Schedule - Error Message

Hi All,
I'm running a webi report on schedule mode and keep getting this error message for the report which was running good for few days:
Prompt - No Default everything is optional, Date Vraiable Prompt daily scheduled based on Customer Exit variable(Automated).
BO Report Statistics: 200 SECONDS
"A protocol message was rejected because it was too big (more than 100663296 bytes). To increase the limit (or to disable these warnings), see CodedInputStream::SetTotalBytesLimit() in google/protobuf/io/coded_stream.h."
By seeing the above statistics of the report which used to 4 min approx, now throwing the above error message.
BO SP9 Windows Only Detail Objs used in Layout and Key Figures as less as 36 Key Figures.
Searched the forum tried all but still no luck.
Thanks,
-Dinya

Does it run when you run the report manually or throws the same error? Was something changed in the BO environment recently (Like patch update or Server config).
Below thread might help you. Not sure if you have already checked this
A Protocal Message was rejected because it was too big

Similar Messages

  • Just got a new Samsung laptop. Windows 7, .  Downloaded and installed Itunes 10.6.3.  Now every time i try to open Itunes, I get BSOD and a Veido Scheduler error message.  Anyone else heard of this problem ?

    Running Windows 7 on a new Samsung Series 7 laptop.  Downloaded latest Itunes 64 bit and installed.  Now, when i try to run Itunes, I get BSOD and a video scheduler error message

    Running Windows 7 on a new Samsung Series 7 laptop.  Downloaded latest Itunes 64 bit and installed.  Now, when i try to run Itunes, I get BSOD and a video scheduler error message

  • While scheduling Error message

    Hi,Friends,
    While scheduling my maintenance plan its displaying warning like this:
    "Error calculating cost do you still want to save?
    How to resolve this.I hope you will help in this regard
    Regards,
    K.Sunil

    Hi Sunil,
                                As You said it is a warning message i mean its not an error that stops the process flow of your scenario , the warning might be due to insufficient data in components or the Activity based costing.once recheck the costing fields the warning message might be rectified.
                   And you can save maintenance plan and save it the scenario will run without any error.Hope you problem will be resolved.
    Regards,
    Bharat

  • Status of a schedule - error message on failure.

    Hello All,
    when querying for status, after scheduling a document, using the schedule Id - the service returns Completed/Failed status. In case of a failure, it does not give us any detailed description of the failure. This would mean that we have to go to lauch pad in order to look at the reason for failure.
    I'm using the http://localhost:6405/biprws/raylight/v1/documents/12345/schedules/34343 to get the status for schedule Id 34343 and document Id 12345.
    Is there any othere service that can give more information on failures?
    Thanks,
    Pavan

    hello,
    The information you are looking for will be available starting 4.1 SP5 ;-)
    For example:
    [GET] raylight/v1/documents/6513/schedules/9046
    Accept: application/xml
    Content-Type: application/xml
    HTTP Response Code: 200
    Response Time: 274 ms
    Response :
    <?xml version="1.0" encoding="UTF-8"?>
    <schedule>
         <id>9046</id>
         <name>ftp_withSpecificName_withoutExtension_NEED_TO_CONFIGURE_CMC</name>
         <format type="webi"/>
         <status id="3">Failed</status>
         <error>
              <error_code>FWB 00031</error_code>
              <message>Destination disabled. []: [CrystalEnterprise.Ftp]. Please note the name of the job server used for your request and contact your system administrator to make sure the specified destination is enabled. (FWB 00031)</message>
         </error>
         <destination>
              <ftp>
                   <port>0</port>
                   <directory>/tmp/d930649f-7f8d-4ca7-a462-dece662783ed</directory>
              </ftp>
         </destination>
         <once retriesAllowed="0" retryIntervalInSeconds="1800">
              <startdate>2014-09-04T10:21:20.533+02:00</startdate>
              <enddate>2024-09-04T11:21:20.488+02:00</enddate>
         </once>
         <serverGroup id="0" required="false"/>
    </schedule>
    Regards,
    eric

