Scheduled Brio/IR Jobs are not running as expected in EPM 11.1.2.2
Hi All,
We are observing some scheduled jobs are not running as expected,they are not running on the scheduled time.
Given below are more details.
We have 2 Jobs running at 6:00 AM daily based on single Recurring Time Event and it is observed that this jobs are not running on time(ex: 6:06 AM EST).
I tried verifying Consolidate Job Status in workspace admin options and the v8_RecurtimeEvent table for any miss in the 'Next Run Time',
but they were having the scheduled date/time of run.No clue from EPM Logs.
Interesting observation is the same jobs are running after updating the schedule time a little bit further(ex: 6:06 AM to 6:07 AM),but again after some days
the updated job(6:07 AM ) will stop running.
Thanks,
Put the IR job logs in TRACE:32 mode which will give more information in the logs . Refer this document link to put in TRACE mode :http://docs.oracle.com/cd/E17236_01/epm.1112/epm_install_troubleshooting_1112200.pdf
Thanks,
KK
Similar Messages
-
Scheduled jobs are not running DPM 2012 R2
Hi,
Recently upgraded my dpm 2012 sp1 to 2012 R2 and upgrade went well but i got 'Connection to the DPM service has been lost.(event id:917 and other event ids in the eventlog errors ike '999,997)'. Few dpm backups are success and most of the dpm backups consistenancy
checks are failed.
After investigating the log files and found two SQL server services running in the dpm 2012 r2 server those are 'sql server 2010 & sql server 2012 'service. Then i stopped sql 2010 server service and started only sql server 2012 service using (.\MICROSOFT$DPM$Acct).
Now 'dpm console issue has gone (event id:917) but new issue ocurred 'all the scheduled job are not running' but manully i can able to run all backup without any issues. i am getting below mentioned event log errors
Log Name: Application
Source: SQLAgent$MSDPM2012
Date: 7/20/2014 4:00:01 AM
Event ID: 208
Task Category: Job Engine
Level: Warning
Keywords: Classic
User: N/A
Computer:
Description:
SQL Server Scheduled Job '7531f5a5-96a9-4f75-97fe-4008ad3c70a8' (0xD873C2CCAF984A4BB6C18484169007A6) - Status: Failed - Invoked on: 2014-07-20 04:00:00 - Message: The job failed. The Job was invoked by Schedule 443 (Schedule 1). The last step to
run was step 1 (Default JobStep).
Description:
Fault bucket , type 0
Event Name: DPMException
Response: Not available
Cab Id: 0
Problem signature:
P1: TriggerJob
P2: 4.2.1205.0
P3: TriggerJob.exe
P4: 4.2.1205.0
P5: System.UnauthorizedAccessException
P6: System.Runtime.InteropServices.Marshal.ThrowExceptionForHRInternal
P7: 33431035
P8:
P9:
P10:
Log Name: Application
Source: MSDPM
Date: 7/20/2014 4:00:01 AM
Event ID: 976
Task Category: None
Level: Error
Keywords: Classic
User: N/A
Computer:
Description:
The description for Event ID 976 from source MSDPM cannot be found. Either the component that raises this event is not installed on your local computer or the installation is corrupted. You can install or repair the component on the local computer.
If the event originated on another computer, the display information had to be saved with the event.
The following information was included with the event:
The DPM job failed because it could not contact the DPM engine.
Problem Details:
<JobTriggerFailed><__System><ID>9</ID><Seq>0</Seq><TimeCreated>7/20/2014 8:00:01 AM</TimeCreated><Source>TriggerJob.cs</Source><Line>76</Line><HasError>True</HasError></__System><Tags><JobSchedule
/></Tags></JobTriggerFailed>
the message resource is present but the message is not found in the string/message table
plz help me to resolve this error.
