Schedule line appears twice for PO confirmation category in MD04

Dear All,
In PO we have two confirmation category AB and LA. When I see in MD04 there are two schedule line as shipping notification of LA as well as for AB. From my analysis I found that it is appearing if the AB sequence is higher then the LA sequence. The sequence is the field which is visible in MD04 details of this shipping notification and also last column in Confirmation control Tab in PO.
But if AB sequence is less then the LA it only shown LA as schedule line. Can you please let me know is this a standard proces or bug in SAP. Do we have any SAP notes to fix this. And whats the logic behind showing both PO confirmation as schdule line although as per process it should show the shipping notification which is corresponding to LA and ignore the AB confirmation key.
Please let me know as earliest as possible
Thanks
Shashi

HI Ragahvendra,
Yes,You need to activate the validation check PO_ACCEPTED_CONF_PUBLISH for validation profile POC3 with following steps:
SPRO>Supply Network Collaboration>Basic Settings>Validation>Own Settings-->Maintain Settings in Validation Profiles
Validation Profile=POC3,
Validation check=PO_ACCEPTED_CONF_PUBLISH
status =active
As you mention PO_ACCEPTED_CONF_PUBLISH is not there in standard validation then you need go for latest SP level.
I am not sure about what is latest SP level for SNC 5.1 but i know latest SP level for SNC 7.0 is 6.
That's why still PO confirmation line updates in ECC immediately eventhough Confirmation Delivery schedule went for approval.
In SPRO>Supply Network Collaboration>Basic Settings>Validation>Own Settings-->Maintain Settings in Validation Profiles it does not check whether validation check exists in standard or not that's why when you add manually it accepts.
Regards,
Nikhil

Similar Messages

  • Schedule line getting created for material whose stocks are maintained

    Hi Friends,
    I am having an unusual problem of schedule line getting created for material whose stocks are there in the system. I have created an SO for some material, and all the material is having sufficient qty in the system but still the system is generating schedule line.
    Can someone please advice what could be the problem and the solution to it.
    Regards,
    Wasim.

    Hello Wasim,
    - In TCode MM02, Check Scheduling in MRP2 Tab of Material master (if MRP is active.)
    - In Tcode OVZ9 - AvC control, for your Availability check maintain (eg. 02) in material & Checking Rule:A-SD order.
    Whether Check availability without replenishment lead time is unchecked, as this Indicates whether, during the availability check, the system checks the replenishment lead time. So, Items for which the delivery date falls within the replenishment lead time, but for which there is no inventory, are confirmed for delivery after the replenishment lead time. In the case of items for which the delivery date falls after the end of the replenishment lead time, the system assumes that everything can be confirmed.
    Thanks & Regards
    JP

  • 72 hour rule being overrode by schedule line appearing on edi orders.

    Hi team
    This is most critical issue i am facing with Schedule line below given is subject line and description of issue in complete way
    72 hour rule being overrode by schedule line appearing on edi orders when changing date
    resulting in seeing the first date change as a second
    where the order is changed within the 72 hour rule window (customer master indication set, EDI order, first change to date, within time frame) but initial date is not overwritte
    AS per Business say it is related to schedule line date changes that somehow 'disqualify' the RDD window change, but it should not disqualify the change
    Amit Mahajan

    Called BT again. They asked me to run the same speed test as above (Results below). The person said he has found a "network fault" with the exchange and will "monitor" my internet for the next 2 days (which they have said they have been doing for the past 10 days. Why will 2 more days make any difference?). Obviously an engineer is needed to be sent to the exchange to fix a bad installation. Why can't this just be done? Why do they need to monitor for a FURTHER 2 days? After which I'm sure they will book an engineer which will take 2+ weeks to come out. At which point I will have been a month without internet. This is absolutely ridiculous and I'll be cancelling my contract VERY soon if this isn't fixed.
    Is there some secret number I can call where I can talk to someone who actually has the ability to do something?

  • Calculate all days in month from schedule line delivery date for 12 mths

    Hi experts,
    I am trying to solve a problem and would appreciate any help! Im on BI7.
    The user will input a date for the schedule line delivery date via a variable.
    From this date I need to go forward 12 months exactly and display a key figure (outstanding value) by months but the first and last months must only use the days in that month i.e not the whole month if not selected by the user.
    I.e if the user types in 13.05.2008
    The display need to show (columns)
    May 08 (13th to end of May 2008)
    June 08   (All)
    July 08    (All)
    August 08    (All)
    Sept 08    (All)
    Oct 08     (All)
    Nov 08     (All)
    Dec 08    (All)
    Jan 09     (All)
    Feb 09    (All)
    Mar 09    (All)
    April 09   (All)
    May 09  (1st to 12)
    So I neen to restrict the key figure (Outstanding Value) by Schedule Line Delivery Date and display as above on a 12 month forecast basis from the day (sch line delivery daye) entered as a variable by the user.
    I also need the first month to only show the dates in the month remaining including the date entered as a variable. The last month must go up to the day before exactly a year in front.
    I have created the 12 months as a structure and can include the key figure and the schedule line delivery date. The schedule line delivery date for each period needs to be restricted. How can I do this to achieve the above?
    Thanks in advance. Will assign good points for a speedy solution.
    Best
    Steve.

