Hi
We are running the latest version of Business Objects 4.0 SP04 (FP3) with Patch 1.
I am having a problem scheduling a Webi report to CSV format. The text qualifier option only allows the choice of ' (single quote). Not only is the text qualifier on text fields - it's also on numeric fields. This obviously causes a problem for Excel and other systems.
Is there a way of removing or replacing this text qualifier or preventing numeric fields from been wrapped with the text qualifier?
We are not having this problem with the interactive "Save as - TXT file" option.
Thanks for any input on this.
Kieran
Hi Experts,
Seeking your opinion on the following issue,
We are in version SAP BO 4.0 SP 4 Update
While trying to schedule a report with as CSV, the only option available as the Text qualifier is single quote ( ' ). Any sort of clue on why we don't see the option "None" listed in the combo?
Thanks,
Thilani
Similar Messages
-
BO Webi Export to CSV Text Qualifier opt xir3 sp5 Full build vs Upgrade path
Hi, can anybody tell me how I can get the 3 option (space) as a Text Qualifier when saving a Webi doc as a CSV. In Prod we have upgraded to SP5 thru the modify path on the install media and do not have this option. In Dev we did a fresh install of SP5 using the same media disc and there we get a 3rd option when saving to csv. both versions are XIR3 sp5 but show different builds via the CMC. Is this option controlled by an xml property file on the app server? Refreshing the Prod instance with a new BO install is not a good option - too many obstacles. This is the only difference I've noted and one that is causing an extra step to strip off double quotes from scheduled Webi docs delivered as CSV files to a file share in Prod.
Dev: Build Date: 2012/02/17:02:04:34
Build Number: 1265
Product Version: 12.5.0.1265
Prod: Build Date: 2011/11/29:21:00:17
Build Number: 1190
Product Version: 12.5.0.1190
I've attached the screen shots illustrating the issue. Bottom line is that I need the Space option as a Text Qualifier. Any ideas how to acquire this 3rd option? Thanks.Hi,
Check the mentioned SAP Note for this issue. 1997321 - In XI 3.1 SP6, when trying to export a Web Intelligence report, the blank option for Save as CSV is not in the drop down as it should be
Workaround:
Stop Tomcat
In the <BusinessObjects install>\Tomcat55 or Tomcat7\webapps\AnalyticalReporting\WEB-INF\classes\ folder, make a backup of the webiviewer.properties file.
Then edit the file in a text editor and locate the line CSV_CharDelimmiter=” ‘
Add a blank space at the end of this file and save it.
Delete the contents of the Tomcat55 or Tomcat7\work\ directory
Restart Tomcat
The blank text qualifier should now appear in the DHTML viewer.
Regards,
Amit -
How to schedule a webi report in csv format without header?
I have a requirement to create scheduled csv reports without table headers? I am unable to do this from CMC. It gives the column headers by default in the exported csv file. However, in the webI rich client, I have an option to save the document as "CSV-Archive" which allows me to omit the column header.
How are these two options different and is there a way to get the "CSV-Archive" option from CMS?
Looking for your valuable suggestions.
Thanks
SukantoIs there a way to get the "CSV-Archive" option from CMS?
Customization of existing options or features in CMC is not available, it will become an enhancement request, you have to place this request in SAP Idea place.
WebIntelligence Rich client is a desktop tool, auto schedule of reports as .csv is not possible, save as CSV and save as to "CSV Archive" from Rich Client is a manual job.
BI launch pad, CMC are BOE Server components have the ability to auto schedule as .csv, as a default behavior column headers will be exported to CSV along with report data.
As a workaround, have a copy of original wibi reports in your webi reports you have to hide table headers and schedule them to save as .csv
To hide table headers:
Edit the report -> Select table block properties -> Chose 'Format Table' -> Under 'General' properties 'Display' options un-check "Show table headers" -
Scheduling webi reports via Java SDK in BI 4.1
Hi,
Has anyone been able to schedule a Webi report containing date prompts via Java SDK in BI 4.1? I have tried doing so but it doesn't work when date prompts are involved, I get the exception raised: java.lang.NullPointerException error. Though the scheduled instance is created and the date prompt appears to be correctly populated the report fails with the above mentioned error message. The code is working for other text prompts but fails when I have a date prompt in the report. I am using the populateWebiPrompts() method to populate the prompts.
