Schedule lines for an external operation in a production order
Hi All,
I have an external operation defined in a production order and a scheduling agreement is assigned to it in the Routing operation details. Now, i want to generate schedule lines when a production order created but the system always generating a purchase requisition. Do we need something to be configured in the background? Please help!
The idea is to have the goods receipt done against the same agreement always.
Regards,
Sravan
Hi Sravan,
As per my view point, this is standard SAP behaviour. System will generate PR only in case of external operation.
If you go to OPL8 (Order type dependent parameters) for your respective order type & plant combination you have option of maintaining setting related to PR only and there is no option of using scheduling agreement or generating schedule lines.
I don't see any possibility to use scheduling agreement using to have schedule lines for external operation.
Regards,
Tejas
Similar Messages
-
Need Schedule Lines for the External Processed Operation
Dear All,
In My routing, I have totally 10 operations. 2 of which are externally processed Operations.
When i create Production Order, the system creates Purchase Requisitions for both the Operations.
My client wants, Schedule lines to be created in the Production Order Operations.
Please guide me where will be the settings to get this.
Thanks & Regards
BalaHi,
For schedule lines cofigration kindly check the following Path:
Material management-- Purchasing--
Schdulling agreement
Here you need to do the cofigration of the following as per your requirements:
Number ranges
Docuemnt types
Release procedure
Screen layout ( if required)
Authorization check for GL Account
Regards,
Syed -
EXTERNAL OPERATION in a production order with different company code plant
Hi,
in my case i am having a production order with 4 operations.
0010 milling
0020 winding
0030 cutting
0040 milling
among this opearion 0030 i want to do it in a plant which is assigned to different company code than mine.
in this case whether i should proceed with PP01 Control key with opearion plant as that plant which is lieing in diffent company code or
i should specify PP02 control key saying that plant as an external vendor for me and do PR and PO for that service .
which should i follow for my case and how cost gets updated .Hi,
For different company code, u have to specify PP02 in the routing for external vendor. In PP02 control key indicator must be set in external opn.
Before that create purchase info record.
Enter subcontract info record in routing.
after running MRP , convert the PR to PO.
Send the material by MB1B by 541 mvt
Receive the material by MIGO by 101 mvt.
Regards,
Raja sd -
Fields update in "Schedule Lines for FRC sched." in a scheduling agreement
May I know how the following fields in the "Schedule Lines for FRC sched." section in a scheduling agreement are being updated?
We have already a new inbound delivery with goods receipt (last June 1, 2010) but the following fields still show the previous inbound delivery details:
For example:
Date of last del. 08.10.2009
Last d. note no. 91011
Last GR 21.10.2009
Last GR qty. 54.500
I wish I can show some screenshots here.
Thanks a lot in advance for your answers.Hi Sravan,
As per my view point, this is standard SAP behaviour. System will generate PR only in case of external operation.
If you go to OPL8 (Order type dependent parameters) for your respective order type & plant combination you have option of maintaining setting related to PR only and there is no option of using scheduling agreement or generating schedule lines.
I don't see any possibility to use scheduling agreement using to have schedule lines for external operation.
Regards,
Tejas -
To generate Schedule lines for scheduling Agreement when MRP is run.
Hi,
Please help advise on my following requirement:
When I run the MRP for 'Single Item - Multi level' (MD02) for a material, I want MRP to generate delivery schedule lines for that material in Scheduling agreement.
Please advise as to how i can go about with this.
Regards,
ManjuHi Manju,
For this you need to set creation indoactor for planning run in SPRO.
The path is spro-MM-CBP-Carry out overall maintenance of plant parameters-Click on maintain-give your plant-click on external procurement under planning run-here you can give your option for the schedule line creation.
Traction code is omi8. Hope this will help you.
Cheers
Ravi -
Schedule lines for schedule agreement
Hi,
I need get all schedule lines for schedule agreement (all schedule lines = all visible in tab analysis u2013 all lines for all forecast dlv. sched).
I check table VBEP and VBEH and I canu2019t find all items.
Could you help?
Thanks in advance,
EHi Manju,
For this you need to set creation indoactor for planning run in SPRO.
The path is spro-MM-CBP-Carry out overall maintenance of plant parameters-Click on maintain-give your plant-click on external procurement under planning run-here you can give your option for the schedule line creation.
Traction code is omi8. Hope this will help you.