    Hi,
        Check "OVLY" and "OVLZ" and If the sceduling is active for he shipping point /sales document type.  Check "OVXD" and see If the Loading time/ Pick/pack time is determined from it. If they are getting determined from shipping point check the shipping point calender in "SCAL" .If it has saturday and sunday as holidays ,then you may have to change them. And check If the customer has goods recieving hours assigned to him (In customer master unloading point). If he has only 5 working days and If he accepts only goods at 8 am in the morining then system would propose like this.Kindly please let me know If you need any more Information on this.
    Regards
    Ram Pedarla

  • Intellisense appearing twice for nodejs in VS 2013

    Intellisense is appearing twice, and stacked on top of one another, when I'm using Visual Studio for NodeJS projects. 
    This image illustrates it well. If I arrow up or down, it doesn't select the object on top (the NodeJS objects), instead, it selects the hidden object behind it.
    Have you ever seen this before? I don't know how to get rid of it, and I've looked through my extensions, and don't see any obvious ones that could be affecting it.  I'm
    using NodeJS tools for Visual Studio. 
    I haen't noticed this issue before I started using the Node Tools for Visual Studio.
    Any hints?
    MS Tech Evangelist - Philadelphia | Baltimore Previously: Xbox Engineer at Comcast www.DavidVoyles.wordpress.com

    Hi Dave,
    Thanks for your friendly response.
    I also try to set up a new clean machine, and then install the VS2013 with update 4 and this extension tool, sorry for that I still couldn’t repro this issue, it works well in my side.
    Summing up our previous discussions:
    If you run your VS in safe mode, it still has this issue.
    http://msdn.microsoft.com/en-us/library/ms241278.aspx
    You reset your VS settings, but it doesn’t work
    http://msdn.microsoft.com/en-us/library/ms247075(v=vs.100).aspx
    You disabled all other add-ins/extension tools in your VS Environments, it still has this issue.
    Am I right?
    Do you have a clean VS setup machine without other add-ins or extension tools? Test it again.
    Maybe you could run the following command lines, check the result.
    Devenv.exe /ResetAddin
    Devenv.exe /ResetSkipPkgs
    If still no help, since we couldn’t repro this issue, and it is related to the Node.js project, if possbile, please post a discussion in this extension tool site, maybe we could get some good suggestions from the node.js experts.
    https://nodejstools.codeplex.com/discussions
    Of course, another suggestion is that if you feel it is the VS IDE issue, since I couldn’t repro this issue with the same project, to get the issue confirmed and diagnose by product team, please create connect report for it. You will get email notification
    for update.http://connect.microsoft.com/VisualStudio/feedback/CreateFeedback.aspx
    Sincerely,
    Jack
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • Multiple schedule line and reschedule for product selection

    Hi,
    Is it possible to mainatine multiple sechedule line for sales order where product selection is active
    Let me explain the problem in detail.
    We are using product selection functionality while creating sales order. Say for example in VB11 transaction I have maintained A= A1, A2 and A3. Where A1 has stock 50, A2 has stock 30, A3 has stock 20. Suppose my sales order is 150 for material A. The reason used is 0004 'automatic'. So while creating the sales order, confirmed qty for A1=50, A2 =30 and A3
    = 20. I have unconfirmed qty. 50. for this scenario, I need to enable a
    partial delivery, 1st I need to let the customer know when my 100 pcs going to be delivered and 2nd when my balance 50 pcs going to be delivered. So in the sales order I need to maintain two schedule line , one for
    confirmed 100 and another for unconfirmed 50. I am not able to do this.
    I can maintain only one schedule line per main item and at the sub item
    level not possible to maintain.
    The second problem is that, when I get stock for unconfirmed 50, I can
    not reschedule. can anyone please help to solve this issue?
    Regards,
    Beena

    goto item and doublle click on item and goto schedule lines and chenage the shedule lines..
    wat i know is by avaiblity check it propose the delievry dates of items...
    goto MM02 and mrp 1.. you can give there days to producee..
    OR doc type propose delivery dates.. lead days...
    hope it helps
    you
    ramki

  • Some info abt SCHEDULE LINES - VBEP; VBBE for OPEN quantites?