  • Error Message: Number is not in external Interval (Testing Schedule)

    Hii ,
    Iam working on Stability study process. I have maintained stabity test with materiial (QS) & performed my test upto Initial test of Inspection lot. But when i click create Testing Scheudle in the Notification (QM02) , system asks for testing schedule data for
    Maintenane strategy, scheduling period.
    On clciking create testing schedule , system throws error message "Number is not in external interval". I have maintained all the prerequite setting on number range in following spro path stability study>testing schedule for stability study> Category--> no range.
    For Group ST   600000000- 6999999999 for Intenal & 70000000-7999999999 for external. But still iam facing with error message ""Number is not in external interval".  It throws message no "IP324" . Even I had cross checked with maintenance setting, but error message remains . How to resolve this issue?
    with regards,
    K.Lokesh.
    Edited by: Lokesh K on Mar 11, 2010 1:13 PM
    Edited by: Lokesh K on Mar 12, 2010 5:55 AM

    Hi Lokesh,
    did you actually enter a number ( i.e. 70000001)?
    Usually Stability studies are created using the external number range so that ringing names can be used for the studies:
    Example:
    Material: 000000000000000001  acetylsalicylic acid
    Stability study: ASA1
    I hope that this information proves usefull.
    Regards
    Isabelle

  • Error message "Error when scheduling the query(JOB_CLOSE)".

    Hi all,
    While using query extractor (rscrm_bapi) I am getting error message "Error when scheduling the query(JOB_CLOSE)".
    Could you please find what this error is?
    Thanks,
    Uday.

    Hi Uday,
    This problem can occur if you changed the query definition.
    In this case the query definition would be inconsistent with the existing extract structure.
    Certain Meta information is maintained with each extract defined using the RSCRM_BAPI. If the definition of the query is changed and you need to use the same extract table then you need to delete the extract using the report RSCRMBW_DEL_ALL_EXTRACTS selecting the extract you want
    to delete.
    After this you could use the same table name for any further extract that you need to create.
    One caution is that the extract table should not be deleted through any other transaction before you run the report.
    Rgds,
    Colum

  • Error Message when Scheduling a report in Infoview

    I have created a report in Crystal Report using the Universe.  Report is saved to the Enterprise and set up to schedule in Infoview.
    When the report is scheduled for now or any other "when" time, I receive the error message:
    "Error in File C:\Program Files\Business Objects\BusinessObjects Enterprise 11.5\Data\procSched\tfcu-fics.reportjobserver\~tmp58860bbee30730.rpt: Unable to connect: incorrect log on parameters."
    Currently running CR Version - 11.5.0313
    BOE Version - 11.5
    On my workstation - the ODBC connection, System DSN, for crystal is using the Adaptive Server Anywhere 9.00 driver - have no issues creating the report from the Universe.
    On the server the ODBC connection, System DSN, for crystal is using the SQL Anywhere 10 driver.  Would using the SQL Anywhere 10 driver create the error message above?
    To test this I changed the workstation System DSN connection for crystal to SQL Anywhere 10 and when trying to refresh a report created from the Universe I kept receiving the ODBC Login window asking for the database password.
    Is there an issue with SQL Anywhere 10 and a Universe not holding the database username or password?

    Try This..
    1. Open the crystal client on your local machine and import that particular report.
    2. Do Database -> Verify Database. Then refresh the report on your PC and make sure that it returns data as expected.
    3. Export it back to repository and try scheduling it again. You can verify through CMC for Crystal Reports under " Database Configuration" property to make sure it points to the right ODBC.
    Let us know.