jacobHi,
i would try to reinstall DPM
Backup DB
uninstall DPM
Install DPM same Version like before
restore DPM DB
run dpmsync.exe -sync
finished
Seidl Michael | http://www.techguy.at |
twitter.com/techguyat | facebook.com/techguyat -
Scheduled jobs do not run as expected after upgrading to 10.2.0.3 or 4
FYI, we've had a ticket open for several days because our scheduled jobs (dbms_scheduler) would no longer run as scheduled after an upgrade to 10.2.0.4 on HPUX, couldn't find the solution by searching in metalink, nor did I find it here or using Google - obviously I wasn't searching correctly. There is a note id that references a set of steps that appears to have resolved our problem. I am putting this note out here so that if you encountered the same difficulty you may come across this note earlier in your troubleshooting efforts rather than later. The full title of the note is: 'Scheduled jobs do not run as expected after upgrading to either 10.2.0.3 or 10.2.0.4'. The Doc ID is: 731678.1.
Thanks - our ticket should be getting closed out on it (our dba will be updating it), the scheduler has been running reliably since we took the steps in the doc mentioned.
-
Some Schedule jobs are not running in Oracle 10g
i have total of 8 Schedules jobs in Oracle 10g test database which were not in sync with prod database . So i re-created all of them again and then enbled them . but some 4 of them didnt ran on their NEXT_RUN_DATE . Showing NULL on LAST_START_DATE and LAST_RUN_DURATION . How to make them Run
select OWNER,JOB_NAME,START_DATE,STATE,SCHEDULE_NAME,LAST_START_DATE,LAST_RUN_DURATION,NEXT_RUN_DATE from ALL_SCHEDULER_JOBS
where OWNER='MESH_FOR' and last_start_date is NULL;
OWNER JOB_NAME START_DATE STATE SCHEDULE_NAME LAST_START_DATE LAST_RUN_DURATION NEXT_RUN_DATE
MESH_FOR REFRESH_TERMINALS_J 27.07.2010 11:00:00,000000000 +02:00 SCHEDULED DAILY_EVERY_30_MINUTES NULL NULL 27.07.2010 11:00:00,000000000 +02:00
MESH_FOR REFRESH_MN_SERVERS_J 27.07.2010 11:00:00,000000000 +02:00 SCHEDULED DAILY_EVERY_30_MINUTES NULL NULL 27.07.2010 11:00:00,000000000 +02:00
MESH_FOR REFRESH_EVENT_INFO_J 27.07.2010 11:00:00,000000000 +02:00 SCHEDULED DAILY_EVERY_30_MINUTES NULL NULL 27.07.2010 11:00:00,000000000 +02:00
MESH_FOR UPDATE_MV_CHANGES_J 27.07.2010 11:00:00,000000000 +02:00 SCHEDULED DAILY_EVERY_30_MINUTES NULL NULL 27.07.2010 11:00:00,000000000 +02:00Hi,
Could you please explain, what is OS authentication?
I created a new user for creating and runing jobs.
I have given following priveleges to the new User.'
1)Connect
2)SELECT_CATALOG_ROLE
3)Create Job
Then, I created the job as follows.
BEGIN
sys.dbms_scheduler.create_job(
job_name => 'SMPL_TST_JB',
job_type => 'PLSQL_BLOCK',
job_action => 'Declare
Result Integer;
begin
Result:=1;
/* Other statments */
Exception
when others then
Result:=3;
end;',
repeat_interval => 'freq=daily;byhour=10;byminute=00;bysecond=00',
start_date => systimestamp,
job_class => 'DEFAULT_JOB_CLASS',
auto_drop => FALSE,
enabled => TRUE);
sys.dbms_scheduler.set_attribute( name => 'SMPL_TST_JB', attribute => 'logging_level', value => DBMS_SCHEDULER.LOGGING_FULL);
sys.dbms_scheduler.set_attribute( name => 'SMPL_TST_JB', attribute => 'restartable', value => TRUE);
END;
Then, I run the job as following.
