Schedule line not getting confirmed despite ATP quantity  available

Hi friend,
I have a created a order for which schedule line of a particular material  is not getting confirmed.
I checked the stock in co09 ATP quantity is available, MD04 has allocated stock to my order.
In our project specific  scenario storage loc is not determined at order level. I also tried adding storage loc at shipping tab and did re atp but no use.
My scope of check includes reservations, sales requirement, deliveries.
If I use another materials which is similar to my above example stcok is getting confirmed but only that particular above material is not getting confirmed.
Am I missing any thing please suggest.

hi,
please check,
STOCK IS GETTING RESERVED AGAINST THE STORAGE LOCATION or NOT.
please check and confirm
balajia

Similar Messages

  • Schedule lines not getting confirmed on staurdays and sundays

    Hi all,
    At sales order level, the schedule lines are not getting confimred on staurdays and sundays. So,in the factory which has been assigned to that plant, we have checked all holidays . Even then it's not confirming on saturdaus and sundays.
    In the factory calendar, it was maintained like this.
    Valid      from Year   1996
                    To Year     2010
    Holiday calendar    ID IN
    Specific rule          none exist
    Work days
    Moday to sunday have been ticked. Only public holidays have not been ticked.
    even then staurday and sundays schedule lines are not getting confirmed. pLEASE ADVISE.

    Hi,
    Go to T.CODE SCAL, select your calender id & click on definition.
    Check the working days.Also check the "Holiday Calendar ID" assigned to the "Factory Calendar ID".
    Check if it helps.
    Regds........
    Sumit

  • Schedule line not getting confirmed for weekend

    Hi,
    We are having 365 days working and the setting for same has been done for factory calender and the same factory calender has been assigned to the plant. Still when i am trying to create the delivery document on saturday, system is confirming the schedule lines only on monday.
    Can anybody please suggest me whether any further setting needs to be done for same.
    Rgds,
    Antima

    Hi Antima,
    Can you please check the lead time in Sales document type,RLT and Inhouse production time in MMR and Lastly the Picking,Packing time in the shipping point.
    If you maintain any of these days system is going to thro future date as confirmation date.
    Please check me if i am wrong.
    Regards
    SK

  • Schedule lines not getting created while applying  exit at line item

    Hii all,
    First of all , I will explain my scenario. I have a requirement to give pop up screen in VA01 to get order quantity as per business requirement.
    i have used customer exit MV45AFZZ , USEREXIT_MOVE_FIELD_TO_VBAP . in this exit i m calling my Z function module which gives pop up screen through which user will enter length code and lot size. from this i will calculate quantity and update quantity field.
    Now problem is that, no schedule lines are getting created when i m applying this quantity calculation logic directly to line item quantity.
    So, I want schedule lines also to be generated. If somebody has a solution , plz reply soon.
    Thanks & Regards,
    Kavan Shah
    my id is [email protected]

    Hi Kavan ,
    by debug u can find out whats the wrong with ur code , check the UPDKZ of XVBAP?
    regards
    Prabhu

  • Schedule lines not covering  the total order Quantity

    We have an issue  with Schedule lines
    Order created on  19-02-201
    Material =M
    Requirement type =KSV
    Order Quantity =2500
    Delivered Quantity=1700
    Schedule Lines
    Date               Order quantity       Confirmed Quantity        Delivered  Quantity
    19-02-2010     801                                        0
    19-03-210       500                                        0
    16-04-2010      500                                    500                                       500
    14-05-2010      500                                    0
    15-06-2010     0                                        500                                        500
    15-06-2010      0                                        500                                        500
    18-06-2010      200                                   200                                         200
    Item  Status
               Processing Status
                                         Overall status=Completed
                                         Delivery Status= Fully Delivered
    1)Even though we have not delivered the total Order Quantity 2500,Delivery Staus is Fully Delivered Why?
    2)Why the system not created SCHEDULE LINES for the remaining Order Quantity  2500-1700=800

    Check if there are still requirements existing for this order on MD04.
    You might also want to check how the availabilty is carried out, whats the replinishment lead time - anything mentioned there. Generally if you take RLT into consideration - then the unfulfilled qty is shown at the end of RLT.
    Not too clear at this moment on the dates you have mentioned, bit hard to read.
    Am curious too, why this is happening.