  • Error message while Creating Work Schedule

    Hi,
    While Hiring an Employee, and creating a work schedule, using the work schedule rule NORM, the error message "No work schedule rule for key 2 00NORM 20100501 ##"
    How do I rectify this issue?
    Regards,
    Arvind
    Please Type the Error in the search forum ............ feild you will find lot of threads related to this issue

    check your PSA grouping in V_001P_ALL

  • R/3 to BW (error message when scheduling load)

    Hi
    I am new to BW and R/3. I have been getting this messsage when scheduling the load (transaction data) from R/3 to BW ODS.
    Error when updating Idocs in Source System
    Diagnosis
    Errors have been reported in Source System during
    IDoc update:
    System response
    There are IDocs with incorrect status.
    Procedure
    Check the IDocs in Source System . You can get here
    using the BW Monitor.
    Removing errors:
    How you remove the errors depends on the error
    message you receive.
    Please advise what,how to solve this issue.
    thanks

    Hi Carlos,
    welcome to SDN.
    Run RSA1 - Source system - right click on the source system concerned - check connection.
    If the source system is inactive, you need to activate or even restore.
    For more details, please check:
    http://help.sap.com/saphelp_nw04/helpdata/en/80/1a618ae07211d2acb80000e829fbfe/content.htm
    Lilly

  • Stock Transport Scheduling Agreement - error message: 'Stock in transit...

    Stock Transport Scheduling Agreement - error message: 'Stock in transit exceeded'
    Hi, I do have a question about transport scheduling agreements.
    I have created a stock transport scheduling agreement via ME37, doc. type LU for a stock material from issuing plant TT01 to receiving plant TH01. The material is maintained in both plants.
    After that,I maintain the delivery schedule via ME38 for a quantity for today. The quantity is available at issuing plant TT01, checked via MMBE.
    Then, I try to post the goods via MIGO. When I try to post the document, I get the following error message: "PL Stock in transit exceeded by 1,000 T% : 794 TH01 S1". Why do I get that? My target is to decreate the stock quantity in TT01 and to increase the stock quantity in TH01.
    Thanks, Peter

    Hi,
    This happens when you are issuing more on the schudle qty, Check you have anything on the transit receive it the try agin to process the issue.
    Hope it helps.
    Suresh

  • Error messages while configuring Scheduler on AIX Machine

    We want to configure OBIEE Scheduler on our AIX Server. While we try to run schconfig.exe we could notice the fallowing error message.
    exec(): 0509-036 Cannot load program schconfig because of the following errors:
    *0509-150 Dependent module libnqutilitygeneric.so could not be loaded.*
    *0509-022 Cannot load module libnqutilitygeneric.so.*
    *0509-026 System error: A file or directory in the path name does not exist.*
    We have already created S_NQ_ERR_MSG, S_NQ_INSTANCE, S_NQ_JOB, and S_NQ_JOB_PARAM tables for this purpose.
    We have taken following steps to execute the schconfig file on AIX environment: -
    In /u04/OracleBI/setup directory we ran the following shell scripts
    *1) common.sh*
    *2) .variant.sh*
    *3) sysenvinit.sh*
    *4) user.sh*
    Then we went to */u04/OracleBI/server/bin* and executed the file *"schconfig"* but no use ...
    Please suggest what needs to be done.
    Thanks in advance!!!
    Regards,
    Nithesh.

    I tracked the issue to faulty Oracle 11g Client drivers for 64-bit, reinstalling/rechecking the client and client paths did not help.
    I installed Oracle 10g R2 64-bit drivers and that fixed the issue for me.

  • After each Error Message,the follwing messages are in Scheduled in ECC SMQ2

    Hello Everyone,
    After each Error Message thrown from ABAP Proxy, the next following messages are in Scheduled in ECC SMQ2 tcode. Can anyone suggest me how to overcome from this issue?
    Thanks,
    Prashanth

    Hello,
    Please, any one respond to my question. I have been trying to get out of this issue but could not.
    Thanks,
    Prashanth

  • Error message " [RunQueryToServer] Job Not Found " while editing Schedules

    Hi,
    We are on BPC 7.5 NW. While trying to Edit Schedules in Datamanager , an error message is received " [RunQueryToServer] Job Not Found ". Could anyone suggest what could be the reason for the issue, is it admin rights of the user involved ?
    Please do let me your suggestions.
    Best Regards,
    SAYAN

    Message starting with Z is home made message. That means the message is designed by your organization only. You should consult with your ABAP team to check the root causes of the error message. If you know the debug process , then you can check it also by debugging. To get the details of the error message, go to SE91 and the enter class ZM and message no 303, then use the option 'where used list' to check the details used of the message.