SQL> begin sys.dbms_scheduler.run_job ('SMPL_TST_JB'); end;
2 /
begin sys.dbms_scheduler.run_job ('SMPL_TST_JB'); end;
ORA-03113: end-of-file on communication channel
Thank you,
Regards
Gowtham Sen. -
Jobs in oracle are not running properly -
Hi
In my database i have some 10 jobs and they are running successfully but the next date is not getting updated to athe new interval. Because of that the jobs are not running furhter.
Is there any solution for this
Oracle 9.2.0.6
O/S linux
RpRAJ> @JOBS2
scheduled jobs
Last This Next Run
WHAT LOG_USER Job B fail Date Date Date Interval
DQ_UPDATION; DOTSOFT 124 N 0 11-NOV-08: 15:59:35 : 16-NOV-08: 15:59:35 5.00
P_SEND_PG_MAILS; DOTSOFT 250 N 0 14-NOV-08: 02:00:03 : 15-NOV-08: 02:00:00 1.00
PLRANL; DOTSOFT 83 N 0 14-NOV-08: 00:00:03 : 15-NOV-08: 00:00:00 1.00
P_MAIL_DIS; DOTSOFT 492 N 0 14-NOV-08: 00:00:03 : 15-NOV-08: 00:00:00 1.00
FRSJOBS; DOTSOFT 106 N 0 14-NOV-08: 00:00:03 : 15-NOV-08: 00:00:00 1.00
bill_net_os_details_proc; DOTSOFT 24 N 0 14-NOV-08: 00:00:03 : 15-NOV-08: 00:00:00 1.00
FRS_REPEAT_UPDT; DOTSOFT 674 N 0 14-NOV-08: 07:00:03 : 14-NOV-08: 15:00:00 .33
FRS_REPEAT_FAULT_UPDT; DOTSOFT 675 N 0 14-NOV-08: 07:00:05 : 14-NOV-08: 15:00:00 .33
portal_application; DOTSOFT 692 N 0 14-NOV-08: 07:02:01 : 14-NOV-08: 08:02:01 .04
an_printpack.an_process(sysdat DOTSOFT 532 N 0 14-NOV-08: 06:35:40 : 14-NOV-08: 07:05:40 .02
e-1,sysdate, 'DOTSOFT', 'D');
MONTHCRON; DOTSOFT 164 N 0 11-NOV-08: 15:59:35 : 11-DEC-08: 00:00:00 29.33
npc_scan_job; DOTSOFT 392 N 11 14-NOV-08: 00:00:03 : 15-NOV-08: 00:00:00 1.00
RECON_ALLPAID_PKG.RECON_ALLPAI DOTSOFT 228 N : : 18-NOV-08: 16:48:15
D; -
Report job is not run at scheduled time
OS:WindowsServer2008R2
Oracle BI 11g(11.1.1.6.0)
CT defined a report job
====
Frequency Daily
Start 2013/01/14 AM 06:00:00
End 2020/01/14 PM 11:59:00
timezone [GMT+09:00]Osaka,Tokyo
====
but he found the report is not run at 06:00:00
at 2013/01/16 08:50AM,he login to BIP,and got to Report Job history.
he found the staus of this report is running and
start processing is 2013/01/16 08:51:32AM
It seems the report job is run after login.
In CT's environment , the followinig work are done Every Day
22:00 stop OracleBI (opmnctl.bat→stopManagedWebLogic.cmd→stopWebLogic.cmd)
00:00 restart server
05:45 clear cashe (nQCmd.exe)
05:45 start OracleBI(BI_START.bat)
06:00 report job is not run for no mail received.-->★
Could you tell me why the report job are not run at 06:00AM
Does any one can give me some advice on investigating this issue, which information are needed?Any suggestion on this issue?