Cheers
Ravi -
Duplicate records in PO scheduled line for framework order (going for dump)
Hi all,
i am creating framework purchase order with item category B. I am assigning external number range for PO. This PO is created with respect to expense PR. i just found there is duplicate records are appearing in schedule line for the same item.
Then, after i save the PO, it is going for dump & sending some message to SAP inbox that there is duplicate records.
later i can not find those PO in the system. Please let me know where i am doing mistake ? why duplicate records are appearing in PO scheduled line ?
Thanks a lot
pabiHi,
Once you please debug the particular program with the help of ABAPer. That may resolve your issue. Thanking you -
How to put schedule lines for one year in a schedule line agreement
dear all
thanks for the support till now from the forum
now i need some seetings by which the scheduling agreement will autoumatically take the schedule line for one year automatically
in my client we are getting open PO so
we have to make one agreement acording to that PO and thats for one year
and this one yr will have same quantity to be produced everyday
means 12nos of material every day for 12 month and this will be for every day
and as per that it should generate a sales order.i need to put schedule line automatically not mannually one by one for each date.so wat is the settingand how to reffer this scheduling agreement we can produce sales order.
please help
subrat
Message was edited by:
subrat pandaDear Subrat,
you cannot create a yearly schedule line in the scheduling agreement. It is not possible due to format restrictions of the date field. But what you can do is the follows (it is the modification, but it should work with the help of user-exits):
1. You can split the year schedule line to the monthly schedule lines. There are two ways to do it. If you apply the DELINS IDOC, then you can do it already during transfer of the data to the application (itr is the best way). Here you can use, for example, user-exit USEREXIT_ZUORDNEN_IDOCS (include LVED4FZZ) or customer function EXIT_SAPLVED4_002, called from the subroutine USEREXIT_DYNPRO (Include LVED4F0U). Alternatively, you can use the user-exit USEREXIT_MOVE_FIELD_TO_VBEP (Include MV45AFZZ) within the call transaction, then it will work also in the dialog case.
2. After getting the monthly schedule lines, you can create a planning delivery schedule, where you can split mothly schedule lines automatically to daily schedule lines according to the customer factory calender.The settings for generation of planning delivery schedules can be found under:
Customizing SPRO: Sales and Distribution => Sales => Sales Documents => Scheduling Agreements with Delivery schedules => Maintain Planning Delivery Sched. Instruct./Splitting Rules
It is the only ways, how you can reach your aim. I hope, this information will help you further.
Kind Regards,
Akmal Vakhidov
Development Support SD, SAP, Walldorf/Germany -
Schedule Lines for Sales BoM Material
Hi All,
When i trying to maintain the multiples schedule lines for the Sales BoM Material(Both Header and Item), system is not allowing to maintain it.Please guide me how to achieve this?Hi,
"Schedule Line allowed" is enabled at Item category. The Requirement is If we have multiple schedule lines for BoM Line Item, we are not able to maintain. Suppose the Order Quantity is 50 Units and we need schedule line of 10 Quantity each month. We are not able to maintain. System takes the complete 50 quantity and do the availability check and proposes the availablity Date. We are not able to maintain different schedules manually. -
Schedule lines for outbound process
hi
can anyone tell me what is schedule lines for outbound process
thanksthanks charlie for your answer can you pl tell me what does it means configured delivery types, item categories and schedule line for outbound processes.
thanks -
I know that by default, schedule lines are not active for TATX (text) items in sales documents.
I'm also pretty sure that this option is not valid even if you activate it in the IMG.
Can anybody tell me:
1) Is my statement above correct ?
2) If so, why are schedule lines not allowed for TATX items.
3) Is there any way around this limitation ?Thanks for your input so far. Perhaps you'll be kind enouth to stick with me a little more.
Let me expalin what my user is doing:
In the IMG configuration of our system, schedule lines were activated for TATX item category, however it still does not work as expected.
User enters a quantity of deliverable product on line item 1 with item category of TAN.
User creates a delivery schedule for line item 1 using schedule lines (category CP).
For line item 2, user wants to send "DOCUMENTATION" for each schedule line.
"DOCUMENTATION" exists in our SAP system as a material master, but no stock exists.
User enters a quantity of DOCUMENTATION on line item 2 with item category TATX.
User creates delivery schedule for line item 2. (auto populates sched category CT).
When delivery is created, the first schedule line for both items works fine.
For subsequent deliveries, line item 1 continues to work, but the line item 2, DOCUMENTATION material does not show up.