CFHi Christopher,
Try adding the following line in your code before scheduling:
iWebi.setUserInputLocaleName(documentInstance.getProperties().getProperty(PropertiesType.BASE_LOCALE));
Also as an FYI, please refer below details.
For scheduling webi reports with prompts, the only supported way is to use Restful webservices SDKs.
The feature of scheduling a webi report with prompts were deprected from release BI 4.x and introduced in the new restfull webservices. Restful is the future which SAP is focussing and would be great to have your application on supported terms with SAP.
You can get details about the restful webservices from the documents and blogs available at below forum
http://scn.sap.com/community/restful-sdk
Thanks,
Prithvi -
Scheduled WEBI reports based on File Events not retrieving data
Dear All,
We are facing performance related issues with Scheduled WEBI reports based on file based events.
When running Web Intelligence on demand it takes 4to 5 Minutes.
Scheduling the same report in Excel format it takes more than 20 minutes.Schedule status showing success but no data found in Excel instance.
Env:BOXI3.1 Sp3
Windows 2003
It woud be great if any one can share your ideas.
Thanks,
KumarHi Kumar,
Is your report has prompts?
if you have prompts , make sure that you assigned prompts in the schedule also.
Hope you have multiple webi processing servers and adpative job servers for better scheduling performance.
Try below solution .
On the BusinessObjects Enterprise server, navigate to the folder <install root>\Business Objects\BusinessObjects Enterprise 12.0\win32_X86\dataAccess\connectionServer
Open the file cs.config in a text editor such as Notepad
Search the file contents for the string "Traces Active"
Modify the line from <Traces Active="Yes"> to <Traces Active="No">
Save the cs.config file
Restart the Web Intelligence Processing Server -
Error when scheduling WEBI report to FTP server
Hi
We are getting error "destination directory error. CrystalEnterprise.Ftp: 550 Requested action not taken" while scheduling WEBI report to FTP server.
Any help would be appreciated
Regards,
AnisaHi All,
I want a run my report once by scheduling, so i provide a time interval for scheduling a report
start date/ time : 11:38:AM 10/30/2011
end date/time : 11:43:AM 10/30/2011
after completion of end time....report is failed and fetching an error
Error : Object could not be scheduled within the specified time Interval
Any solution for resolving this error -
Hi,
When i schedule webi report as "Now", it takes some time to start? The status is in "Pending" state fo long time.
Could you please let me know
What is the reason behind this? How this can be resolved?
Thanks & Regards,
M.A.JilaniHi Khaled,
Normally when we schedule a report as "Now"..it takes hardly 1 min to start..
in my case it is taking more than half an hr or more to start...
Status Success
External Destination: None
Creation Time: 7/26/2010 5:45 AM
Start Time: 7/26/2010 6:12 AM
End Time: 7/26/2010 6:14 AM -
Date error when scheduling webi reports
Hi,
When i click the prompt option in re schedule the scheduled webi report, i got the error "while trying to invoke the method java.util.date.gettime() of a null object loaded from a local variable 'date' "
The BI version is 4.1 SP03
The scheduled webi reports failing and got the error as "Unparseable date: "01/01/1900" "
How to solve this issues?
Regards,
KathirThis might fix it from the note http://service.sap.com/sap/support/notes/1981477
Create a WebI report that uses a date object in the Query Filters
Schedule the report
Reschedule by manually entering date value which shows only date and no timestampExample: 12/31/2007
Reschedule by selecting date value from the calendar which shows date timestampExample: 12/31/2007 12:00:00 AM
Create a biar file using the Import Wizard and migrate to BI 4.1 SP2
BI 4.1 SP2 BILaunchPad, navigate to and Right click the report and go to “History”
Right click the instance without a timestamp for the date parameter and select “Reschedule”
Click on “Prompts” on the left menu and note an error is produced:This error occurred: while trying to invoke the method java.util.Date.getTime() of an object loaded from local variable ‘date’
Attempting to schedule this instance (as Run Now or Reschedule) without selecting a Prompt value fails with the error: Unparseable date: “12/31/2007”
Using the instance with a timestamp works as expected -
Error When Trying to Schedule Webi report using SAP authentication
Hii,
We are trying to Schedule Webi report in CMC for Group of Users using SAP authentication(SSO) ,While Trying this we are geting error Unable to Connect to SAP BW server Incomplete Logon Data ..(IES 10901) .