    Hi Experts,
    Pls. clarify me that,
    Am trying to show up the OPEN or BALANCE or BACK quantities in the report FOR EACH SCHEDULE LINE FOR EACH ITEM/POSNR.
    So, I need to look/subtract the VBEP-WMENG, VBFA-RFMNG for Delivery i.e. "J" VBTYP_N and the BALANCE I hv to show up.
    So, pls. let me know How Can I build the logic betwn VBEP, VBFA, VBBE? Is VBBE-MBDAT is comes into picture?
    thanq

    no reply

  • Schedule Lines not generated for MRP Type PD

    HI All,
    I have created Schduling Agreement, maintained Source List with MRP Relevant - 2 option and maintained Vendor as Fix, maintained info record.
    I have created a material with MRP type as PD and lot size as EX, and strategy group as MTS. Now when i enter requirement through MD61 and do MRP Run through MD02, system is generating PR instead of Del Schdule line inspite of schduling agreement. 
    But If i change MRP type to VB and maintain reorder point and maintain min lot size, then system generates Del Schdule lines for the same material.
    What could be the reason. I want delivery schedules based on MRP Type PD.
    Where I am wrong in MRP Views or in any cutomization. It seems that purchasing part is fine since it creats scudles line so no problem in SA or in Source List.
    Please help
    Regards,
    Vikas

    I have created Schduling Agreement, maintained Source List with MRP Relevant - 2 option and maintained Vendor as Fix, maintained info record.
    I have created a material with MRP type as PD and lot size as EX, and strategy group as MTS. Now when i enter requirement through MD61 and do MRP Run through MD02, system is generating PR instead of Del Schdule line inspite of schduling agreement.
    But If i change MRP type to VB and maintain reorder point and maintain min lot size, then system generates Del Schdule lines for the same material.
    What could be the reason. I want delivery schedules based on MRP Type PD.
    Where I am wrong in MRP Views or in any cutomization. It seems that purchasing part is fine since it creats scudles line so no problem in SA or in Source List.
    Hi Vikas,
                      After being thru with your query,i would like to reply your ultimate question"I want delivery schedules based on MRP Type PD"
    Simple answer:put parameter 'delivery schedule line' as '3'(schedule lines in opening period) without simulation mode.
    Please make sure you  don't make any change with previous settings(custom)
    please get it done and revert.
    Regards
    Chandra

  • Schedule Lines for TATX items

    I know that by default, schedule lines are not active for TATX (text) items in sales documents.
    I'm also pretty sure that this option is not valid even if you activate it in the IMG.
    Can anybody tell me:
    1) Is my statement above correct ?
    2) If so, why are schedule lines not allowed for TATX items.
    3) Is there any way around this limitation ?

    Thanks for your input so far.  Perhaps you'll be kind enouth to stick with me a little more.
    Let me expalin what my user is doing:
    In the IMG configuration of our system, schedule lines were activated for TATX item category, however it still does not work as expected.
    User enters a quantity of deliverable product on line item 1 with item category of TAN.
    User creates a delivery schedule for line item 1 using schedule lines (category CP).
    For line item 2, user wants to send "DOCUMENTATION" for each schedule line.
    "DOCUMENTATION" exists in our SAP system as a material master, but no stock exists.
    User enters a quantity of DOCUMENTATION on line item 2 with item category TATX.
    User creates delivery schedule for line item 2.  (auto populates sched category CT).
    When delivery is created, the first schedule line for both items works fine.
    For subsequent deliveries, line item 1 continues to work, but the line item 2, DOCUMENTATION material does not show up.
    I suspect that we are trying to use the TATX item category differently than it was intended, and that some other method would be a better fit for making deliveries of non-stocked material.

  • Copying delivery time from 1st  (unconfirmed) schedule line to confirmed SL

    Hi Friends
    Long time since I visited our forum.
    During order creation or change,  by selecting all items and using 'Edit- fast change of- Delivery date' menu option one can set a delivery date and time for all the items. This info moves to schedule line 1 (for the requested delivery date) Shipping tab to Arrival time field. However if an item (s) is not confirmed for the requested date, then a second schedule line is created for the confirmed date based on user's choice in the ATP dialog window. Now the issue is that delivery time is not copied to the new SLs. And it will be cumbersome to enter it by going into the SL-Sales tab for multiple items via  their confirmed SLs.  Is there a config way ( I doubt it) to get the delivery time (only time) copied to the confirmed SLs from the first SL. Or user exit is the only route?  if so is it FORM USEREXIT_MOVE_FIELD_TO_VBEP    in MV45AFZZ? Does this info stay once it comes via this user exit or do we need to do anything extra during Sales document save or prepare? Oh, by the way, we are set up for complete delivery and fixed date/qty checked.
    Let me know ASAP. Thanks.