-
Hi Experts
we are using Oracle 10g Database Release 2 on Server 2000 ,
Since a Month Jobs are not Running,
I Created the Jobs from Toad,
for the last one and Half years the Jobs were Running Fine
what could be the Cause for this Behaviour,
my Jobs Status is in online Status only but not Getting Executed
There is no Error i am finding ,
i need to Run the Job Manually Executing Every time
please Suggest
many thanksJobs are Runnig Prporperly running Manually,
please Find the out put for the Below Query
SQL>select job, schema_user, last_date, last_sec, next_date, last_date,last_sec, next_sec, total_time, broken, failures, what from dba_jobs
JOB SCHEMA_USER LAST_DATE LAST_SEC NEXT_DATE LAST_DATE LAST_SEC NEXT_SEC TOTAL_TIME B FAILURES WHAT
1 SYSMAN 07-JUNE-09 12:14:47 07-JUNE-09 07-JUNE-09 12:14:47 12:15:47 45084 N 0 EMD_MAINTENANCE.EXECUTE_EM_DBMS_JOB_PROCS();
4001 FLOWS_030100 07-JUNE-09 04:53:44 07-JUNE-09 07-JUNE-09 04:53:44 12:53:44 706 N 0 wwv_flow_cache.purge_sessions(p_purge_sess_older_then_hrs => 24);
4002 FLOWS_030100 07-JUNE-09 12:13:42 07-JUNE-09 07-JUNE-09 12:13:42 12:23:42 1661 N 0 wwv_flow_mail.push_queue(wwv_flow_platform.get_preference('SMTP_HOST_ADDRESS'),wwv_flow_platform.get_preference('SMTP_HOST_PORT'));
121 user_dml 06-JUNE-09 16:07:42 07-JUNE-09 06-JUNE-09 16:07:42 16:07:42 111 N 0 doclib.do_alert_todos;
122 user_dml 07-JUNE-09 12:12:42 07-JUNE-09 07-JUNE-09 12:12:42 12:27:42 1029 N 0 ctx_ddl.sync_index('doclib_docs_idx2', '2M');
184 user_dml 07-JUNE-09 00:00:04 08-JUNE-09 07-JUNE-09 00:00:04 00:00:00 19852 N 0 user_dml.CREATE_STC_CIRCUIT_PATH_DAILY;
201 user_dml 07-JUNE-09 00:00:04 08-JUNE-09 07-JUNE-09 00:00:04 00:00:00 92 N 0 user_dml.CREATE_STC_HELD_TX_REQUEST_DLY;
521 FLOWS_030100 04-MAR-09 15:30:30 0 N wwv_flow_mail.push_queue;
641 FLOWS_030100 13-JUN-09 12:21:35 0 N wwv_flow_mail.push_queue;
681 FLOWS_030100 15-JUL-09 12:32:49 0 N wwv_flow_mail.push_queue;
Thanks a lot -
Identify Jobs that are not running on their Scheduled date time
I have 29 scheduled jobs that run at different intervals of time. Some run once a day. few others run on hourly basis while others run on Sundays.
I was working on a query that would let me know if a particular job did not run on its scheduled date and time.
SELECT * from all_scheduler_jobs WHERE state <>'DISABLED'; will give me a list of all jobs that I have to monitor and that are not in the disabled state. But how can I verify that the jobs are running at their scheduled date time?
Any help please? I need to create a view of all such jobs and then plan to send an alert so that appropriate action can be taken and it is assured that all important jobs run as per schedule.
Thanks.Hi,
I can see 2 approaches.
- for jobs that have run but ran very late you should query dba_scheduler_job_run_details and filter by the difference between req_start_date and actual_start_date
- for jobs that should have run but shouldn't, query for DBA_SCHEDULER_JOBS jobs that are SCHEDULED where next_run_date is in the past
Hope this helps,
Ravi. -
IDOC Monitoring issue - job BPM_DATA_COLLECTION* not running.
Hi all,
We are facing an issue with BPM "IDOC Monitoring" (under application monitoring), which we have setup to monitor Inbound and Outbound Idocs in 2 separate R/3 systems.
In one system it works fine, and measured values are returned each time the monitor is set to run according to the specified schedule.
However, for another R/3 system, the monitor has never run, even though the settings are identical in the monitoring setup.