Authorization done at BI side and Its working properly.Users are able to login into BI Launchpad and View Report as per authorization
Some Webi reports are created using BICS connection and some are created using Universe Design Tool (.UNV) which are migrated from BO 3.1 to BO 4.0
Server Status:
BO server and Client Tools-:BO 4.0 SP6
BW System-7.01
Please refer attach Screen ShotHi Rupesh,
Please check the below note:
Seems issue with SNC/STS settings.
1798197 - Schedules fails with error "Database error: Unable to connect to SAP BW server Incomplete logon data.. (IES 10901)" in BI 4.0
https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/sno/ui_entry/entry.htm?param=69765F6D6F64653D3030312669765F7361… -
Getting multiple error while refreshing or scheduling WebI report
Hi BO Admin Experts ,
Feacing multiple errors while refreshing or scheduling webi reports in BI4.0 CMC ,
Please find the below errors :
1)report schedule status failed
2)Parameters : xxxcorp-franklinee; ATOu supply unv
Error Message : An internal error occured while calling 'ProcessDPcmndsEx' API (Error:ERR_WIS_30270)
3 ) Format : WebI
Parameters : 10000000000159270
Error Message :CORBA error while communicating with the SL service
Could you please help me on the abive 3 issues for the WebI schedule reports
Cheers ,
Pradeep GorpaduHi,
While refreshing the WEBI Reports would recommend you check the WEBI PROCESSING Server's last changed date from CMC--> Servers.
Check when you are refreshing the reports, do you see the time stamp changed of WEBI PROCESSING servers?
Do you keep getting this error messages for all WEBI reports? Can you re-produce this with simple e-fashion reports as well?
After that go to the node where WEBI PROCESSING servers installed and check on the event viewer details if you see any relevant error messages.
Regards,
Upendra -
Scheduled Webi Reports Don't Open on iOS's MS Exchange Mail
Hi all,
I am not sure if this is the right place to write this post but I will try anyway.
We are using BO 4.0 SP6 and schedule webi reports as attached xlsx of pdf in e-mails.The problem is that the attached pdf's and excel files don't open right away in iPhone's native mail application when using MS Exchange. A tiny question mark shows up on the top corner of the attachment and when you tap on it, it asks which application to use to open it. We can choose iBooks app for example to view the file. We would like the attachment to open right away as we tap on it as it does usually.
Here are some test results:
-We have observed this issue on iOS 8. However, there are rumors that it started with iOS 7. Same rumors suggest that it would work fine before iOS 7.
-We use iOS' native mail application with a MS Exchange account set up.
-We have also tested it with a gmail account set up next to the exchange account. The attachment opened with no problem.
-If someone forwards the mail received from the BO server, to another exchange mail, the attachment opens just fine.
-We have no problem opening other exchange mails with attachments on mobile.
We suspect, the exchange mail can't confirm the sender address thus can't trust the attachment if it is really a pdf-excel file. So we tried scheduling the webi report with a valid mail address in the sender information box but it didn't work.
Has anyone came across such a problem?
I know this issue involve SAP, Apple and Microsoft and each one will point the other for the blame. But any help will be appreciated.
Thank youHi Emre,
Though this appears on Mobile, this belongs to Webi Product team. As the schedule of Webi reports and the email output would be controlled by them. They can work with Apple to identify the cause and fix the defect. Hence, you can post your question in SAP BusinessObjects Web Intelligence
I would also recommend that you contact Webi Product Support through the official channel http://support.sap.com/incident
Regards,
Ashutosh -
Scheduling Webi reports from SAP Portal.
is there a way to schedule webi reports from the SAP enterpirse portal.
Toor.Hello Ingo,
We also need to implement the server side trust configuration.
I'm searching the document you are refering to but couldn't find it :
I only found the fowllowing documents which doesn't discuss the server side trust
BusinessObjects XI Integration Kit for SAP Installation Guide
BusinessObjects XI Integration for SAP Solutions User's Guide
Business Objects XI Integration Kit for SAP Release Notes
I didn't found it there http://help.sap.com/businessobject/product_guides/boexi/en/boxi_DocMap_en.pdf
Could you provide me the direct link please ?
Thank you !
Edited by: Raoul Shiro on Apr 1, 2011 10:05 AM -
Can Tivoli (TWS) be used for scheduling WebI reports in BO XI 3.1?
I am trying to figure out if it is possible to schedule WebI reports to refresh using TWS?
We are using BO XI 3.1 SP2 deployed on unix and would like to use TWS to refresh WebI reports that are built on SAP BW Bex queries. Does anyone have any experience scheduling WebI reports using TWS with XI 3.1? Any information you can provide would be appreciated!
