help others from running into the same.
Plea
I strongly suspect the two issues are related to a root cause ... in addition to my user error in file management of backups ... what is going on?iTunes Support (Eric) emailed me some instructions. I am posting, in hopes that this will help others.
_Suggestions from iTunes Support_
Troubleshooting 1. iTunes Store: Finding missing purchases and downloads http://support.apple.com/kb/TS1408
Troubleshooting 2. Direct Assistance
_Results based on Suggestions_
Results on "Searching the harddrive" - did not resolve my concerns
Results from "Direct Assistant" - i emailed the list of the missing files... status is pending
Conclusion
I'll follow up again later, if I have new news. -
Using family sharing, how does one view and download songs from a family member's collection in itunes?
When you click on your device you are presented with the pages
Summary
Info
Apps
Tones
Music
Movies
TV shows
Books
Photos
To remove Audiobooks depending on the type of Audiobook ie a series of mp3 files you will find under music and probably have to deselect the album name to remove it. I don't have any of these as I download from Audible or I use Audiobook Builder to stictch together mp3 files into m4b files. To find these Click on Books you will immediately see a section for books (in reality ebooks). Scroll down past that and you will see Audiobooks where you can select and deselect. Deselect the required Audiobooks and Click Sync -
Payment to one vendor and charge TDS for other no.of vendors against same invoice
Is it possible to book invoice and payment to one vendor and charge TDS for other 3-4 vendors against same invoice.
Is there any config require and any such process exist?Hi,
Please go through the following process and see whether it suffice your requirement
1. Create Vendor Invoice.
2. Go to transaction code F-53
Click on
Click on
Click on
Click on Document - Simulate
If entry is found O.K. Click on
Hope, this solves your issue else revert.
Regards,
Tejas -
trying to find out which adapter to buy which has 30pin socket on one end and lightening plug on other - any help really valued - thanks
Many thanks - I was typing in the wrong keywords - fr your time and trouble.
Dave -
How export a report in Excel where show Page Header in one sheet and the Body in other sheet?
Hi,
I need help!, because I need export a report in Excel where the Page Header shows in one sheet and the Body in other sheet. I have SQL 2008 R2, is it possible?
Thanks a lot for your answers.
Sukey Nakasima
Sukey NakasimaHi Sukey,
If I understand correctly, you hope the Page Header shows in one sheet, the body and hidden page headers in another sheet when exports a report to Excel. To achieve this goal, we can put page header content into a rectangle, then set the visibility of rectangle
using expressions. For more details, please refer to the following steps:
1. Add a rectangle to the page header, then drag the page header content into it.
2. Click the rectangle, in the Properties window, click Visibility, in the Hidden text box, click Expression, type the following expression:
=IIf(Globals!RenderFormat.Name="EXCEL" and Globals!PageNumber <>1,true,false)
3. In the Report Body, right click the Table Header row of the first tablix and select Tablix Properties, check Add a page break before check box.
4. Click the tablix, in the Properties window, click PageBreak, in the Disabled text box, click Expression, type the following expression:
=IIf(Globals!RenderFormat.Name="EXCEL",TRUE,FALSE)
If you have any more questions, please feel free to ask.
Thanks,
Wendy Fu -
MIC from one plant to be Extend in other Plant Codes
Dear SAPians,
I want to extend the MIC from one plant to other 7 plant codes. Please guide how can i do it?
Thanks in Advance.Hi Atul,
As suggested by Kundan, it is recommended to use the MICs created in one plant in other plants, to reduce the duplication of master data.
If the MIC parameters / control indicators are different in other plant, then you can change in the inspection plan or create new MIC by copying the MIC from other plant, but you cannot extend MIC from one plant to other plant.
If your business says all the MICs should be plant specific, then create MICs in all the plants by copying from the existing plant. You can use master data uploading tools for large volume of data.
With Best Regards,
Vithal -
Withdrawal from other plant- sales
Hi dudes,
suppose if i am using 70 special proc. key for semifinished materials and are planned in other plant gets consumed for FERT materials order in the main plant.
suppose if i maintain the sales views for these semifinshed materilas in the main plant and can i do the PGI for sales order from other plant to main plant where the sales procesing is happening.
thanks in advance
RobertSpecial procurment key 70 is reservation from FERT plant to the supplyiong plant.
Against this reservation you need to issue the material? Is it your scenario?
As I know the material will be withdrawn duting backflush from the supplying plant directly
If you want to sell the raw material from supplying plant to production plant, then you need to set up STO, in OMGN.
Since usually we use it for inter company tranfer and billing, I am not sure whether you can do it for the plants with in the same company code. -
We have several portable devices and a mini mac on our system and have found that if we delete an email on one device it is removed from others.
We don't want this, but at the same time we need to keep our devices clear of clutter.
It was suggested that switch off the sync mail switch in settings - Icloud, but this only works on IPads & Ipods
anybody got any better ideas ??We have several portable devices and a mini mac on our system and have found that if we delete an email on one device it is removed from others.
We don't want this, but at the same time we need to keep our devices clear of clutter.
It was suggested that switch off the sync mail switch in settings - Icloud, but this only works on IPads & Ipods
anybody got any better ideas ?? -
MM - Daily Report of the materials received from other plants
Hello
I want the daily report of all the materials received from other plants i,e by stock transfer. Is there any way to get this information from the standard reports
regards
Ravi PalDear Prashant
i checked with this transaction but the problem is that this gived the report for only the GR taken against STO with SD Delivery i,e with or with out billing. the system is not picking the STO with MM delivery whan we enter the supplyiny plant as u said
pl check this
thnaks
regards
ravi pal
Maybe you are looking for
-
The mail application on my I-Mac dates all emails, in or out, as 5th (of whatever month it is). It seems to get the time right. The computer clock is fine. I have no problem with my MacBook - just with the I-Mac. Any ideas, please?
-
Another Program Setting Network Settings
Just bought a 12-inch PB off eBay, and it won't log on to Facebook. Thinking perhaps there is an issue with Virus scan or firewall, I want to Network Settings. But I can't do anything with Network settings. It's stuck in a loop of telling me that net
-
HT201077 I need to stop photos from syncing to the ipod touch how
How can I find the menu where you can choose what sync's to the ipod touch? I cannot find it with the "new" set up. I need to stop the photos from my computer from moving to the ipod touch.
-
Changes to Muse site with new update
I made a change to an existing, published Muse site after I installed an update. When I clicked "save", it wanted me to save over the old name. Then when I clicked "publish", to load the changes to BC, it loaded everything, instead of the just the pa
-
In Finder: Macintosh HD Info: I get Used: 40.28 GB on disk. In Disk Utility: Partition - Volume Information Size: 231.93 GB Available Space: 181.17 GB (So Used?: 49.96 GB) Roughly one says 40 GB used and the other 50 GB used Why is that?