From reading the Interfaces Monitoring Setup guide, I found that this monitor depends on a job called BPM_DATA_COLLECTION* which runs in the monitored system. In the system where monitoring is functioning correctly, I can see this job is completing successfully at the time the monitor is set to run. All I find is completed jobs - no scheduled or released jobs present.
However, for the system where the monitoring is not functioning, I found that this job is not running, but that the job is sitting in scheduled status instead.
When I tested manually running the job in this system, it ran successfully, and in Solution Manager the monitor brought back the measured value, so the monitor only ran successfully when I manually ran the job in the monitored system.
I read notes 1321015 & 1339657 relating to IDOC monitoring. 1321015 appears to be more relevant, yet it does not exactly describe my issue - it mentions the job BPM_DATA_COLLECTION* failing rather than just remaining in scheduled status which is what I see.
Anyone else see this issue before?
On a more general point - the standard BPM Setup guide doesn't really go into much detail on IDOC Monitoring, and makes no mention of what is happening in the background, i.e. the job BPM_DATA_COLLECTION* being created and run as per schedule. This info is found in a separate document "Interface Monitoring Setup Guide".
Is there any single document which describes fully what happens both in the Solution Manager and the Monitored systems when BPM is activated? For example, to describe which monitors require jobs to be run, which monitors require additional setup in monitored system, etc? A document such as this which describes exactly the process flow for each monitor would be very useful in troubleshooting issues going forward.
Thanks,
JohnHello John,
most probably the user assigned to the corresponding RFC READ connection that connects SolMan with the backend system doesn't have proper authorization to release a job. That's why it is only created/scheduled but not released. Verify if the RFC user on the backend has the latest CSMREG profile assigned according to SAP note 455356.
You can also check if the latest ST-PI support package is installed on your backend system as the ST-PI usualy contain the latest definition of CSMREG.
Best Regards
Volker -
Hi All,
I Have encountered an Issue with JOB not getting Triggered in BI system .
For Datasource 2LIS_04_P_ARBPL , I have created Infopackage , when I am going to schedule tab and running an Infopackage. Job is not getting trigger . And it is going on Hold for a longer period.
Data is in the source system and I am unable to fetch data from source system .
One more thing there was some upgration activity happened in the source system one day before.
Could u please let us know , Is the reason behind could be upgration in source system ?
Please let me know what needs to be crosschecked and what could be the solution for this Issue.
Looking for response .....
Regards,
MaheshHi ,
In the Source system Data is fetching I mean through RSA3.
Even I able to replicate the Datasource as well.
Also in T-code : SM59 , when I am checking Source system Connection check , it is not poping any error.
But When I am Checking through RSA1 - > Source System
Source system connection by clicking CHECK Option then it is poping an error "Check Failed for RFC Connection ; Check Destination ".
Also In Source system T-code :SM50 I can see three BGD WP which are in waiting status.
In T-code : BD87 I have checked I didnt find any IDOC's in Yellow colour .
How do we need to check whether ALEREMOTE is active or not?
Actually my Issue is Jobs are not getting trigger in BI . So what all things needs to be taken care apart from this.
So Is there any thing to be taken care from Basis team for Restarting of BI Jobs after any kind of Upgration activity in general?
Regards,
Mahesh -
Oracle automatic statistics optimizer job is not running after full import
Hi All,
I did a full import in our QA database, import was successful, however GATHER_STATS_JOB is not running after sep 18 2010 though its enable and scheduled, i did query last_analyzed table to check and its confirmed that it didnt ran after sep18,2010.