    Hi
    If I understand you, the problem is that EZEIT is initial, ie; VBEP-EZEIT = 0 (ie: it has the value on dynpro'00:00:00' depending of the format of your country). The problem for this userexit is that it's called in the end of subroutine VBEP_FUELLEN in the include FV45EFEP_VBEP_FUELLEN. If you read the ABAP coding you have the call to a subroutine before:
    * Anlieferzeit ermitteln
          perform vbep-ezeit_ermitteln.
    If you read it in include FV45EF0V_VBEP-EZEIT_ERMITTELN, you can read this coding:
      if vbep-ezeit = 0.
        if vbep-edatu ne *vbep-edatu or vbep-prgrs ne *vbep-prgrs or
           ( svbep-tabix = 0 and ( vbep-wmeng ne 0 or vbep-bmeng ne 0 ) ).
          perform anliefertermin_pruefen using vbep-prgrs
                                               vbep-edatu
                                               vbep-ezeit
                                               vbep-cmeng
                                               vbep-bmeng
                                               da_dialog
                                               da_edatu
                                               da_ezeit
                                               sy-subrc.
          if sy-subrc = 2.
            vbep-ezeit = da_ezeit.
          endif.
        endif.
      endif.
    * Sekunden sind bei Lieferplänen für Zulieferer nicht relevant
      check not vbak-abdis is initial and
            not vbep-ezeit+4(2) is initial.
      clear vbep-ezeit+4(2).
    I think that you are looking for this, am I right? Surely, you knew it before to post this subject.
    Alghough the purpose of userexit is populate fields from an append (fields ZZ) but it's possible to change others. I suggest to think about this, because I think that it's the same and you can know the checks to avoid inconsistencies. If you need something else, please let us know.
    This is only a suggestion. I hope this helps you
    Regards
    Eduardo
    Edited by: E_Hinojosa on Apr 1, 2011 10:38 AM
    Edited by: E_Hinojosa on Apr 1, 2011 10:38 AM

  • Long text for line item appears twice in my PO form...

    Hello Experts,
    I am wondering why my long text for my 1st line item is appearing twice. In my PO, I only
    maintained a long text for my 1st PO line item appeards twice. below is my code:
    /E          ITEM_LINE_1
    IZ           &EKPO-EBELP&,,&EKPO-TXZ01&
    IZ           ,,&EKPO-EMATN&,,&EKPO-MENGE&,,&EKPO-MEINS&,,&EKPO-UMREZ&,,&EKPO-NETPR&,,
    =           &EKPO-NETWR&
    /:           DEFINE &LV_TEXTNAME& = ''
    /:           PERFORM GET_LONGTEXT_ITEM IN PROGRAM ZMMRP0008
    /:           USING &EKPO-EBELN&
    /:           USING &EKPO-EBELP&
    /:           CHANGING &LV_TEXTNAME&
    /:           ENDPERFORM
    /:           INCLUDE &LV_TEXTNAME& OBJECT 'EKPO' ID 'F01'
    The element 'ITEM_LINE_1' is called per line item. So in my case, 3 times. The INCLUDE statement
    at the end of the element is for the longtext. I am now confused as to why it appears twice for the 1st line item.
    Thank you guys and take care!

    Hi,
    You can debug and check whats happening there.
    Regards,
    Ram

  • Billing in the basis of billing plan for multiple schedule lines

    Hi All,
    I have one scenario in which we have created milestoen billing via project systems in sales order. Now Suppose I have three line items in my sales order and against each line items we have maintained multiple schedule lines. ex. 10%, 40%,50% respectively. Similarly for other line items also we have maintained the same. Now I need to generate invoice on the basis of schedule lines(billing plan). for ex. single Invoice covers 2 schedule lines out of total schedule lines in the line item. Similarly for other line items.
    Kindly guide.
    Thanks.