Thanks,
DerekHi
I can think of two options:
1) You define in BO CMC external events and schedule your reports to wait for them. In the TWS you can schedule an OS script to create the file that triggers the BO external event. The reports will run only after the file is created.
2) You write a java program that uses the BOBJ SDK in order to schedule immediately your reports. In the TWS you create a scedule that starts the java program. (You can find examples how to use the SDK here http://www.sdn.sap.com/irj/boc/samples )
Regards,
Stratos -
Scheduled webi reports fail, why? If I restart BO services they work again
Hello.
I'm having a problem with my scheduled Webi reports and I don't know what is causing it. I have some reports scheduled to run at 8:00 am, and are supposed to be sent to a determined e-mail. Last week it worked well and the reports were sent to their destination successfuly, then this week the same reports didn't reach their destination. I verified in the History option and all of them showed a Failed status. I checked the detail and this is what it shows:
Unexpected exception caught. Reason: [java.lang.NullPointerException: i_statusInfo is null.]
If I try to reschedule these reports or any other report or a new report I get the same error. The only way I can make the schedule option work again for my webi reports is restarting BusinessObjects services.
But I guess this is not the right solution.
What can I do? How can I determine what is causing my scheduled webi reports fail?
What does this java.lang.NullPointerException: i_statusInfo is null message mean?
Is there a way I could track the service that is failing? which BO service is the service that manage the Schedule reports?
Any help is welcome.
Edited by: Erika Atencio on Sep 1, 2010 6:27 PM>
Efstratios Karaivazoglou wrote:
> Which version of BOBJ (incl. SP and FP) are you using?
>
> Regards,
>
> Stratos
BusinessObjects XI 3.1 SP2
FixPack 2.6
Edited by: Erika Atencio on Sep 1, 2010 8:46 PM -
Scheduling WebI reports in BusinessObjects 4.0 date prompts
will SAp Business Objects 4.0 include some kind of feature to allow people to schedule webi reports in an easier way if the report conatins date prompts? For example if my report has 2 dates start date and end date prompts, it's logical if I want to schedule it to be refreshed every month I don't want to keep it scheduling with the same start date and end date for ever. I want them to change depending on the month.
I know there are some things that can be done at universe level, but what if a user doesn't have rights to modify the universe? It would be more useful to have some option in the schedule window to make the values change depending on some basic conditions.
Or at least if profiles settings could help to do that by selecting in the list objects instead of fixed values from the list, it could help too.Hi,
This looks like to be a request for future product enhancements.
You need to log an Enhancement Request via Idea Place for the feature/functionality you would like to see in BI4.0. Please follow steps in the attached SAP note [1515837 - How To: Enhancement Request Process - Idea Place |https://bosap-support.wdf.sap.corp/sap(bD1lbiZjPTAwMQ==)/bc/bsp/sno/ui_entry/entry.htm?param=69765F6D6F64653D3030312669765F7361706E6F7465735F6E756D6265723D3030303135313538333726]. If this idea is already submitted, you will need just to add your vote to it.
Regards,
Jeff
Maybe you are looking for
-
Hi2all! I have made a simple video player on Flash 8 with FLVPlayback component, created a skin for it and so on. It worked perfect in IE and FireFox with FlashPlayer 8. But When I installed FlashPlayer 9, My Movie failed to load skin and flv video i
-
Customize the display of portlets in Available Portlets frame
Hi, Is there a way in which we can customize the appearance of portlets and providers in the "Available Portlets" frame of the "Add Portlets to Region" page? We have a large number of portlets and providers and would like to classify and display them
-
Clicking links in emails in Thunderbird, Firefox disappears from view
When clicking links in emails in Thunderbird Firefox disappears from view along with its task bar button. Firefox is still open and works, if you know what you are clicking on and prevents other still visible windows being worked with as the mouse on
-
Lion won't hold preferences after NetRestore
Hi, Quick qustion that hopefully someonwe here will be able to guide me to an answer with. I'm setup a master image in Lion on a MacBook Pro and sucessfully created the image and hosted it up on as a NetRestore. In this image I made a local account t
-
I just upgraded my iMac to Mountain Lion and my bluetooth headset doesn't work. All I get is static. Worked fine with Lion. It doesn't work with my new MacBook Pro either. I use the headset extensively talking on Skype and gtalk with my partner. Help