Please refer below for the output
OWNER JOB_NAME ENABL STATE START_DATE END_DATE LAST_START_DATE NEXT_RUN_D
SYS GATHER_STATS_JOB TRUE SCHEDULED 18-09-2010 06:00:02
Oracle defined automatic optimizer statistics collection job
=======
SQL> select OWNER,JOB_NAME,STATUS,REQ_START_DATE,
to_char(ACTUAL_START_DATE, 'dd-mm-yyyy HH24:MI:SS') ACTUAL_START_DATE,RUN_DURATION
from dba_scheduler_job_run_details where
job_name='GATHER_STATS_JOB' order by ACTUAL_START_DATE asc; 2 3 4
OWNER JOB_NAME STATUS REQ_START_DATE ACTUAL_START_DATE
RUN_DURATION
SYS GATHER_STATS_JOB SUCCEEDED 16-09-2010 22:00:00
+000 00:00:22
SYS GATHER_STATS_JOB SUCCEEDED 17-09-2010 22:00:02
+000 00:00:18
SYS GATHER_STATS_JOB SUCCEEDED 18-09-2010 06:00:02
+000 00:00:26
What could be the reason for GATHER_STATS_JOB job not running although its set to auto
SQL> select dbms_stats.get_param('AUTOSTATS_TARGET') from dual;
DBMS_STATS.GET_PARAM('AUTOSTATS_TARGET')
AUTO
Does anybody has this kind of experience, please share
Apprecitate your responses
Regards
srh?So basically you are saying is if none of the tables are changed then GATHER_STATS_JOB will not run, but i see tables are updated still the job is not running. I did >query dba_scheduler_jobs and the state of the job is true and scheduled. Please see my previous post on the output
Am i missing anything here, do i look for some parameters settings
So basically you are saying is if none of the tables are changed then GATHER_STATS_JOB will not run,GATHER_STATS_JOB will run and if there are any table in which there's a 10 percent change in data, it will gather statistics on that table. If no table data have changes less than 10 percent, it will not gather statistics.
http://download.oracle.com/docs/cd/B19306_01/server.102/b14211/stats.htm#i41282
Hope this helps.
-Anantha -
Spawn jobs are not getting priority and target servergiven at selection scn
Hi Abapers,
I am scheduling main program as a job in backend through FMs JOB_OPEN, JOB_SUBMIT and JOB_CLOSE with priority and target server taken from user at selection screen through SE38,after executing the job,job will generate the spawn jobs (i.e child jobs). The spawn jobs also be scheduled with same priority and target server from taken user. But after completion of main job execution, the spawn jobs are not generating with same priority and target server taken from selection screen. May be its getting refreshed.
Please give me an idea how the spawn jobs also have to get the same priority and server of main job?
Please reply as soon as possible. I need it urgently.Hi,
I have used below statements for ADD EXTRACT and ADD REPLICAT.
------Extract
ADD EXTRACT ext_1, TRANLOG, BEGIN NOW
-------Data Pump
ADD EXTRACT pump_1, EXTTRAILSOURCE /app/ggs/trail/local_trail_1/ta, BEGIN NOW
-------Replicat
ADD REPLICAT rep_1, EXTTRAIL /app/ggs/trail/remote_trail_1/tb, BEGIN NOW, CHECKPOINTTABLE ogg.tarun_chk
Yes, i have tried tutorial at Oracle Learning Library.
Thanks
Tarun
Edited by: user8886876 on Feb 12, 2012 9:56 PM -
Job is not running in Source system.
Hi Experts,
One issue I have because of this I am not able to load data into Data sources.
I am in BI 7.0 environment.
when I execute infopackage, total and techinical status are in yellow.
I found in R/3 Job is not running, based on this statement in SM37. from the fallowing.
Call customer enhancement EXIT_SAPLRSAP_001 (CMOD) with 0 records
Result of customer enhancement: 0 records
IDOC: Info IDoc 2, IDoc No. 3136, Duration 00:00:00
IDoc: Start = 14.05.2009 07:23:39, End = 14.05.2009 07:23:39
Synchronized transmission of info IDoc 3 (0 parallel tasks)
IDOC: Info IDoc 3, IDoc No. 3137, Duration 00:00:00
IDoc: Start = 14.05.2009 07:23:39, End = 14.05.2009 07:23:39
Job finished
Job satrt time and end time are same, so job is not running in the sourcesystem, am i right. let me known if i am worng.
It is Standard Data source but in the above statement becasue *result of Customer enhancement:0 records.*
please help me to reslove this issue to load data into BI.