  • Schedule Lines not getting created in MRP

    Dear All.
    I created Scheduling agreement and assigned this Scheduling agreement in Source list with indicator 2 which is u201CRecord relevant to MRP. Sched.lines generated automaticallyu201D
    Then I run MRP using MDO3 and parameters
    Processing key: NETCH
    Create Preq:     1
    Del schedules:     3
    Create MRPlist:     1
    Planning mode:     3
    Scheduling:     2
    But still the results shows as its creating Purchase Requisition .
    What can be reason for this?
    Please let me know your thoughts on this
    Regards
    Shyam

    hi,
    Normally this shd not happen if the data is maitained properly....
    I mean you shd check the run results from MD04/06..in which check which sourcelist the system/MRP has taken while run..is this source same as you maintained....
    Yes check header data....
    As you are saying that yes, the sch. agr. validity lies, but only this doesn't mean that del. sch. will generate....you have to check the schedule dates which would have mentioned for the generation of del. schedule...if this date is  later, means, tomorrow or day after tomorrow even though its in validity period, system will not generate del. sch. for this sch. agreement...then system will PR...
    Also, if you always want delivery sch. to get generated in your normal process, then in the MRP group customising setting you can tick for the del. sch. generations...
    Regards
    Priyanka.P

  • Schedule lines not generated after MRP run

    Dear All,
    I am trying to create Schedule lines through MRP run , but instead system creates MRP element PRqRel  and its PurRqs when i check in MD04 ,  the following are the prerequisite i done before MRP run , but still Schedule lines are not generating.
    1.activated checkbox source list in material master.,Procurement type is F, MRP type PD , lot size MB , marked JIT  Scheduling indicator as 1 in Pur view of material master , no MRP group is used in our process.
    2.Maintained Inforecord.
    3.Maintained source list for the material and marked MRP relevant as 2. Validity also checked.
    4. Quota arrangement for this vendor only.
    5. Created New scheduling agreement.
    6. Material is not sent for subcontracting.
    7. Ran  MD02 with following parameters ,
    Processing key NETCH Net Change in Total Horizon
    Create purchase req. 1 Purchase requisitions in opening period
    Delivery schedules 3 Schedule lines
    Create MRP list 1 MRP list
    Planning mode 3 Adapt planning data (normal mode)
    Please let me know if i am missing something
    Thanks in Advance
    Benny

    Hi,
    Please check the below links...
    Schedule Lines not getting created in MRP
    Schedule Lines not generated for MRP Type PD
    Kuber

  • Schedule lines are not getting confirmed even though stock is there

    HI,
    i want to discuiss one sensitive issues which is a simple one.
    my schedule lines is not getting confirmed even stock is there at sales order.
    there is no delivery block.
    there is no minimum stock level.
    there is no credit check for that.
    there is stock of 2 EA in that plant and storage location, but stock is not getting confirmed at sales order level or transaction level.
    even stock is there it is going to avaliability check overview screen and giving stock confirmation after 12 days.
    even i checked all the dates.............but its of no use.
    what to do ?
    after testing all the possible options i am taking help from
    please help me in this regard,
    regards,
    balajit

    Hi
    you need to check the following.....
    First check the Factory calander of your plant whethear some holidays or not
    Second most importantly you have to check which stretagy group is assigned  in the material . whethear it is make to order or make to stock. change it as make to stock.
    "What happened if material stretagy group is make to order then from sales order system generate requirement of that material against that particular stock, that time system do not consider the unrestricted stock and not confirm schedule line."
    Regards
    Shambhu Sarkar

  • Make to order production - schedule line not confirmed

    Hi,
    I created a  " make to order production " having few normal materials & few supersession materials.
    created PO, GR,invoice, all done.PO is updated in sales order.
    Schedule line is automatically confirmed for normal materials, but not confirmed for supersession materials.
    can anybody tell me , how schedule line can be automatically confirm for supersession materials.
    Thanks.

    Is your scenario a third party one? After you finished GR for the PO, have you checked inventory of those materials? But I still didn't understand what's difference between new material and "supersession" old one? New for what and old for what? Could you be more specific or any example will be helpful.

  • Sales order not getting confirmed because of oldest of open items overdue.

    Hi all
             Businesses using the auto order creation for sales, sales order getting created but when I check it in schedule line the quantity is not getting confirmed even quantity is available and credit limit is also available and there are no open items due. When I check ,availability tab in VA02 manually, its coming oldest of open items overdue.
    Pls help...
    Regards
    Nagesh

    Hello,
    please check in the system in ova8
    Credit check against oldest open item
    Indicates whether the system carries out a credit check based on the age of the oldest open item.
    The oldest open item must not be older than the number of days specified.
    If in ova8 it checked then system is checking the oldest open Items .
    Thanks,
    venkataswamy.y