  • Error Message : Object could not be scheduled within the specified time interval

    Post Author: mohamed elkashef
    CA Forum: Publishing
    Dear All when i try to run event for daily reports it sometimes take generation status failed with this error  message : Object could not be scheduled within the specified time interval so  i need to know the reason of failure and how can i fix  this error  thanks a lot 

    Post Author: nvnaresh
    CA Forum: Publishing
    Dear jsanzone,
    I'm facing the same error even when the server time out is more than the query execution time of the report.By server time out I assume connection time out of WebI report server which I have set to 180 min.But the actual query takes maximum of 5 min.
    We are using BO XIR2+SP2.
    I scheduled a webI report to get saved in Excel format to an Unmanaged disk location upon a File Event.
    We have 3 such reports to be scheduled on the same event.
    Expected frequency of File Event getting fired in a day is twice.Scheduling frequency I have set it as every one hour with the file event.
    This usually should work fine.
    But frequently 1 or 2 of the above 3 instances are getting failed with the following error "Object could not be scheduled with in specified time interval " after being in Running state for few hours(8). Amazingly this is not happening every time. May be once or twice in a week.This works fine after I restart the BO services and the same thing repeats after 3 or 4 days.
    Do I need to increase any server parameters?
    Why is this happening randomly?  

  • Scheduling a Deski report fails with error message: "Failed to get property

    Hi,
    We have created few Desktop Intelligence report. Now when these report are schedules to be refreshed weekly (on Sunday), it fails with the following error message:
    "Failed to Get Property"
    Have tried to refresh the reports manually in Full Client too but the report fails there too.
    Have checked for the connection information. The servers are up and running.
    Have tried to re-create the connection and even tried to re-import and export the Universe.
    If we rename the report and save it and export, it works fine. Can not try this workaround as have more that 500 reports.
    Please suggest.
    regards,

    Hi Maria,
    usually the message "Failed to Get Property" is followed by an item name such as SI_FILE, or SI_VARIABLE, or SI_USE_ORIGINALDS, and so on.
    Could you please specify as much information coming from the error message as you can?
    Furthermore, is this issue happening with any Desktop Intelligence reports you schedule?
    Are the reports using the same Universe?
    Which DB are you using?
    Regards,
    Samanta F.

Maybe you are looking for

  • Percentage Overhead Rates are not capture with Transport request

    Hi, I have defined Percentage Overheads rate in KZZ2 and assigned the same  into Costing Sheet.But while saving the transport reqest in to QAS client,It is throwing the below error.Kindly help me in solving this issue. Individual entries cannot be pu

  • Mysterious PPC freezes

    I have a PPC imac, and have been experiencing system freezes. I can still move the cursor, but dock doesn't come up, I can't switch applications, or force-quit. The only thing I can do is hold down the power switch for five seconds, then restart. It

  • OSX Maverick iMac Resolution: stuck at 640x480. How do I fix this?

    This is my iMac: - 21.5 inch - late 2012 - 2.9 Ghz Intel Core i5 - NVIDIA GeForce GT 650M 512MB - OSX 10.9.2 After updating to Mavericks, the screen resolution somehow got stuck at 640x480 and I'm unable to change it. Going into display settings and

  • AES encriptation

    Hi, first my english is bad. I have this code for AES enc/dec import java.security.*; import javax.crypto.*; import javax.crypto.spec.*; import java.io.*; * This program generates a AES key, retrieves its raw bytes, and * then reinstantiates a AES ke

  • Extending Extendscript with C

    I need to expose some C code to ExtendScript and I'm stuck. The After Effects Scripting Guide doesn't say much about that topic, but the JavaScript Tools Guide does (both are downloadable from the After Effects Developer Center). The latter isn't spe