I suspect that we are trying to use the TATX item category differently than it was intended, and that some other method would be a better fit for making deliveries of non-stocked material. -
Unable to enter multiple Schedule lines for BOM material in Sales Order
Hi All,
We have a Sales Order where in which we cannot add additional schedule lines for BOM material.
The schedule lines are greyed out, user was able to add schedule lines earlier.
I have checked all assignments in VOV6, VOV7 and everything seems to be fine and no changes have been made to item category being used.
Please provide a solution for this.
PFB link in which similar situation posted in this community but the final resolution method is not discussed.
http://scn.sap.com/message/13201504#13201504
Regards,
SamikshHi Samiksh,
Pls check for that particular customer, only complete delivery allowed(c) is set in the CMR or CMIR. If so, you can't enter multiple schedule lines for that customer.. it would be grayed out in the sales order schedule lines except confirmed line.
or check the problematic sales order at item level shipping tab if the par del/item is set to 'C'
With regards
S.Siva -
Multiple Schedule Lines for Individual Qty in Standard Order
Hello All,
I have a Client Requirement to Set up the Standard Order for a Material which will be sold on Single Quantity every Month.
This will have to occur from the same Order. For this Multiple Schedule Lines are required to be generated as per Monthly Delivery Schedule.
I know this functionality comes under Scheduling Agreements where we can deliver goods as per confirmed Schedule Lines for the Month.
But Client Requirement is to set up this functionality in Standard Order Only as setting up scheduling agreements calls for mapping of New Order Types which is not feasible.
So Can you provide with your valuable Inputs as to whether this can be possible through Standard Order in the system.
Looking forward to your esteemed reply!!
Warm Regards,
Onkar KhedekarDear Onkar:
If you don't want to use Schedule agreements, you can enter several schedule lines for each item in "Schedule line" tab at item level.
Enter in this tab each schedule line per month.
But be aware which date you enter becuase this requirement will be transfered to MRP.
Check it and revert.
Jose Antonio Martinez -
Automatic Schedule Lines for SA
Dear Gurus,
Is it possible to create automatic Schedule lines for Subcontracting Scheduling Agreements????
cheersHi
It is possible to create SA for item catgory L. No specific configurational setting is required.
Pls check
Regards,
Raman -
SA Schedule lines for requirements within PTF
Hello Gurus,
I have a question that you can surely help me with.
I have setup a scheduling agreement for a material, and with the source list setup the MRP now successfully generates schedule lines for all requirements that are outside of the planning time fence. However, if I put a requirement inside the planning time fence, then MRP does not create a schedule line just outside the PTF to cover that requirement, instead it creates a planned order just outside the PTF (or a purchase requisition if I change the "Create Purch. req." MRP control parameter).
Why does it not create a delivery schedule line? The validity of agreement is set to 1st of april, so it is defined will in the past. The target quantity on the scheduling agreement is well above the current scheduled quantity.
Thank you for any suggestions on this issue. I am sure it is just me who is being an MRP ignorant.Check the validity date of your Source List. It may be that it is outside the time frame of your requirements.
Try setting it up to say, January 1st of this year, see what happens.
Award points if useful.
Maybe you are looking for
-
DVI to VGA or DVI to Component?
I just purchased a new 26" LCD tv. I've notice whenever I connect anything to it via VGA (e.g: Macbook Pro, iMac, or my Xbox360) the colors are somewhat washed out, there's a great deal of pixilation, as well as poor black levels. Yet when I watch th
-
Java.lang.ExceptionInInitializerError - while using a third party tool
Hi All, I am trying to include truezip into my application. but I get the following stack trace. When I tried using the truezip in a standalone java class it orked but I am unable to make it work with appserver. type Exception report message descript
-
PDF file is not opening in adobe reader
Hi, When some users are trying to click on the pdf files then they are opening in browser rather than in adobe reader. I have checked almost all the settings that i could found for opening the files in client app. Few of them were- 1. Web application
-
Hi All, We have an interface running in production server which is taking huge processing time. It is a File to IDoc scenario wherein the file size is about 1MB and it gets converted to something between 4-5MB after Content Conversion. Also, this iss
-
List of systems that can / cannot be configured to accept SAP SSO
Hi All, this may sound like a strange request, but I'm in search of a list that shows examples of common systems that cannot(!) be configured to use SAP SSO tickets. The reason is that we are evaluating various SSO infrastructures for a client. IBM W