  • Schedule line not determined

    the following is the data:
    1) the order is standard order type
    2) the schedule line category is consumption MRP with production allocation
    3)Item category is TAN
    4)the material is externally procurred and sold from the stock mainatined in company's plant
    5)customer is one-time customer
    Now for the above data when I create a standard sales order, I am not getting the scehdule line for the item and hence the quantity is not getting confirmed.

    hi rupali,
    1. go to VOV5, please check the determination i.e
    item category+MRP type= schedule line cat
    2. check the item category (vov7) where u wl find the field schedule line  allowed in the  in the right hand side . please check it.
    cheers
    reward

  • Sales order not getting confirmed!!

    we have a situation here.
    when i see in co09 it looks like following. I am not able to understand why sales order of 70 is not getting confirmed though ample reciept element is available (pch ord)? and why sales order of 350 on 25th aug is getting partially confirmed?
    Date                 time                 category   document               receipt/req           conf q           cuml atp q     atp q
    08/23/2010     08:12:14     Stock     Distribution Center     70      0      280-            0
    08/20/2010     09:58:00     Deliv.                                70-     70      280-
    08/20/2010     23:59:59     Deliv.                                70-     70      280-
    08/20/2010     23:59:59     Deliv.                                140-     140      280-
    08/20/2010     23:59:59     Deliv.                                70-     70      280-
    08/24/2010     12:00:00     PchOrd                                1,540      0      0                  0
    08/25/2010     00:00:00     SalesOrder                                70-     0      0
    08/25/2010     07:00:18     SalesOrder                                350-     0      0
    08/25/2010     07:00:18     SalesOrder                                0      280      0
    moreover why last column (atp quantity) is showing 0 quantity when pchOrd OF 1540 is available? on later dates last column has recipt quantity visible. example-
    09/07/2010     00:00:00     PchOrd                                350      0      350      350
    09/07/2010     00:00:00     PchOrd                                1,470      0      1,400      1,050
    am i reading it correctly? is there any link which says how to read these results?

    Madhu,
    It is not config, it is part of runtime.  /SAPAPO/BOP > Parameters check tab
    Check prerequisite settings
    http://help.sap.com/saphelp_scm70/helpdata/EN/c6/958139a17cd02ae10000000a11402f/frameset.htm
    Best Regards,
    DB49
    Edited by: Dogboy49 on Mar 29, 2011 10:37 AM

  • No schedule line category could be determined during quantity adjustment

    Dear sir,
    i m getting this error while doing va31 plz helep me reagrding this  matter?
    error- No schedule line category could be determined during quantity adjustment.
    Regards,
    Debesh Tripathy
    Regards,
    Debesh Tripathy

    Hi,
    Go to IMG u2013 SD u2013 Sales u2013 Schedule Lines u2013 Assign schedule line categories.
    Over there check the assignment of your combination.
    Item category which is determined in scheduling agreement.
    Then MRP type which you have given in the material master data.
    So first note down these setting then check the combination of this setting in path given above.
    If there is no setting made then click on the new entry.
    Give the assignment of your combination and save it.
    Now try to create your document in the VA31 and check whether every thing runs fine or not.
    Regards
    Raj.

  • TO is not getting confirmed

    Hi All,
    I'm currently working on a delivery #XXXXXXXX.  When I try to confirm the delivery for  a quantity of 15 I received the following message.
    Item 10: Only 0.001 EA from material XXXXXX.XX are available
    but 3 EA from batch XXX1 has been confirmed but the remaining 12 Transfer Order is not getting confirmed.
    Currently we have 40each in stock.  Out of 40 EA ,20 belongs XXX1 batch & 20 belongs to XXX2 batch.
    Please advise.

    It would be very hard to give you a good answer without knowing more about your sytem and methods.
    Have you tried LT12 (manualy confirm the T.O.)?
    You will need to provide the SU # when confirming if there are multiple SU in the pick from bin.
    Check for open t.o. against the material, also check stock catagory of the remaining material.
    Edited by: Arakish on Jun 25, 2010 11:22 PM

  • Maintenance schedule is not getting generated

    Hi....
    Past one year, maintenance schedule is not getting generated.
    Could you please let me know to where i have to look out for this problem in Equipment & Functional Locations?
    What are all the fields will be mandatory and triggering the maintenance schedule / Notification in Equipment / Functional Locations?
    Need your response at the earliest.
    Regards,
    Mohd Ali.

    Hi
    There May be several resons...
    Check Whether Maintenace for perticualr maintenance plan is not scheduled... their could completion requirement tick might selected previous maint. not done for the equipment.
    Check any scheduling for inactive equips/fl
    check any long offset has been set....
    check while scheduling any sortfield key is set or genral...if pertiucalr sort key is belong to Eq/fl which will not help
    regards
    krish