1. what I have to do to run job in source system side.
2. should I take any help from Basis.
Regards
Vijay
Edited by: vijay anand on May 14, 2009 3:02 PM
Edited by: vijay anand on May 14, 2009 3:04 PMHi Rupesh,
in RSA3 data is availbale,
but it is not coming to BI,
Messages from source system
see also Processing Steps Request
These messages are sent by IDoc from the source system. Both the extractor itself as well as the service API can send messages. When errors occur, several messages are usually sent together.
From the source system, there are several types of messages that can be differentiated by the so-called Info-IDoc-Status. The IDoc with status 2 plays a particular role here; it describes the number of records that have been extracted in a source system and sent to BI. The number of the records received in BI is checked against this information.
the abovemessage I am getting in details tab.
Regards
Vijay -
Job not running on expected time
Hi,
Please see the job details
X NUMBER;
BEGIN
SYS.DBMS_JOB.SUBMIT
*( job => X*
*,what => 'BEGIN INVS_RIM_DATA_LOAD(''01A'',''RIMADMIN'',TRUNC(SYSDATE)); END;'*
*,next_date => to_date('15/08/2011 23:09:00','dd/mm/yyyy hh24:mi:ss')*
*,interval => 'TRUNC(SYSDATE+1)+23.15/24'*
*,no_parse => TRUE*
SYS.DBMS_OUTPUT.PUT_LINE('Job Number is: ' || to_char(x));
END;
commit;
For taking the cold backup, db is shut down on every Friday 11:00PM and open by 02:30 PM Saturday. So job expected to run on Friday night will be running by Saturday 02:30AM. It is ok for us. But problem is job is not running on Saturday night.
When checked on Sunday morning the user_jobs shows details as
Last_date : 13-Aug-2011 02:30:14 AM
Next_Date : 14-Aug-2011 11:09:00 PM
Issue we are facing is job is not running on 13-Aug 11:09:00 PM
Please help me to fix this issue.Well, it runs on the expected time (for me). This is your interval: TRUNC(SYSDATE+1)+23.15/24
If the last job run at 13-Aug-2011 02:30:14 AM, then the next one should be:
= TRUNC( '13-Aug-2011 02:30:14 AM' + 1 ) + 23.15/24
= TRUNC( '14-Aug-2011 02:30:14 AM' ) + 23.15/24
= '14-Aug-2011' + 23.15/24
= '14-Aug-2011 11:09:00 PM'
You can create an additional job which will work at Saturday nights. This is the easiest fix I can think.
Regards
Gokhan Atil -
Hello Guys ,
STandard jobs are not released .can u please tell me the reasond???Hi
Is this a new system or a copied system? Generally this happens in a copied system since the default server group still has the source system information and hence jobs will not run. Goto Txn SM61 and look for Job group. In the default list, you should see your server instance name. If it is showing any other name, just delete the entry and add the current instance to the list.
Hope it helps
Javed
Edited by: Javed Sapstar on Dec 27, 2010 9:41 AM
Maybe you are looking for
-
Nikon D3s file orientation in Bridge cs4
I have noted that the correct orientation of D3s nef files is occasionally ignored or randomly re-assigned in front of my eyes in Bridge essentials
-
Validate dates in oracle forms
Hello everyone. I have a field column in my form , ORDER_START_DATE. The date format is DD.MON.RRRR Now I want to add a validation to this field and I know you have least allowed value as a field property. I want to make sure the least allowed value
-
Question about Finder-Load-Beans flag
Hi all, I've read that the Finder-Load-Beans flag could yield some valuable gains in performance but: 1) why is it suggested to do individual gets of methods within the same Transaction ? (tx-Required). 2) this strategy is useful only for small sets
-
Why does Mixradio not remember songs I liked?
I like a song and when that same song plays hours or days later it shows no signs of me liking that song. Is Mixradio supposed to do that?
-
Trying to open a 400mb mp4 file in Quicktime but message (OSStatus error -12848) comes up, can someone help?