    Hi
    Your milestone billing plan integrates with PS means that you have an order related billing.
    Hence schedule line is a confusing word and I assume it as a billing plan.
    Each milestone-related billing date is blocked for processing until the Project System confirms that the milestone is completed. The billing block will automatically be removed once the milestone is achieved.
    Do maintain copy controls properly at item category level (VTFA) and your billing should happen standard SAP way.
    If still you face any errors, please post the screenshots.
    Thanks
    Atul

  • Schedule Line Category change-USER EXIT

    REQUIREMENT:
    When saving a SALES ORDER, Change the schedule line category on the SALES ORDER from CP(Standard Availability Check) to CS(Third Party Processing u2013Trigger Purchase Requisition)
    Initially when we create the SALES ORDER, we have Schedule line category CP to generate schedule lines based on stock availability
    SO Date- 09/14/2010
    Schedule line 0001--- 09/14/2010 --- Confirmed Qty (0) --- Sched Line Categ(CP)
    Schedule line 0002--- 09/16/2010 --- Confirmed Qty (1) --- Sched Line Categ(CP)
    Config Change: We have changed the Schedule line category- CS to turn off Purchase Order Scheduling (Indicator turned off--P.req.del.scheduling)so that when we change the schedule line category, no PO scheduling happens again
    Our requirement is that when saving the sales order, we want to change both the schedule lines item category-0001/0002 from CP to CS
    SO Date- 09/14/2010
    Schedule line 0001--- 09/14/2010 --- Confirmed Qty (0) --- Sched Line Categ(CS)
    Schedule line 0002--- 09/16/2010 --- Confirmed Qty (1) --- Sched Line Categ(CS)
    After saving the order, a Purchase Requisition is generated for the Schedule Line 0002..
    MY QUESTION:
    Is this possible using the BAPI_SALESORDER_CHANGE without changing the dates on the schedule lines or deleting any schedule line
    Thanks
    Kumar

    Hello Kumar,
    Please check the User exit and let us know whether your requirment is met or not.
    #USEREXIT_MOVE_FIELD_TO_VBEP
    Use this user exit to assign values to new fields at the level of the sales document schedule lines.
    The user exit is called up at the end of the FORM routine VBEP_FUELLEN.
    Regards,
    Sarthak

  • Schedule Lines for Sales BoM Material

    Hi All,
    When i trying to maintain the multiples schedule lines for the Sales BoM Material(Both Header and Item), system is not allowing to maintain it.Please guide me how to achieve this?

    Hi,
    "Schedule Line allowed" is enabled at Item category. The Requirement is If we have multiple schedule lines for BoM Line Item, we are not able to maintain. Suppose the Order Quantity is 50 Units and we need schedule line of 10 Quantity each month. We are not able to maintain. System takes the complete 50 quantity and do the availability check and proposes the availablity Date. We are not able to maintain different schedules manually.

  • Schedule Line Category - sales order

    Hi All,
    I have 2 sales orders with the same material in the item shows 2 different schedule line categories.
    For example:
    Sales order 1 with Item A  - Schedule line category - CB
    Sales order 2 with Item A - Schedule line category - CN
    What could be causing this? Nothing has changed in the material master.
    Any input would be helpful.
    Thanks,
    Meghna

    In both the sales orders--- is the delivering plant is same or not??(pl check)
    Apart from the above suggestions--pl check whether this material has been maintained with different MRP types in different plants.
    Yes it is possible-
    1.a same item can contain two different schedule line categories either in one sales order if maintained in different line items or
    2. In different sales orders...
    If a item has been maintained with two different MRP types in different plants--then different schedule line categories can be determined.
    Pl update us.
    Phanikumar

Maybe you are looking for

  • Certain artist pictures not showing up on iPhone

    Hello, We all know that iOS 7 has artist pictures in the Music app that are default chosen by iTunes. For most of my artists, this new feature works perfectly fine, except for the artists that do not have a picture chosen by iTunes, and I'm ok with t

  • Best practices for performance on io and storage.

    I'm building / buying a new server was planning on going virtual. Dual xeon 2620 v3 with 64 GB ram we have about 15 users and 14 remote users. Main server 2008 / 2012 SQL 2nd Server 2008 / 2012 File storage 3rd Server / Terminal Services / Citrix (ma

  • Mac Pro sudden restar while working

    I just got my new Mac Pro and having very strage behaviour. While working logout suddenly and login screen comes automatically. All my apps are closed and my work which I was doing.... also lost. It happen specially with Cinema 4D app because most of

  • Password protecting output file

    I know this might sound crazy but is there a possibility in XI to password protect or even zip it after it has been created in the outbound file adapter?? -Ken

  • Buttons Missing Of Screen

    Hi I just purchased a MacBook Pro, I use it in conjunction with my photography. When I opened my HDR editing software (Photomatix Pro) and edited a photograph, i could not access some buttons that had vanished off the bottom of the screen. I also not